TOPICS WE WILL COVER
• Benefits of AMI and where we are starting from
• Overview of technologies
• How AMI is changing Meter Service Departments and metering jobs
• Metering and the Future of AMI
tescometering.com 2
AMI BENEFITS
• Two-way communication to the meter
• Why is this important or desirable?
• Usage
• Voltage
• Current
• Power Quality
• Disconnect/Reconnect
• Outages
• The Future
• Location
• Displays
tescometering.com 3
PRE-AMI METER OPERATIONS
• Fewer meter techs in the field and in the shop
than there were 25 years ago
• Fewer Field checks and site verifications due to
lack of personnel, lack of experience and lack of
expertise
• More features under glass in the meters even
before AMI deployed
• Significantly more features under glass in every
AMR and AMI system being considered or being
deployed
• Metering losses starting to be identified “by
accident” as opposed to being “by design”.
Common Features and Common Sources of Concern
tescometering.com 4
THE PENDULUM STARTS TO MOVE
• Meter Operations. Prior to deployment many larger utilities take an attitude of
“this is only metering – how hard can that be?”. Over the course of deployment
Meter Operations gains a stature and a respect from the rest of the organization
that was not previously accorded them – even if this is only begrudging respect.
• New tests for AMI meters (e.g. communication,
disconnect) are identified
• The complexity and issues around high revenue
metering are at least acknowledged by the rest of
the organization
• Tests which have not been performed in years are
suddenly back in vogue
tescometering.com 5
THE NEW REALITIES
• Electro-Mechanical Meters typically lasted 30 years and more. Electronic AMI
meters are typically envisioned to have a life span of fifteen years and given the
pace of technology advances in metering are not expected to last much longer
than this.
• This means entire systems are envisioned to be exchanged every fifteen years
or so. In the interim the meter population and communication network inherent
in the infrastructure for each utility must be maintained.
• Meter communication and meter data
management are becoming as important to
metering operations as meter accuracy.
• Firmware upgrades, firmware stability and cyber
security are becoming increasingly important to
metering departments
tescometering.com 6
WHAT TECHNOLOGIES ARE WE USING?
• RF Mesh
• Power Line Carrier (PLC)
• LTL Back Haul
tescometering.com 7
RF MESH
• True RF Mesh
• Meters and collectors
• Software and firmware
• Head End Systems
• The difference
between frequencies
• Proprietary and non-proprietary
frequencies
• Penetration vs. distance trade-off
tescometering.com 8
POWER LINE CARRIER
• Pros and Cons
• Copper Wires
• Amount of data – now and in the future
tescometering.com 9
LTL BACK HAUL
• Infrastructure will win
• IoT vs. number of meters
• New IoT devices are being installed at a rate of 127 per second or 11 million per
day
• 165 million connected electric meter customers in the U.S. and
Canada
• After 12 years we are 60% complete or roughly 100 million done
• But never discount the fact that Electric Utilities will always own the
Copper Wires. LTL and PLC will displace RF in the mid term and
eliminate RF in the long term – strictly because of infrastructure and not
on the merits of technology.
tescometering.com 10
EXPECTED & UNEXPECTED TRENDS AT THE
END OF DEPLOYMENT
Expected:
• The AMI deployment team will declare victory at some point and move on. Clean-up
will be left for the meter service department and these will be the hardest meters to
access and to get reliably on the network
• Change Management continues to be a tremendous challenge for every vendor
through every deployment
• Meter Acceptance testing including far more than accuracy testing for every
deployment
• Firmware upgrades must be checked and tested before mass deployment
tescometering.com 11
Unexpected:
• Meter Certification Testing never
slowed down over the course of any of
the deployments
WHY DO AMI METERS FAIL?
tescometering.com 12
Looking back at various deployments – what are the chief
causes to reject meter shipments?
Meter functional test failures including but not limited to;
• Incorrect firmware
• Bad settings
• Alarms and errors that do not clear
• Communication test failures
• Bad tables
• Failed disconnect switches
LESSONS FOR THE FUTURE?
• Are these infant mortality issues or are these issues to be concerned about
going forward?
• What was NEVER the reason for rejecting a shipment – meter accuracy.
• Which are the most difficult meters for every deployment – the transformer
rated meters. Often these forms are not available until very late in the
deployment and sometimes not until the deployment has officially ended.
tescometering.com 13
COMMERCIAL AND INDUSTRIAL METERING
CHALLENGES
• Most AMI deployments utilize third party contractors to handle the residential and
some self contained non-2S services. The balance is typically handled by the meter
service department of the utility.
• No AMI deployment has used the AMI communication network to handle the
communication with the largest customer meters. The risk from even a short term
interruption of communication or loss of data far outweighs the benefit of meters
which are already being communicated with daily or even several times a day.
• As these services are evaluated for new metering technology, issues are being found
at some accounts. These issues represent revenue losses due to inappropriate
metering schemes or partially failed metering components (e.g. transformers,
electronic components).
tescometering.com 14
HOW ARE THESE NEW REALITIES STARTING TO AFFECT
METERING OPERATIONS?
• Metering is becoming more about IT. Some metering departments have been
reorganized after AMI as part of the IT department.
• Metering emphasis will shift strongly toward C&I customers and further and further
away from residential meters
• Metering resources are being refocused on C&I accounts.
• There are fewer levels of meter tech. Every meter tech needs to be at the higher
level as there is not enough lower level work to warrant full time employees
• Utility commissions are being less forgiving of allowing rate relief for project over
runs and metering inaccuracies
tescometering.com 15
NEW OR EXPANDED ROLES FOR METERING
DEPARTMENTS OF ALL SIZES
• Responsible for either reviewing ANSI Tests or even performing some
of these ANSI Tests
• Perform Meter Functionality testing on new and returned AMI meters
• Register and communication module energy measurement
comparison
• Disconnect/Reconnect Functionality
• Outage Performance
• Meter Communications Performance
• Consumer safety and combating real and perceived issues
• Near continuous research into the “next” technology and the next
deployment
tescometering.com 16
SHOP TESTING
• Accuracy testing
• Meter Communications Performance
• Software and firmware verification
• Setting verification
• Functional testing
• Disconnect/reconnect Functionality
and as left setting
tescometering.com 17
FIELD TESTING AND INSPECTION
• Work with third party deployment vendor or
perform the deployment
• Self contained
• Transformer Rated
• Accuracy Testing
• Meter Communications Performance
• Software & Firmware Verification
• Setting Verification
• Functional Testing
• Disconnect/Reconnect Functionality
and as left setting
• Tamper Verification
• Site Audits appropriate to the type
of meter
tescometering.com 18
RMA’S, ROOT CAUSE ANALYSIS AND
IN SERVICE TESTING
Opportunities to Learn:
• Meters returned from the field as bad or flagged on incoming inspection. These RMA’s
need to be tracked not only for warranty purposes but more importantly to understand
the root cause of the issues.
tescometering.com 19
• In Service Test programs need to be utilized to understand
the overall performance of AMI meters and as failures are
identified these meters need to be dissected and the
failure mode understood. If necessary, once the failure
mode is understood the meter population may need to also
be dissected to identify sub-groups of meter that may be
similarly affected. This could be a group of meters…
• from the same shipment.
• that were deployed in the same geographic area.
• that saw the same type of usage or environment.
No one knows the actual life of their AMI meter. To do this we must learn as
much as we can from the failures and the performance of the meters we have
deployed.
RMA PROCESSING
TYPICALLY MISSED WHEN CREATING THE DEPLOYMENT PLAN
• One area typically overlooked in the planning for AMI
deployments is the handling of these RMA’s.
• This is a new process with many idiosyncrasies.
• This is a new process requiring new equipment and new skill
sets
• This is a new process that needs to be performed on top of
the standard day to day meter service work
• AMI helps to reduce a lot of less value add work, but
increases the higher value work at every utility. RMA
processing is one of the better examples of this type of
work.
tescometering.com 20
AND OF COURSE – THE “OUT OF LEFT FIELD”
DEPLOYMENT ISSUES
• Oh – let’s store 1.7 Million Meters by the way. No, we don’t know for
how long but here they come.
• Yeah…..you’re approved to deploy but we are going to need you to test
100% of the meters you are removing. That won’t be a problem, right?
• KYZ? What’s that? You need what from us?
• Can we see your audit plan? Where is your audit team by the way?
tescometering.com 21
POST-DEPLOYMENT NEEDS
• AMI Population Management
• Once deployment is complete the certification and
acceptance testing does not stop.
• Everyone understands the importance of acceptance
testing, but future generations of a smart meter also require
certification testing.
• New software and firmware needs to be tested and
compared against the performance of older generations.
• New hardware must be tested and compared to older
generations.
• Firmware upgrades need to be checked
• New head end systems or IT protocols need to be tested
against a large group of meters before going live.
tescometering.com 22
REAL LIFE EXAMPLES OF CHANGE
MANAGEMENT IN ACTION
• Issues in the system not the components – what is the definition of a meter and
when did the meter change?
• Meter and communication device interface
• Feature Creep – every manufacturer wants to differentiate themselves – sometimes
this works in unanticipated ways
• Recovery from power outages
• Short and long demand periods
• But we only changed….lessons we
should have learned from Microsoft
• Over the air upgrades
• Thank Goodness for test plans – right?
• Half closed disconnect devices
• Disconnect devices of unknown state
• Meters with incorrect firmware
tescometering.com 23
THE NEED FOR ANALYTIC CAPABILITY IN METER
SERVICE OPERATIONS
• Information is King and AMI is making Meter Services King
of the Mountain. But this assumes that Meter Services is
able to combine operational knowledge with analytical
capabilities by creating teams that have both capabilities.
These analytic capabilities include the ability to
understand and master “Big Data”. The ability to
understand how various data bases are put together and
how best to harvest the data and look for trends in this
data.
• Operational knowledge
• Revenue diversion knowledge
• Ability to spot trends
• Filter and mine data from various sources in the AMI data stream.
• Once this team coalesces under one roof Meter Services is
poised to start providing work orders for various
operational groups within and outside of traditional Meter
Service Departments.
tescometering.com 24
SUMMARY
• Benefits of AMI
• Far more information than just accurate energy usage
• Allows Meter Services to focus field resources on Transformer Rated Services
• Overview of the Technologies
• PLC and LTL will be here for the long term
• RF will be here for the near term
• How AMI is changing Meter Service Departments
• Challenges Meter Services to provide far more value to the organization by providing better analytics of the
data being received from the new meters
• Meter Services must add telecommunications tools and expertise
• The meter man of the future knows not only metering but they are communication experts and are
involved with handling, reporting and analyzing far more customer and system data
• There are fewer “routine jobs” in the field and many of the standard tasks are no longer required. This
will lead to fewer classifications of meter techs going forward and the need for a more highly trained
tech.
tescometering.com 25
SUMMARY (CONT.)
• Metering and the Future of AMI
• Metering will be in a near constant cycle of looking for the next technology, evaluating those technologies,
planning for deploying these technologies, and cleaning up the aftermath of the deployment of
these technologies.
• Metering will begin to run non-metering operational groups
• Each Utility must take a far more active role as part of checking, certifying, and rechecking the functionality of
their meters.
tescometering.com 26
QUESTIONS AND DISCUSSION
Tom Lawton
President
tom.lawton@tescometering.com
TESCO – The Eastern Specialty Company
Bristol, PA
215-228-0500
This presentation can also be found under Meter Conferences and
Schools on the TESCO website: tescometering.com
ISO 9001:2015 Certified Quality Company
ISO 17025:2017 Accredited Laboratory
tescometering.com 27

Weitere ähnliche Inhalte

Ähnlich wie AMI Technology Overview

Ähnlich wie AMI Technology Overview (20)

Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
SEMA 2016 - Managing Meter Shops of the Future
SEMA 2016 - Managing Meter Shops of the FutureSEMA 2016 - Managing Meter Shops of the Future
SEMA 2016 - Managing Meter Shops of the Future
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Shops of the Future
Meter Shops of the FutureMeter Shops of the Future
Meter Shops of the Future
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and Information
 
ECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the FutureECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the Future
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations During and After AMI Deployment
Meter Operations During and After AMI DeploymentMeter Operations During and After AMI Deployment
Meter Operations During and After AMI Deployment
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Tesco's AMI Specific Products and Services
Tesco's AMI Specific Products and ServicesTesco's AMI Specific Products and Services
Tesco's AMI Specific Products and Services
 
Fundamentals of AMI Testing
Fundamentals of AMI TestingFundamentals of AMI Testing
Fundamentals of AMI Testing
 
Site Verification for Newer Employees
Site Verification for Newer EmployeesSite Verification for Newer Employees
Site Verification for Newer Employees
 
New Uses For Electric Meters as We Continue to Leverage AMI Technology
New Uses For Electric Meters as We Continue to Leverage AMI TechnologyNew Uses For Electric Meters as We Continue to Leverage AMI Technology
New Uses For Electric Meters as We Continue to Leverage AMI Technology
 
Meter Testing 101.pptx
Meter Testing 101.pptxMeter Testing 101.pptx
Meter Testing 101.pptx
 

Kürzlich hochgeladen

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Kürzlich hochgeladen (20)

Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 

AMI Technology Overview

  • 1. AMI TECHNOLOGY OVERVIEW Tuesday, March 8, 2022 11:10 AM – 12:30 PM Mike Osterhout and Tom Lawton
  • 2. TOPICS WE WILL COVER • Benefits of AMI and where we are starting from • Overview of technologies • How AMI is changing Meter Service Departments and metering jobs • Metering and the Future of AMI tescometering.com 2
  • 3. AMI BENEFITS • Two-way communication to the meter • Why is this important or desirable? • Usage • Voltage • Current • Power Quality • Disconnect/Reconnect • Outages • The Future • Location • Displays tescometering.com 3
  • 4. PRE-AMI METER OPERATIONS • Fewer meter techs in the field and in the shop than there were 25 years ago • Fewer Field checks and site verifications due to lack of personnel, lack of experience and lack of expertise • More features under glass in the meters even before AMI deployed • Significantly more features under glass in every AMR and AMI system being considered or being deployed • Metering losses starting to be identified “by accident” as opposed to being “by design”. Common Features and Common Sources of Concern tescometering.com 4
  • 5. THE PENDULUM STARTS TO MOVE • Meter Operations. Prior to deployment many larger utilities take an attitude of “this is only metering – how hard can that be?”. Over the course of deployment Meter Operations gains a stature and a respect from the rest of the organization that was not previously accorded them – even if this is only begrudging respect. • New tests for AMI meters (e.g. communication, disconnect) are identified • The complexity and issues around high revenue metering are at least acknowledged by the rest of the organization • Tests which have not been performed in years are suddenly back in vogue tescometering.com 5
  • 6. THE NEW REALITIES • Electro-Mechanical Meters typically lasted 30 years and more. Electronic AMI meters are typically envisioned to have a life span of fifteen years and given the pace of technology advances in metering are not expected to last much longer than this. • This means entire systems are envisioned to be exchanged every fifteen years or so. In the interim the meter population and communication network inherent in the infrastructure for each utility must be maintained. • Meter communication and meter data management are becoming as important to metering operations as meter accuracy. • Firmware upgrades, firmware stability and cyber security are becoming increasingly important to metering departments tescometering.com 6
  • 7. WHAT TECHNOLOGIES ARE WE USING? • RF Mesh • Power Line Carrier (PLC) • LTL Back Haul tescometering.com 7
  • 8. RF MESH • True RF Mesh • Meters and collectors • Software and firmware • Head End Systems • The difference between frequencies • Proprietary and non-proprietary frequencies • Penetration vs. distance trade-off tescometering.com 8
  • 9. POWER LINE CARRIER • Pros and Cons • Copper Wires • Amount of data – now and in the future tescometering.com 9
  • 10. LTL BACK HAUL • Infrastructure will win • IoT vs. number of meters • New IoT devices are being installed at a rate of 127 per second or 11 million per day • 165 million connected electric meter customers in the U.S. and Canada • After 12 years we are 60% complete or roughly 100 million done • But never discount the fact that Electric Utilities will always own the Copper Wires. LTL and PLC will displace RF in the mid term and eliminate RF in the long term – strictly because of infrastructure and not on the merits of technology. tescometering.com 10
  • 11. EXPECTED & UNEXPECTED TRENDS AT THE END OF DEPLOYMENT Expected: • The AMI deployment team will declare victory at some point and move on. Clean-up will be left for the meter service department and these will be the hardest meters to access and to get reliably on the network • Change Management continues to be a tremendous challenge for every vendor through every deployment • Meter Acceptance testing including far more than accuracy testing for every deployment • Firmware upgrades must be checked and tested before mass deployment tescometering.com 11 Unexpected: • Meter Certification Testing never slowed down over the course of any of the deployments
  • 12. WHY DO AMI METERS FAIL? tescometering.com 12 Looking back at various deployments – what are the chief causes to reject meter shipments? Meter functional test failures including but not limited to; • Incorrect firmware • Bad settings • Alarms and errors that do not clear • Communication test failures • Bad tables • Failed disconnect switches
  • 13. LESSONS FOR THE FUTURE? • Are these infant mortality issues or are these issues to be concerned about going forward? • What was NEVER the reason for rejecting a shipment – meter accuracy. • Which are the most difficult meters for every deployment – the transformer rated meters. Often these forms are not available until very late in the deployment and sometimes not until the deployment has officially ended. tescometering.com 13
  • 14. COMMERCIAL AND INDUSTRIAL METERING CHALLENGES • Most AMI deployments utilize third party contractors to handle the residential and some self contained non-2S services. The balance is typically handled by the meter service department of the utility. • No AMI deployment has used the AMI communication network to handle the communication with the largest customer meters. The risk from even a short term interruption of communication or loss of data far outweighs the benefit of meters which are already being communicated with daily or even several times a day. • As these services are evaluated for new metering technology, issues are being found at some accounts. These issues represent revenue losses due to inappropriate metering schemes or partially failed metering components (e.g. transformers, electronic components). tescometering.com 14
  • 15. HOW ARE THESE NEW REALITIES STARTING TO AFFECT METERING OPERATIONS? • Metering is becoming more about IT. Some metering departments have been reorganized after AMI as part of the IT department. • Metering emphasis will shift strongly toward C&I customers and further and further away from residential meters • Metering resources are being refocused on C&I accounts. • There are fewer levels of meter tech. Every meter tech needs to be at the higher level as there is not enough lower level work to warrant full time employees • Utility commissions are being less forgiving of allowing rate relief for project over runs and metering inaccuracies tescometering.com 15
  • 16. NEW OR EXPANDED ROLES FOR METERING DEPARTMENTS OF ALL SIZES • Responsible for either reviewing ANSI Tests or even performing some of these ANSI Tests • Perform Meter Functionality testing on new and returned AMI meters • Register and communication module energy measurement comparison • Disconnect/Reconnect Functionality • Outage Performance • Meter Communications Performance • Consumer safety and combating real and perceived issues • Near continuous research into the “next” technology and the next deployment tescometering.com 16
  • 17. SHOP TESTING • Accuracy testing • Meter Communications Performance • Software and firmware verification • Setting verification • Functional testing • Disconnect/reconnect Functionality and as left setting tescometering.com 17
  • 18. FIELD TESTING AND INSPECTION • Work with third party deployment vendor or perform the deployment • Self contained • Transformer Rated • Accuracy Testing • Meter Communications Performance • Software & Firmware Verification • Setting Verification • Functional Testing • Disconnect/Reconnect Functionality and as left setting • Tamper Verification • Site Audits appropriate to the type of meter tescometering.com 18
  • 19. RMA’S, ROOT CAUSE ANALYSIS AND IN SERVICE TESTING Opportunities to Learn: • Meters returned from the field as bad or flagged on incoming inspection. These RMA’s need to be tracked not only for warranty purposes but more importantly to understand the root cause of the issues. tescometering.com 19 • In Service Test programs need to be utilized to understand the overall performance of AMI meters and as failures are identified these meters need to be dissected and the failure mode understood. If necessary, once the failure mode is understood the meter population may need to also be dissected to identify sub-groups of meter that may be similarly affected. This could be a group of meters… • from the same shipment. • that were deployed in the same geographic area. • that saw the same type of usage or environment. No one knows the actual life of their AMI meter. To do this we must learn as much as we can from the failures and the performance of the meters we have deployed.
  • 20. RMA PROCESSING TYPICALLY MISSED WHEN CREATING THE DEPLOYMENT PLAN • One area typically overlooked in the planning for AMI deployments is the handling of these RMA’s. • This is a new process with many idiosyncrasies. • This is a new process requiring new equipment and new skill sets • This is a new process that needs to be performed on top of the standard day to day meter service work • AMI helps to reduce a lot of less value add work, but increases the higher value work at every utility. RMA processing is one of the better examples of this type of work. tescometering.com 20
  • 21. AND OF COURSE – THE “OUT OF LEFT FIELD” DEPLOYMENT ISSUES • Oh – let’s store 1.7 Million Meters by the way. No, we don’t know for how long but here they come. • Yeah…..you’re approved to deploy but we are going to need you to test 100% of the meters you are removing. That won’t be a problem, right? • KYZ? What’s that? You need what from us? • Can we see your audit plan? Where is your audit team by the way? tescometering.com 21
  • 22. POST-DEPLOYMENT NEEDS • AMI Population Management • Once deployment is complete the certification and acceptance testing does not stop. • Everyone understands the importance of acceptance testing, but future generations of a smart meter also require certification testing. • New software and firmware needs to be tested and compared against the performance of older generations. • New hardware must be tested and compared to older generations. • Firmware upgrades need to be checked • New head end systems or IT protocols need to be tested against a large group of meters before going live. tescometering.com 22
  • 23. REAL LIFE EXAMPLES OF CHANGE MANAGEMENT IN ACTION • Issues in the system not the components – what is the definition of a meter and when did the meter change? • Meter and communication device interface • Feature Creep – every manufacturer wants to differentiate themselves – sometimes this works in unanticipated ways • Recovery from power outages • Short and long demand periods • But we only changed….lessons we should have learned from Microsoft • Over the air upgrades • Thank Goodness for test plans – right? • Half closed disconnect devices • Disconnect devices of unknown state • Meters with incorrect firmware tescometering.com 23
  • 24. THE NEED FOR ANALYTIC CAPABILITY IN METER SERVICE OPERATIONS • Information is King and AMI is making Meter Services King of the Mountain. But this assumes that Meter Services is able to combine operational knowledge with analytical capabilities by creating teams that have both capabilities. These analytic capabilities include the ability to understand and master “Big Data”. The ability to understand how various data bases are put together and how best to harvest the data and look for trends in this data. • Operational knowledge • Revenue diversion knowledge • Ability to spot trends • Filter and mine data from various sources in the AMI data stream. • Once this team coalesces under one roof Meter Services is poised to start providing work orders for various operational groups within and outside of traditional Meter Service Departments. tescometering.com 24
  • 25. SUMMARY • Benefits of AMI • Far more information than just accurate energy usage • Allows Meter Services to focus field resources on Transformer Rated Services • Overview of the Technologies • PLC and LTL will be here for the long term • RF will be here for the near term • How AMI is changing Meter Service Departments • Challenges Meter Services to provide far more value to the organization by providing better analytics of the data being received from the new meters • Meter Services must add telecommunications tools and expertise • The meter man of the future knows not only metering but they are communication experts and are involved with handling, reporting and analyzing far more customer and system data • There are fewer “routine jobs” in the field and many of the standard tasks are no longer required. This will lead to fewer classifications of meter techs going forward and the need for a more highly trained tech. tescometering.com 25
  • 26. SUMMARY (CONT.) • Metering and the Future of AMI • Metering will be in a near constant cycle of looking for the next technology, evaluating those technologies, planning for deploying these technologies, and cleaning up the aftermath of the deployment of these technologies. • Metering will begin to run non-metering operational groups • Each Utility must take a far more active role as part of checking, certifying, and rechecking the functionality of their meters. tescometering.com 26
  • 27. QUESTIONS AND DISCUSSION Tom Lawton President tom.lawton@tescometering.com TESCO – The Eastern Specialty Company Bristol, PA 215-228-0500 This presentation can also be found under Meter Conferences and Schools on the TESCO website: tescometering.com ISO 9001:2015 Certified Quality Company ISO 17025:2017 Accredited Laboratory tescometering.com 27