SlideShare ist ein Scribd-Unternehmen logo
1 von 10
Downloaden Sie, um offline zu lesen
The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Venue: C.8.09 room, Taylor’s University Lakeside Campus
Date: 6/9/2017
Project Status: Coordination
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
2.4
INTRODUCTION
The meeting commenced at 9:00am and was chaired by project
manager, Ar Tiong Jia Min.
The minutes of meeting are confirmed by all in attendance.
PROJECT BRIEF
Existing Condition
- Existing large trees to remain undisturbed
- Existing parking to be re-arranged
Theme
- Contemporary
- Low energy (natural ventilation, lighting)
- Reusable energy (rain water harvesting)
Mechanical Requirement
- Air Cond (only if necessary)
- Low energy light fittings
Landscape
- Trees, shrubs (for boundary)
- Turf
- Outdoor tiles and paving
INFO
INFO
IRT
ARY
IRW
ART
J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
3.0
3.1
3.2
4.0
SITE INFORMATION & PROJECT REQUIREMENT
Size
- 600m2
Required spaces
- Office (maximum 3 person)
- Lounge
- Toilets (2 units each M/F)
- Indoor & outdoor recreation area
(darts, carom, congkak, table tennis, table games)
- Cafeteria
- Magazine corner
Structure
- Light weight, fast construction (container design)
Materials
- Insulated wall
- Finishes, fixtures with good quality and workmanship
Budget allocation
RM1,500,000.00 (not inclusive of professional fees)
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 13/9/2017
Time: 10:00am
ARY
ARY
IRT
IRT
SRS
ALL
The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Schematic Design Phase – Client Consultant Meeting
Venue: C.8.09 room, Taylor’s University Lakeside Campus
Date: 13/9/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.11
2.2
3.0
3.1
3.11
3.2
3.3
4.0
4.1
4.2
INTRODUCTION
The meeting commenced at 9:00am and was chaired by the
architect, Ar. Yong.
The minutes of meeting are confirmed by all in attendance.
SCHEMATIC DESIGN
3D massing model and basic spatial planning proposed by Yong
Architects.
Requirement of office (3 pax), Lounge, Toilets, Indoor/ outdoor
recreational area, cafeteria (20 pax), Magazine corner
Form has been accepted, floors plans to be produced
C&S MATTERS
Container with steel structure suggested by Isotect
Isotect to propose flooring materials for upper and lower floors
Isotect to recommend proper foundation for container construction
Soil test results and information to be concluded
M&E MATTERS
KC.W M&E to explore and provide consultation on sustainable
energy approaches
Placement of utilities consultation from KC.W M&E
INFO
INFO
INFO
INFO
ARY
INFO
IRT
IRT
IRT
IRW
INFO
J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
5.0
5.1
5.2
6.0
6.1
7.0
QS MATTERS
Shipping container pricing explained by Schani Group QS
Schani Group QS to estimate budget and prices for shipping
containers
OTHER PROJECT MATTERS
Grantt Chart to be provided by J Project Manager
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 20/9/2017
Time: 10:00am
INFO
SRS
ART
The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Detailed Design Phase – Client Consultant Meeting
Venue: Outdoor Meeting Area (Outside Library), Taylor’s University Lakeside Campus
Date: 20/9/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
3.4
INTRODUCTION
The meeting commenced at 9:00am and was chaired by the
architect, Ar. Yong.
The minutes of meeting are confirmed by all in attendance.
SCHEMATIC DESIGN
Floor plans and 3D model presented by Yong Architects.
Interior space dimensions are proposed and accepted.
Yong Architects to produce detail drawing plans liase with
proposal from all other consultants.
C&S MATTERS
Soil test result is produced. The ground is covered by crusher
stones. Water accumulation occurs after rain. Solution given is to
remove portion of crusher stone, followed by flattening, levelling
and soil excavation prior to construction.
Strip foundation is proposed and accepted.
Flooring materials for upper and lower floors are proposed and
accepted.
An underground drain pipe discharging to the nearest existing
drainage system is proposed.
INFO
INFO
INFO
INFO
ARY
INFO
INFO
INFO
INFO
J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
3.5
3.6
3.7
3.8
4.0
4.1
4.2
4.3
5.0
5.1
5.2
6.0
6.1
7.0
7.1
8.0
Sewerage system is proposed to collect and channel waste water
towards an underground septic tank to be discharged to Indah
Water Konsortium (IWK).
Water supply system is proposed where the source is to be
obtained from the water main in Syopz Mall.
Isotect to explore on construction and connection details.
Isotect to produce structural and system plans
M&E MATTERS
The proposal of lighting and air conditioning arrangements are
proposed and accepted.
KC.W M&E to produce M&E drawings with proposed details.
KC.W M&E to propose reusable energy scheme for the proposed
building.
QS MATTERS
Rough estimation of budget is proposed by Schani Group QS
Extra or change in each consultant’s proposal to be revised and
came up with a more detailed budget estimation by Schani Group
QS.
J PROJECT MANAGER & ARCHITECT
J Architect to propose landscape design and treatment.
OTHER PROJECT MATTERS
Gantt Chart is provided by J Project Manager.
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 27/9/2017
Time: 10:00am
INFO
INFO
IRT
IRT
IRW
INFO
INFO
SRS
ART
INFO
The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Design Phase 2 – Client Consultant Meeting
Venue: C8.09, Taylor’s University Lakeside Campus
Date: 27/9/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
2.4
3.0
3.1
3.2
3.3
4.0
4.1
4.2
4.3
INTRODUCTION
The meeting commenced at 10:00am and was chaired by the
architect, Ar. Yong.
The minutes of meeting are confirmed by all in attendance.
SCHEMATIC DESIGN
Floor plans and design are finalized by Yong Architects.
Interior spaces layout and materials is under consideration.
Detail drawing plans are produced and checked.
Elevation, Section and Renderings are to be produced by Yong
Architects.
C&S MATTERS
Structural drawing is produced by Isotect C&S.
Material supplier is still being sourced for cost estimation.
Construction cost is being estimated by Isotect C&S and it is to be
finalized by Schani Group QS.
M&E MATTERS
Finalization of fitting and services.
Material supplier is still being sourced for cost estimation.
Rainwater harvesting system and Solar energy system is to be
INFO
INFO
INFO
ARY
INFO
ARY
INFO
IRT
SRS
INFO
INFO
INFO
J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
5.0
5.1
5.2
6.0
6.1
6.2
7.0
7.1
applied to the building.
QS MATTERS
Revising costing for indoor materials by Schani Group QS.
Reevaluation of container pricing
J PROJECT MANAGER & ARCHITECT
J Architect has finalized landscape layout.
Suitable vegetation classification and cost estimation is still under
consideration by J architect.
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 27/9/2017
Time: 10:00am
INFO
INFO
INFO
ART
INFO
The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy,
Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia.
Subject: Tender Phase – Client Consultant Meeting
Venue: C8.09, Taylor’s University Lakeside Campus
Date: 04/10/2017
No. Invitation Organisation Initial Contact
1
2
3
4
5
Ar. Tiong Jia Min
Ar. Yong Yu Joon
Ir. Tan Sheau Hui
Ir. Wong Kai Chiang
Sr. Schani Daniel
J Project Manager
Yong Architects
Isotect C&S
KC.W M&E
Schani Group QS
ART
ARY
IRT
IRW
SRS
012-2243576
013-2623579
014-5764578
017-4576355
019-5804357
Item Particulars Action
1.0
1.1
1.2
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
4.0
4.1
4.2
INTRODUCTION
The meeting commenced at 10:00am and was chaired by the
architect, Ar. Tiong.
The minutes of meeting are confirmed by all in attendance except
for Schani Group QS who was absent without any apology.
SCHEMATIC DESIGN
Interior spaces layout and materials are finalized by Yong
Architects.
Detail drawing plans are produced and checked.
Elevation, Section and Renderings produced by Yong Architects.
C&S MATTERS
Structural drawing is produced by Isotect C&S.
Material supplier is sourced and cost has been confirmed by Isotect
C&S.
Construction cost i estimated and finalized by Schani Group QS.
M&E MATTERS
Fitting and services finalised by KC.W M&E
Rainwater harvesting system and Solar energy system finalized by
KC.W M&E
INFO
INFO
INFO
ARY
INFO
ARY
INFO
INFO
INFO
INFO
J PROJECT MANAGER
…………………………..
AR TIONG JIA MIN
6.0
6.1
7.0
7.1
J PROJECT MANAGER & ARCHITECT
Gentt Chart and Pert Chard produced by J Project Manager
ADJOURNMENT AND NEXT MEETING
There being no further matters the meeting was adjourned at
12:00pm. Next meeting shall be:
Date: 11/10/2017
Time: 10:00am
INFO
INFO

Weitere ähnliche Inhalte

Ähnlich wie Meeting Minute Exercise

To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...Peachy Essay
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othmannadiacbass
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLCrysmond Goh
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pmkimberlywjs
 
Site visit report
Site visit reportSite visit report
Site visit reportEyelynLee
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Jannah Jailani
 
Ici 2
Ici 2Ici 2
Ici 2gjj97
 
Intern report
Intern reportIntern report
Intern reporthongbinng
 
Jason Leong CV 2014
Jason Leong CV 2014Jason Leong CV 2014
Jason Leong CV 2014Jason Leong
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 
Resume_Testimonial
Resume_TestimonialResume_Testimonial
Resume_TestimonialKenneth Tan
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1Ho Yen Liang
 

Ähnlich wie Meeting Minute Exercise (20)

Project background
Project backgroundProject background
Project background
 
To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pm
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pm
 
Internship report
Internship reportInternship report
Internship report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume as on 06 05 2015
Resume as on 06 05 2015Resume as on 06 05 2015
Resume as on 06 05 2015
 
Ici 2
Ici 2Ici 2
Ici 2
 
Intern report
Intern reportIntern report
Intern report
 
Jason Leong CV 2014
Jason Leong CV 2014Jason Leong CV 2014
Jason Leong CV 2014
 
resume 66
resume 66resume 66
resume 66
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Gusyahri hidayat (cm)
Gusyahri hidayat (cm)Gusyahri hidayat (cm)
Gusyahri hidayat (cm)
 
F inal ici super project
F inal ici super projectF inal ici super project
F inal ici super project
 
Resume_Testimonial
Resume_TestimonialResume_Testimonial
Resume_Testimonial
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 

Mehr von Sheau Hui Tan

Student Project Management Report
Student Project Management ReportStudent Project Management Report
Student Project Management ReportSheau Hui Tan
 
Project Management- Documenting a Project
Project Management- Documenting a ProjectProject Management- Documenting a Project
Project Management- Documenting a ProjectSheau Hui Tan
 
Titiwangsa Lake Garden, Kuala Lumpur Site Analysis
Titiwangsa Lake Garden, Kuala Lumpur Site AnalysisTitiwangsa Lake Garden, Kuala Lumpur Site Analysis
Titiwangsa Lake Garden, Kuala Lumpur Site AnalysisSheau Hui Tan
 
Building Science PSALI report
Building Science PSALI reportBuilding Science PSALI report
Building Science PSALI reportSheau Hui Tan
 
Building Science final report
Building Science final report Building Science final report
Building Science final report Sheau Hui Tan
 
Theories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essayTheories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essaySheau Hui Tan
 
Bim final documentation
Bim final documentation Bim final documentation
Bim final documentation Sheau Hui Tan
 
Csi proposal vivacity
Csi proposal  vivacityCsi proposal  vivacity
Csi proposal vivacitySheau Hui Tan
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculationSheau Hui Tan
 
Bstructure calculation
Bstructure calculationBstructure calculation
Bstructure calculationSheau Hui Tan
 
Building Service final report
Building Service final reportBuilding Service final report
Building Service final reportSheau Hui Tan
 
Nishinoyama House Architectural Analysis
Nishinoyama House Architectural AnalysisNishinoyama House Architectural Analysis
Nishinoyama House Architectural AnalysisSheau Hui Tan
 
Proposal of Adaptive Reuse
Proposal of Adaptive ReuseProposal of Adaptive Reuse
Proposal of Adaptive ReuseSheau Hui Tan
 
Seminar Talk on Georgetown Conservation
Seminar Talk on Georgetown ConservationSeminar Talk on Georgetown Conservation
Seminar Talk on Georgetown ConservationSheau Hui Tan
 

Mehr von Sheau Hui Tan (20)

Student Project Management Report
Student Project Management ReportStudent Project Management Report
Student Project Management Report
 
Project Management- Documenting a Project
Project Management- Documenting a ProjectProject Management- Documenting a Project
Project Management- Documenting a Project
 
Titiwangsa Lake Garden, Kuala Lumpur Site Analysis
Titiwangsa Lake Garden, Kuala Lumpur Site AnalysisTitiwangsa Lake Garden, Kuala Lumpur Site Analysis
Titiwangsa Lake Garden, Kuala Lumpur Site Analysis
 
Building Science PSALI report
Building Science PSALI reportBuilding Science PSALI report
Building Science PSALI report
 
Btech final report
Btech final reportBtech final report
Btech final report
 
Building Science final report
Building Science final report Building Science final report
Building Science final report
 
Theories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essayTheories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essay
 
Synopsis Writing
Synopsis WritingSynopsis Writing
Synopsis Writing
 
Bim final documentation
Bim final documentation Bim final documentation
Bim final documentation
 
Csi proposal vivacity
Csi proposal  vivacityCsi proposal  vivacity
Csi proposal vivacity
 
Internship report
Internship reportInternship report
Internship report
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
 
Bstructure calculation
Bstructure calculationBstructure calculation
Bstructure calculation
 
Building Service final report
Building Service final reportBuilding Service final report
Building Service final report
 
Nishinoyama House Architectural Analysis
Nishinoyama House Architectural AnalysisNishinoyama House Architectural Analysis
Nishinoyama House Architectural Analysis
 
Conservation slides
Conservation slidesConservation slides
Conservation slides
 
Proposal of Adaptive Reuse
Proposal of Adaptive ReuseProposal of Adaptive Reuse
Proposal of Adaptive Reuse
 
Seminar Talk on Georgetown Conservation
Seminar Talk on Georgetown ConservationSeminar Talk on Georgetown Conservation
Seminar Talk on Georgetown Conservation
 
Bcon report
Bcon reportBcon report
Bcon report
 
Progress
ProgressProgress
Progress
 

Kürzlich hochgeladen

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 

Meeting Minute Exercise

  • 1. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy, Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia. Venue: C.8.09 room, Taylor’s University Lakeside Campus Date: 6/9/2017 Project Status: Coordination No. Invitation Organisation Initial Contact 1 2 3 4 5 Ar. Tiong Jia Min Ar. Yong Yu Joon Ir. Tan Sheau Hui Ir. Wong Kai Chiang Sr. Schani Daniel J Project Manager Yong Architects Isotect C&S KC.W M&E Schani Group QS ART ARY IRT IRW SRS 012-2243576 013-2623579 014-5764578 017-4576355 019-5804357 Item Particulars Action 1.0 1.1 1.2 2.0 2.1 2.2 2.3 2.4 INTRODUCTION The meeting commenced at 9:00am and was chaired by project manager, Ar Tiong Jia Min. The minutes of meeting are confirmed by all in attendance. PROJECT BRIEF Existing Condition - Existing large trees to remain undisturbed - Existing parking to be re-arranged Theme - Contemporary - Low energy (natural ventilation, lighting) - Reusable energy (rain water harvesting) Mechanical Requirement - Air Cond (only if necessary) - Low energy light fittings Landscape - Trees, shrubs (for boundary) - Turf - Outdoor tiles and paving INFO INFO IRT ARY IRW ART
  • 2. J PROJECT MANAGER ………………………….. AR TIONG JIA MIN 3.0 3.1 3.2 4.0 SITE INFORMATION & PROJECT REQUIREMENT Size - 600m2 Required spaces - Office (maximum 3 person) - Lounge - Toilets (2 units each M/F) - Indoor & outdoor recreation area (darts, carom, congkak, table tennis, table games) - Cafeteria - Magazine corner Structure - Light weight, fast construction (container design) Materials - Insulated wall - Finishes, fixtures with good quality and workmanship Budget allocation RM1,500,000.00 (not inclusive of professional fees) ADJOURNMENT AND NEXT MEETING There being no further matters the meeting was adjourned at 12:00pm. Next meeting shall be: Date: 13/9/2017 Time: 10:00am ARY ARY IRT IRT SRS ALL
  • 3. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy, Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia. Subject: Schematic Design Phase – Client Consultant Meeting Venue: C.8.09 room, Taylor’s University Lakeside Campus Date: 13/9/2017 No. Invitation Organisation Initial Contact 1 2 3 4 5 Ar. Tiong Jia Min Ar. Yong Yu Joon Ir. Tan Sheau Hui Ir. Wong Kai Chiang Sr. Schani Daniel J Project Manager Yong Architects Isotect C&S KC.W M&E Schani Group QS ART ARY IRT IRW SRS 012-2243576 013-2623579 014-5764578 017-4576355 019-5804357 Item Particulars Action 1.0 1.1 1.2 2.0 2.1 2.11 2.2 3.0 3.1 3.11 3.2 3.3 4.0 4.1 4.2 INTRODUCTION The meeting commenced at 9:00am and was chaired by the architect, Ar. Yong. The minutes of meeting are confirmed by all in attendance. SCHEMATIC DESIGN 3D massing model and basic spatial planning proposed by Yong Architects. Requirement of office (3 pax), Lounge, Toilets, Indoor/ outdoor recreational area, cafeteria (20 pax), Magazine corner Form has been accepted, floors plans to be produced C&S MATTERS Container with steel structure suggested by Isotect Isotect to propose flooring materials for upper and lower floors Isotect to recommend proper foundation for container construction Soil test results and information to be concluded M&E MATTERS KC.W M&E to explore and provide consultation on sustainable energy approaches Placement of utilities consultation from KC.W M&E INFO INFO INFO INFO ARY INFO IRT IRT IRT IRW INFO
  • 4. J PROJECT MANAGER ………………………….. AR TIONG JIA MIN 5.0 5.1 5.2 6.0 6.1 7.0 QS MATTERS Shipping container pricing explained by Schani Group QS Schani Group QS to estimate budget and prices for shipping containers OTHER PROJECT MATTERS Grantt Chart to be provided by J Project Manager ADJOURNMENT AND NEXT MEETING There being no further matters the meeting was adjourned at 12:00pm. Next meeting shall be: Date: 20/9/2017 Time: 10:00am INFO SRS ART
  • 5. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy, Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia. Subject: Detailed Design Phase – Client Consultant Meeting Venue: Outdoor Meeting Area (Outside Library), Taylor’s University Lakeside Campus Date: 20/9/2017 No. Invitation Organisation Initial Contact 1 2 3 4 5 Ar. Tiong Jia Min Ar. Yong Yu Joon Ir. Tan Sheau Hui Ir. Wong Kai Chiang Sr. Schani Daniel J Project Manager Yong Architects Isotect C&S KC.W M&E Schani Group QS ART ARY IRT IRW SRS 012-2243576 013-2623579 014-5764578 017-4576355 019-5804357 Item Particulars Action 1.0 1.1 1.2 2.0 2.1 2.2 2.3 3.0 3.1 3.2 3.3 3.4 INTRODUCTION The meeting commenced at 9:00am and was chaired by the architect, Ar. Yong. The minutes of meeting are confirmed by all in attendance. SCHEMATIC DESIGN Floor plans and 3D model presented by Yong Architects. Interior space dimensions are proposed and accepted. Yong Architects to produce detail drawing plans liase with proposal from all other consultants. C&S MATTERS Soil test result is produced. The ground is covered by crusher stones. Water accumulation occurs after rain. Solution given is to remove portion of crusher stone, followed by flattening, levelling and soil excavation prior to construction. Strip foundation is proposed and accepted. Flooring materials for upper and lower floors are proposed and accepted. An underground drain pipe discharging to the nearest existing drainage system is proposed. INFO INFO INFO INFO ARY INFO INFO INFO INFO
  • 6. J PROJECT MANAGER ………………………….. AR TIONG JIA MIN 3.5 3.6 3.7 3.8 4.0 4.1 4.2 4.3 5.0 5.1 5.2 6.0 6.1 7.0 7.1 8.0 Sewerage system is proposed to collect and channel waste water towards an underground septic tank to be discharged to Indah Water Konsortium (IWK). Water supply system is proposed where the source is to be obtained from the water main in Syopz Mall. Isotect to explore on construction and connection details. Isotect to produce structural and system plans M&E MATTERS The proposal of lighting and air conditioning arrangements are proposed and accepted. KC.W M&E to produce M&E drawings with proposed details. KC.W M&E to propose reusable energy scheme for the proposed building. QS MATTERS Rough estimation of budget is proposed by Schani Group QS Extra or change in each consultant’s proposal to be revised and came up with a more detailed budget estimation by Schani Group QS. J PROJECT MANAGER & ARCHITECT J Architect to propose landscape design and treatment. OTHER PROJECT MATTERS Gantt Chart is provided by J Project Manager. ADJOURNMENT AND NEXT MEETING There being no further matters the meeting was adjourned at 12:00pm. Next meeting shall be: Date: 27/9/2017 Time: 10:00am INFO INFO IRT IRT IRW INFO INFO SRS ART INFO
  • 7. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy, Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia. Subject: Design Phase 2 – Client Consultant Meeting Venue: C8.09, Taylor’s University Lakeside Campus Date: 27/9/2017 No. Invitation Organisation Initial Contact 1 2 3 4 5 Ar. Tiong Jia Min Ar. Yong Yu Joon Ir. Tan Sheau Hui Ir. Wong Kai Chiang Sr. Schani Daniel J Project Manager Yong Architects Isotect C&S KC.W M&E Schani Group QS ART ARY IRT IRW SRS 012-2243576 013-2623579 014-5764578 017-4576355 019-5804357 Item Particulars Action 1.0 1.1 1.2 2.0 2.1 2.2 2.3 2.4 3.0 3.1 3.2 3.3 4.0 4.1 4.2 4.3 INTRODUCTION The meeting commenced at 10:00am and was chaired by the architect, Ar. Yong. The minutes of meeting are confirmed by all in attendance. SCHEMATIC DESIGN Floor plans and design are finalized by Yong Architects. Interior spaces layout and materials is under consideration. Detail drawing plans are produced and checked. Elevation, Section and Renderings are to be produced by Yong Architects. C&S MATTERS Structural drawing is produced by Isotect C&S. Material supplier is still being sourced for cost estimation. Construction cost is being estimated by Isotect C&S and it is to be finalized by Schani Group QS. M&E MATTERS Finalization of fitting and services. Material supplier is still being sourced for cost estimation. Rainwater harvesting system and Solar energy system is to be INFO INFO INFO ARY INFO ARY INFO IRT SRS INFO INFO INFO
  • 8. J PROJECT MANAGER ………………………….. AR TIONG JIA MIN 5.0 5.1 5.2 6.0 6.1 6.2 7.0 7.1 applied to the building. QS MATTERS Revising costing for indoor materials by Schani Group QS. Reevaluation of container pricing J PROJECT MANAGER & ARCHITECT J Architect has finalized landscape layout. Suitable vegetation classification and cost estimation is still under consideration by J architect. ADJOURNMENT AND NEXT MEETING There being no further matters the meeting was adjourned at 12:00pm. Next meeting shall be: Date: 27/9/2017 Time: 10:00am INFO INFO INFO ART INFO
  • 9. The Works: Playzone Recreational District on Zone H Parking Lot, Taylor’s Univeristy, Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, Malaysia. Subject: Tender Phase – Client Consultant Meeting Venue: C8.09, Taylor’s University Lakeside Campus Date: 04/10/2017 No. Invitation Organisation Initial Contact 1 2 3 4 5 Ar. Tiong Jia Min Ar. Yong Yu Joon Ir. Tan Sheau Hui Ir. Wong Kai Chiang Sr. Schani Daniel J Project Manager Yong Architects Isotect C&S KC.W M&E Schani Group QS ART ARY IRT IRW SRS 012-2243576 013-2623579 014-5764578 017-4576355 019-5804357 Item Particulars Action 1.0 1.1 1.2 2.0 2.1 2.2 2.3 3.0 3.1 3.2 3.3 4.0 4.1 4.2 INTRODUCTION The meeting commenced at 10:00am and was chaired by the architect, Ar. Tiong. The minutes of meeting are confirmed by all in attendance except for Schani Group QS who was absent without any apology. SCHEMATIC DESIGN Interior spaces layout and materials are finalized by Yong Architects. Detail drawing plans are produced and checked. Elevation, Section and Renderings produced by Yong Architects. C&S MATTERS Structural drawing is produced by Isotect C&S. Material supplier is sourced and cost has been confirmed by Isotect C&S. Construction cost i estimated and finalized by Schani Group QS. M&E MATTERS Fitting and services finalised by KC.W M&E Rainwater harvesting system and Solar energy system finalized by KC.W M&E INFO INFO INFO ARY INFO ARY INFO INFO INFO INFO
  • 10. J PROJECT MANAGER ………………………….. AR TIONG JIA MIN 6.0 6.1 7.0 7.1 J PROJECT MANAGER & ARCHITECT Gentt Chart and Pert Chard produced by J Project Manager ADJOURNMENT AND NEXT MEETING There being no further matters the meeting was adjourned at 12:00pm. Next meeting shall be: Date: 11/10/2017 Time: 10:00am INFO INFO