1. Thai Tran [U.S. Citizen]
3309 Wesley St.
Fort Worth, Tx. 76111
Cell: 682-564-3888
Objectives:
Seeking a position in telecommunication field tech, installation, integration, testing and
troubleshooting communication equipment in a highly competitive company that would utilize my
technical expertise.
Experience:
World Link (Samsung/Sprint), Pacific Northwest Market – Field Engineer
From: 05/2013 – 05/2015
- Samsung MMBS carriers commissioning and integration on the 3G, 4G, and 2.5 TD LTE
- Provide technical support, and troubleshoot any issues (onsite).
- Work on Samsung MMBS (Multi-mode Base Station) CDMA DU, 4G LTE DU, and 2.5 TD LTE DU (Eltek
and Texon /Emerson cabinets).
- Cisco ASR-901 and CSR-2941.
- Perform migration activities (TDM T1s and fiber; M1 and M2): upgrading Cisco ASR-901 to latest IOS
version (15.2-2-SNH1), loading environmental files on CDMA DU (CIMA), 4G LTE DU (UAMA), and 2.5
LTE DU (LMA).
- Perform 2.5 TD LTE, 4G, and 3G acceptance tests (ATP): VSWR, TX-Power, RSSI, test calls
(Voice1x and data DO), and alarms verification.
- Primary markets: Pacific Northwest (WA, OR, ID, UT, SF Bay Area and CO).
Versacom LLC, LA Market – Field Tech From: 07/2012 – 04/2013
- Ericsson UMTS 1st
, 2nd
, 3rd
, and 4th
carriers commissioning/integration on the 3106, 3206, 6102, 6601
cabinets
- Installed DU, RU, and PSU and cables. Terminate RF jumper at node B and diplexers
- Loads basic packages and then upgrade packages
- Internal combining 1900 to 1900 or 850 to 850(cross cabling and remove RF jumpers from branch B 1st
Carrier and place it on branch A 2nd
Carrier) antennas sharing.
- Troubleshooting with NIC Engineer to cleared all alarm in node B
- Call test (SMS, mobile to mobile, data test, 411, 611) plus E911 call testing single and dual bands
2. Field Tech XPI Parsons From: 02/2009 to 05/2012
T-Mobile Dallas Nokia Flexi Market
- Experience with troubleshooting alarms that cause system failure prior commissioning.
Downloaded updated SW and configure each RF modules.
- Responsible to install Nokia Flexi BTS and commissioning.
- Installed RF jumpers and terminated DIN connectors to main feeders. Used Anritsu Site
Master S331 to sweep DTF and SRL on all jumpers and the whole lines.
- Job functions included: installed FCOA, System, RFs, and Power modules. Ran all external
cables, terminated ground and power up all modules.
- Reported daily with site folder and commissioning files to upper management.
- Hand on with high power voltage AC to DC
- Site Audit and Quality Control
- Troubleshooting issues with NODE B on NOKIA
- Installing of new build sites
- ERICSSON UMTS
- 3rd
Carrier Integration, configuration, and commission
Level 3 Tech Sprint/Nextel From: 06/2005 to 09/2008
- Cell Phone Technicians- responsible for, repairing and refurbishments of wireless
phone (able to diagnose and replace as necessary any external parts on entire phone)
- Programming with software utilizing computer applications and diagnostics tools for
troubleshooting.
- Performs functional testing inspects products to verify conformance to specifications and
performing quality assurance.
- Performs fundamental soldering component and connectors as needs.
Education
High School Diploma
Professional References
Trace Lewark
Samsung/Sprint
Region 14 Field Operations Manager
214-298-7204
307-256-6496
Eden Ta
Field Lead
Samsung/Sprint
817-501-5251
Loc Tran
Field Operations Manager
817-233-4263