HIT3X11-JI
Page 1 of 8 Issue No. 3
INSTALLATION INSTRUCTIONS FOR
6.35/11kV THREE CORE POLYMERIC CABLE
HEATSHRINK TERMINATIONS
FOR CABLES WITH COPPER TAPE SCREENS
OR COPPER WIRE SCREENS.
FOR INDOOR USE.
SERIES: HIT-3X-11
Issue Date Dr / Ec No. Author Approved
1 AUG 2004 4351 AB PW
2 NOV 2004 4351 AB PA
3 NOV 2006 5226 MH Aaron Buscombe
PRYSMIAN CABLES & SYSTEMS, OAK ROAD, WREXHAM INDUSTRIAL ESTATE, WREXHAM, LL13 9PH
UNITED KINGDOM Tel: 08705 133 143
Kit No.
Conductor Cross
section mmÂČ
HIT-3X-A-11 16-25
HIT-3X-B-11 35-70
HIT-3X-C-11 95-240
HIT-3X-D-11 300-400
HIT3X11-JI
Page 2 of 8 Issue No. 3
General Instructions:
VERY IMPORTANT - PLEASE READ BEFORE STARTING THE INSTALLATION.
Before shrinking one tube onto another or onto polymeric insulation or before
applying any mastic, clean and degrease the underlying surfaces. Where any of
these surfaces are semi conducting or stress controlling take care not to drag any
carbon particles onto any insulating components. Metal sheaths/armours of cables
should always be scraped / abraded and degreased before applying any earth bonds
or mastics.
When using heatshrink tubing;
‱ Use a propane (preferred) or butane gas torch.
‱ Use torch in a well-ventilated area.
‱ obtain soft blue flame with yellow tip. Pencil blue flames should not be used.
‱ Aim torch in direction of heatshrink to preheat material.
‱ Continuously move flame to avoid scorching.
‱ Any cut tubing should be smooth with no jagged edges.
‱ Recovered tubing should be smooth, wrinkle free with inner components defined.
NOTES ON FITTING OF TERMINATION’S.
Remember to fit any gland or non-splitable gland plates over the cable before
starting the termination.
If possible lower the gland plate to ease installation.
The terminations have been designed for use in a cable box with a minimum of 400
mm from the centre line of the bushing to the base of the cable box.
HIT3X11-JI
Page 3 of 8 Issue No. 3
1. Check gland and box dimensions against drawing before stripping as
dimensions may vary.
2. Strip the cable as shown in Fig. 1.
3. Remove any fillers to the level of the bedding cut.
Note: Length of exposed armour is dependent on gland used.
Figures used in diagram are nominal length.
4. Secure the exposed armour wires with a temporary binder wire.
5. Clean and de-grease the exposed core and remaining Oversheath.
6. If a gland sleeve is to be used position over the prepared core and nest on the
oversheath.
HIT3X11-JI
Page 4 of 8 Issue No. 3
7. Fit the three earth braids to the
copper tape using the roll springs
around the braid and the copper
tape screen (Fig. 2). Applying a
twisting pressure to ensure a tight
connection is made.
8. Using brown stress control mastic,
place the point of the tape at the
conductive screen cutback, stretch
to œ its original width & tightly
wrap, with a 50% overlap, to fill the
conductive screen step creating a
smooth transition. Overlap the
tape onto the insulation and tape
screen by 10 mm. (Fig. 3)
HIT3X11-JI
Page 5 of 8 Issue No. 3
9. Position Stress Control Sleeve
over each core, 10mm below the
end of the brown mastic, shrink
using a soft yellow flame shrink
from bottom, working upwards
(Fig. 4).
10. Using half a strip of red sealant tape
stretch to œ its original width & tightly
wrap, with a 50% overlap, over each
roll spring to create a smooth
transition. (Fig. 5).
HIT3X11-JI
Page 6 of 8 Issue No. 3
11. Bend back armour wires from
termination area.
12. Lift the earth braids away from inner
sheath.
13. Wrap one layer with 50% overlap of
black sealant mastic over inner
sheath.
14. Lay the earth braids into the sealant,
ensuring that the solder water block
is located centrally over the mastic,
then apply black sealant mastic over
the solder block. (Fig. 6).
16. Position breakout boot over the
cores; Ensure that the breakout is
seated well down into the crutch.
17. Using a soft yellow flame shrink from
centre, working downwards (1), then
and work upwards towards fingers
(2). (Fig. 7).
HIT3X11-JI
Page 7 of 8 Issue No. 3
18. Offer the partially installed
termination to the cable box; cut
cores to length, taking note of any
core crossing that may be required.
Remove the insulation for the lug
depth + 5 mm.
19. Fit the lug as per manufactures
instructions.
20. Using the remaining red sealant
tape, with a 50% overlap, wrap
around lug barrel. Build up the tape
diameter equal to the insulation.
Overlap the core insulation by 10
mm. (Fig. 8).
21. Fit the outer red anti-track tubes
over the legs of the breakout,
pushing well down into crutch.
Shrink down using a soft yellow
flame shrink in an upwards
direction. (Fig. 9)
22. Cut the tubes so that it fits just onto
the palm of the lug. Make sure that
the tubes do not prevent good
contact with the bushing.
HIT3X11-JI
Page 8 of 8 Issue No. 3
Completed termination
23. The gland plate assembly should now be completed following the
manufacture’s instructions. The terminations should be allowed to cool before
moving or energising. (Fig. 10).
Important Notice To Users
DISCLAIMER
1. The information contained in these installation instructions is intended to describe the correct method of installing
cable accessories under normal conditions. Prysmian has no control over site conditions that may affect
installation, and it is the responsibility of the installer to ensure the site is suitable.
2. Installation must always be carried out by a properly trained competent person.
3. Prysmian’s liability in respect of all products supplied by it are set out in its Conditions of Sale, a copy of which is
available on request.

Weitere Àhnliche Inhalte

Was ist angesagt?

Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Thorne & Derrick International
 
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Thorne & Derrick International
 
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...Thorne & Derrick International
 
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnNexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnThorne & Derrick International
 
Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020Power System Operation
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...Thorne & Derrick International
 
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...Thorne & Derrick International
 
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...AKBAR TRADING
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 CablesThorne & Derrick International
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Shahab Khan
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Thorne & Derrick International
 
Electrical wiring
Electrical wiringElectrical wiring
Electrical wiringPatel Mit
 
Earthing or Grounding
Earthing or GroundingEarthing or Grounding
Earthing or GroundingAswin KP
 
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...Thorne & Derrick International
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission lineFazlur Rahman
 
Cable and laying
Cable and layingCable and laying
Cable and layingBHAGWAN PRASAD
 
Installation & maintenance of power cable
Installation & maintenance of power cableInstallation & maintenance of power cable
Installation & maintenance of power cableAmbuj Mishra
 
Ug cables
Ug cablesUg cables
Ug cablesmsmsn2k2
 
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|AKBAR TRADING
 

Was ist angesagt? (20)

Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
 
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
 
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
 
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnNexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
 
Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
 
Underground cables (1)
Underground cables  (1)Underground cables  (1)
Underground cables (1)
 
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...
 
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
 
Electrical wiring
Electrical wiringElectrical wiring
Electrical wiring
 
Earthing or Grounding
Earthing or GroundingEarthing or Grounding
Earthing or Grounding
 
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission line
 
Cable and laying
Cable and layingCable and laying
Cable and laying
 
Installation & maintenance of power cable
Installation & maintenance of power cableInstallation & maintenance of power cable
Installation & maintenance of power cable
 
Ug cables
Ug cablesUg cables
Ug cables
 
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
 

Ähnlich wie 11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV Termination

3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 CablesThorne & Derrick International
 
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cablesThorne & Derrick International
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Thorne & Derrick International
 
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)Thorne & Derrick International
 
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 CablesThorne & Derrick International
 
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Thorne & Derrick International
 
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...Thorne & Derrick International
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsMot panels
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Solar
 
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...AKBAR TRADING
 
Data Link Cable Joints BR1932 (NR Network Rail PADS)
Data Link Cable Joints BR1932 (NR Network Rail PADS) Data Link Cable Joints BR1932 (NR Network Rail PADS)
Data Link Cable Joints BR1932 (NR Network Rail PADS) Thorne & Derrick International
 
G901 05 2013a
G901 05 2013aG901 05 2013a
G901 05 2013aRAYL_2014
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer3M
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...nasina balasubrahmayam
 
Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionThorne & Derrick International
 
Annex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guideAnnex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guideIgors Cardoso
 
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Thorne & Derrick International
 
OFCPulling
OFCPullingOFCPulling
OFCPullingBala V
 
CoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoastal Joinery Hardware
 

Ähnlich wie 11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV Termination (20)

3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
 
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
 
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
 
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
 
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
 
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...
 
Data Link Cable Joints BR1932 (NR Network Rail PADS)
Data Link Cable Joints BR1932 (NR Network Rail PADS) Data Link Cable Joints BR1932 (NR Network Rail PADS)
Data Link Cable Joints BR1932 (NR Network Rail PADS)
 
G901 05 2013a
G901 05 2013aG901 05 2013a
G901 05 2013a
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...
 
Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation Instruction
 
Annex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guideAnnex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guide
 
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
 
OFCPulling
OFCPullingOFCPulling
OFCPulling
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
 
CoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation Instructions
 

Mehr von Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptThorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick InternationalThorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Thorne & Derrick International
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingThorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RoweThorne & Derrick International
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresThorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandThorne & Derrick International
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Thorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DThorne & Derrick International
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetThorne & Derrick International
 

Mehr von Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
 

KĂŒrzlich hochgeladen

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...gurkirankumar98700
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 

KĂŒrzlich hochgeladen (20)

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍾 8923113531 🎰 Avail...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV Termination

  • 1. HIT3X11-JI Page 1 of 8 Issue No. 3 INSTALLATION INSTRUCTIONS FOR 6.35/11kV THREE CORE POLYMERIC CABLE HEATSHRINK TERMINATIONS FOR CABLES WITH COPPER TAPE SCREENS OR COPPER WIRE SCREENS. FOR INDOOR USE. SERIES: HIT-3X-11 Issue Date Dr / Ec No. Author Approved 1 AUG 2004 4351 AB PW 2 NOV 2004 4351 AB PA 3 NOV 2006 5226 MH Aaron Buscombe PRYSMIAN CABLES & SYSTEMS, OAK ROAD, WREXHAM INDUSTRIAL ESTATE, WREXHAM, LL13 9PH UNITED KINGDOM Tel: 08705 133 143 Kit No. Conductor Cross section mmÂČ HIT-3X-A-11 16-25 HIT-3X-B-11 35-70 HIT-3X-C-11 95-240 HIT-3X-D-11 300-400
  • 2. HIT3X11-JI Page 2 of 8 Issue No. 3 General Instructions: VERY IMPORTANT - PLEASE READ BEFORE STARTING THE INSTALLATION. Before shrinking one tube onto another or onto polymeric insulation or before applying any mastic, clean and degrease the underlying surfaces. Where any of these surfaces are semi conducting or stress controlling take care not to drag any carbon particles onto any insulating components. Metal sheaths/armours of cables should always be scraped / abraded and degreased before applying any earth bonds or mastics. When using heatshrink tubing; ‱ Use a propane (preferred) or butane gas torch. ‱ Use torch in a well-ventilated area. ‱ obtain soft blue flame with yellow tip. Pencil blue flames should not be used. ‱ Aim torch in direction of heatshrink to preheat material. ‱ Continuously move flame to avoid scorching. ‱ Any cut tubing should be smooth with no jagged edges. ‱ Recovered tubing should be smooth, wrinkle free with inner components defined. NOTES ON FITTING OF TERMINATION’S. Remember to fit any gland or non-splitable gland plates over the cable before starting the termination. If possible lower the gland plate to ease installation. The terminations have been designed for use in a cable box with a minimum of 400 mm from the centre line of the bushing to the base of the cable box.
  • 3. HIT3X11-JI Page 3 of 8 Issue No. 3 1. Check gland and box dimensions against drawing before stripping as dimensions may vary. 2. Strip the cable as shown in Fig. 1. 3. Remove any fillers to the level of the bedding cut. Note: Length of exposed armour is dependent on gland used. Figures used in diagram are nominal length. 4. Secure the exposed armour wires with a temporary binder wire. 5. Clean and de-grease the exposed core and remaining Oversheath. 6. If a gland sleeve is to be used position over the prepared core and nest on the oversheath.
  • 4. HIT3X11-JI Page 4 of 8 Issue No. 3 7. Fit the three earth braids to the copper tape using the roll springs around the braid and the copper tape screen (Fig. 2). Applying a twisting pressure to ensure a tight connection is made. 8. Using brown stress control mastic, place the point of the tape at the conductive screen cutback, stretch to Âœ its original width & tightly wrap, with a 50% overlap, to fill the conductive screen step creating a smooth transition. Overlap the tape onto the insulation and tape screen by 10 mm. (Fig. 3)
  • 5. HIT3X11-JI Page 5 of 8 Issue No. 3 9. Position Stress Control Sleeve over each core, 10mm below the end of the brown mastic, shrink using a soft yellow flame shrink from bottom, working upwards (Fig. 4). 10. Using half a strip of red sealant tape stretch to Âœ its original width & tightly wrap, with a 50% overlap, over each roll spring to create a smooth transition. (Fig. 5).
  • 6. HIT3X11-JI Page 6 of 8 Issue No. 3 11. Bend back armour wires from termination area. 12. Lift the earth braids away from inner sheath. 13. Wrap one layer with 50% overlap of black sealant mastic over inner sheath. 14. Lay the earth braids into the sealant, ensuring that the solder water block is located centrally over the mastic, then apply black sealant mastic over the solder block. (Fig. 6). 16. Position breakout boot over the cores; Ensure that the breakout is seated well down into the crutch. 17. Using a soft yellow flame shrink from centre, working downwards (1), then and work upwards towards fingers (2). (Fig. 7).
  • 7. HIT3X11-JI Page 7 of 8 Issue No. 3 18. Offer the partially installed termination to the cable box; cut cores to length, taking note of any core crossing that may be required. Remove the insulation for the lug depth + 5 mm. 19. Fit the lug as per manufactures instructions. 20. Using the remaining red sealant tape, with a 50% overlap, wrap around lug barrel. Build up the tape diameter equal to the insulation. Overlap the core insulation by 10 mm. (Fig. 8). 21. Fit the outer red anti-track tubes over the legs of the breakout, pushing well down into crutch. Shrink down using a soft yellow flame shrink in an upwards direction. (Fig. 9) 22. Cut the tubes so that it fits just onto the palm of the lug. Make sure that the tubes do not prevent good contact with the bushing.
  • 8. HIT3X11-JI Page 8 of 8 Issue No. 3 Completed termination 23. The gland plate assembly should now be completed following the manufacture’s instructions. The terminations should be allowed to cool before moving or energising. (Fig. 10). Important Notice To Users DISCLAIMER 1. The information contained in these installation instructions is intended to describe the correct method of installing cable accessories under normal conditions. Prysmian has no control over site conditions that may affect installation, and it is the responsibility of the installer to ensure the site is suitable. 2. Installation must always be carried out by a properly trained competent person. 3. Prysmian’s liability in respect of all products supplied by it are set out in its Conditions of Sale, a copy of which is available on request.