SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
PV Grid Parity Monitor for residential
consumers
Financial AdvisoryStrategy Consulting Market IntelligencePolicy Consulting
Leonardo ENERGY Webinar Series/ Madrid (Spain)
05 March 2015 at 17h30 CET
MarĂ­a JesĂşs BĂĄez, Manager
mjb@creara.es
RocĂ­o Moya, Analyst
rmm@creara.es
GPM 3rd Issue Residential Segment
• ECLAREON - CREARA
• Grid Parity Monitor (GPM)
- Introduction
- Definitions and Methodology
- Results
- Conclusions
Agenda
2
3
• Founded in Madrid in 2003
• Specialist in energy efficiency
and energy savings
• CREARA’s services:
- Consulting
- Engineering
- Management
- Training
Creara and Eclareon (Spain) merged their business to form Creara Energy
Experts and consolidate their leadership in sustainable energy services
• Opened in Madrid in 2005
• Management consultants in
smarter energy
• ECLAREON’s services:
- Policy consulting
- Strategy consulting
- Financial advisory
- Market intelligence
RECENT CORPORATE EVENTS COMPANY OVERVIEW
• ECLAREON-CREARA
• Grid Parity Monitor (GPM)
- Introduction
- Definitions and Methodology
- Results (Europe and Asia)
- Conclusions
Agenda
4
PV “grid parity” is the moment when the cost of generating PV
electricity is equal to the price paid for grid electricity
For the sake of simplicity
this report compares PV
LCOE with retail electricity
prices
In reality, depending on the
local self-consumption
regulation, a part of the PV
generation might be lost or
valued at a lower rate (100%
self-consumption ratios are
not attainable)
Note: * Levelized Cost of Electricity
Source: CREARA analysis
INTRODUCTION
Grid electricity price
PV electricity cost (LCOE*)
EUR ct /
kWh
Grid Parity
Years
Simplistic Illustration of PV Grid Parity
• Grid electricity is cheaper than
PV-generated electricity
- PV needs support
mechanisms (FiT, tax credit,
etc.)
• PV-generated electricity is
cheaper than grid electricity
- It is more convenient to self-
consume PV electricity than
to buy electricity from the
utility
5
The PV Grid Parity Monitor may well be one of the most
comprehensive analyses of PV grid parity to date
INTRODUCTION
Overview of PV Grid Parity Monitor
Objective
• To analyze the proximity of grid parity from the viewpoint of a residential consumer
- Total final costs of generating PV electricity with a 3kW/3.3kWp PV system are compared with
residential retail electricity prices
Methodology
• It is based on a rigorous and transparent methodology
- This presentation includes a summary of the main assumptions and considerations
Geographical
Focus
• 5 potential markets in Europe: France, Germany, Italy, UK, and Spain
• 7 promising markets outside Europe: Australia, Brazil, California, Chile, Japan, Israel, and
Mexico
Frequency • It is recurrent: it will be updated every year to show the evolution of PV grid parity proximity
Inputs
• It uses real and up-dated data as inputs, not estimates
- Includes turnkey quotations of local PV installers from each of the countries under study
• It includes specific and detailed information per country (and city, when applicable)
- For example, the discount rate, retail electricity prices, and inflation
Source: CREARA
6
The PV Grid Parity Monitor is sponsored by renowned international
companies
Gold Sponsor
INTRODUCTIONSPONSORS
7
The PV Grid Parity Monitor is supported by relevant partners
Partner Associations
Technical PartnersSupported by
INTRODUCTIONPARTNERS
8
LCOE of a PV system refers to the constant and theoretical
cost of generating PV electricity over the PV system lifetime
DEFINITIONS & METHODOLOGY
0
200
400
600
800
1.000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
0
10
20
30
40
50
60
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
EUR ct /
kWh
EUR
8,800
9,000
Indicative Total Cost of a Small-Scale PV System
PV LCOE of the PV System
Source: CREARA analysis
• PV Levelized Cost of Energy (LCOE)
accounts for all costs associated with a PV
system over its life
- These may include initial investment, O&M,
taxes, debt service, among others
• It assumes a constant value per year and is
expressed as cost per kWh
- It incorporates total PV electricity generated
over the system’s lifespan
• It considers the return required from the
investment, to discount future costs (and
production) to present
Initial Investment
Operating Expenses
Key:
9
For a specific PV system, PV LCOE is fixed as soon as the PV
system is built, but grid electricity prices are likely to increase
LCOE of PV Technology vs. Grid Electricity Price
0
5
10
15
20
25
30
2009S1 2009S2 2010S1 2010S2 2011S1 2011S2 2012S1
Years
EUR ct/
kWh
LCOE of PV technology
Grid electricity price
0
10
20
30
40
50
60
70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
EUR ct/
kWh
Years of operation of the PV system
Grid electricity price
LCOE of a specific PV system
installed in S1 2012
LCOE of A SPECIFIC PV System Installed S1 2012 vs. Grid Electricity Price
Source: CREARA analysis
DEFINITIONS & METHODOLOGY
10
11
RESULTS
Grid Parity proximity and regulatory support (mainly via net
metering or net billing) vary significantly from country to country
Positioning Matrix of the countries analyzed
0,0
0,2
0,3
0,5
0,6
0,8
- +Regulatory support to PV self-consumption
-
+
GridParityProximity
Australia
Brazil
Chile
France
Germany
Italy Mexico
Spain
UK
California
Israel
Japan
Note: Data of 1st semester 2014
Source: CREARA Analysis
RESULTSBRAZIL
In Brazil, the reduction of electricity tariffs has pushed PV grid
parity further away
Note: * Compound Annual Growth Rate
Source: CREARA analysis
BRL ct/
kWh
Standard Tariff
Grid tariffs
PV LCOE (avg.) -14.8%
-8.4%
BRL ct/
kWh
Standard Tariff
Grid tariffs
PV LCOE (avg.) -14.8%
-6.2%
Past evolution of grid electricity price and PV LCOE
(SAO PAULO)
Past evolution of grid electricity price and PV LCOE
(ITACARAMBI)
• While in São Paulo PV
technology is still far from being
competitive against grid
electricity, in Itacarambi grid
parity could be reached sooner
- High installation prices and a
high discount rate still prevent
PV technology from being
competitive against grid
electricity
• The recently approved net-
metering regulation seems an
excellent instrument to foster the
PV self-consumption market
Assessment of Brazilian regulatory framework
for PV self-consumption
12
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
50
100
150
200
250
300
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
50
100
150
200
250
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
RESULTSCHILE
PV Grid Parity has already been reached in the residential
segment, albeit to different extents in different locations of Chile
CLP/
kWh
Standard Tariff
Surcharge tariff (Winter)
Grid tariffs
PV LCOE (avg.) -19.3%
-9.3%
-8.1%
CLP/
kWh
Standard Tariff
Surcharge tariff (Winter)
Grid tariffs
PV LCOE (avg.) -19.3%
-6.7%
-5.5%
Past evolution of grid electricity price and PV LCOE
(SANTIAGO)
Past evolution of grid electricity price and PV LCOE
(COPIAPÓ)
• Full Grid Parity has been reached
in Northern Chile, whilst in other
locations with lower irradiation
only partial grid parity has been
reached
- In Santiago, Grid Parity is only
partial since PV LCOE is only
competitive with the rate
applicable to excess
consumption in winter
• The net billing regulation, which
has recently been implemented
is, on a first evaluation, a proper
incentive to generate a PV self-
consumption market
Assessment of Chilean regulatory framework
for PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
13
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
50
100
150
200
250
300
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
50
100
150
200
250
300
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
RESULTSFRANCE
Low electricity prices still prevent Full Grid Parity from being
reached in France
EUR ct/
kWh
Standard Tariff
Grid tariffs
PV LCOE (avg.) -13.2%
7.7%
4.9%
EUR/
kWh
Grid tariffs
PV LCOE (avg.) -13.2%
Past evolution of grid electricity price and PV LCOE
(PARIS)
Past evolution of grid electricity price and PV LCOE
(MARSEILLE)
• Low electricity prices still
prevent Full Grid Parity for being
reached in France
• Currently, FiTs in France do not
incentivize the PV self-
consumption market
- BIPV systems are being
fostered over BAPV
- Self-consumption will gain
relevance provided that FiTs
are being reduced and
electricity becomes more
expensive
Assessment of French regulatory framework
for PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
14
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
10
20
30
40
50
60
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
Peak Tariff
Off-Peak Tariff 9.4%
0
5
10
15
20
25
30
35
40
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
Standard Tariff
7.7%
4.9%
Peak Tariff
Off-Peak Tariff 9.4%
RESULTSGERMANY
Despite the low irradiation levels in Germany, full grid parity has
been reached throughout the country
EUR ct/
kWh Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -12.5%
7.7%
9.1%
EUR ct/
kWh Off-Peak Tariff
Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -12.5%
9.4%
10.4%
12.5%
Past evolution of grid electricity price and PV LCOE
(BERLIN)
Past evolution of grid electricity price and PV LCOE
(MUNICH)
• Low PV installation prices, a low
discount rate and high retail
electricity prices compensate low
irradiation levels for Germany to
reach full Grid Parity in the
residential segment
• The EEG FiT scheme fosters the
self-consumption market in an
efficient way, as FiTs for small-
scale systems are currently lower
than the retail electricity price
Assessment of German regulatory framework
for PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
15
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
10
20
30
40
50
60
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
5
10
15
20
25
30
35
40
45
50
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
RESULTSITALY
In Italy, full grid parity has been reached and the market is driven
by a regulation that fosters self-consumption
EUR ct/
kWh
Grid tariffs
PV LCOE (avg.) -16.7%
EUR ct/
kWh
Grid tariffs
PV LCOE (avg.) -16.7%
Past evolution of grid electricity price and PV LCOE
(ROME)
Past evolution of grid electricity price and PV LCOE
(PALERMO)
• Thanks to competitive PV system
installation costs, high irradiation
levels and expensive grid
electricity prices, PV Grid Parity
has already been reached in the
residential segment in Italy
• The Scambio Sul Posto (SSP) net-
metering mechanism allows users
with PV systems under 200 kW to
obtain credits
- It is expected that the
methodology used to calculate
the credit amount will be
modified soon
Assessment of Italian regulatory framework for
PV self-consumption
Note: * Tiers correspond to different consumption levels **Compound Annual Growth Rate
Source: CREARA analysis
16
CAGR**
S1'09-S1'14
CAGR**
S1'09-S1'14
0
5
10
15
20
25
30
35
40
45
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
Standard Tariff (tier 2)*
Standard Tariff (tier 3)*
Standard Tariff (tier 4)* 2.0%
3.2%
1.7%
Standard Tariff (tier 1)* -3.5%
0
5
10
15
20
25
30
35
40
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
Standard Tariff (tier 2)*
Standard Tariff (tier 3)*
Standard Tariff (tier 4)* 2.0%
3.2%
1.7%
Standard Tariff (tier 1)* -3.5%
RESULTSMEXICO
In Mexico, PV is already competitive against grid electricity for
DAC consumers
MXN/
kWh
Standard Tariff
DAC Tariff
Grid tariffs
PV LCOE (avg.) -18.4%
8.9%
7.8%
MXN/
kWh
Standard Tariff
DAC Tariff
Grid tariffs
PV LCOE (avg.) -18.4%
8.9%
5.7%
Past evolution of grid electricity price and PV LCOE
(MEXICO CITY)
Past evolution of grid electricity price and PV LCOE
(HERMOSILLO)
• An excellent opportunity exists for
PV technology among DAC
consumers
- DAC consumers are
households with high electricity
consumption (about 500,000
potential clients in Mexico)
• Mexico´s Government introduced
at the end of 2013 an in-depth
energy reform
- The market is now open to the
private sector for both energy
generation and energy retailers,
an opportunity for the expansion
of the PV market
Assessment of Mexican regulatory framework
for PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
17
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
1
2
3
4
5
6
7
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
1
2
3
4
5
6
7
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
RESULTSSPAIN
Grid parity has been reached in Spain, but regulatory support is
still needed to develop the market
EUR ct/
kWh
Off-Peak Tariff
Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -5.3%
7.9%
7.8%
4.4%
EUR ct/
kWh
Off-Peak Tariff
Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -5.7%
4.4%
4.4%
1.1%
Past evolution of grid electricity price and PV LCOE
(MADRID)
Past evolution of grid electricity price and PV LCOE
(LAS PALMAS)
• Grid parity has been reached both
in Continental Spain and in the
Canary Islands
- PV is already competitive
against the standard (no TOU)
retail electricity price
- The perception on regulatory
risks has negatively impacted
grid parity proximity
• It is essential that the Spanish
Government publishes a regulation
to enable PV self-consumers to
feed their excess generation into
the grid in exchange for a
compensation
Assessment of Spanish regulatory framework
for PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
18
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
5
10
15
20
25
30
35
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
5
10
15
20
25
30
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
RESULTSUK
PV technology is still far from being competitive against grid
electricity prices in the residential segment in the UK
GBP ct/
kWh
Off-Peak Tariff
Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -12.5%
1.4%
0.5%
2.1%
GBP ct/
kWh
Off-Peak Tariff
Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -12.5%
-0.6%
-0.7%
0.8%
Past evolution of grid electricity price and PV LCOE
(LONDON)
Past evolution of grid electricity price and PV LCOE
(PLYMOUTH)
• In the UK, PV Grid Parity is still far
from being reached
- PV LCOE has experienced a
considerable decrease since
2009 but system prices have
stagnated in the last two years
• The FIT scheme for small-scale PV
systems fosters the PV self-
consumption market in an efficient
way
Assessment of UK’s regulatory framework for
PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
19
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
10
20
30
40
50
60
70
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
10
20
30
40
50
60
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
RESULTSUSA
In California, Partial Grid Parity has been reached in the residential
segment
USD ct/
kWh
BaseTariff
Standard Tariff
High Peak Tariff
Grid tariffs
PV LCOE (avg.) -6.3%
3.1%
3.7%
4.4%
USDct/
kWh
Off-Peak Tariff
Standard Tariff
Peak Tariff
Grid tariffs
PV LCOE (avg.) -6.3%
1.4%
4.4%
5.1%
Past evolution of grid electricity price and PV LCOE
(LOS ANGELES)
Past evolution of grid electricity price and PV LCOE
(SAN FRANCISCO)
• Both in Los Angeles and San
Francisco, PV LCOE of the most
competitive quotations is already
lower than the highest TOU
electricity rates
- PV self-consumption is an
attractive alternative for
consumers with a relatively high
proportion of electricity demand
during peak hours
• The Californian net-metering
system is a trendsetting policy on
how to promote PV self-
consumption in a cost-effective
way
Assessment of Californian regulatory
framework for PV self-consumption
Note: * Compound Annual Growth Rate
Source: CREARA analysis
20
CAGR*
S1'09-S1'14
CAGR*
S1'09-S1'14
0
5
10
15
20
25
30
35
40
45
50
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
0
10
20
30
40
50
60
2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
CONCLUSIONS
Main conclusions
• According to the study, in the first semester of 2014, the cost of PV generation as expressed by the
LCOE (Levelized Cost of Electricity) in the residential segment decreased in all of the cities
analyzed
- From a 28% annual decline in Australia to 5% in Spain, mainly as a result of the decreasing trend of
the cost of PV systems, driven by lower equipment prices (across the board) and increased
competition in emerging markets
• Results show that full grid parity has been reached in several countries
- This is the case of Chile (CopiapĂł), Germany, Italy, and Mexico for DAC consumers
• Even if Grid Parity (defined as the moment when PV LCOE equals retail electricity prices) has been
reached, regulatory cover is still necessary to foster the PV self-consumption market
- The Spanish case illustrates this rule very well: grid parity has been reached but with no
governmental support the market has failed to develop
• As 100% self-consumption is not likely to happen for a residential consumer, a proper valuation of
the excess of energy has to be performed to properly understand the business case of a specific
consumer
Source: CREARA
21
22
The GPM is a Series of analyses that show the evolution of PV
competitiveness in different consumer segments: residential,
commercial, and utility-scale
Do you want more information about the GPM?
Click on the envelope to send us an email 
Available @
http://www.leonardo-energy.org/
BE THE NEXT SPONSOR OF THE GPM
Contact us:
Davide Sabatino
dsa@creara.es
+34 913 950 154
OVERVIEW of GPM reports
October‘12 May‘13 Feb’ 2015
March’14 May’15
Aug ’14 July’15
1ST ISSUE 2ND ISSUE 3RD ISSUE
RESIDENTIAL
COMMERCIAL
UTILITY SCALE
March’15CHILE
April’15MEXICO

Weitere ähnliche Inhalte

Was ist angesagt?

IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311
IEA_RETD
 
130328 introduction to network codes
130328 introduction to network codes130328 introduction to network codes
130328 introduction to network codes
ENTSO-E
 
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
Tuong Do
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
sanjeev jain
 
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
Tuong Do
 
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
Tuong Do
 
Pages from 2015 Storage-forum-presentations
Pages from 2015 Storage-forum-presentationsPages from 2015 Storage-forum-presentations
Pages from 2015 Storage-forum-presentations
Bill Jackson
 

Was ist angesagt? (19)

Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Levellised generic tariff
Levellised generic tariffLevellised generic tariff
Levellised generic tariff
 
IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311
 
Abt meter
Abt meterAbt meter
Abt meter
 
Laure Duliere - T&D Europe
Laure Duliere - T&D EuropeLaure Duliere - T&D Europe
Laure Duliere - T&D Europe
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
 
Wf storage 2018 presentation_ores v1_may 18th 2018
Wf storage 2018 presentation_ores v1_may 18th 2018Wf storage 2018 presentation_ores v1_may 18th 2018
Wf storage 2018 presentation_ores v1_may 18th 2018
 
130328 introduction to network codes
130328 introduction to network codes130328 introduction to network codes
130328 introduction to network codes
 
Capacitor installation and re conductoring
Capacitor installation and re conductoringCapacitor installation and re conductoring
Capacitor installation and re conductoring
 
Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India)
 
An Introduction to Network Codes (April 2014)
An Introduction to Network Codes (April 2014)An Introduction to Network Codes (April 2014)
An Introduction to Network Codes (April 2014)
 
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
 
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
 
Grid Integration and Grid Development from a Financial and Regulatory Perspec...
Grid Integration and Grid Development from a Financial and Regulatory Perspec...Grid Integration and Grid Development from a Financial and Regulatory Perspec...
Grid Integration and Grid Development from a Financial and Regulatory Perspec...
 
Pages from 2015 Storage-forum-presentations
Pages from 2015 Storage-forum-presentationsPages from 2015 Storage-forum-presentations
Pages from 2015 Storage-forum-presentations
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Regional Security Coordination (RSCI) & ENTSO-E'S recommendations
Regional Security Coordination (RSCI) & ENTSO-E'S recommendationsRegional Security Coordination (RSCI) & ENTSO-E'S recommendations
Regional Security Coordination (RSCI) & ENTSO-E'S recommendations
 

Ähnlich wie Photovoltaic Grid Parity Monitor for Residential Consumers - Issue 3b

Grid Parity for Solar Energy
Grid Parity for Solar EnergyGrid Parity for Solar Energy
Grid Parity for Solar Energy
Leonardo ENERGY
 
02 epia m-latour - budapest - 22 09 2011
02 epia   m-latour - budapest - 22 09 201102 epia   m-latour - budapest - 22 09 2011
02 epia m-latour - budapest - 22 09 2011
pvsinbloom
 
Photovoltaic Trends Report from Selected IEA Countries (2016)
Photovoltaic Trends Report from Selected IEA Countries (2016)Photovoltaic Trends Report from Selected IEA Countries (2016)
Photovoltaic Trends Report from Selected IEA Countries (2016)
Turlough Guerin GAICD FGIA
 

Ähnlich wie Photovoltaic Grid Parity Monitor for Residential Consumers - Issue 3b (20)

Webinar - PV Grid Parity Monitor - Residential 3rd Issue
Webinar - PV Grid Parity Monitor - Residential 3rd IssueWebinar - PV Grid Parity Monitor - Residential 3rd Issue
Webinar - PV Grid Parity Monitor - Residential 3rd Issue
 
Photovoltaic Grid Parity Monitor - Utility Scale - 1
Photovoltaic Grid Parity Monitor - Utility Scale - 1Photovoltaic Grid Parity Monitor - Utility Scale - 1
Photovoltaic Grid Parity Monitor - Utility Scale - 1
 
Anglian Water Trial – Cambridge
Anglian Water Trial – CambridgeAnglian Water Trial – Cambridge
Anglian Water Trial – Cambridge
 
SHAMS Dubai
SHAMS DubaiSHAMS Dubai
SHAMS Dubai
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy system
 
Trends in photovoltaic markets and industry - 2018
Trends in photovoltaic markets and industry - 2018Trends in photovoltaic markets and industry - 2018
Trends in photovoltaic markets and industry - 2018
 
Oliver Spink
Oliver SpinkOliver Spink
Oliver Spink
 
Grid Parity for Solar Energy
Grid Parity for Solar EnergyGrid Parity for Solar Energy
Grid Parity for Solar Energy
 
IEA Technology roadmap solar photovoltaic energy 2014
IEA Technology roadmap solar photovoltaic energy 2014 IEA Technology roadmap solar photovoltaic energy 2014
IEA Technology roadmap solar photovoltaic energy 2014
 
Island Power Generation and Demand Side Purchasing and Selling
Island Power Generation and Demand Side Purchasing and SellingIsland Power Generation and Demand Side Purchasing and Selling
Island Power Generation and Demand Side Purchasing and Selling
 
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storageWebinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
 
Concepts of economic attributes part 1
Concepts of economic attributes part 1Concepts of economic attributes part 1
Concepts of economic attributes part 1
 
Concepts of economic attributes part 1
Concepts of economic attributes part 1Concepts of economic attributes part 1
Concepts of economic attributes part 1
 
02 epia m-latour - budapest - 22 09 2011
02 epia   m-latour - budapest - 22 09 201102 epia   m-latour - budapest - 22 09 2011
02 epia m-latour - budapest - 22 09 2011
 
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETSBUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
 
Training Module on Electricity Market Regulation - SESSION 8 - Pricing
Training Module on Electricity Market Regulation - SESSION 8 - PricingTraining Module on Electricity Market Regulation - SESSION 8 - Pricing
Training Module on Electricity Market Regulation - SESSION 8 - Pricing
 
Photovoltaic Trends Report from Selected IEA Countries (2016)
Photovoltaic Trends Report from Selected IEA Countries (2016)Photovoltaic Trends Report from Selected IEA Countries (2016)
Photovoltaic Trends Report from Selected IEA Countries (2016)
 
Impact of Mandatory Time-of-use Tariff on the Residential Customers in Italy
Impact of Mandatory Time-of-use Tariff on the Residential Customers in Italy Impact of Mandatory Time-of-use Tariff on the Residential Customers in Italy
Impact of Mandatory Time-of-use Tariff on the Residential Customers in Italy
 
1. power system losses introduction
1. power system losses introduction   1. power system losses introduction
1. power system losses introduction
 
1. power system losses introduction
1. power system losses introduction1. power system losses introduction
1. power system losses introduction
 

Mehr von Leonardo ENERGY

Mehr von Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

KĂźrzlich hochgeladen

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

KĂźrzlich hochgeladen (20)

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Photovoltaic Grid Parity Monitor for Residential Consumers - Issue 3b

  • 1. PV Grid Parity Monitor for residential consumers Financial AdvisoryStrategy Consulting Market IntelligencePolicy Consulting Leonardo ENERGY Webinar Series/ Madrid (Spain) 05 March 2015 at 17h30 CET MarĂ­a JesĂşs BĂĄez, Manager mjb@creara.es RocĂ­o Moya, Analyst rmm@creara.es GPM 3rd Issue Residential Segment
  • 2. • ECLAREON - CREARA • Grid Parity Monitor (GPM) - Introduction - Definitions and Methodology - Results - Conclusions Agenda 2
  • 3. 3 • Founded in Madrid in 2003 • Specialist in energy efficiency and energy savings • CREARA’s services: - Consulting - Engineering - Management - Training Creara and Eclareon (Spain) merged their business to form Creara Energy Experts and consolidate their leadership in sustainable energy services • Opened in Madrid in 2005 • Management consultants in smarter energy • ECLAREON’s services: - Policy consulting - Strategy consulting - Financial advisory - Market intelligence RECENT CORPORATE EVENTS COMPANY OVERVIEW
  • 4. • ECLAREON-CREARA • Grid Parity Monitor (GPM) - Introduction - Definitions and Methodology - Results (Europe and Asia) - Conclusions Agenda 4
  • 5. PV “grid parity” is the moment when the cost of generating PV electricity is equal to the price paid for grid electricity For the sake of simplicity this report compares PV LCOE with retail electricity prices In reality, depending on the local self-consumption regulation, a part of the PV generation might be lost or valued at a lower rate (100% self-consumption ratios are not attainable) Note: * Levelized Cost of Electricity Source: CREARA analysis INTRODUCTION Grid electricity price PV electricity cost (LCOE*) EUR ct / kWh Grid Parity Years Simplistic Illustration of PV Grid Parity • Grid electricity is cheaper than PV-generated electricity - PV needs support mechanisms (FiT, tax credit, etc.) • PV-generated electricity is cheaper than grid electricity - It is more convenient to self- consume PV electricity than to buy electricity from the utility 5
  • 6. The PV Grid Parity Monitor may well be one of the most comprehensive analyses of PV grid parity to date INTRODUCTION Overview of PV Grid Parity Monitor Objective • To analyze the proximity of grid parity from the viewpoint of a residential consumer - Total final costs of generating PV electricity with a 3kW/3.3kWp PV system are compared with residential retail electricity prices Methodology • It is based on a rigorous and transparent methodology - This presentation includes a summary of the main assumptions and considerations Geographical Focus • 5 potential markets in Europe: France, Germany, Italy, UK, and Spain • 7 promising markets outside Europe: Australia, Brazil, California, Chile, Japan, Israel, and Mexico Frequency • It is recurrent: it will be updated every year to show the evolution of PV grid parity proximity Inputs • It uses real and up-dated data as inputs, not estimates - Includes turnkey quotations of local PV installers from each of the countries under study • It includes specific and detailed information per country (and city, when applicable) - For example, the discount rate, retail electricity prices, and inflation Source: CREARA 6
  • 7. The PV Grid Parity Monitor is sponsored by renowned international companies Gold Sponsor INTRODUCTIONSPONSORS 7
  • 8. The PV Grid Parity Monitor is supported by relevant partners Partner Associations Technical PartnersSupported by INTRODUCTIONPARTNERS 8
  • 9. LCOE of a PV system refers to the constant and theoretical cost of generating PV electricity over the PV system lifetime DEFINITIONS & METHODOLOGY 0 200 400 600 800 1.000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 0 10 20 30 40 50 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 EUR ct / kWh EUR 8,800 9,000 Indicative Total Cost of a Small-Scale PV System PV LCOE of the PV System Source: CREARA analysis • PV Levelized Cost of Energy (LCOE) accounts for all costs associated with a PV system over its life - These may include initial investment, O&M, taxes, debt service, among others • It assumes a constant value per year and is expressed as cost per kWh - It incorporates total PV electricity generated over the system’s lifespan • It considers the return required from the investment, to discount future costs (and production) to present Initial Investment Operating Expenses Key: 9
  • 10. For a specific PV system, PV LCOE is fixed as soon as the PV system is built, but grid electricity prices are likely to increase LCOE of PV Technology vs. Grid Electricity Price 0 5 10 15 20 25 30 2009S1 2009S2 2010S1 2010S2 2011S1 2011S2 2012S1 Years EUR ct/ kWh LCOE of PV technology Grid electricity price 0 10 20 30 40 50 60 70 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 EUR ct/ kWh Years of operation of the PV system Grid electricity price LCOE of a specific PV system installed in S1 2012 LCOE of A SPECIFIC PV System Installed S1 2012 vs. Grid Electricity Price Source: CREARA analysis DEFINITIONS & METHODOLOGY 10
  • 11. 11 RESULTS Grid Parity proximity and regulatory support (mainly via net metering or net billing) vary significantly from country to country Positioning Matrix of the countries analyzed 0,0 0,2 0,3 0,5 0,6 0,8 - +Regulatory support to PV self-consumption - + GridParityProximity Australia Brazil Chile France Germany Italy Mexico Spain UK California Israel Japan Note: Data of 1st semester 2014 Source: CREARA Analysis
  • 12. RESULTSBRAZIL In Brazil, the reduction of electricity tariffs has pushed PV grid parity further away Note: * Compound Annual Growth Rate Source: CREARA analysis BRL ct/ kWh Standard Tariff Grid tariffs PV LCOE (avg.) -14.8% -8.4% BRL ct/ kWh Standard Tariff Grid tariffs PV LCOE (avg.) -14.8% -6.2% Past evolution of grid electricity price and PV LCOE (SAO PAULO) Past evolution of grid electricity price and PV LCOE (ITACARAMBI) • While in SĂŁo Paulo PV technology is still far from being competitive against grid electricity, in Itacarambi grid parity could be reached sooner - High installation prices and a high discount rate still prevent PV technology from being competitive against grid electricity • The recently approved net- metering regulation seems an excellent instrument to foster the PV self-consumption market Assessment of Brazilian regulatory framework for PV self-consumption 12 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 50 100 150 200 250 300 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 50 100 150 200 250 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 13. RESULTSCHILE PV Grid Parity has already been reached in the residential segment, albeit to different extents in different locations of Chile CLP/ kWh Standard Tariff Surcharge tariff (Winter) Grid tariffs PV LCOE (avg.) -19.3% -9.3% -8.1% CLP/ kWh Standard Tariff Surcharge tariff (Winter) Grid tariffs PV LCOE (avg.) -19.3% -6.7% -5.5% Past evolution of grid electricity price and PV LCOE (SANTIAGO) Past evolution of grid electricity price and PV LCOE (COPIAPÓ) • Full Grid Parity has been reached in Northern Chile, whilst in other locations with lower irradiation only partial grid parity has been reached - In Santiago, Grid Parity is only partial since PV LCOE is only competitive with the rate applicable to excess consumption in winter • The net billing regulation, which has recently been implemented is, on a first evaluation, a proper incentive to generate a PV self- consumption market Assessment of Chilean regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 13 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 50 100 150 200 250 300 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 50 100 150 200 250 300 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 14. RESULTSFRANCE Low electricity prices still prevent Full Grid Parity from being reached in France EUR ct/ kWh Standard Tariff Grid tariffs PV LCOE (avg.) -13.2% 7.7% 4.9% EUR/ kWh Grid tariffs PV LCOE (avg.) -13.2% Past evolution of grid electricity price and PV LCOE (PARIS) Past evolution of grid electricity price and PV LCOE (MARSEILLE) • Low electricity prices still prevent Full Grid Parity for being reached in France • Currently, FiTs in France do not incentivize the PV self- consumption market - BIPV systems are being fostered over BAPV - Self-consumption will gain relevance provided that FiTs are being reduced and electricity becomes more expensive Assessment of French regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 14 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 10 20 30 40 50 60 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 Peak Tariff Off-Peak Tariff 9.4% 0 5 10 15 20 25 30 35 40 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 Standard Tariff 7.7% 4.9% Peak Tariff Off-Peak Tariff 9.4%
  • 15. RESULTSGERMANY Despite the low irradiation levels in Germany, full grid parity has been reached throughout the country EUR ct/ kWh Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -12.5% 7.7% 9.1% EUR ct/ kWh Off-Peak Tariff Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -12.5% 9.4% 10.4% 12.5% Past evolution of grid electricity price and PV LCOE (BERLIN) Past evolution of grid electricity price and PV LCOE (MUNICH) • Low PV installation prices, a low discount rate and high retail electricity prices compensate low irradiation levels for Germany to reach full Grid Parity in the residential segment • The EEG FiT scheme fosters the self-consumption market in an efficient way, as FiTs for small- scale systems are currently lower than the retail electricity price Assessment of German regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 15 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 10 20 30 40 50 60 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 5 10 15 20 25 30 35 40 45 50 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 16. RESULTSITALY In Italy, full grid parity has been reached and the market is driven by a regulation that fosters self-consumption EUR ct/ kWh Grid tariffs PV LCOE (avg.) -16.7% EUR ct/ kWh Grid tariffs PV LCOE (avg.) -16.7% Past evolution of grid electricity price and PV LCOE (ROME) Past evolution of grid electricity price and PV LCOE (PALERMO) • Thanks to competitive PV system installation costs, high irradiation levels and expensive grid electricity prices, PV Grid Parity has already been reached in the residential segment in Italy • The Scambio Sul Posto (SSP) net- metering mechanism allows users with PV systems under 200 kW to obtain credits - It is expected that the methodology used to calculate the credit amount will be modified soon Assessment of Italian regulatory framework for PV self-consumption Note: * Tiers correspond to different consumption levels **Compound Annual Growth Rate Source: CREARA analysis 16 CAGR** S1'09-S1'14 CAGR** S1'09-S1'14 0 5 10 15 20 25 30 35 40 45 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 Standard Tariff (tier 2)* Standard Tariff (tier 3)* Standard Tariff (tier 4)* 2.0% 3.2% 1.7% Standard Tariff (tier 1)* -3.5% 0 5 10 15 20 25 30 35 40 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 Standard Tariff (tier 2)* Standard Tariff (tier 3)* Standard Tariff (tier 4)* 2.0% 3.2% 1.7% Standard Tariff (tier 1)* -3.5%
  • 17. RESULTSMEXICO In Mexico, PV is already competitive against grid electricity for DAC consumers MXN/ kWh Standard Tariff DAC Tariff Grid tariffs PV LCOE (avg.) -18.4% 8.9% 7.8% MXN/ kWh Standard Tariff DAC Tariff Grid tariffs PV LCOE (avg.) -18.4% 8.9% 5.7% Past evolution of grid electricity price and PV LCOE (MEXICO CITY) Past evolution of grid electricity price and PV LCOE (HERMOSILLO) • An excellent opportunity exists for PV technology among DAC consumers - DAC consumers are households with high electricity consumption (about 500,000 potential clients in Mexico) • Mexico´s Government introduced at the end of 2013 an in-depth energy reform - The market is now open to the private sector for both energy generation and energy retailers, an opportunity for the expansion of the PV market Assessment of Mexican regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 17 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 1 2 3 4 5 6 7 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 1 2 3 4 5 6 7 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 18. RESULTSSPAIN Grid parity has been reached in Spain, but regulatory support is still needed to develop the market EUR ct/ kWh Off-Peak Tariff Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -5.3% 7.9% 7.8% 4.4% EUR ct/ kWh Off-Peak Tariff Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -5.7% 4.4% 4.4% 1.1% Past evolution of grid electricity price and PV LCOE (MADRID) Past evolution of grid electricity price and PV LCOE (LAS PALMAS) • Grid parity has been reached both in Continental Spain and in the Canary Islands - PV is already competitive against the standard (no TOU) retail electricity price - The perception on regulatory risks has negatively impacted grid parity proximity • It is essential that the Spanish Government publishes a regulation to enable PV self-consumers to feed their excess generation into the grid in exchange for a compensation Assessment of Spanish regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 18 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 5 10 15 20 25 30 35 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 5 10 15 20 25 30 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 19. RESULTSUK PV technology is still far from being competitive against grid electricity prices in the residential segment in the UK GBP ct/ kWh Off-Peak Tariff Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -12.5% 1.4% 0.5% 2.1% GBP ct/ kWh Off-Peak Tariff Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -12.5% -0.6% -0.7% 0.8% Past evolution of grid electricity price and PV LCOE (LONDON) Past evolution of grid electricity price and PV LCOE (PLYMOUTH) • In the UK, PV Grid Parity is still far from being reached - PV LCOE has experienced a considerable decrease since 2009 but system prices have stagnated in the last two years • The FIT scheme for small-scale PV systems fosters the PV self- consumption market in an efficient way Assessment of UK’s regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 19 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 10 20 30 40 50 60 70 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 10 20 30 40 50 60 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 20. RESULTSUSA In California, Partial Grid Parity has been reached in the residential segment USD ct/ kWh BaseTariff Standard Tariff High Peak Tariff Grid tariffs PV LCOE (avg.) -6.3% 3.1% 3.7% 4.4% USDct/ kWh Off-Peak Tariff Standard Tariff Peak Tariff Grid tariffs PV LCOE (avg.) -6.3% 1.4% 4.4% 5.1% Past evolution of grid electricity price and PV LCOE (LOS ANGELES) Past evolution of grid electricity price and PV LCOE (SAN FRANCISCO) • Both in Los Angeles and San Francisco, PV LCOE of the most competitive quotations is already lower than the highest TOU electricity rates - PV self-consumption is an attractive alternative for consumers with a relatively high proportion of electricity demand during peak hours • The Californian net-metering system is a trendsetting policy on how to promote PV self- consumption in a cost-effective way Assessment of Californian regulatory framework for PV self-consumption Note: * Compound Annual Growth Rate Source: CREARA analysis 20 CAGR* S1'09-S1'14 CAGR* S1'09-S1'14 0 5 10 15 20 25 30 35 40 45 50 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1 0 10 20 30 40 50 60 2009S1 2010S1 2011S1 2012S1 2013S1 2014S1
  • 21. CONCLUSIONS Main conclusions • According to the study, in the first semester of 2014, the cost of PV generation as expressed by the LCOE (Levelized Cost of Electricity) in the residential segment decreased in all of the cities analyzed - From a 28% annual decline in Australia to 5% in Spain, mainly as a result of the decreasing trend of the cost of PV systems, driven by lower equipment prices (across the board) and increased competition in emerging markets • Results show that full grid parity has been reached in several countries - This is the case of Chile (CopiapĂł), Germany, Italy, and Mexico for DAC consumers • Even if Grid Parity (defined as the moment when PV LCOE equals retail electricity prices) has been reached, regulatory cover is still necessary to foster the PV self-consumption market - The Spanish case illustrates this rule very well: grid parity has been reached but with no governmental support the market has failed to develop • As 100% self-consumption is not likely to happen for a residential consumer, a proper valuation of the excess of energy has to be performed to properly understand the business case of a specific consumer Source: CREARA 21
  • 22. 22 The GPM is a Series of analyses that show the evolution of PV competitiveness in different consumer segments: residential, commercial, and utility-scale Do you want more information about the GPM? Click on the envelope to send us an email  Available @ http://www.leonardo-energy.org/ BE THE NEXT SPONSOR OF THE GPM Contact us: Davide Sabatino dsa@creara.es +34 913 950 154 OVERVIEW of GPM reports October‘12 May‘13 Feb’ 2015 March’14 May’15 Aug ’14 July’15 1ST ISSUE 2ND ISSUE 3RD ISSUE RESIDENTIAL COMMERCIAL UTILITY SCALE March’15CHILE April’15MEXICO