2. Confidential
UK Based - Bracknell (& Cambridge)
Process Design - focus on liquids / low
solids - including fats + oils
Project Delivery - design & build
Team – 20+
Engineering –
process, mechanical, electrical
Operations – site based delivery, trials
Research – with York University
Sales, Marketing, Financial
Trials Unit - mobile Small Scale
Production Plant (SSPP)
Project Partners - UTS Biogas (Higher
Solids AD) / Ener-G (CHP)
2
CLEARFLEAU – AN OVERVIEW
3. Confidential
AD evolving into 3 core sectors:
MUNICIPAL (COMMUNITY): landfill diverted.
Diverse feedstocks (44 sites)
FARM: slurry & crop feedstocks
Lower cost technology (42 sites)
INDUSTRIAL: bio-degradable waste
On-site heat & power (16 sites)
Non – Water Industry (146 sites)
EVOLVING MARKETPLACE
4. Confidential
Dairy Industry
BV Dairy, Shaftesbury*
Arla Foods, Stourton (Leeds)*
Volac, South Wales*
First Milk (Glenfield), Scotland / FM Group
Barbers, Shepton Mallet*
Food Processing Industries
Nestle, Fawdon* / Nestle Group
Brewing and Beverage
Diageo, Speyside* / Diageo Group
Hook Norton Brewery
Biofuels
Greenergy*, Immingham
Olleco (Agri-Energy)*, Liverpool
4
OUR MARKET FOCUS
* Trials Undertaken
5. Confidential
Drivers to apply Anaerobic
Digestion (AD)
Escalating energy costs
Treatment capacity limits
Effluent discharge consents
Pressure on disposal costs
Revenue generation potential
Project payback based on:
Lower disposal costs
On-site energy savings
AD is revenue generative
− Incentive payments
− Carbon reduction
ON-SITE INDUSTRAL DIGESTION
6. Confidential
l
Type Band
RPI Index 1.048
AD Biogas ≤ 250 kW 14.0 14.0 14.7 15.16 14.0 13.3 12.6 12.0 11.4
AD Biogas > 250 kW - 500 kW 13.0 13.0 13.6 14.02 13.0 12.4 11.7 11.2 10.6
AD Biogas > 500 kW - 5 MW 9.4 9.4 8.96 9.24 8.96 8.6 8.1 8.1 8.1
RHI
Phase 1
Biogas
Combustion
< 200 kWt 6.8 7.1 7.1 7.3 7.5+
≤ 200 kWt 7.3
> 200 kW - 500 kW 5.9
> 500 kW 2.2
Current (+) index linked
RHI
Phase 2
Biogas
Combustion
Consultation
01-APR-2017-
31-MAR-2018
01-APR-2018-
31-MAR-2019
Installation eligibility dates between>
FIT
01-APR-2012-
30-SEP-2012
01-OCT-2012-
31-MAR-2013
01-APR-2013-
31-MAR-2014
01-APR-2014-
31-MAR-2015
01-APR-2015-
31-MAR-2016
01-APR-2016-
31-MAR-2017
Starting tariff (p/kWh)
+ 3.2 p/kWh for feed into grid
Tariffs are paid for 20 years from registration
date and are index linked for inflation
03-MAR-2012-
31-MAR-2012
Blackmore Vale (BV) Dairy – overview - process milk into cream, soft cheese and yoghurt for sale to food service and manufacturersFinance from ETF (Environ. Transformation Fund) – administered by WRAP, funded by DECC and DEFRA (don’t mention the logos!), as part of a Government initiative to stimulate wider adoption of innovative ADThis project is part of efforts by BVD to decrease it’s carbon footprint – C02 / other greenhouse gas emissions can be reduced by cutting fossil fuel consumption or generating renewable energy – BVD is doing both – generating heat and electricity