Earned Value Management Variance
Unfortunately, Earned Value Management variance has a stigma seated in fear of failure. Sadly that stigma could and should be eradicated and the people in the pilot’s seat – upper management – should be reassuring their lieutenants that variance is actually a good thing.
https://tensix.com
1. Earned Value Management Variance
04/07/11
by TheCobraGuy
Variance isn’t a Dirty Word
There’s a lot of process and rigmarole involved in reporting
variance as part of an Earned Value Management System
(EVMS). We’ve witnessed many Control Account Managers
(CAMs) trying to duck and weave around variance issues as
they inevitably crop up on their accounts. Unfortunately,
variance has a stigma seated in fear of failure. Sadly that
stigma could and should be eradicated and the people in the
pilot’s seat – upper management – should be reassuring their
lieutenants that variance is actually a good thing.
That sounds a little odd, but if you hand any Earned Value Management (EVM) professional a
CPR that boasts no variance, that person will quickly conclude you’ve failed to execute any
meaningful earned value on your project. Variance should be added to the other two certainties
in life – death and taxes. You are going to have variance.
Your job as the Control Account Manager is to catch it early and figure out how to mitigate it.
After all, the Performance Measurement Baseline (PMB) against which you are attempting to
measure your project was only your best guess about how things would unfold. When did
anything ever go exactly according to plan?
Management isn’t about getting everything right – management is about fixing what goes wrong.
That’s why the word ‘management’ appears as part of the earned value method’s name; it puts
the ‘M’ in EVMS. So let’s start to change our minds about what a variance really means. What it
means is, “I planned it this way, things changed, and the EVM system, if it was set up right, is
giving me a heads up while I can still do something about it.”
We often see variance reports that, instead of giving facts and figures about
what’s really happening on the control accounts, are filled with defensive
rhetoric and platitudes. This can occur because of inexperience on the
manager’s part or just a lack of understanding about the purpose of earned
value generally. This is common because most people have earned value
thrust upon them as part of a larger responsibility.
Mitigation
You can’t mitigate unforeseen events on your project, so variance reporting
in that context is to be expected. You can and should however, be able to
Ten Six Consulting LLC | T: (703) 910-2600 F: (866) 780-8996 | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451
2. mitigate unnecessary variance that occurs because you didn’t set up your EVMS correctly from
the outset. Poorly chosen earned value techniques on your work packages can rob you of
performance and have your team going blind working on avoidable variance paperwork rather
than focusing on getting the project done. The common mistakes we see in the field are these:
1. Underestimating the scope of setting up a certifiable earned value management system.
2. Assigning your control accounts too far down the work breakdown structure. If control
accounts are too low down, too detailed, your CAMs will spend their lives explaining
every little hiccup.
3. Not investing in the earned value education of your management team.
4. Trying to insert an EVMS into a project that has already started.
5. Attempting to plan a project without any understanding of earned value techniques and
processes.
6. Attempting to plan a project with only some understanding of earned value techniques.
7. Thinking that an EVM system is just software.
Getting back to variance issues for a minute, the mistakes listed above are ones that will pretty
much guarantee a difficult, costly and unpopular implementation of earned value. Variance
typically starts to appear on or around the third reporting cycle of most projects. This will happen
earlier and in greater numbers on a badly setup system. When a huge number of variances
appear, you’ll quickly have the CAMs rebelling as they disappear in a sea of unnecessary paper
work and frustration.
Bottom line – start as early as possible, educate your team, call in the experts if necessary and
be ready to accept change in your management culture. If you get it right from the outset,
variance reports will become just another tool in your arsenal for success, not a swear word
around the water cooler.
Ten Six Consulting LLC | T: (703) 910-2600 F: (866) 780-8996 | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451