4. ASHES > 6 Inches
• Pre‐treatment allows 12 inches separation distance from
ASHES
• Options
– Drip (always requires pre‐treatment)
– Control Fill
• Any disposal product
• Separation distance is dependent on permeability
– 5‐60 min/inch must have 24 inches
– 61‐240 min/inch must have 18 inches
– Wisconsin Mound
• Permeability <120 min/inch
• Must have 12 inches of original soil before ASHES
– >26 inches allows for shallow conventional (8 inch product & 61‐
240 min/inch) – needs 12 inches of cover