SlideShare ist ein Scribd-Unternehmen logo
1 von 37
Created by:-
Sunil Thakur
Economical Feasibility:Economical Feasibility:
The cost of acquiring the proposed system is not too high. The agency
already has the suitable hardware with them. Even the software is already
available with them. So it creates no extra burden on agency. System is
developed in Visual Basic and in MS Access which are both advances in
feature.
Operational feasibility:Operational feasibility:
The main objective here is to determine whether the system will work after it
is developed and installed. A proper investigation was done in this regard and
as a result, the following conclusions were derived:
* There was sufficient support from the management and the personnel
involved.
* As it automates the automobile agency system completely, so the
system becomes more efficient.
* The persons involved in the current working of the system were met and
discussions were held with them to evolve a system with which they had good
support and participation.
* The repetitive work of the currently manual system is eliminated.
Technical feasibility:Technical feasibility:
The necessary technologies that are required to implement the
proposed system are available easily in the software market. The
main hardware equipments such as computers, printers, etc. are
easily available. The software of VB is easily available in the
market. VB is a tool that allows us to develop Windows based
applications. So user feels very comfortable with it. Microsoft
Access is a powerful program to create and manage our
databases. It has many built in features to assist us in
constructing and viewing our information. Access is much more
involved and is a more genuine database application than other
programs such as Microsoft Works.
Since visual basic is an event driven programming we used this
tool to optimize our project.
We used the toolbox containing the object and controls, which
we will add to the form to create the user interface for your
project. Controls like command buttons, text boxes, radio
buttons, check boxes, Adodc controls, data combo, data grid,
frames, labels, image control, drive list box are present on the
toolbox, also known as OCX files. He Form Designer window
contains the form on which the controls and objects are going
to be placed. Your application can have more than one form.
We used Access as backend to build our simple Payroll System.
All tables are designed in Access for our project.
The database needs to be designed in an appropriate manner. This
includes
The use of "Primary Keys" in each table
Making sure that you use "Auto Numbers" where appropriate
and normal numbers where you what to enter the information
manually
Using the correct field type.
Zero level DFDZero level DFD
Level 1 DFDLevel 1 DFD
1.LOGIN
DATABASE
2. TICKET CANCEL
3. FLIGHT INFORMATION
4. PNR NO.DETAILS
5. RESERVATION
6.SEATS AVAILIBLITY
1. LOGIN FORM
2. WELCOME
FORM
3. MAIN FORM
4. DISPLAY INFORMATION FORM
5.FLIGHT INFORMATION
FORM
6. TICKET STATUS FORM
7.RESEVATION SLIP FORM
8. REFUND SLIP
9.TICKET INFORMATION FORM
10. NEW RESERVATION FORM
11.DELETE ACCOUNT FORM
1. FLIGHT INFORMATION
4.RESERVATION
REPORT
TESTING
The testing of various modules is done at various stages of development
process. The golden rule to be kept in mind while testing is that the testing
should be done with a view to identifying the ways to in which system is likely
to fail.
NEED FOR TESTING
Testing is vital to the success of the system. Testing has the logical
assumption that all the part of the system is correct and the goal is
successfully achieved.
LEVELS OF TESTING
1. Unit Testing
2. Integration testing
3. System testing
4. System acceptances
USERS NEEDS
ACCEPTANCE
TESTING
REQUIREMENT SYSTEM
DESIGN
INTEGRATION
TESTING
CODE UNIT
These different levels of testing attempt to detect types of faults.
The relation of faults introduced in different phases and different
levels of testing are shown here.
1. UNIT TESTING
For my project I performed this testing by running each form separately and
encountered many errors. Most of which were type mismatch, data source not
found, linking errors, end of file encountered, problem with loops etc.
2. INTEGRATION TESTING
The second level of testing is often called integration testing. In this, many
testing modes are combined into sub system, which are tested .The goes
here is to see if the modules can be integrated properly, the emphasis being
on the testing interface between modules. During this also I encountered a
number of problem ranging from the similar type of problems as above to
new kind of problems mainly updating.
3. SYSTEM TESTING
The next level of testing is the system testing. Here the entire software system
is tested. The reference and the goal are to see if the software meets its
requirement. This is essentially a validation exercise.
This level of testing is performed with realistic data to demonstrate that
software is working satisfactory. Testing is on external behavior of the system.
The internal logic is not emphasized.
4.ACCEPTANCE TESTING
Airline system ppt

Weitere ähnliche Inhalte

Was ist angesagt?

Jatin sharma (42162)
Jatin sharma (42162)Jatin sharma (42162)
Jatin sharma (42162)
Jatin Sharma
 

Was ist angesagt? (20)

Airport terminal planning and design
Airport terminal planning and designAirport terminal planning and design
Airport terminal planning and design
 
Toll plaza ppt
Toll plaza pptToll plaza ppt
Toll plaza ppt
 
smart parking system 5.pptx
smart parking system 5.pptxsmart parking system 5.pptx
smart parking system 5.pptx
 
Air transportation
Air transportationAir transportation
Air transportation
 
Classification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptxClassification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptx
 
railway reservation software documentaion
railway reservation software documentaionrailway reservation software documentaion
railway reservation software documentaion
 
Student portal system application -Project Book
Student portal system application -Project BookStudent portal system application -Project Book
Student portal system application -Project Book
 
runway orientation.pdf
runway orientation.pdfrunway orientation.pdf
runway orientation.pdf
 
5. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 31506115. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 3150611
 
Intelligent Transportation System (ITS)
Intelligent Transportation System (ITS)Intelligent Transportation System (ITS)
Intelligent Transportation System (ITS)
 
Airline Reservation System
Airline Reservation SystemAirline Reservation System
Airline Reservation System
 
Modern technology used in airport security
Modern technology used in airport security Modern technology used in airport security
Modern technology used in airport security
 
Applications of GIS to Logistics and Transportation
Applications of GIS to Logistics and TransportationApplications of GIS to Logistics and Transportation
Applications of GIS to Logistics and Transportation
 
Air Transport
Air TransportAir Transport
Air Transport
 
Parking management system ppt
Parking management system pptParking management system ppt
Parking management system ppt
 
Jatin sharma (42162)
Jatin sharma (42162)Jatin sharma (42162)
Jatin sharma (42162)
 
BIS4995 : Web-based Package Tour Reservation System
BIS4995 : Web-based Package Tour Reservation System BIS4995 : Web-based Package Tour Reservation System
BIS4995 : Web-based Package Tour Reservation System
 
Project Report Online Test
Project Report Online TestProject Report Online Test
Project Report Online Test
 
Attendance Monitoring System of Marinduque Academy Inc.
Attendance Monitoring System of Marinduque Academy Inc.Attendance Monitoring System of Marinduque Academy Inc.
Attendance Monitoring System of Marinduque Academy Inc.
 
Toll Management Systems
Toll Management SystemsToll Management Systems
Toll Management Systems
 

Andere mochten auch (9)

Semantic Parsing to Linked Data
Semantic Parsing to Linked DataSemantic Parsing to Linked Data
Semantic Parsing to Linked Data
 
Transformer
TransformerTransformer
Transformer
 
Supermarket
SupermarketSupermarket
Supermarket
 
Supermarkets
SupermarketsSupermarkets
Supermarkets
 
Bab 7
Bab 7Bab 7
Bab 7
 
Ms access 2007
Ms access 2007Ms access 2007
Ms access 2007
 
Training MS Access 2007
Training MS Access 2007Training MS Access 2007
Training MS Access 2007
 
A Case Study - WestJet Airlines: Information Technology Governance and Corpor...
A Case Study - WestJet Airlines: Information Technology Governance and Corpor...A Case Study - WestJet Airlines: Information Technology Governance and Corpor...
A Case Study - WestJet Airlines: Information Technology Governance and Corpor...
 
Introduction to Airline Industry
Introduction to Airline IndustryIntroduction to Airline Industry
Introduction to Airline Industry
 

Ähnlich wie Airline system ppt

PRESS MANAGEMENT Documentation
PRESS MANAGEMENT DocumentationPRESS MANAGEMENT Documentation
PRESS MANAGEMENT Documentation
anuj_rakheja
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
Dilip Prajapati
 
departmental store
departmental storedepartmental store
departmental store
Freelancer
 
Different Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application TestingDifferent Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application Testing
Rachel Davis
 
Systems development
Systems developmentSystems development
Systems development
Elijah Liu
 
127801976 mobile-shop-management-system-documentation
127801976 mobile-shop-management-system-documentation127801976 mobile-shop-management-system-documentation
127801976 mobile-shop-management-system-documentation
Nitesh Kumar
 

Ähnlich wie Airline system ppt (20)

PRESS MANAGEMENT Documentation
PRESS MANAGEMENT DocumentationPRESS MANAGEMENT Documentation
PRESS MANAGEMENT Documentation
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
lake city institute of technology
lake city institute of technology lake city institute of technology
lake city institute of technology
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
departmental store
departmental storedepartmental store
departmental store
 
Software Process and Requirement
Software Process and RequirementSoftware Process and Requirement
Software Process and Requirement
 
Online examination management system..pdf
Online examination management system..pdfOnline examination management system..pdf
Online examination management system..pdf
 
Different Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application TestingDifferent Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application Testing
 
College management
College managementCollege management
College management
 
System development life cycle
System development life cycleSystem development life cycle
System development life cycle
 
Systems development
Systems developmentSystems development
Systems development
 
127801976 mobile-shop-management-system-documentation
127801976 mobile-shop-management-system-documentation127801976 mobile-shop-management-system-documentation
127801976 mobile-shop-management-system-documentation
 
System analysis and design
System analysis and designSystem analysis and design
System analysis and design
 
Online news 365
Online news 365Online news 365
Online news 365
 
Project Documentation Student Management System format.pptx
Project Documentation Student Management System format.pptxProject Documentation Student Management System format.pptx
Project Documentation Student Management System format.pptx
 
Different Approaches To Sys Bldg
Different Approaches To Sys BldgDifferent Approaches To Sys Bldg
Different Approaches To Sys Bldg
 
Bug Tracking Java Project
Bug Tracking Java ProjectBug Tracking Java Project
Bug Tracking Java Project
 
Library Management System using oracle database
Library Management System using oracle databaseLibrary Management System using oracle database
Library Management System using oracle database
 
Leave management ppt made by krishna ballabh gupta
Leave management ppt made by krishna ballabh gupta Leave management ppt made by krishna ballabh gupta
Leave management ppt made by krishna ballabh gupta
 
44478167 hospital-management-system
44478167 hospital-management-system44478167 hospital-management-system
44478167 hospital-management-system
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Airline system ppt

  • 2.
  • 3. Economical Feasibility:Economical Feasibility: The cost of acquiring the proposed system is not too high. The agency already has the suitable hardware with them. Even the software is already available with them. So it creates no extra burden on agency. System is developed in Visual Basic and in MS Access which are both advances in feature. Operational feasibility:Operational feasibility: The main objective here is to determine whether the system will work after it is developed and installed. A proper investigation was done in this regard and as a result, the following conclusions were derived: * There was sufficient support from the management and the personnel involved. * As it automates the automobile agency system completely, so the system becomes more efficient. * The persons involved in the current working of the system were met and discussions were held with them to evolve a system with which they had good support and participation. * The repetitive work of the currently manual system is eliminated.
  • 4. Technical feasibility:Technical feasibility: The necessary technologies that are required to implement the proposed system are available easily in the software market. The main hardware equipments such as computers, printers, etc. are easily available. The software of VB is easily available in the market. VB is a tool that allows us to develop Windows based applications. So user feels very comfortable with it. Microsoft Access is a powerful program to create and manage our databases. It has many built in features to assist us in constructing and viewing our information. Access is much more involved and is a more genuine database application than other programs such as Microsoft Works.
  • 5. Since visual basic is an event driven programming we used this tool to optimize our project. We used the toolbox containing the object and controls, which we will add to the form to create the user interface for your project. Controls like command buttons, text boxes, radio buttons, check boxes, Adodc controls, data combo, data grid, frames, labels, image control, drive list box are present on the toolbox, also known as OCX files. He Form Designer window contains the form on which the controls and objects are going to be placed. Your application can have more than one form.
  • 6. We used Access as backend to build our simple Payroll System. All tables are designed in Access for our project. The database needs to be designed in an appropriate manner. This includes The use of "Primary Keys" in each table Making sure that you use "Auto Numbers" where appropriate and normal numbers where you what to enter the information manually Using the correct field type.
  • 7.
  • 8. Zero level DFDZero level DFD
  • 10.
  • 17.
  • 29.
  • 32.
  • 33. TESTING The testing of various modules is done at various stages of development process. The golden rule to be kept in mind while testing is that the testing should be done with a view to identifying the ways to in which system is likely to fail. NEED FOR TESTING Testing is vital to the success of the system. Testing has the logical assumption that all the part of the system is correct and the goal is successfully achieved. LEVELS OF TESTING 1. Unit Testing 2. Integration testing 3. System testing 4. System acceptances
  • 34. USERS NEEDS ACCEPTANCE TESTING REQUIREMENT SYSTEM DESIGN INTEGRATION TESTING CODE UNIT These different levels of testing attempt to detect types of faults. The relation of faults introduced in different phases and different levels of testing are shown here.
  • 35. 1. UNIT TESTING For my project I performed this testing by running each form separately and encountered many errors. Most of which were type mismatch, data source not found, linking errors, end of file encountered, problem with loops etc. 2. INTEGRATION TESTING The second level of testing is often called integration testing. In this, many testing modes are combined into sub system, which are tested .The goes here is to see if the modules can be integrated properly, the emphasis being on the testing interface between modules. During this also I encountered a number of problem ranging from the similar type of problems as above to new kind of problems mainly updating.
  • 36. 3. SYSTEM TESTING The next level of testing is the system testing. Here the entire software system is tested. The reference and the goal are to see if the software meets its requirement. This is essentially a validation exercise. This level of testing is performed with realistic data to demonstrate that software is working satisfactory. Testing is on external behavior of the system. The internal logic is not emphasized. 4.ACCEPTANCE TESTING