2. Tiscon ReadyBuild is a
downstream service
brand which provides
customised solutions for
all your construction
needs related to rebars.
3. The DGEN gas-based mega power
project for 1200MW (3 units of
400MW) at Dahej in Gujrat is owned
byTorrent Power Limited.The project
was being constructed in the coastal
area of Dahej which is largely an
industrial zone.
4. The prevention of rebar corrosion was a big
challenge as the saline environment is extremely
prone to corrosion. As a solution, epoxy coated
and CRS were evaluated in order to decrease the
impact of corrosion on the rebars. However, the
outcome of epoxy coating did not seem
satisfactory and was very high on cost.
5. It was found thatTataTiscon SD was nearly matching the specifications of BARC with
UTS/YS>1.15. Further it was found that if rolled at higher temperatures in slower
mills, normal Fe 500D could also develop higher ductility.
6. Keeping in mind the client’s monthly requirement and
lead time of 25-30 days, a buffer stock was created at
the Ahmedabad stockyard so as to be able to supply
the material with minimum time gap.
TheTiscon ReadyBuild Solution
7. “From our personal experience of
using CRS rebars at our site, we have
found that it is better in quality, gives
better economic returns and is more
feasible for us as well.The service and
support fromTata Steel is also
commendable.”
8. Tiscon ReadyBuild is effectively
making construction a far more
hassle-free process. In many similar
projectsTiscon ReadyBuild has
proven itself indispensable to the
construction process. In an age
where speed and technology are
the ruling buzzwords this service
fromTataTiscon has truly made a
mark in the construction industry.