1. BREEAM OUTSTANDING ACCREDITED HOSPITAL
ARCHITECTURAL CONCEPTS:
The hospital layout is designed around clinical adjacencies to ensure it is highly
functional.
Patient orientated design that promotes health and wellbeing.
Intuitive layout reduces the stresses of wayfinding within the hospital.
MISSION STATEMENT Wherever possible natural daylight is introduced and views to the outside are
The building design and engineering strategy follows the needs of a 21st century healthcare facility provided.
– providing a therapeutic environment that promotes health and well-being, is patient orientated, The facade design follows a modern, simple and efficient statement design.
intuitive and flexible to future needs. The aim is to design a positive impact building that uses fewer Each floor is divided into 3 main fire compartments. Each compartment has
two independent escape routes
resources, generates less waste, curbs CO2 emissions and to save the NHS money over its life-cycle.
25% Green Space.
Cardiff Bay Orthopaedic Hospital
2011
Group F R. Bayton, B. Drew, S. Godicke, T. Lawson & I. Smith
SUPERSTRUCTURE: MECHANICAL SERVICES ELECTRICAL SERVICES:
Cast-in-situ reinforced concrete frame. 9 Air Handling Units have been selected to Calculated power requirement of
C50/60 concrete mix with a 50% GGBS provide all occupied rooms with the option 210kVA, supplied by LV DNO connection.
content specified. of mechanical ventilation. Standby generator provides backup to the
Flat slab design offers maximum flexibility in
Ultra Clean Ventilation system used within essential areas of the hospital.
layout.
the operating theatres for infection control. Solar shading system tracks the sun and
Slabs designed using the yield-line method.
10kW ground source heat pump used for collects electricity via PV technology.
The structure is braced by concrete shear
walls incorporated into lift cores. under-floor heating in atrium. 62 PV panels installed on the roof.
SUSTAINABILITY:
10000L GRP Storage Tank stores sufficient Fibre optic cables draw natural light down
Steel sections have been utilized in the
Narrow plan design reduces energy costs.
atrium to provide long spans of column free water to supply 24 hour requirements. into corridors.
Rainwater harvesting for toilet flushing and irrigation.
space. 460kW gas fired, condensing boiler selected
Locally sourced materials & labour specified.
SUBSTRUCTURE: as the primary method of heating water.
Extensive green roof.
CFA piles are to be utilized due to their low External VIE has been sized to store
Building management system optimises the use of services.
noise and vibration installation. 3927L of oxygen at -160°C.
Flexible for future developments in medical science
144 CFA piles (450mm diameter) are to be
or management. PROJECT COSTS:
installed to a depth of 23 metres.
Floor slabs are to be ground bearing.
BREEAM Rating: 85.2%.
INFECTION CONTROL:
Inpatient and outpatient departments separated. All wash basins are sensor operated
Clean and dirty corridors provided for operating theatres. All surfaces, floors and walls have an easy clean, durable
ESTIMATED CAPITAL COST: £7.92M
High ventilation rates throughout patient areas prevent airborne transmission. hygienic surface coating. Cost per square metre: £1494