SlideShare ist ein Scribd-Unternehmen logo
1 von 7
OSAMA ALI MOHAMED HAMMAM
16Eryan Tadros –Dir Elmalak- Hadaek El koba
Cairo ,Egypt
01128658146&01093828661:mobile
Personal information
Date of birth: 24/7/1979*
Nationality: Egyptian*
*Marital status: married
*Military service: finished
Qualification : Education
University degree : B.sc civil engineering
University : Zagazig university
Graduation year : 2003
General Grade : accept (61.2%(
Project Grade : excellent ( structure(
Language skills
*Native language Arabic
*Very good in English spoken/written.
Computer Skills
*Autocad , SAB.
Microwsoft Office (word ,exel* (..,
Experience
A. From 11 -2-2004 till 11 -7- 2004 (6 months)
.
Company: DC Dorsch Consult office
Position :site engineer
Project :at Mansheit Naser development project
Owner : Egyptian government (German grant)
Contractor: Arab contractors (Naser city branch)
B. From 1 -10- 2005 till 1 -4- 2007 (18 months)
Company: Utilities consult
Position :site engineer
Project Mansheit Naser development project
Owner : Egyptian government (German grant)
Contractor : Saad Hanna sons &
1. Sewer Lines
a. Excavation works for manholes, inspection champers and pipe
lines.
b. Laying and testing pipes.
c. Constructing manholes and inspection champers by concrete and
engineering bricks.
d. Using VCP pipes different diameters 9" 18" for main lines and
( 7" VCP – 6" UPVC )for house connections.
e. Finishing works for constructed manholes and champers.
2. Water lines
a. Excavation works, laying and testing pipes with fitting (elbows,
tee, reducers ……)
b. Using DCI ductile cast iron (100,200,300 mm) for main lines and
UPVC 20mm for house connections.
3. Construting one lifting pump station .
4. Constructing one force mains line using DCI 200mm pipes length
250 m with all fittings.
C. From 6 -6- 2007 till 1 -4- 2011 (46 months)
Company: Al Tamimi Contracting Company in Saudi Arabia
Position : Site engineer
Projects : High Technical College for girls (Baha)
Primary school for girls (Skaka)
Compound of schools for girls (Borida)
Owner : Saudi government (Ministry of Education)
1. 3 months in finishing works at constructing technical institute in
Baha
2. Executive manager Constructing and finishing schools ( 2 projects)
a. Excavation and constructing 2 underground R.C tanks ( 7*4*4m
for water & 30*4*4m for sewage )
b. Excavation and all concrete works for main and servant
buildings.
c. Building works (hollow block for inside walls & snatched block
with thermal insulation for outside walls)
d. Water and thermal insulations & Sloped concrete & foam
concrete for roof.
e. Water net works for all buildings and connecting to the
underground tank and to the upper tanks by separated lines.
f. Sewage line works inside buildings and outer sewage net to the
tank.
g. Fixing all sanitary all sets.
h. Firefighting works inside buildings and the general location upto
pump room.
i. Electrical works ( lightening + power ) and Alarm net with
fixing the main and branch panels + stretching cable.
j. Construct power and electric room and handover to electric
department.
k. Plaster and Painting works for the inside walls and the fronts.
l. Fixing steel & metal doors & aluminum windows
m.Fixing marble for stairs.
n. Tile works : (terrazzo) for the roofs & ( ceramics) for room
flooring and path room walls.
o. Fixing Steel works (columns, beam, roof) for the student hall.
p. Presenting monthly payment to the educational department.
q. All restriction works handover to the consultant.
r. Handover all projects to the owner ( committee from ministry of
education )
D. From 15 -4- 2012 till 1 -9- 2014 ( 30 months)
Company: Protection for Contracting and Design “PSC “
Position : Site engineer
Projects : ANODE for Cook and Carbon Blocks Factory
(El-Ein El-Sokhna)
PSC (Subcontractor) & NFC (Chinese company) main contractor
Project of 54 million EP for PSC only and total cost 466 million EP
for NFC
Owner : Egyptian government (Ministry of Investment)
1. Construction Main Calcining Cook system (( Furnace )).
a) Excavation and all concrete works (raft + isolated footings +
pedestals .
b) Preparing and fixing anchors and plates for steel columns and
the main machine which fixed by NFC company.
c) Construct 3 oil up ground tanks ( 12*8*3m)
d) Construct main cable trench at Furnace.
2. Construction 4 big (( Silos )) by slip form height 40 m and 22m
diameter. (one of four engineers)
 Excavation and all concrete works ( raft + walls + slab + walls
+ slab + walls of 32m by slip form + steel beams and slab)
3. Construction 4 small Silos by slip form height 40 m and 22m
diameter. (one of four engineers)
 Excavation and all concrete works ( raft + walls + slab + walls
+ slab + walls of 32m by slip + steel beams and slab)
4. Construction Bucket elevator ( as an undergrond tank 12*8*7m).
5. Construction 2 Main Electrical and Power buildings.
a) All concrete works for one building + building works
b) Finishing works for two buildings (plastering + painting +
raised floors + ceramics works + steel doors + aluminum
windows +water and sewage lines +sanitary sets +lightening
and power+ finishing the roof thermal and water insulation
and sloped concrete and terrazzo tiles …)
6. Construction 2 water tanks ( 28*16*4m) with inside RC walls
a) Testing +Treatment + fixing steel handrails on the roof.
7. Pump room (24*8*9m)
8. 2 Guard houses.
9. 2 Sewage and industrial treatment station
10. Compressed Air building.
11. Workshop building.
12. Tunnel ( as box section 26*4*3.5m )
13. Slab On Grade ( SOG ) ..
a) .Reinforced by ( steel bars / steel fiber / fiber mesh )
b) Plain concrete SOG for platform.
14. 3 Truck scales
15. Water lines
16. Sewage lines: (excavating + casting insitu + finishing ) manholes
17. Domestic lines
18. Fire fighting lines
• All lines were steel welded pipes ( excavation, bedding,
pipe laying, fittings , welding , testing )
19. Gas lines ( excavation, bedding, backfilling ) laying pipes and
fittings by Egyptian Gas Company
20. Gas rooms
21. Cable lines ( excavation , bedding, backfilling )
22. Telephone & Net cables
23. Slab On Grade ( SOG ):-
a) .Reinforced by ( steel bars or steel mesh or fiber mesh )
c) Plain concrete SOG for platform.
E. From 1 -9- 2014 till 1-12-2014 ( 4 months)
Company: Protection for Contracting and Design “PSC “
Position : Executive manager
Projects : Upgrading Wets Production area
Owner : GlaxoSmithKline factory
F. From 1 -12- 2014 till 1-2-2015 ( 3 months)
Company: Protection for Contracting and Design “PSC “
Position : Executive manager engineer
Projects : Spinning Factory
Owner : Bidco International co.
G. From 1 -2- 2014 till Now ( 3 months)
Company: Protection for Contracting and Design “PSC “
Position : Executive manager engineer
Projects : Gypsum Board manufacturing
Owner : ECOBAT factory
*Ability to work in team & under pressure
*Ability to learn new tasks quickly
*Learning from mistakes and changes behavior as result of what was learnt
Listening, problem solving and communication.*
*Customer service orientation.
*Able to work with minimal supervision
*Excellent communication and negotiation skills
*Familiarity with computer use
*Comfort with shifts
*Comfort with physical work
*Pride in achieving individual targets
----------------------------------------------------------------------------------------------------
References, documents and Certificates
All will be available upon request
Personal skills
G. From 1 -2- 2014 till Now ( 3 months)
Company: Protection for Contracting and Design “PSC “
Position : Executive manager engineer
Projects : Gypsum Board manufacturing
Owner : ECOBAT factory
*Ability to work in team & under pressure
*Ability to learn new tasks quickly
*Learning from mistakes and changes behavior as result of what was learnt
Listening, problem solving and communication.*
*Customer service orientation.
*Able to work with minimal supervision
*Excellent communication and negotiation skills
*Familiarity with computer use
*Comfort with shifts
*Comfort with physical work
*Pride in achieving individual targets
----------------------------------------------------------------------------------------------------
References, documents and Certificates
All will be available upon request
Personal skills

Weitere ähnliche Inhalte

Was ist angesagt?

construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015Hassan gariesh
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
ENG.MOHAMED ABU EL-AZM C.V
ENG.MOHAMED ABU EL-AZM C.VENG.MOHAMED ABU EL-AZM C.V
ENG.MOHAMED ABU EL-AZM C.VMohamed El-azm
 
c.v super intendent piping
c.v  super intendent pipingc.v  super intendent piping
c.v super intendent pipingsaber etaby
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)khaled sonbol
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction managerMohamed Roshdy
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -maen KHODR
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHosam Ahmed
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osmanGomaa Khamis
 
Company Profile Wah Tung
Company Profile   Wah TungCompany Profile   Wah Tung
Company Profile Wah Tungvipproject
 

Was ist angesagt? (19)

construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
ENG.MOHAMED ABU EL-AZM C.V
ENG.MOHAMED ABU EL-AZM C.VENG.MOHAMED ABU EL-AZM C.V
ENG.MOHAMED ABU EL-AZM C.V
 
amir cv
amir cvamir cv
amir cv
 
c.v super intendent piping
c.v  super intendent pipingc.v  super intendent piping
c.v super intendent piping
 
Khaled cv07
Khaled cv07Khaled cv07
Khaled cv07
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
Alaa CV
Alaa CVAlaa CV
Alaa CV
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
Mahmoud Abou-Elhamd
Mahmoud Abou-ElhamdMahmoud Abou-Elhamd
Mahmoud Abou-Elhamd
 
Michael Mabrouk CV (6)
Michael Mabrouk CV (6)Michael Mabrouk CV (6)
Michael Mabrouk CV (6)
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
 
Company Profile Wah Tung
Company Profile   Wah TungCompany Profile   Wah Tung
Company Profile Wah Tung
 
C.V-Ayman
C.V-Ayman  C.V-Ayman
C.V-Ayman
 

Ähnlich wie cv بدون

Ähnlich wie cv بدون (20)

Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
remon rezek c.v
remon rezek c.vremon rezek c.v
remon rezek c.v
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
C.V
C.VC.V
C.V
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
CV update
CV updateCV update
CV update
 
MCV
MCVMCV
MCV
 
c.v M_Helal 8-2016
c.v M_Helal  8-2016c.v M_Helal  8-2016
c.v M_Helal 8-2016
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 

cv بدون

  • 1. OSAMA ALI MOHAMED HAMMAM 16Eryan Tadros –Dir Elmalak- Hadaek El koba Cairo ,Egypt 01128658146&01093828661:mobile Personal information Date of birth: 24/7/1979* Nationality: Egyptian* *Marital status: married *Military service: finished Qualification : Education University degree : B.sc civil engineering University : Zagazig university Graduation year : 2003 General Grade : accept (61.2%( Project Grade : excellent ( structure( Language skills *Native language Arabic *Very good in English spoken/written.
  • 2. Computer Skills *Autocad , SAB. Microwsoft Office (word ,exel* (.., Experience A. From 11 -2-2004 till 11 -7- 2004 (6 months) . Company: DC Dorsch Consult office Position :site engineer Project :at Mansheit Naser development project Owner : Egyptian government (German grant) Contractor: Arab contractors (Naser city branch) B. From 1 -10- 2005 till 1 -4- 2007 (18 months) Company: Utilities consult Position :site engineer Project Mansheit Naser development project Owner : Egyptian government (German grant) Contractor : Saad Hanna sons & 1. Sewer Lines a. Excavation works for manholes, inspection champers and pipe lines. b. Laying and testing pipes. c. Constructing manholes and inspection champers by concrete and engineering bricks. d. Using VCP pipes different diameters 9" 18" for main lines and ( 7" VCP – 6" UPVC )for house connections. e. Finishing works for constructed manholes and champers. 2. Water lines a. Excavation works, laying and testing pipes with fitting (elbows, tee, reducers ……) b. Using DCI ductile cast iron (100,200,300 mm) for main lines and UPVC 20mm for house connections.
  • 3. 3. Construting one lifting pump station . 4. Constructing one force mains line using DCI 200mm pipes length 250 m with all fittings. C. From 6 -6- 2007 till 1 -4- 2011 (46 months) Company: Al Tamimi Contracting Company in Saudi Arabia Position : Site engineer Projects : High Technical College for girls (Baha) Primary school for girls (Skaka) Compound of schools for girls (Borida) Owner : Saudi government (Ministry of Education) 1. 3 months in finishing works at constructing technical institute in Baha 2. Executive manager Constructing and finishing schools ( 2 projects) a. Excavation and constructing 2 underground R.C tanks ( 7*4*4m for water & 30*4*4m for sewage ) b. Excavation and all concrete works for main and servant buildings. c. Building works (hollow block for inside walls & snatched block with thermal insulation for outside walls) d. Water and thermal insulations & Sloped concrete & foam concrete for roof. e. Water net works for all buildings and connecting to the underground tank and to the upper tanks by separated lines. f. Sewage line works inside buildings and outer sewage net to the tank. g. Fixing all sanitary all sets. h. Firefighting works inside buildings and the general location upto pump room. i. Electrical works ( lightening + power ) and Alarm net with fixing the main and branch panels + stretching cable. j. Construct power and electric room and handover to electric department. k. Plaster and Painting works for the inside walls and the fronts. l. Fixing steel & metal doors & aluminum windows m.Fixing marble for stairs.
  • 4. n. Tile works : (terrazzo) for the roofs & ( ceramics) for room flooring and path room walls. o. Fixing Steel works (columns, beam, roof) for the student hall. p. Presenting monthly payment to the educational department. q. All restriction works handover to the consultant. r. Handover all projects to the owner ( committee from ministry of education ) D. From 15 -4- 2012 till 1 -9- 2014 ( 30 months) Company: Protection for Contracting and Design “PSC “ Position : Site engineer Projects : ANODE for Cook and Carbon Blocks Factory (El-Ein El-Sokhna) PSC (Subcontractor) & NFC (Chinese company) main contractor Project of 54 million EP for PSC only and total cost 466 million EP for NFC Owner : Egyptian government (Ministry of Investment) 1. Construction Main Calcining Cook system (( Furnace )). a) Excavation and all concrete works (raft + isolated footings + pedestals . b) Preparing and fixing anchors and plates for steel columns and the main machine which fixed by NFC company. c) Construct 3 oil up ground tanks ( 12*8*3m) d) Construct main cable trench at Furnace. 2. Construction 4 big (( Silos )) by slip form height 40 m and 22m diameter. (one of four engineers)  Excavation and all concrete works ( raft + walls + slab + walls + slab + walls of 32m by slip form + steel beams and slab) 3. Construction 4 small Silos by slip form height 40 m and 22m diameter. (one of four engineers)  Excavation and all concrete works ( raft + walls + slab + walls + slab + walls of 32m by slip + steel beams and slab) 4. Construction Bucket elevator ( as an undergrond tank 12*8*7m). 5. Construction 2 Main Electrical and Power buildings. a) All concrete works for one building + building works b) Finishing works for two buildings (plastering + painting + raised floors + ceramics works + steel doors + aluminum windows +water and sewage lines +sanitary sets +lightening
  • 5. and power+ finishing the roof thermal and water insulation and sloped concrete and terrazzo tiles …) 6. Construction 2 water tanks ( 28*16*4m) with inside RC walls a) Testing +Treatment + fixing steel handrails on the roof. 7. Pump room (24*8*9m) 8. 2 Guard houses. 9. 2 Sewage and industrial treatment station 10. Compressed Air building. 11. Workshop building. 12. Tunnel ( as box section 26*4*3.5m ) 13. Slab On Grade ( SOG ) .. a) .Reinforced by ( steel bars / steel fiber / fiber mesh ) b) Plain concrete SOG for platform. 14. 3 Truck scales 15. Water lines 16. Sewage lines: (excavating + casting insitu + finishing ) manholes 17. Domestic lines 18. Fire fighting lines • All lines were steel welded pipes ( excavation, bedding, pipe laying, fittings , welding , testing ) 19. Gas lines ( excavation, bedding, backfilling ) laying pipes and fittings by Egyptian Gas Company 20. Gas rooms 21. Cable lines ( excavation , bedding, backfilling ) 22. Telephone & Net cables 23. Slab On Grade ( SOG ):- a) .Reinforced by ( steel bars or steel mesh or fiber mesh ) c) Plain concrete SOG for platform. E. From 1 -9- 2014 till 1-12-2014 ( 4 months) Company: Protection for Contracting and Design “PSC “ Position : Executive manager Projects : Upgrading Wets Production area Owner : GlaxoSmithKline factory F. From 1 -12- 2014 till 1-2-2015 ( 3 months) Company: Protection for Contracting and Design “PSC “ Position : Executive manager engineer Projects : Spinning Factory Owner : Bidco International co.
  • 6. G. From 1 -2- 2014 till Now ( 3 months) Company: Protection for Contracting and Design “PSC “ Position : Executive manager engineer Projects : Gypsum Board manufacturing Owner : ECOBAT factory *Ability to work in team & under pressure *Ability to learn new tasks quickly *Learning from mistakes and changes behavior as result of what was learnt Listening, problem solving and communication.* *Customer service orientation. *Able to work with minimal supervision *Excellent communication and negotiation skills *Familiarity with computer use *Comfort with shifts *Comfort with physical work *Pride in achieving individual targets ---------------------------------------------------------------------------------------------------- References, documents and Certificates All will be available upon request Personal skills
  • 7. G. From 1 -2- 2014 till Now ( 3 months) Company: Protection for Contracting and Design “PSC “ Position : Executive manager engineer Projects : Gypsum Board manufacturing Owner : ECOBAT factory *Ability to work in team & under pressure *Ability to learn new tasks quickly *Learning from mistakes and changes behavior as result of what was learnt Listening, problem solving and communication.* *Customer service orientation. *Able to work with minimal supervision *Excellent communication and negotiation skills *Familiarity with computer use *Comfort with shifts *Comfort with physical work *Pride in achieving individual targets ---------------------------------------------------------------------------------------------------- References, documents and Certificates All will be available upon request Personal skills