 Approval of minutes – Erich Tiepel
 Grounds Report- Steve Sarro
   Driving Range Improvements
      Phelps/Tanner consulting
   Tree Care
      2012 Maintenance
      Imprelis
   Water Update
      Harriman Construction
      Outlook on 2013
        Water
        Rough maintenance and new mow lines
        Project Status: tees, dam, bunker
   New Business
Concept A
Concept A
 Lower Range Tee
 New Target Greens
 Some Mounding around the range
 Reconstructed staging area and bag drop North side of
    clubhouse
   Minor revisions to the Pfluger putting green
   Estimated Cost for Range area only $455,000
   Estimated Cost for Staging Area only $225,000
   Estimated Design/Engineering Costs $75,000
   Total Estimated Cost for Concept A: $755,000
Concept B
Concept B
 Include the cope of work with Concept A
 Minor changes to the access from 12 Green to 13 Tee
 Move 1 and 13 Tee back to gain approximately 30 yards
 Shifts range to the left and away from 16 fairway.
 Changes to the practice green
 Estimated Cost of $895,000
Old Cottonwood


         More Poa




                    More Bent
Water Plan 2013 Storage Rights:
            Total of 107-122 AF

1. 24 AF in Soda Lakes
2. 58 AF in Harriman
3. 25-40AF from Mt. Mutual Reservoir Co.
2012 was the hottest summer on record
PCC used 136 AF of storage water from
         May through October

Weitere ähnliche Inhalte

Was ist angesagt?

GSWRA_EnergyEfficiency_SEPT2015_DBT
GSWRA_EnergyEfficiency_SEPT2015_DBTGSWRA_EnergyEfficiency_SEPT2015_DBT
GSWRA_EnergyEfficiency_SEPT2015_DBTDylan Thisse, P.E.
 
Stop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerStop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerCraig Harrington
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITIONIceland Geothermal
 
Senior Capstone Final
Senior Capstone FinalSenior Capstone Final
Senior Capstone FinalAlston Loper
 
Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Yale Carden
 
Recoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit optionsRecoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit optionsRecoup WWHRS
 
2011 Energy Management Presentation
2011 Energy Management Presentation2011 Energy Management Presentation
2011 Energy Management PresentationAJ Mesiti
 
GeoExchange Heating and Cooling: The 5 Slide Challenge
GeoExchange Heating and Cooling: The 5 Slide ChallengeGeoExchange Heating and Cooling: The 5 Slide Challenge
GeoExchange Heating and Cooling: The 5 Slide ChallengeYale Carden
 

Was ist angesagt? (10)

GSWRA_EnergyEfficiency_SEPT2015_DBT
GSWRA_EnergyEfficiency_SEPT2015_DBTGSWRA_EnergyEfficiency_SEPT2015_DBT
GSWRA_EnergyEfficiency_SEPT2015_DBT
 
Stop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerStop Don't R&R Contractors Flyer
Stop Don't R&R Contractors Flyer
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
 
Roger Baroudi, SSHI
Roger Baroudi, SSHIRoger Baroudi, SSHI
Roger Baroudi, SSHI
 
Senior Capstone Final
Senior Capstone FinalSenior Capstone Final
Senior Capstone Final
 
Benefits of Modular District Energy
Benefits of Modular District EnergyBenefits of Modular District Energy
Benefits of Modular District Energy
 
Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013
 
Recoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit optionsRecoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit options
 
2011 Energy Management Presentation
2011 Energy Management Presentation2011 Energy Management Presentation
2011 Energy Management Presentation
 
GeoExchange Heating and Cooling: The 5 Slide Challenge
GeoExchange Heating and Cooling: The 5 Slide ChallengeGeoExchange Heating and Cooling: The 5 Slide Challenge
GeoExchange Heating and Cooling: The 5 Slide Challenge
 

Andere mochten auch

Pinehurst CC Tree Management Program Guide
Pinehurst CC Tree Management Program GuidePinehurst CC Tree Management Program Guide
Pinehurst CC Tree Management Program Guidessarro
 
2 21-12 meeting
2 21-12 meeting2 21-12 meeting
2 21-12 meetingssarro
 
образование для всех
образование для всехобразование для всех
образование для всехiespuzbekistan
 
Pinehurst CC Tree Management Guide Final
Pinehurst CC Tree Management Guide FinalPinehurst CC Tree Management Guide Final
Pinehurst CC Tree Management Guide Finalssarro
 
Bill Selph backgrounder
Bill Selph backgrounderBill Selph backgrounder
Bill Selph backgrounderBill Selph
 
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...iespuzbekistan
 
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...iespuzbekistan
 
Pcc green comm_jan_10_13
Pcc green comm_jan_10_13Pcc green comm_jan_10_13
Pcc green comm_jan_10_13ssarro
 
February 2013 PCC Greens Meeting
February 2013 PCC Greens MeetingFebruary 2013 PCC Greens Meeting
February 2013 PCC Greens Meetingssarro
 

Andere mochten auch (9)

Pinehurst CC Tree Management Program Guide
Pinehurst CC Tree Management Program GuidePinehurst CC Tree Management Program Guide
Pinehurst CC Tree Management Program Guide
 
2 21-12 meeting
2 21-12 meeting2 21-12 meeting
2 21-12 meeting
 
образование для всех
образование для всехобразование для всех
образование для всех
 
Pinehurst CC Tree Management Guide Final
Pinehurst CC Tree Management Guide FinalPinehurst CC Tree Management Guide Final
Pinehurst CC Tree Management Guide Final
 
Bill Selph backgrounder
Bill Selph backgrounderBill Selph backgrounder
Bill Selph backgrounder
 
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
 
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
Проблемы и перспективы обеспечения трудоустройства людей с инвалидностью в Ре...
 
Pcc green comm_jan_10_13
Pcc green comm_jan_10_13Pcc green comm_jan_10_13
Pcc green comm_jan_10_13
 
February 2013 PCC Greens Meeting
February 2013 PCC Greens MeetingFebruary 2013 PCC Greens Meeting
February 2013 PCC Greens Meeting
 

Ähnlich wie March_2013_PCC_green_committee

Bundoora park - On par for water saving
Bundoora park - On par for water savingBundoora park - On par for water saving
Bundoora park - On par for water savingNEXTDC
 
PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12ssarro
 
Grand business mtg - roof replacement 2013-09
Grand business mtg - roof replacement 2013-09Grand business mtg - roof replacement 2013-09
Grand business mtg - roof replacement 2013-09GrandAdvent
 
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...Michael Hewitt, GISP
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationJones Edmunds
 
November 12 green_committee
November 12 green_committeeNovember 12 green_committee
November 12 green_committeessarro
 

Ähnlich wie March_2013_PCC_green_committee (6)

Bundoora park - On par for water saving
Bundoora park - On par for water savingBundoora park - On par for water saving
Bundoora park - On par for water saving
 
PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12
 
Grand business mtg - roof replacement 2013-09
Grand business mtg - roof replacement 2013-09Grand business mtg - roof replacement 2013-09
Grand business mtg - roof replacement 2013-09
 
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA Presentation
 
November 12 green_committee
November 12 green_committeeNovember 12 green_committee
November 12 green_committee
 

March_2013_PCC_green_committee

  • 1.
  • 2.  Approval of minutes – Erich Tiepel  Grounds Report- Steve Sarro  Driving Range Improvements  Phelps/Tanner consulting  Tree Care  2012 Maintenance  Imprelis  Water Update  Harriman Construction  Outlook on 2013  Water  Rough maintenance and new mow lines  Project Status: tees, dam, bunker  New Business
  • 5.  Lower Range Tee  New Target Greens  Some Mounding around the range  Reconstructed staging area and bag drop North side of clubhouse  Minor revisions to the Pfluger putting green  Estimated Cost for Range area only $455,000  Estimated Cost for Staging Area only $225,000  Estimated Design/Engineering Costs $75,000  Total Estimated Cost for Concept A: $755,000
  • 8.
  • 9.
  • 10.  Include the cope of work with Concept A  Minor changes to the access from 12 Green to 13 Tee  Move 1 and 13 Tee back to gain approximately 30 yards  Shifts range to the left and away from 16 fairway.  Changes to the practice green  Estimated Cost of $895,000
  • 11.
  • 12. Old Cottonwood More Poa More Bent
  • 13.
  • 14. Water Plan 2013 Storage Rights: Total of 107-122 AF 1. 24 AF in Soda Lakes 2. 58 AF in Harriman 3. 25-40AF from Mt. Mutual Reservoir Co.
  • 15. 2012 was the hottest summer on record PCC used 136 AF of storage water from May through October