Hanoi – Hochiminh city railway line                        Do Vang Bridge’s construction
 bridges safety improvement project                   technology of beam casted on
scaffolding
               CHAPTER III: MATERIAL REGULATIONS
I. GENERAL

   All meterials for box girder and other items shall be in accordance with the
Specification of Project and shall be taken test sample according to quality controlling
plan. Sample for test and construction shall be supervised and approved by Engineer.

   Just only use materials which are approved by Engineer according to Specification
and Quality Controlling Plan.

   Materials which not satisfy the above requirement shall be rejected and removed out
from Site.

   Approved material source shall be use for the entire Project. For a new source, it is
necessary to take sample and be approved by Engineer in accordance with Specification
if the source has any change.

   During placing concrete for continuously voided slab beam segments, all materials
must be enough for mixing and providing not interupted.

II. MATERIALS

1. Reinforcement

   a. High strength reinforcement

   High strength strand with low relaxation shall be in accordance with ASTM416-99
standard of Grade 270 or equivalent, with the main parameters as follows:

   + Grade 270, low relaxation.

   + Breaking strength:                  fpu = 1860MPa

   + Yield limit:                        fpy = 1674 MPa

   + Modulus of elasticity:              195000 MPa

   + Relaxation after 1000h at 20°C      ≤ 2,5 %.

   Construction regulations:

   + High strength strand shall be not welded.

                                           31
Hanoi – Hochiminh city railway line                        Do Vang Bridge’s construction
 bridges safety improvement project                   technology of beam casted on
scaffolding
   + Each coil of cable must have Certificate of Producer. The Certificate shows
   relative curve between load and elongation, measured area, elastic mudulus for each
   lot.

   + High strength cable lots shall be checked before testing, taken sample to test for
   each lot or taken a group sample for every 20T.

   + In any case, jacking force for each strand is not over 0, 80 of minimum ultimate
   strength of cable.

   + Jack must be suitable with presstressed tendon about structure and tensioning
   force. Jack and gauge shall be checked before using.

   b. Non-prestressed reinforcement

   The Subcontractor intends to use Viet Y Steel for construction Project.

   Non-prestressed reinforcement must be in accordance with Specification of Project:

                                       JISG 3112

                                         SD345
2. Prestressed anchor

   Pre-stressed anchor must be conformed to 22TCN 267-2000 Standard and the
following requirements:

   + All anchor devices must have enough capacity to keep prestressed cable with a
   stress not less than 95% of ultimate tensile strength of prestressed cable showed on
   Certificate of Producer and anchor, cable Test Result.

   + Anchor shall be checked to ensure type as submitted, geometric dimension,
   mechanical defect to reject defected anchor.

3. Duct

    The corrugated duct must be appropriate, synchronous with type, grade of prestressed
cable and anchor. Duct system shall be airproof, waterproof. Diameter of duct must be
greater at least 6mm than nominal diameter of tendon; cross section area must be greater
2.5 times than tendon area.

   The minimum thickness of duct must be in accordance with approved design and
instruction of producer that be agreed by Engineer.

                                           32
Hanoi – Hochiminh city railway line                         Do Vang Bridge’s construction
 bridges safety improvement project                    technology of beam casted on
scaffolding
4. Concrete

   The girder concrete is B arccording to Specification of Project.

   Mix design shall conform to Specifications of Project.

   Material regulation is as follows:

   a. Cement

   Cement is Portland cement corresponding to JIS R5210 or ASTM-C150-98 (TCVN
PCB40, TCVN6260-1997) standard. Expiry date and Manufacturer Certificate shall be
submitted before using. Product lots brought into Site must have full bags, components.

   Bagged cement shall be kept in a temporary depot and used on time since the material
has been delivered.

   Bulk cement shall be kept in silo corresponding to manufacturer regulations.

   b. Fine aggregate: Sand

   Fine aggregate using for concrete shall be in accordance with JISA 1102 or equivalent
standard.

   Aggregate shall be kept to avoid segregating or contaminating. The centre of depot
must be prevented from moisture excess.

   To prevent different-size aggregates from mixing together, make a baffle between
them.
  Only use uncontaminated, non-toxic mud, clean fine aggregate. The fineness modulus
must satisfy the Specification of Project as the following:
   + Granular composition (according to JISA 1102 standard):

                   Sieve number (mm)      Percentage passing by weight
                            10                        100
                             5                      90~100
                            2.5                     80~100
                            1.2                      50~90
                           0.60                      25~65
                           0.30                      10~35
                           0.15                      2~10A




                                            33
Hanoi – Hochiminh city railway line                          Do Vang Bridge’s construction
 bridges safety improvement project                     technology of beam casted on
scaffolding
   The Subcontractor has intention in using Mia Duong, Ha 12 – Bo Trach – Quang
Binh coarse sand for concreting works of Project.
   Aggregate shall be checked with the above requirements before constructing.
   c. Coarse aggregate: Rock 1x2

   Coarse aggregate must respond to JISA 1102 or equivalent.
   The Subcontractor intends to use stones Len Cut Tai - Quang Trach - Quang Binh for
concreting works of Project.
   Coarse aggregate size is shown in the below table:

                   Sieve number (mm)     Percentage passing by weight

                             30                          100

                             25                      95~100

                             20                           -

                             15                         30~70

                             10                           -

                              5                         0~10

                             2.5                        0~5

   d. Water

   Water for mixing or curing concrete must be fresh water, uncontaminated with oil,
saline, acid, sugar, vegetable or other toxic materials. Excluding water approved as
potable water by competent authority, others shall be tested and satisfied AASHTO-T26
standard: Water for concrete and mortar. Water/concrete ratio is not over 0.40.

   Water sources for constructing continuous box girder casted on scaffolding of Do
Vang Bridge shall be the source using for Sub-structure items of Project.

   Check pH value at site before placing concrete or test water sample again if
necessary.

   e. Admixture

   Admixture shall meet instructions JISA 6204.


                                            34
Hanoi – Hochiminh city railway line                         Do Vang Bridge’s construction
 bridges safety improvement project                    technology of beam casted on
scaffolding
   Admixture that boots setting speed, increases mobility or retarding admixture, wetting
admixture, v.v… can be use but must be approved by Engineer before constructing.

   Admixture may be one of the following types: SiKa Viscocrete 3000-10 to be in
accordance with real construction requirements at Site.

   Admixture not the type as required shall be rejected and removed out of Site. Water
fixed content and admixture shall be put together at mixing plant.

   Inspector shall check type, maintenance, and ratio of concrete admixture whether as
required or not.

5. Pumped grout

Grout made from Pooclang cement, water and admixture are accepted by Engineer.
Grout is mixed as follows:
               Bleeding rate is not over 3%
               Non-shrinkage
Swelling index is not over 10%. But this rate is always smaller than bledding rate after
atomizing up to bleed completely.
Compressive strength of cylinder (50x100mm) of 28 days is not smaller than 20 MPa.
The rate of water/cement is not over than 0.4
The content of Cl is not over 0.3kg/m3
Ecflux time is from 10-15 seconds according to Marsh Cone testing.




                                              35

Weitere ähnliche Inhalte

Was ist angesagt?

Pharma catalogue 2017 18
Pharma catalogue 2017 18Pharma catalogue 2017 18
Pharma catalogue 2017 18vijay oak
 
VG Check list for OHE mast grouting rev 00
VG Check list for OHE mast grouting rev  00VG Check list for OHE mast grouting rev  00
VG Check list for OHE mast grouting rev 00Varadharajalu Gopal
 
study of self-compacting concrete for economical construction
study of self-compacting concrete for economical constructionstudy of self-compacting concrete for economical construction
study of self-compacting concrete for economical constructionTejas6957
 
VG check list for OHE foundation
VG check list for OHE foundation VG check list for OHE foundation
VG check list for OHE foundation Varadharajalu Gopal
 
Self Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & TstingSelf Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & TstingJeewapriya Alahakoon
 
self compacting concrete.
self compacting concrete.self compacting concrete.
self compacting concrete.Saravana murthy
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouringBharatha Rathnayke
 
Cold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionCold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionScott Conwell, FAIA, FCSI
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)ghani386
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping worksSurya Kant
 
Self compacting concrete
Self compacting concrete Self compacting concrete
Self compacting concrete ARIVU SUDAR
 
High strength m70 concrete grade
High strength m70 concrete gradeHigh strength m70 concrete grade
High strength m70 concrete gradejay panchal
 

Was ist angesagt? (20)

Pipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragadaPipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragada
 
Pharma catalogue 2017 18
Pharma catalogue 2017 18Pharma catalogue 2017 18
Pharma catalogue 2017 18
 
VG Check list for OHE mast grouting rev 00
VG Check list for OHE mast grouting rev  00VG Check list for OHE mast grouting rev  00
VG Check list for OHE mast grouting rev 00
 
study of self-compacting concrete for economical construction
study of self-compacting concrete for economical constructionstudy of self-compacting concrete for economical construction
study of self-compacting concrete for economical construction
 
VG check list for OHE foundation
VG check list for OHE foundation VG check list for OHE foundation
VG check list for OHE foundation
 
Sand gforscc
Sand gforsccSand gforscc
Sand gforscc
 
Self Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & TstingSelf Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & Tsting
 
Husam CV updated (1)
Husam CV updated (1)Husam CV updated (1)
Husam CV updated (1)
 
self compacting concrete.
self compacting concrete.self compacting concrete.
self compacting concrete.
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
 
Cold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionCold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry Construction
 
Tips for optimizing structural masonry
Tips for optimizing structural masonryTips for optimizing structural masonry
Tips for optimizing structural masonry
 
BBA approval
BBA approvalBBA approval
BBA approval
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Self compacting concrete
Self compacting concrete Self compacting concrete
Self compacting concrete
 
High strength m70 concrete grade
High strength m70 concrete gradeHigh strength m70 concrete grade
High strength m70 concrete grade
 
SELF-COMPACTING CONCRETE (SCC)
SELF-COMPACTING CONCRETE (SCC)SELF-COMPACTING CONCRETE (SCC)
SELF-COMPACTING CONCRETE (SCC)
 

Ähnlich wie 05.chapter iii

6 pavement quality concrete
6 pavement quality concrete6 pavement quality concrete
6 pavement quality concretethamand7
 
Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...
Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...
Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...IRJET Journal
 
02725 sewer manholes
02725 sewer manholes02725 sewer manholes
02725 sewer manholesAni Alikaj
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1Er Naveen Kumar
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes FittingsIdol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes FittingsIndiaMART InterMESH Limited
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxChristopherThomas578171
 
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...IRJET Journal
 
IRJET- Strength and Behaviour of High Performance Concrete with GGBS
IRJET- Strength and Behaviour of High Performance Concrete with GGBSIRJET- Strength and Behaviour of High Performance Concrete with GGBS
IRJET- Strength and Behaviour of High Performance Concrete with GGBSIRJET Journal
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdfShahrukhKhan424745
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02Minh Bui Si
 
HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)Kiran Raj Veerappen
 
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...IRJET Journal
 
RACI SPACER 2016 CATALOG
RACI SPACER 2016 CATALOGRACI SPACER 2016 CATALOG
RACI SPACER 2016 CATALOGRaci srl Italy
 
IRJET - Effect of Silica Fume on Properties of Concrete
IRJET -  	  Effect of Silica Fume on Properties of ConcreteIRJET -  	  Effect of Silica Fume on Properties of Concrete
IRJET - Effect of Silica Fume on Properties of ConcreteIRJET Journal
 
capstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxcapstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxYogitaSalunke1
 
CEMENT CONCRETE MIX DESIGN.ppt
CEMENT CONCRETE  MIX DESIGN.pptCEMENT CONCRETE  MIX DESIGN.ppt
CEMENT CONCRETE MIX DESIGN.pptKuberBhusal1
 
Final Presentation
Final PresentationFinal Presentation
Final PresentationMonique F M
 

Ähnlich wie 05.chapter iii (20)

6 pavement quality concrete
6 pavement quality concrete6 pavement quality concrete
6 pavement quality concrete
 
Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...
Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...
Characterization of Self-compacting Concrete using Viscosity Modifying Admixt...
 
uv_bpm.pdf
uv_bpm.pdfuv_bpm.pdf
uv_bpm.pdf
 
02725 sewer manholes
02725 sewer manholes02725 sewer manholes
02725 sewer manholes
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes FittingsIdol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
 
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
 
IRJET- Strength and Behaviour of High Performance Concrete with GGBS
IRJET- Strength and Behaviour of High Performance Concrete with GGBSIRJET- Strength and Behaviour of High Performance Concrete with GGBS
IRJET- Strength and Behaviour of High Performance Concrete with GGBS
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
 
HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)
 
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
 
RACI SPACER 2016 CATALOG
RACI SPACER 2016 CATALOGRACI SPACER 2016 CATALOG
RACI SPACER 2016 CATALOG
 
IRJET - Effect of Silica Fume on Properties of Concrete
IRJET -  	  Effect of Silica Fume on Properties of ConcreteIRJET -  	  Effect of Silica Fume on Properties of Concrete
IRJET - Effect of Silica Fume on Properties of Concrete
 
capstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxcapstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptx
 
CEMENT CONCRETE MIX DESIGN.ppt
CEMENT CONCRETE  MIX DESIGN.pptCEMENT CONCRETE  MIX DESIGN.ppt
CEMENT CONCRETE MIX DESIGN.ppt
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 

Mehr von GTVT

Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
Biện pháp thay dàn cầu đường sắt Tân An -  Bình ĐịnhBiện pháp thay dàn cầu đường sắt Tân An -  Bình Định
Biện pháp thay dàn cầu đường sắt Tân An - Bình ĐịnhGTVT
 
De cuong tn 17
De cuong tn 17De cuong tn 17
De cuong tn 17GTVT
 
Cong nghe duc dam i
Cong nghe duc dam iCong nghe duc dam i
Cong nghe duc dam iGTVT
 
Liên kết trong kết cấu thép
Liên kết trong kết cấu thépLiên kết trong kết cấu thép
Liên kết trong kết cấu thépGTVT
 
2.de cuong thi cong coc ep
2.de cuong thi cong coc ep2.de cuong thi cong coc ep
2.de cuong thi cong coc epGTVT
 
06.chapter iv
06.chapter iv06.chapter iv
06.chapter ivGTVT
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter iiGTVT
 
03.chapter i
03.chapter i03.chapter i
03.chapter iGTVT
 
02.contents
02.contents02.contents
02.contentsGTVT
 
22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)GTVT
 
22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)GTVT
 
22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)GTVT
 
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)GTVT
 
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)GTVT
 
22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)GTVT
 
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)GTVT
 
22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)GTVT
 

Mehr von GTVT (20)

Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
Biện pháp thay dàn cầu đường sắt Tân An -  Bình ĐịnhBiện pháp thay dàn cầu đường sắt Tân An -  Bình Định
Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
 
De cuong tn 17
De cuong tn 17De cuong tn 17
De cuong tn 17
 
Cong nghe duc dam i
Cong nghe duc dam iCong nghe duc dam i
Cong nghe duc dam i
 
Liên kết trong kết cấu thép
Liên kết trong kết cấu thépLiên kết trong kết cấu thép
Liên kết trong kết cấu thép
 
2.de cuong thi cong coc ep
2.de cuong thi cong coc ep2.de cuong thi cong coc ep
2.de cuong thi cong coc ep
 
06.chapter iv
06.chapter iv06.chapter iv
06.chapter iv
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter ii
 
03.chapter i
03.chapter i03.chapter i
03.chapter i
 
02.contents
02.contents02.contents
02.contents
 
22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)
 
22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)
 
22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)
 
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
 
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
 
22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)
 
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
 
22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)
 

05.chapter iii

  • 1. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding CHAPTER III: MATERIAL REGULATIONS I. GENERAL All meterials for box girder and other items shall be in accordance with the Specification of Project and shall be taken test sample according to quality controlling plan. Sample for test and construction shall be supervised and approved by Engineer. Just only use materials which are approved by Engineer according to Specification and Quality Controlling Plan. Materials which not satisfy the above requirement shall be rejected and removed out from Site. Approved material source shall be use for the entire Project. For a new source, it is necessary to take sample and be approved by Engineer in accordance with Specification if the source has any change. During placing concrete for continuously voided slab beam segments, all materials must be enough for mixing and providing not interupted. II. MATERIALS 1. Reinforcement a. High strength reinforcement High strength strand with low relaxation shall be in accordance with ASTM416-99 standard of Grade 270 or equivalent, with the main parameters as follows: + Grade 270, low relaxation. + Breaking strength: fpu = 1860MPa + Yield limit: fpy = 1674 MPa + Modulus of elasticity: 195000 MPa + Relaxation after 1000h at 20°C ≤ 2,5 %. Construction regulations: + High strength strand shall be not welded. 31
  • 2. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding + Each coil of cable must have Certificate of Producer. The Certificate shows relative curve between load and elongation, measured area, elastic mudulus for each lot. + High strength cable lots shall be checked before testing, taken sample to test for each lot or taken a group sample for every 20T. + In any case, jacking force for each strand is not over 0, 80 of minimum ultimate strength of cable. + Jack must be suitable with presstressed tendon about structure and tensioning force. Jack and gauge shall be checked before using. b. Non-prestressed reinforcement The Subcontractor intends to use Viet Y Steel for construction Project. Non-prestressed reinforcement must be in accordance with Specification of Project: JISG 3112 SD345 2. Prestressed anchor Pre-stressed anchor must be conformed to 22TCN 267-2000 Standard and the following requirements: + All anchor devices must have enough capacity to keep prestressed cable with a stress not less than 95% of ultimate tensile strength of prestressed cable showed on Certificate of Producer and anchor, cable Test Result. + Anchor shall be checked to ensure type as submitted, geometric dimension, mechanical defect to reject defected anchor. 3. Duct The corrugated duct must be appropriate, synchronous with type, grade of prestressed cable and anchor. Duct system shall be airproof, waterproof. Diameter of duct must be greater at least 6mm than nominal diameter of tendon; cross section area must be greater 2.5 times than tendon area. The minimum thickness of duct must be in accordance with approved design and instruction of producer that be agreed by Engineer. 32
  • 3. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding 4. Concrete The girder concrete is B arccording to Specification of Project. Mix design shall conform to Specifications of Project. Material regulation is as follows: a. Cement Cement is Portland cement corresponding to JIS R5210 or ASTM-C150-98 (TCVN PCB40, TCVN6260-1997) standard. Expiry date and Manufacturer Certificate shall be submitted before using. Product lots brought into Site must have full bags, components. Bagged cement shall be kept in a temporary depot and used on time since the material has been delivered. Bulk cement shall be kept in silo corresponding to manufacturer regulations. b. Fine aggregate: Sand Fine aggregate using for concrete shall be in accordance with JISA 1102 or equivalent standard. Aggregate shall be kept to avoid segregating or contaminating. The centre of depot must be prevented from moisture excess. To prevent different-size aggregates from mixing together, make a baffle between them. Only use uncontaminated, non-toxic mud, clean fine aggregate. The fineness modulus must satisfy the Specification of Project as the following: + Granular composition (according to JISA 1102 standard): Sieve number (mm) Percentage passing by weight 10 100 5 90~100 2.5 80~100 1.2 50~90 0.60 25~65 0.30 10~35 0.15 2~10A 33
  • 4. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding The Subcontractor has intention in using Mia Duong, Ha 12 – Bo Trach – Quang Binh coarse sand for concreting works of Project. Aggregate shall be checked with the above requirements before constructing. c. Coarse aggregate: Rock 1x2 Coarse aggregate must respond to JISA 1102 or equivalent. The Subcontractor intends to use stones Len Cut Tai - Quang Trach - Quang Binh for concreting works of Project. Coarse aggregate size is shown in the below table: Sieve number (mm) Percentage passing by weight 30 100 25 95~100 20 - 15 30~70 10 - 5 0~10 2.5 0~5 d. Water Water for mixing or curing concrete must be fresh water, uncontaminated with oil, saline, acid, sugar, vegetable or other toxic materials. Excluding water approved as potable water by competent authority, others shall be tested and satisfied AASHTO-T26 standard: Water for concrete and mortar. Water/concrete ratio is not over 0.40. Water sources for constructing continuous box girder casted on scaffolding of Do Vang Bridge shall be the source using for Sub-structure items of Project. Check pH value at site before placing concrete or test water sample again if necessary. e. Admixture Admixture shall meet instructions JISA 6204. 34
  • 5. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding Admixture that boots setting speed, increases mobility or retarding admixture, wetting admixture, v.v… can be use but must be approved by Engineer before constructing. Admixture may be one of the following types: SiKa Viscocrete 3000-10 to be in accordance with real construction requirements at Site. Admixture not the type as required shall be rejected and removed out of Site. Water fixed content and admixture shall be put together at mixing plant. Inspector shall check type, maintenance, and ratio of concrete admixture whether as required or not. 5. Pumped grout Grout made from Pooclang cement, water and admixture are accepted by Engineer. Grout is mixed as follows: Bleeding rate is not over 3% Non-shrinkage Swelling index is not over 10%. But this rate is always smaller than bledding rate after atomizing up to bleed completely. Compressive strength of cylinder (50x100mm) of 28 days is not smaller than 20 MPa. The rate of water/cement is not over than 0.4 The content of Cl is not over 0.3kg/m3 Ecflux time is from 10-15 seconds according to Marsh Cone testing. 35