1. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Venue: C.8.09 room, Taylor’s University Lakeside Campus
Date: 6/9/2017
Project Status: Coordination
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
2.4
INTRODUCTION
The meeting commenced at 9:00am and was chaired by project
manager, Ar Tiong Jia Min.
The minutes of meeting are confirmed by all in attendance.
PROJECT BRIEF
Existing Condition
- Existing large trees to remain undisturbed
- Existing parking to be re-arranged
Theme
- Contemporary
- Low energy (natural ventilation, lighting)
- Reusable energy (rain water harvesting)
Mechanical Requirement
- Air Cond (only if necessary)
- Low energy light fittings
Landscape
- Trees, shrubs (for boundary)
- Turf
- Outdoor tiles and paving
INFO
INFO
IRT
ARY
IRW
ART
2. J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
3.0
3.1
3.2
4.0
SITE INFORMATION & PROJECT REQUIREMENT
Size
- 600m2
Required spaces
- Office (maximum 3 person)
- Lounge
- Toilets (2 units each M/F)
- Indoor & outdoor recreation area
(darts, carom, congkak, table tennis, table games)
- Cafeteria
- Magazine corner
Structure
- Light weight, fast construction (container design)
Materials
- Insulated wall
- Finishes, fixtures with good quality and workmanship
Budget allocation
RM1,500,000.00 (not inclusive of professional fees)
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 13/9/2017
Time: 10:00am
ARY
ARY
IRT
IRT
SRS
ALL
3. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Schematic Design Phase – Client Consultant Meeting
Venue: C.8.09 room, Taylor’s University Lakeside Campus
Date: 13/9/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.11
2.2
3.0
3.1
3.11
3.2
3.3
4.0
4.1
4.2
INTRODUCTION
The meeting commenced at 9:00am and was chaired by the
architect, Ar. Yong.
The minutes of meeting are confirmed by all in attendance.
SCHEMATIC DESIGN
3D massing model and basic spatial planning proposed by Yong
Architects.
Requirement of office (3 pax), Lounge, Toilets, Indoor/ outdoor
recreational area, cafeteria (20 pax), Magazine corner
Form has been accepted, floors plans to be produced
C&S MATTERS
Container with steel structure suggested by Isotect
Isotect to propose flooring materials for upper and lower floors
Isotect to recommend proper foundation for container construction
Soil test results and information to be concluded
M&E MATTERS
KC.W M&E to explore and provide consultation on sustainable
energy approaches
Placement of utilities consultation from KC.W M&E
INFO
INFO
INFO
INFO
ARY
INFO
IRT
IRT
IRT
IRW
INFO
4. J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
5.0
5.1
5.2
6.0
6.1
7.0
QS MATTERS
Shipping container pricing explained by Schani Group QS
Schani Group QS to estimate budget and prices for shipping
containers
OTHER PROJECT MATTERS
Grantt Chart to be provided by J Project Manager
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 20/9/2017
Time: 10:00am
INFO
SRS
ART
5. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Detailed Design Phase – Client Consultant Meeting
Venue: Outdoor Meeting Area (Outside Library), Taylor’s University Lakeside Campus
Date: 20/9/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
3.4
INTRODUCTION
The meeting commenced at 9:00am and was chaired by the
architect, Ar. Yong.
The minutes of meeting are confirmed by all in attendance.
SCHEMATIC DESIGN
Floor plans and 3D model presented by Yong Architects.
Interior space dimensions are proposed and accepted.
Yong Architects to produce detail drawing plans liase with
proposal from all other consultants.
C&S MATTERS
Soil test result is produced. The ground is covered by crusher
stones. Water accumulation occurs after rain. Solution given is to
remove portion of crusher stone, followed by flattening, levelling
and soil excavation prior to construction.
Strip foundation is proposed and accepted.
Flooring materials for upper and lower floors are proposed and
accepted.
An underground drain pipe discharging to the nearest existing
drainage system is proposed.
INFO
INFO
INFO
INFO
ARY
INFO
INFO
INFO
INFO
6. J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
3.5
3.6
3.7
3.8
4.0
4.1
4.2
4.3
5.0
5.1
5.2
6.0
6.1
7.0
7.1
8.0
Sewerage system is proposed to collect and channel waste water
towards an underground septic tank to be discharged to Indah
Water Konsortium (IWK).
Water supply system is proposed where the source is to be
obtained from the water main in Syopz Mall.
Isotect to explore on construction and connection details.
Isotect to produce structural and system plans
M&E MATTERS
The proposal of lighting and air conditioning arrangements are
proposed and accepted.
KC.W M&E to produce M&E drawings with proposed details.
KC.W M&E to propose reusable energy scheme for the proposed
building.
QS MATTERS
Rough estimation of budget is proposed by Schani Group QS
Extra or change in each consultant’s proposal to be revised and
came up with a more detailed budget estimation by Schani Group
QS.
J PROJECT MANAGER & ARCHITECT
J Architect to propose landscape design and treatment.
OTHER PROJECT MATTERS
Gantt Chart is provided by J Project Manager.
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 27/9/2017
Time: 10:00am
INFO
INFO
IRT
IRT
IRW
INFO
INFO
SRS
ART
INFO
7. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Design Phase 2 – Client Consultant Meeting
Venue: C8.09, Taylor’s University Lakeside Campus
Date: 27/9/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
2.4
3.0
3.1
3.2
3.3
4.0
4.1
4.2
4.3
INTRODUCTION
The meeting commenced at 10:00am and was chaired by the
architect, Ar. Yong.
The minutes of meeting are confirmed by all in attendance.
SCHEMATIC DESIGN
Floor plans and design are finalized by Yong Architects.
Interior spaces layout and materials is under consideration.
Detail drawing plans are produced and checked.
Elevation, Section and Renderings are to be produced by Yong
Architects.
C&S MATTERS
Structural drawing is produced by Isotect C&S.
Material supplier is still being sourced for cost estimation.
Construction cost is being estimated by Isotect C&S and it is to be
finalized by Schani Group QS.
M&E MATTERS
Finalization of fitting and services.
Material supplier is still being sourced for cost estimation.
Rainwater harvesting system and Solar energy system is to be
INFO
INFO
INFO
ARY
INFO
ARY
INFO
IRT
SRS
INFO
INFO
INFO
8. J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
5.0
5.1
5.2
6.0
6.1
6.2
7.0
7.1
applied to the building.
QS MATTERS
Revising costing for indoor materials by Schani Group QS.
Reevaluation of container pricing
J PROJECT MANAGER & ARCHITECT
J Architect has finalized landscape layout.
Suitable vegetation classification and cost estimation is still under
consideration by J architect.
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 27/9/2017
Time: 10:00am
INFO
INFO
INFO
ART
INFO
9. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Tender Phase – Client Consultant Meeting
Venue: C8.09, Taylor’s University Lakeside Campus
Date: 04/10/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
4.0
4.1
4.2
INTRODUCTION
The meeting commenced at 10:00am and was chaired by the
architect, Ar. Tiong.
The minutes of meeting are confirmed by all in attendance except
for Schani Group QS who was absent without any apology.
SCHEMATIC DESIGN
Interior spaces layout and materials are finalized by Yong
Architects.
Detail drawing plans are produced and checked.
Elevation, Section and Renderings produced by Yong Architects.
C&S MATTERS
Structural drawing is produced by Isotect C&S.
Material supplier is sourced and cost has been confirmed by Isotect
C&S.
Construction cost i estimated and finalized by Schani Group QS.
M&E MATTERS
Fitting and services finalised by KC.W M&E
Rainwater harvesting system and Solar energy system finalized by
KC.W M&E
INFO
INFO
INFO
ARY
INFO
ARY
INFO
INFO
INFO
INFO
10. J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
6.0
6.1
7.0
7.1
J PROJECT MANAGER & ARCHITECT
Gentt Chart and Pert Chard produced by J Project Manager
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 11/10/2017
Time: 10:00am
INFO
INFO