SlideShare ist ein Scribd-Unternehmen logo
1 von 13
Downloaden Sie, um offline zu lesen
Thomas Van Alstine, BBA
Statement of Qualification




                             13/02/12
Van Alstine Project Examples




      13/02/12
New Innovations – Supported
                                   UAV – Utilized for Microwave Line of Sites
                                   Saved Millions of Dollars in reducing site visit
                                   times and requirements for Cranes on
                                   Greenfield Sites for LOS activities. Safety -
                                   reduced the necessity for tower riggers
                                   required to climb and photograph. Site
                                   Acquisition - provided Panoramic Site Photos
                                   and three-Dimensional Detail on Existing
                                   Tower Structures.
Carbon Fiber Tower
Reduced Weight (Airfreight Done
from US to Australia), Green
Environmentally Friendly, Simple
Erection, fast Manufacture time.




                13/02/12
LTE - Fixed Broadband




13/02/12
Service Capabilities & Areas of Expertise

•  Project Management

•  Construction Management

•  Survey

•  Site Acquisition

•  Equipment/System Integration

•  Field Technicians & Installers




            13/02/12
A Few Companies to which Thomas has a
  Working History of providing Services.




                                           13/02/12
Thomas Van Alstine
   Full Range of Knowledge and Experience


                         Project Management


    Land –Use Planning                           Site
                                               Planning




Site and Network          Turnkey                      System
                                                     Engineering
  Optimization
                         Alternatives


        Installation                           Site Acquisition
             &
      Commissioning
                            Site Preparation

                                                                   13/02/12
Thomas Van Alstine
Project Management Perspective




      n    Overall Project objectives and material lists well
            defined and characterized
      n    Basis for Network Rollout established
      n    SOW for Services clearly delineated
      n    Customer communication during all phases of
            design and implementation
      n    Scheduling
      n    Crew Assignments
      n    Reporting/Tracking

                                                                 13/02/12
Various Types of BTS Sites



 Rooftop     Blacktop    Tenant Improvement




Greenfield   Co-Locate       Cabinetized   Antennas
                                            BTS

                                           13/02/12
Photos



               AT&T Build




    13/02/12
Photos




            Ericsson Mini-link Microwave Install




         13/02/12
Photos




                    Site/Tower Construction




         13/02/12
Photos



                Civil Construction




     13/02/12

Weitere ähnliche Inhalte

Ähnlich wie Thomas Van Alstine BBA Statement Qualification Project Examples

Unicorn Wireless Engineering Presentation
Unicorn Wireless Engineering PresentationUnicorn Wireless Engineering Presentation
Unicorn Wireless Engineering Presentationdrottmayer
 
Unicorn Wireless Engineering Presentation
Unicorn Wireless Engineering PresentationUnicorn Wireless Engineering Presentation
Unicorn Wireless Engineering PresentationRaulArellano
 
Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutionsabbasz
 
SSNS 1Q12 Services Presentation
SSNS 1Q12 Services PresentationSSNS 1Q12 Services Presentation
SSNS 1Q12 Services Presentationcampojo
 
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Belva Thomas
 
Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center
Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center
Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center Alaeddine El Fawal
 
CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC
 
How Green Is Your Data Center
How Green Is Your Data CenterHow Green Is Your Data Center
How Green Is Your Data Centerdgillespie13
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015Ummar Alam
 
Yan Zhang resume
Yan Zhang resumeYan Zhang resume
Yan Zhang resumeYanZhang314
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yMasood Dar
 
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)Comit Projects Ltd
 
07.site preparation.civil
07.site preparation.civil07.site preparation.civil
07.site preparation.civilNguyen Bao
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentationguest080219
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationJoaquim Almeida
 

Ähnlich wie Thomas Van Alstine BBA Statement Qualification Project Examples (20)

Unicorn Wireless Engineering Presentation
Unicorn Wireless Engineering PresentationUnicorn Wireless Engineering Presentation
Unicorn Wireless Engineering Presentation
 
Unicorn Wireless Engineering Presentation
Unicorn Wireless Engineering PresentationUnicorn Wireless Engineering Presentation
Unicorn Wireless Engineering Presentation
 
Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutions
 
SSNS 1Q12 Services Presentation
SSNS 1Q12 Services PresentationSSNS 1Q12 Services Presentation
SSNS 1Q12 Services Presentation
 
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center
Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center
Alaeddine El Fawal DR Plan for Private-Cloud Based Data Center
 
CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010
 
Sandeep resume
Sandeep resumeSandeep resume
Sandeep resume
 
How Green Is Your Data Center
How Green Is Your Data CenterHow Green Is Your Data Center
How Green Is Your Data Center
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015
 
Yan Zhang resume
Yan Zhang resumeYan Zhang resume
Yan Zhang resume
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
CV_Satyendra
CV_SatyendraCV_Satyendra
CV_Satyendra
 
Steve Lincoln CV
Steve Lincoln CVSteve Lincoln CV
Steve Lincoln CV
 
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
 
07.site preparation.civil
07.site preparation.civil07.site preparation.civil
07.site preparation.civil
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 

Thomas Van Alstine BBA Statement Qualification Project Examples

  • 1. Thomas Van Alstine, BBA Statement of Qualification 13/02/12
  • 2. Van Alstine Project Examples 13/02/12
  • 3. New Innovations – Supported UAV – Utilized for Microwave Line of Sites Saved Millions of Dollars in reducing site visit times and requirements for Cranes on Greenfield Sites for LOS activities. Safety - reduced the necessity for tower riggers required to climb and photograph. Site Acquisition - provided Panoramic Site Photos and three-Dimensional Detail on Existing Tower Structures. Carbon Fiber Tower Reduced Weight (Airfreight Done from US to Australia), Green Environmentally Friendly, Simple Erection, fast Manufacture time. 13/02/12
  • 4. LTE - Fixed Broadband 13/02/12
  • 5. Service Capabilities & Areas of Expertise •  Project Management •  Construction Management •  Survey •  Site Acquisition •  Equipment/System Integration •  Field Technicians & Installers 13/02/12
  • 6. A Few Companies to which Thomas has a Working History of providing Services. 13/02/12
  • 7. Thomas Van Alstine Full Range of Knowledge and Experience Project Management Land –Use Planning Site Planning Site and Network Turnkey System Engineering Optimization Alternatives Installation Site Acquisition & Commissioning Site Preparation 13/02/12
  • 8. Thomas Van Alstine Project Management Perspective n  Overall Project objectives and material lists well defined and characterized n  Basis for Network Rollout established n  SOW for Services clearly delineated n  Customer communication during all phases of design and implementation n  Scheduling n  Crew Assignments n  Reporting/Tracking 13/02/12
  • 9. Various Types of BTS Sites Rooftop Blacktop Tenant Improvement Greenfield Co-Locate Cabinetized Antennas BTS 13/02/12
  • 10. Photos AT&T Build 13/02/12
  • 11. Photos Ericsson Mini-link Microwave Install 13/02/12
  • 12. Photos Site/Tower Construction 13/02/12
  • 13. Photos Civil Construction 13/02/12