SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Downloaden Sie, um offline zu lesen
1
P
r
,
m2F1RST
Hydrogen Fueling Infrastructure Research and Station Technology
Design and Footprint of Liquid Hydrogen-Supplied Refueling
Stationsfor Urban Sites
Brian Ehrhart
Sandia National Laboratories
Call with NREL and UMD
October 29,2019
SAND2019-XXXX
Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology and Engineering Solutions of
Sandia, LLC., a wholly owned subsidiary of Honeywell International, Inc.,for the U.S. Department of Energys National Nuclear Security
Administration under contract DE-NA0003525.
0Sandia National laboratories Hydrogen Fueling Infrastructure Research Station Technology
SAND2019-13054PE
Specified components needed for three methods of hydrogen
supply
Gas
Hydrogen
Compressed Hydrogen
L
Delivery Trucks Liquid Hydrogen
'
v.-
41)641j
Liquid
AC Power
• PEM
Water Electrolysis
On-site Hydrogen Production
LH2
Evaporator
Cascade Dispenser
Compressorl System
142F1RST
1. Fueling stationssupplied by LH2 may utilize
cryopumps in the long-term. Compressors were
assumedforsimplicity ofmodeling, as thefootprint
associated with a pump is likely to be comparable.
• Compressor • Cascade
— 25 kg/hrflow rate(constant600 kg/day)
— Outlet pressure of94.4 MPa(13,688 psi)
• Chillers
— 25.2 kW(7.2 tons)of refrigeration needed for
each chiller
— Aluminum cooling block of 1,330 kg(0.49 m3
)
needed for each
— 10cascade units,each containing 5(1:1:3)
pressure vessels
Outletflow rate 60 kg/hr to each dispenser
Dispensing
4fueling positions,70 MPa,-40°C
'mita National Laboratories 'Fr"ImREL Hydrogen Fueling Infrastructure Research Station Technology
Liquid storage P&ID
•
8 7 6 I 5 I 4 I 3 I 2 I 1
CONTROL AIR
PSV-101
PSV-100
10 bar
LIQUID STORAGE TAN K
HV-101
220-100
FV-1020
TO FIRE PANEL
RAH-100
IR FLAME DETECTOR
AIMED AT HYDROGEN STORAGE
HV- 00
CN L-100
CRVOGENIC PU MP
GH 100
AMBIENT AIR EVAPORATOR
TO COMPRESSOR
NOTE 1: APPLIES TO MODU LAR STATION ONLY. A BUILD-ON-SITE
STATION WILL NOT HAVE A SKID- OR CONTAINER-MOUNTED,PRE-
ASSEMBLED SYSTEM.
REFERENCE STATION:
LIQUID STORAGE
8 7 6 5 4 3 2 1
H
G
F
E
D
B
A
anctia National taboratories 7-1NREL ---------
Hydrogen Fueling Infrastructure Research Station Technology
H
G
F
E
D
C
B
A
Compressor and Other EquipmentP&ID
8 7 6 5 4 3
(
4
H2 Z3r
I 2 I 1
GAS STORAGE
COMPRESSION SKID OR CONTAINER BOUNDARY.SEE NOTE 1 ♦
TO COMMON 136-VENT MAST
- LOCATED ON BACK OF GMP
10'ABOVE GRADE
TO GAS STORAGE
CONTROL AIR
TO FIRE PANEL
RAH-100
FSV-100
COH-100
AIR COMPRESSOR
PBAL 100
AF-1C0
FV-10:)
ee
HV-201
-0T0 I
I IfHV-202
ZVO-100
P CP< /'
ZVO-101
ZVO-400
AIR DRYER
AF-1O1
ZVO-401
IVO-402
C>
F
<I
ZVO-403
PLC/
Gas Control Cabinet
NOTE2
GW 800
OF-802
GW 801
C>4 C><C1
CW-800
ti
*V-204
HV-203
CNH 300
Motor - -
480 V,
60 kW - -
I
li ll
-
- '
14C-CHW-800-SCH40-F2
9/16"-H-15000PSI
COMPRESSOR,
MULTIP LE STAGES
-1643
1.17,
I HV-300
FXHV-300
A
Ul
FF 300
FV-101
CHILLERS 26.2-kW EACH
FSV-300 HV-301
HV-400 a FV-4(0
— I k_d
1-1-4 TO
DISPENSER
FROM
DISPENSER
TO CASCADE
TO CASCADE
CONTROL AIR
ZVO-046
IR FLAME DETECTOR
AIMED AT HYDROGEN
COMPRESSOR
NOTE 1:APPLIES TO MODULAR STATION ONLY. A BUILD-ON-SITE STATION
WILL NOT HAVE A SKID- OR CONTAINER-MOUNTED,PRE-ASSEMBLED SYSTEM.
NOTE 2:IN MANY MODULAR STATIONS THE HEAT EXCHANGE EQUIPMENT
WILL BE ROOF-MOUNTED
TO DISPENSER
CONTROL AIR
REFERENCE STATION:
COMPRESSION AND COOLING
8 7 6 5 4 1
H
G
F
E
D
C
B
trAtOrfel E Hydrogen Fueling Infrastructure Research Stalion Technology
Cascade P&ID - Detail MIIMPIP'
8 7 6
4i42F1RST
RESTOF
CASCADE
CONTROL
AIR
A
AA

EU
, Ole
DTI3
HV-4X1
TO COM MON 2
-VENT MAST
LOCATED ON BACK OF GMP
10 ABOVE G RADE
9/16"-H-15000PSI
L><
ZVO-4X1
1>Y<I
ZVO-4X2
ZVO-4X3
-
41>F<
ZVO-4X4
[51
FV-4X1
11Aft
II
'="'
=7
EC,
r>a
-013-3
FP
HV-4X2
DTI
H2Storage PBNH-4X1
MAWP-13780PSIG
HV-4X01 HV-4XC2
FV-4X2
/IA

Tim, Tcry
.s• 481
Ole
HV-4X3
1>T<1
H2Storage PBNH-4X2
DTCI
MAWP-13780PSIG
HV-4X11 HV-4X12
ZVO-4X5
PLC/
Gas Control Cabinet
H2 Storage PBNH-4X3
MAWP-13780PSIG
FV-4X3 HV-4X21 HV-4X22
- 81
AlkAlk
t='ElOr
1-
4
HV-4X4
FV-4X4
A
Alk 
-
7
=Tn:17
WIZ
•
FV-4X5
r>
T
1 H2Storage PBNH-4X4
•
c>
T
<3 H2 Storage PBNH-4X5
MAWP-13780PSIG
HV-4X31 HV-4X32
1>
T
1
MAWP-13780 PSIG
HV-4X41 -
1 HV-4X42
REFERENCE STATION:
CASCADE UNIT
8 7 6 5 4 3 1
H
G
F
E
D
C
B
A
a i'oratories 7-1NREL ------
Hydrogen FuelIng Infrastructure Research Station Technology
H
G
F
E
D
B
A
Cascade P&ID - Overview
8 7 6 5 4 3 2
4.41 11;r
1
MODULAR STORAGE SKID OR CONTAINER BOUNDARY.SEE NOTE 1
TO COMMON 2"VENT MAST
LOCATED ON BACK OFGMP
10ABOVEGRADE
SEE NOTE 2
—C
—C
—C
—C
(›
T
‹ sv-4
i
>
T
<
3 SV-3
E>
T
(
1 SV-2
cj
cz
i sv-1
• .e•
TO FIRE PANEL
7
-
1
RAH-400
IR FLAME DETECTOR
AIMED AT HYDROGEN STORAGE
FROM
COMPRESSOR
9/16
.
'-H-15000P51
CONTROL AIR
TO DISPENSER
NOTE 1: APPLIES TO MODU LAR STATION ONLY. A
BUILD-ON-SITE STATION WILL NOT HAVE A SKID- OR
CONTAIN ER-MOUNTED,PRE-ASSEMBLED SYSTEM.
NOTE 2: EACH SET OF 5 CYLINDERS SHOWN HERE IS
A REPRESENTATION OF THE CASCADE UNIT SHOWN
ON THE PREVIOUS SHEET
REFERENCE STATION:
CASCADE STORAGE
8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
El Sandia National laboratories irINREL Hydrogen Fueling Infrastructure Research Stafion Technology
Dispenser P&ID .1111
1111
.11111MPIIIIPilir
•
8 7
FROM CHILLER
-
/ 4
TO CHILLER
7o0 BAR
-N-OZZLE
9/16"-H-15000P5I
To EPO
circuit
FROM CASCADE
CONTROL AIR 2V0-900
r
. ER3
2V0-901
[2><Z1 r
ZVO-903
1:9<1
ZVO-902
HV-904
70MPa DISPENSER
WUN-900
FV/Controls Internal
120V,1p,15A
ON-900
H70-Cold
H70-740
HEAT
4— ](CHANGER
1330 kg
H70-Warm
T
di
HV-900
HEAT
EXCHANGER
1330 kg
PLC/Gas Control Cabinet
To EPO
circuit
--,•
CZ=1.
700 BAR NOZZLE
7OMPa DISPENSER
WUN-902
FV/Controls Internal
120V,lp,15A
DN-902
H7O-Co
HEAT
EXCHANGER
1330 kg
H70-1-40
H70-Warm
CI*
HV-902
70MPa DISPENSER
WUN-901
FV/Controls Internal
120V,lp,15A
ON-901
H70-CoW
H70-740
To EPO
cicuit
HV-901 H70-Warm
HEAT
EXCHANGER
1330 kg
70MPa DISPENSER
WUN-903
FV/Controls Internal
120V,1p,15A
DN-903
H70-Cold
H70-740
Jt
To EPO
circuit
-t
At
HV-903 H70-Warm
700 BAR NOZZLE
IR FLAME DETECTOR
AIMED AT DISP HOSES
TO FIRE PANEL
RAH-900
700 BAR NOZZLE
REFERENCE STATION:
DISPENSER SUB-SYSTEM
8 7 6 5 4 3
H
G
F
E
D
B
anctia National taboratories EL ---------- -
Hydrogen Fueling Infrastructure Research Station Technology
Hydrogen System Layout
8
'
40'
_...„
0
011111111M
41112F1RST
'mita National Laboratories rINREL Hydrogen Fueling !nfrastructure Research Station Technology
LH2 Base Case View
_____-------
142F1RST
/
'mita National Laboratories veINREL Hydrogen Fueling !nfrastructure Research Station Technology
Base Case Liquid: Large footprintdue to delivery truck and
non-reducible 75ft. air intakes setback
78'
75'
170'
4k2F1RST
• Bulk liquid storage
— 800 kg, 11,299 L
(2,985 gal)
• Lot size: 170 x 125 ft
• Total Area: 21,250ft2
'mita National Laboratories NREL Hydrogen Fueling Infrastructure Research Station Technology
"
11111111.
7
.
1
Identified challenges in interpretation and implementation of (
4H2F1RST
NFPA 2leading to code updates
Gaseoussetback distances
— Large system can have "bulk
storage" before and after
compressor
• Complexity ofsystem makes
selection of single pressure and
diameter challenging
Liquid setback distances
• Hybrid system (liquid-to-gas)analyzed as
all-liquid system
— Recently changedin 2020Ed.ofNFPA 55/2
• Setback distances are differentfor most
exposures,only a few able to be reduced
— Single system could take worst-case:
maximum pressure from one area
and maximum ID from other area
— Could also calculate setback
distances for each system section
and select largest
• In Appendix I, but nowhere else
Calculationsforlargersystem may lead to
unintendedsetback distances
anclia National Laboratories
Group Exposure Reducible Distance
1
1 Lotlines Yes 15 rn(50ft)
2 Air intakes 23 rn(75 ft)
3 Operable openings in buildings 23 rn(75 ft)
4Ignition sources 15 m(50ft)
2
5 Places ofpublic assembly 23 m(75 ft)
6Parked cars 1.7 m(25 ft)
3
7(a)(1)Sprinklered non-combustible building Yes 1.5 m(5 ft)
7(a)(2)(i)Unsprinklered, without fire-rated wall Yes 15 m(50ft)
7(a)(2)(ii)Unsprinklered, with fire-rated wall Yes 1.5 rn(5 ft)
7(b)(1)Sprinklered combustible building Yes 15 m(50ft)
7(b)(2)Unsprinklered combustible building Yes 23 m(75 ft)
8Flammable gas systems (other than H2) Yes 23 m(75 ft)
9Between stationary LH2containers 1.5 m(5 ft)
10 All classes offlammable and combustible liquids Yes 23 rn(75 ft)
11 Hazardous material storage including LO2 Yes 23 rn(75 ft)
12Heavy timber, coal Yes 23 rn(75 ft)
13 Wallopenings 15 m(50ft)
14 Inlet to underground sewers 1.5 m(5 ft)
15a Utilities overhead: public transit electric wire 15 m(50ft)
15b Utilities overhead: other overhead electric wire 7.5 m(25 ft)
15c Utilities overhead: hazardous material piping 4.6 m(15 ft)
16Flammable gas metering and regulating stations 4.6 m(15 ft)
-
.
-- --- '—w,ii
-_
:
:
7
.
-_. - 1-,;-
_
;
_
-
_—:--
---
f--_,--
NFPA 2020 Requirements
Proposed Requirements
141' 91' 71'
-:7.
191'
1-41.5""-
0.1
Gas
Ga
G
Group 2
Group 1
Gas: Air In12ikas
75'
07'
sz Group 3
157'
Current Requirements
141' 91'
60'
71'
-4115"""
-
11-25'-1
"
-
80'
50'
130'
75'
180'
41112F1RST
11.c
A
191'
V
'mita National Laboratories mREL
..4 Hydrogen Fueling Infrastructure Research Station Technology
New NFPA 2020 Liquid Station Layout
72"I
63'
-40
ol
72" 1'
44°1
151-
7
78'
75'
52'
55'
41'
-41-1°
- 71 2"
Comientence Store
eeeeeoeoee
156' •
30'
117'
12'
142F1RST
'mita National Laboratories rINREL Hydrogen Fueling Infrastructure Research Station Technology
1
1111.1.111Pmr—
Underground Direct Bury
22'
-410'
75'
8
'
37'
)(.
(
)
)
)
( )
( )
)
C )( )C
50'
ConvenienceStore
ag•
)
)
)
( )
)
)
145'
C )
)
5
'
30'
107'
12'
4112F1RST
,7
-
A2C111111.11
andia National Laboratories -7-1NREL Hydrogen Fueling Infrastructure Research Station Technology
---
'
11411111
Summary of lot sizesfor all cases
Total Lot Area (ft2
) Reduction from Base Case
Base Case Gas 17,640
New NFPA Separation Distances 17,640 0.00%
New Delivery Single Truck 14,391 18.42%
New Delivery Double Truck 15,875 10.01%
Gasoline Co-Location 21,980 -24.60% (Increase)
Underground Direct-Bury 16,060 8.96%
Underground Vault 13,720 22.22%
Rooftop Storage 15,400 12.70%
Base Case Liquid 21,250 0.00%
New NFPA Separation Distances 18,252 14.11%
New Liquid Delivery 19,080 10.21%
Gasoline Co-Location 25,330 -19.20% (Increase)
Underground Direct-Bury 15,515 26.99%
Rooftop Storage 19,840 6.63%
Base Case 14,756 0.00%
New NFPA Separation Distances 11,934 19.12%
Gasoline Co-Location 21,980 -48.96% (Increase)
Jnderground Direct-Bury 13,340 9.60%
Underqround Vault 16,240 -10.06% (Increase)
Roofto• Stora•e 11 466 2230%
F1RST
TECHNICAL BACK-UP SLIDES
41i
-i2F1RST 1
andia National Laboratories REL Hydrogen Fueling infrastructure Research Station Technology
Non-hydrogen station components have large impacton
footprint
Assumptions and considerations:
• Delivery truck path
— Trucks must be capable ofturning without reversing
— Corner lot not considered (entry and exit only on
single lot side)
Convenience store
— 50 x 30ft
• Parking/Traffic Flow
— Convenience store parking
— Fueling positions
— UT Parking Lot Design Manual
• Kept consistent between designs
• System was idealized for comparison
— Other location-specific factors will also have large
impact on footprint
-.m=51=
i2F1RST
WB-50 CIVB-15) DESIGN VEHICLE
RADIUS • 45 ft (13.72 mI
SCALE .1:20 (1:2001
Turning Template for Semi-Troiler with 50 ft (15.24 m1 Wneeloose
Texas DOT Road Design Manual
'mita National Laboratories
"F"er
.0.
1 .41 NREL Hydrogen Fueling !nfrastructure Research Station Technology

Weitere ähnliche Inhalte

Ähnlich wie Design and Footprint of LH2 Supplied Refueling.pdf

Bushing test tap
Bushing test tapBushing test tap
Bushing test tapbijumt
 
Nacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLER
Nacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLERNacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLER
Nacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLERCentro Studi Galileo
 
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghPFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghJhomelEbero
 
Giuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiulianoBozzo98
 
Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07John Grover
 
Rmdg Aerospace Presentation Powerpoint 97
Rmdg Aerospace Presentation Powerpoint 97Rmdg Aerospace Presentation Powerpoint 97
Rmdg Aerospace Presentation Powerpoint 97Chris Summers
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS STedyChriswanda1
 
Nlc 0280-1250-co y-un50_00
Nlc 0280-1250-co y-un50_00Nlc 0280-1250-co y-un50_00
Nlc 0280-1250-co y-un50_00Oliverh Kalprit
 
Static analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolioStatic analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolioKristoforusAnggara
 
XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...
XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...
XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...Centro Studi Galileo
 
Ringo Valves - Driving Energy
Ringo Valves - Driving EnergyRingo Valves - Driving Energy
Ringo Valves - Driving EnergySergio Viscarret
 
Utilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdfUtilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdfhariskhalil8
 
Z-catalogo13
Z-catalogo13Z-catalogo13
Z-catalogo13RRPumps
 

Ähnlich wie Design and Footprint of LH2 Supplied Refueling.pdf (20)

Bushing test tap
Bushing test tapBushing test tap
Bushing test tap
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
Nacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLER
Nacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLERNacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLER
Nacer Achaichia - Honeywell - REFRIGERANTI A BASSO GWP PER CHILLER
 
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghPFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
 
Giuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendio
 
Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07
 
R gz7 v1-databook
R gz7 v1-databookR gz7 v1-databook
R gz7 v1-databook
 
R gz7 v1-databook
R gz7 v1-databookR gz7 v1-databook
R gz7 v1-databook
 
Rmdg Aerospace Presentation Powerpoint 97
Rmdg Aerospace Presentation Powerpoint 97Rmdg Aerospace Presentation Powerpoint 97
Rmdg Aerospace Presentation Powerpoint 97
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
 
3S technology
3S technology3S technology
3S technology
 
Nlc 0280-1250-co y-un50_00
Nlc 0280-1250-co y-un50_00Nlc 0280-1250-co y-un50_00
Nlc 0280-1250-co y-un50_00
 
Api process pumps
Api process pumpsApi process pumps
Api process pumps
 
Oil gas applications
Oil  gas applicationsOil  gas applications
Oil gas applications
 
Static analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolioStatic analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolio
 
XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...
XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...
XVII CONVEGNO EUROPEO - N. Achaichia ECO-EFFICIENCY COMPARISON OF SUPERMARKET...
 
Ringo Valves - Driving Energy
Ringo Valves - Driving EnergyRingo Valves - Driving Energy
Ringo Valves - Driving Energy
 
Utilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdfUtilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdf
 
Natural Gas Dryer for Fueling Station Operations
Natural Gas Dryer for Fueling Station OperationsNatural Gas Dryer for Fueling Station Operations
Natural Gas Dryer for Fueling Station Operations
 
Z-catalogo13
Z-catalogo13Z-catalogo13
Z-catalogo13
 

Kürzlich hochgeladen

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Kürzlich hochgeladen (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Design and Footprint of LH2 Supplied Refueling.pdf

  • 1. 1 P r , m2F1RST Hydrogen Fueling Infrastructure Research and Station Technology Design and Footprint of Liquid Hydrogen-Supplied Refueling Stationsfor Urban Sites Brian Ehrhart Sandia National Laboratories Call with NREL and UMD October 29,2019 SAND2019-XXXX Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International, Inc.,for the U.S. Department of Energys National Nuclear Security Administration under contract DE-NA0003525. 0Sandia National laboratories Hydrogen Fueling Infrastructure Research Station Technology SAND2019-13054PE
  • 2. Specified components needed for three methods of hydrogen supply Gas Hydrogen Compressed Hydrogen L Delivery Trucks Liquid Hydrogen ' v.- 41)641j Liquid AC Power • PEM Water Electrolysis On-site Hydrogen Production LH2 Evaporator Cascade Dispenser Compressorl System 142F1RST 1. Fueling stationssupplied by LH2 may utilize cryopumps in the long-term. Compressors were assumedforsimplicity ofmodeling, as thefootprint associated with a pump is likely to be comparable. • Compressor • Cascade — 25 kg/hrflow rate(constant600 kg/day) — Outlet pressure of94.4 MPa(13,688 psi) • Chillers — 25.2 kW(7.2 tons)of refrigeration needed for each chiller — Aluminum cooling block of 1,330 kg(0.49 m3 ) needed for each — 10cascade units,each containing 5(1:1:3) pressure vessels Outletflow rate 60 kg/hr to each dispenser Dispensing 4fueling positions,70 MPa,-40°C 'mita National Laboratories 'Fr"ImREL Hydrogen Fueling Infrastructure Research Station Technology
  • 3. Liquid storage P&ID • 8 7 6 I 5 I 4 I 3 I 2 I 1 CONTROL AIR PSV-101 PSV-100 10 bar LIQUID STORAGE TAN K HV-101 220-100 FV-1020 TO FIRE PANEL RAH-100 IR FLAME DETECTOR AIMED AT HYDROGEN STORAGE HV- 00 CN L-100 CRVOGENIC PU MP GH 100 AMBIENT AIR EVAPORATOR TO COMPRESSOR NOTE 1: APPLIES TO MODU LAR STATION ONLY. A BUILD-ON-SITE STATION WILL NOT HAVE A SKID- OR CONTAINER-MOUNTED,PRE- ASSEMBLED SYSTEM. REFERENCE STATION: LIQUID STORAGE 8 7 6 5 4 3 2 1 H G F E D B A anctia National taboratories 7-1NREL --------- Hydrogen Fueling Infrastructure Research Station Technology
  • 4. H G F E D C B A Compressor and Other EquipmentP&ID 8 7 6 5 4 3 ( 4 H2 Z3r I 2 I 1 GAS STORAGE COMPRESSION SKID OR CONTAINER BOUNDARY.SEE NOTE 1 ♦ TO COMMON 136-VENT MAST - LOCATED ON BACK OF GMP 10'ABOVE GRADE TO GAS STORAGE CONTROL AIR TO FIRE PANEL RAH-100 FSV-100 COH-100 AIR COMPRESSOR PBAL 100 AF-1C0 FV-10:) ee HV-201 -0T0 I I IfHV-202 ZVO-100 P CP< /' ZVO-101 ZVO-400 AIR DRYER AF-1O1 ZVO-401 IVO-402 C> F <I ZVO-403 PLC/ Gas Control Cabinet NOTE2 GW 800 OF-802 GW 801 C>4 C><C1 CW-800 ti *V-204 HV-203 CNH 300 Motor - - 480 V, 60 kW - - I li ll - - ' 14C-CHW-800-SCH40-F2 9/16"-H-15000PSI COMPRESSOR, MULTIP LE STAGES -1643 1.17, I HV-300 FXHV-300 A Ul FF 300 FV-101 CHILLERS 26.2-kW EACH FSV-300 HV-301 HV-400 a FV-4(0 — I k_d 1-1-4 TO DISPENSER FROM DISPENSER TO CASCADE TO CASCADE CONTROL AIR ZVO-046 IR FLAME DETECTOR AIMED AT HYDROGEN COMPRESSOR NOTE 1:APPLIES TO MODULAR STATION ONLY. A BUILD-ON-SITE STATION WILL NOT HAVE A SKID- OR CONTAINER-MOUNTED,PRE-ASSEMBLED SYSTEM. NOTE 2:IN MANY MODULAR STATIONS THE HEAT EXCHANGE EQUIPMENT WILL BE ROOF-MOUNTED TO DISPENSER CONTROL AIR REFERENCE STATION: COMPRESSION AND COOLING 8 7 6 5 4 1 H G F E D C B trAtOrfel E Hydrogen Fueling Infrastructure Research Stalion Technology
  • 5. Cascade P&ID - Detail MIIMPIP' 8 7 6 4i42F1RST RESTOF CASCADE CONTROL AIR A AA EU , Ole DTI3 HV-4X1 TO COM MON 2 -VENT MAST LOCATED ON BACK OF GMP 10 ABOVE G RADE 9/16"-H-15000PSI L>< ZVO-4X1 1>Y<I ZVO-4X2 ZVO-4X3 - 41>F< ZVO-4X4 [51 FV-4X1 11Aft II '="' =7 EC, r>a -013-3 FP HV-4X2 DTI H2Storage PBNH-4X1 MAWP-13780PSIG HV-4X01 HV-4XC2 FV-4X2 /IA Tim, Tcry .s• 481 Ole HV-4X3 1>T<1 H2Storage PBNH-4X2 DTCI MAWP-13780PSIG HV-4X11 HV-4X12 ZVO-4X5 PLC/ Gas Control Cabinet H2 Storage PBNH-4X3 MAWP-13780PSIG FV-4X3 HV-4X21 HV-4X22 - 81 AlkAlk t='ElOr 1- 4 HV-4X4 FV-4X4 A Alk - 7 =Tn:17 WIZ • FV-4X5 r> T 1 H2Storage PBNH-4X4 • c> T <3 H2 Storage PBNH-4X5 MAWP-13780PSIG HV-4X31 HV-4X32 1> T 1 MAWP-13780 PSIG HV-4X41 - 1 HV-4X42 REFERENCE STATION: CASCADE UNIT 8 7 6 5 4 3 1 H G F E D C B A a i'oratories 7-1NREL ------ Hydrogen FuelIng Infrastructure Research Station Technology
  • 6. H G F E D B A Cascade P&ID - Overview 8 7 6 5 4 3 2 4.41 11;r 1 MODULAR STORAGE SKID OR CONTAINER BOUNDARY.SEE NOTE 1 TO COMMON 2"VENT MAST LOCATED ON BACK OFGMP 10ABOVEGRADE SEE NOTE 2 —C —C —C —C (› T ‹ sv-4 i > T < 3 SV-3 E> T ( 1 SV-2 cj cz i sv-1 • .e• TO FIRE PANEL 7 - 1 RAH-400 IR FLAME DETECTOR AIMED AT HYDROGEN STORAGE FROM COMPRESSOR 9/16 . '-H-15000P51 CONTROL AIR TO DISPENSER NOTE 1: APPLIES TO MODU LAR STATION ONLY. A BUILD-ON-SITE STATION WILL NOT HAVE A SKID- OR CONTAIN ER-MOUNTED,PRE-ASSEMBLED SYSTEM. NOTE 2: EACH SET OF 5 CYLINDERS SHOWN HERE IS A REPRESENTATION OF THE CASCADE UNIT SHOWN ON THE PREVIOUS SHEET REFERENCE STATION: CASCADE STORAGE 8 7 6 5 4 3 2 1 H G F E D C B El Sandia National laboratories irINREL Hydrogen Fueling Infrastructure Research Stafion Technology
  • 7. Dispenser P&ID .1111 1111 .11111MPIIIIPilir • 8 7 FROM CHILLER - / 4 TO CHILLER 7o0 BAR -N-OZZLE 9/16"-H-15000P5I To EPO circuit FROM CASCADE CONTROL AIR 2V0-900 r . ER3 2V0-901 [2><Z1 r ZVO-903 1:9<1 ZVO-902 HV-904 70MPa DISPENSER WUN-900 FV/Controls Internal 120V,1p,15A ON-900 H70-Cold H70-740 HEAT 4— ](CHANGER 1330 kg H70-Warm T di HV-900 HEAT EXCHANGER 1330 kg PLC/Gas Control Cabinet To EPO circuit --,• CZ=1. 700 BAR NOZZLE 7OMPa DISPENSER WUN-902 FV/Controls Internal 120V,lp,15A DN-902 H7O-Co HEAT EXCHANGER 1330 kg H70-1-40 H70-Warm CI* HV-902 70MPa DISPENSER WUN-901 FV/Controls Internal 120V,lp,15A ON-901 H70-CoW H70-740 To EPO cicuit HV-901 H70-Warm HEAT EXCHANGER 1330 kg 70MPa DISPENSER WUN-903 FV/Controls Internal 120V,1p,15A DN-903 H70-Cold H70-740 Jt To EPO circuit -t At HV-903 H70-Warm 700 BAR NOZZLE IR FLAME DETECTOR AIMED AT DISP HOSES TO FIRE PANEL RAH-900 700 BAR NOZZLE REFERENCE STATION: DISPENSER SUB-SYSTEM 8 7 6 5 4 3 H G F E D B anctia National taboratories EL ---------- - Hydrogen Fueling Infrastructure Research Station Technology
  • 8. Hydrogen System Layout 8 ' 40' _...„ 0 011111111M 41112F1RST 'mita National Laboratories rINREL Hydrogen Fueling !nfrastructure Research Station Technology
  • 9. LH2 Base Case View _____------- 142F1RST / 'mita National Laboratories veINREL Hydrogen Fueling !nfrastructure Research Station Technology
  • 10. Base Case Liquid: Large footprintdue to delivery truck and non-reducible 75ft. air intakes setback 78' 75' 170' 4k2F1RST • Bulk liquid storage — 800 kg, 11,299 L (2,985 gal) • Lot size: 170 x 125 ft • Total Area: 21,250ft2 'mita National Laboratories NREL Hydrogen Fueling Infrastructure Research Station Technology
  • 11. " 11111111. 7 . 1 Identified challenges in interpretation and implementation of ( 4H2F1RST NFPA 2leading to code updates Gaseoussetback distances — Large system can have "bulk storage" before and after compressor • Complexity ofsystem makes selection of single pressure and diameter challenging Liquid setback distances • Hybrid system (liquid-to-gas)analyzed as all-liquid system — Recently changedin 2020Ed.ofNFPA 55/2 • Setback distances are differentfor most exposures,only a few able to be reduced — Single system could take worst-case: maximum pressure from one area and maximum ID from other area — Could also calculate setback distances for each system section and select largest • In Appendix I, but nowhere else Calculationsforlargersystem may lead to unintendedsetback distances anclia National Laboratories Group Exposure Reducible Distance 1 1 Lotlines Yes 15 rn(50ft) 2 Air intakes 23 rn(75 ft) 3 Operable openings in buildings 23 rn(75 ft) 4Ignition sources 15 m(50ft) 2 5 Places ofpublic assembly 23 m(75 ft) 6Parked cars 1.7 m(25 ft) 3 7(a)(1)Sprinklered non-combustible building Yes 1.5 m(5 ft) 7(a)(2)(i)Unsprinklered, without fire-rated wall Yes 15 m(50ft) 7(a)(2)(ii)Unsprinklered, with fire-rated wall Yes 1.5 rn(5 ft) 7(b)(1)Sprinklered combustible building Yes 15 m(50ft) 7(b)(2)Unsprinklered combustible building Yes 23 m(75 ft) 8Flammable gas systems (other than H2) Yes 23 m(75 ft) 9Between stationary LH2containers 1.5 m(5 ft) 10 All classes offlammable and combustible liquids Yes 23 rn(75 ft) 11 Hazardous material storage including LO2 Yes 23 rn(75 ft) 12Heavy timber, coal Yes 23 rn(75 ft) 13 Wallopenings 15 m(50ft) 14 Inlet to underground sewers 1.5 m(5 ft) 15a Utilities overhead: public transit electric wire 15 m(50ft) 15b Utilities overhead: other overhead electric wire 7.5 m(25 ft) 15c Utilities overhead: hazardous material piping 4.6 m(15 ft) 16Flammable gas metering and regulating stations 4.6 m(15 ft) - . -- --- '—w,ii -_ : : 7 . -_. - 1-,;- _ ; _ - _—:-- --- f--_,--
  • 12. NFPA 2020 Requirements Proposed Requirements 141' 91' 71' -:7. 191' 1-41.5""- 0.1 Gas Ga G Group 2 Group 1 Gas: Air In12ikas 75' 07' sz Group 3 157' Current Requirements 141' 91' 60' 71' -4115""" - 11-25'-1 " - 80' 50' 130' 75' 180' 41112F1RST 11.c A 191' V 'mita National Laboratories mREL ..4 Hydrogen Fueling Infrastructure Research Station Technology
  • 13. New NFPA 2020 Liquid Station Layout 72"I 63' -40 ol 72" 1' 44°1 151- 7 78' 75' 52' 55' 41' -41-1° - 71 2" Comientence Store eeeeeoeoee 156' • 30' 117' 12' 142F1RST 'mita National Laboratories rINREL Hydrogen Fueling Infrastructure Research Station Technology
  • 14. 1 1111.1.111Pmr— Underground Direct Bury 22' -410' 75' 8 ' 37' )(. ( ) ) ) ( ) ( ) ) C )( )C 50' ConvenienceStore ag• ) ) ) ( ) ) ) 145' C ) ) 5 ' 30' 107' 12' 4112F1RST ,7 - A2C111111.11 andia National Laboratories -7-1NREL Hydrogen Fueling Infrastructure Research Station Technology
  • 15. --- ' 11411111 Summary of lot sizesfor all cases Total Lot Area (ft2 ) Reduction from Base Case Base Case Gas 17,640 New NFPA Separation Distances 17,640 0.00% New Delivery Single Truck 14,391 18.42% New Delivery Double Truck 15,875 10.01% Gasoline Co-Location 21,980 -24.60% (Increase) Underground Direct-Bury 16,060 8.96% Underground Vault 13,720 22.22% Rooftop Storage 15,400 12.70% Base Case Liquid 21,250 0.00% New NFPA Separation Distances 18,252 14.11% New Liquid Delivery 19,080 10.21% Gasoline Co-Location 25,330 -19.20% (Increase) Underground Direct-Bury 15,515 26.99% Rooftop Storage 19,840 6.63% Base Case 14,756 0.00% New NFPA Separation Distances 11,934 19.12% Gasoline Co-Location 21,980 -48.96% (Increase) Jnderground Direct-Bury 13,340 9.60% Underqround Vault 16,240 -10.06% (Increase) Roofto• Stora•e 11 466 2230% F1RST
  • 16. TECHNICAL BACK-UP SLIDES 41i -i2F1RST 1 andia National Laboratories REL Hydrogen Fueling infrastructure Research Station Technology
  • 17. Non-hydrogen station components have large impacton footprint Assumptions and considerations: • Delivery truck path — Trucks must be capable ofturning without reversing — Corner lot not considered (entry and exit only on single lot side) Convenience store — 50 x 30ft • Parking/Traffic Flow — Convenience store parking — Fueling positions — UT Parking Lot Design Manual • Kept consistent between designs • System was idealized for comparison — Other location-specific factors will also have large impact on footprint -.m=51= i2F1RST WB-50 CIVB-15) DESIGN VEHICLE RADIUS • 45 ft (13.72 mI SCALE .1:20 (1:2001 Turning Template for Semi-Troiler with 50 ft (15.24 m1 Wneeloose Texas DOT Road Design Manual 'mita National Laboratories "F"er .0. 1 .41 NREL Hydrogen Fueling !nfrastructure Research Station Technology