SlideShare ist ein Scribd-Unternehmen logo
1 von 42
Downloaden Sie, um offline zu lesen
- 1 -
“Hi Maturity in the CMMI Services
Context"
Chinmay Pradhan
QAI Global
CMMI For Services
- 2 -
• Helps Build Better Services
• Looks at Services from Strategic
perspective
• Applicable across broad spectrum
of work done
• Aligned and Leverages existing
service management frameworks
eg ITIL, CoBIT etc
Snapshot of Services Where CMMI SVC has been applied
- 3 -
• Majority is for Application Management
•Production Support
•Change Requests
•Bug Fixes
• Other Non Conventional work types
are also catching up
Work Types WIth SVC Implemented
Application Management and
Support
Training Services
Risk Consutling
ERP Configuration
ERP Support
Staff Augumentation
BPO
Service System
• Services are useful intangible and non-storable results
delivered through the operation of a service system.
Âť CMMI SVC
• Services are characterized by
–Simultaneity
–Heterogeneity
• A Service System is a combination of
–People using
•Tools and Resources to execute
–Process Steps to complete an service operation
- 4 -
Service Components: Elements that help deliver a Service
- 5 -
Work
products
Work
Processes
Tools
Infrastructure
People
Streamlined Service Delivery
Modeling in an Application Support
Service
- 6 -
Typical Expectations
- 7 -
Year-on-Year Savings
Technical Complexity
Assumed system
- 8 -
No of
Requests
per Day
• Based on actual average TAT per step and priority
•Helped analyze the capacity required per day and hence plan for the month
• Was simple to use and understand
But!!!
In Reality….
- 9 -
19
4
• Events are dynamic
with multiple factors
affecting the
performance
• The inflow of tickets
changes constantly
• The performance for
each of the steps is
not fixed, but variable
An animated view of the service system
In Reality….
• There were far too many dynamic factors to be considered in
the entire resolution process like
–If a high Priority ticket came in all others have to be
dropped till this is fixed
–If resources are busy then tickets will be in queue
–The Process Performance is a function of the complexity
and not just the priority,
• Additional complexity: can have high priority simple tickets and
also complex tickets.
- 10 -
- 11 -
… to control the Key Process Outputs
Key Process Inputs:
Control these …
Output Variability
“Outputs inherit variability from inputs.”
Sub Process and its Impact
One approach for Modeling Such a System
- 12 -
Let’s Take an example
The Service System we have picked up is
–Service to resolve Production support requests for large banking
application
–There are 2 different kinds of requests that come in to the queue,
Type 1 and Type 2. Each having its own priorities and SLA’s
–The Service provides a 6X18 hr support.
Some of the challenges faced by the service system are
–The resource allocation and utilization vis a vis the SLA performance
is sub optimal i.e if the SLA compliance is comfortable then there is
low utilization
–Team composition and shift allocation
- 13 -
Creating the Model
The service system was aptly described by a queue based system. To
model such a system we required:
• Standard Simulation Modeling Tool. E.g Process Model
• Resources with the knowledge of such modeling and the skill to use the
tools
• Process maps of actual events
• Map of all possible occurring conditions i.e high priority gets picked first,
there are shifts with breaks,
• Actual data with respect to the
–Request classifications i.e no of type 1 and type 2, breakup of their
priorities.
–The Turnaround time for each process steps
–Waiting time if any
- 14 -
The data required – Not very different from what is typically collected
• The data collected were
–A sample of the actual turnaround time for each process
steps by their priorities and types
–Request incoming patterns; quite an eye opener.
–Operating condition were
• Shifts of 9am to 6pm, 6pm to 3am
• Till now separate teams work on separate types
• If high priority request comes it is picked up immediately
- 15 -
The Model
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
- 16 -
•Daily incoming pattern
described as statistical
distributions for each
type of request
•Data was entered for the
entire time period for
support i.e 9 am to 6pm
and then 6pm to 3 am
•Requests had priority
assigned using
probabilities
•Requests arrive at a
system before they are
assigned and allocated
across
The Model
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
- 17 -
•Current team assignment was
depicted using the shift
timings
•One Resource was to
complete the whole request
before he or she was free
• Before the shift started or
during breaks the queues will
build up
•If a high priority ticket enters
the system, it will get
addressed immediately
•SLA are established for all
ticket categories and
priorities
Using the Model with current team settings
- 18 -
•Shift 1
•Engineer Group 1 (4
Resources)
•Engineer Group 3(4
Resources)
•Shift 2
•Engineer Group 2(4
Resources)
•Engineer Group 4( 4
Resources)
•Average idle time of 15%
for Eng 1 and 14% for Eng
3
Using the Model with current team settings
- 19 -
•Average SLA at 95% CI is
predicted to be
•Type 1
•P1 92%
•P2 91%
•P3 89%
•Type 2
•P1 89%
•P2 74%
•P3 98%
With a target of 90%
compliance there could be quite
some misses
Evaluating Strategies :
• The Model was used to
• Simulate various scenarios and Identify
–Evaluate available strategies to improve Utilization and
SLA compliance
–Identify the potential areas of improvement in the process
steps.
- 20 -
Evaluating Strategies
• One of the things noticed in the setup was the queue that
was getting built up in the non working period of 3 am to 9
am.
• Since the data for the inflow had not been analyzed before it
was not realized that the engineers used to start work with
the queue that was leading to SLA’s being breached
• What would be the impact if the team did not have the
queue?
• Also it was noticed that there was typically some free
resources in the day in the first shift but the second shift was
tight.
• What if we overlap shift timings?
• What if we cross skill the people in the night shift so that
anyone free can take in the other queue?
- 21 -
Changes Made in the rules
• The inflow was modified to evaluate the impact of yanking
away the requests logged during the non working hours.
• One of the resources was cross trained
and assigned to both the queue so that requests can be
resolved from both.
• The timings of this resource were made on an overlapping
slot of 2pm to 11 pm so that there is an availability in both
the shifts.
- 22 -
Using the Model with changes
- 23 -
•Shift 1
•Engineer Group 1 (4
Resources)
•Engineer Group 3(2
Resources)
•Shift 2
•Engineer Group 2(2
Resources)
•Engineer Group 4( 1
Resources)
•Mid Shift
•Engineer 5 ( 1
Resource)
•A reduction of 6 resources
from the team
•Average un-utilization was
the highest for Eng 4 at 53%
for the only person there
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
Engineer
5
- 24 -
•Average SLA at 95% CI
Predicted
•Type 1
•P1 93%
•P2 88%
•P3 90%
•Type 2
•P1 93%
•P2 88%
•P3 100%
SLA Compliance much
healthier
Using the Model with changes
- 25 -
0.00
10.00
20.00
30.00
40.00
50.00
60.00
StudyandResponse
StudyandResponse2
Analysis
Debugg
Analysis2
Debugg2
Storage
PercentofTotalMinutes
Top 7 Hot SpotsTop 7 Hot Spots
Percentage of NVA Minutes
Percentage of BVA Minutes
Percentage of VA Minutes
•The Study and Response
Process Step was seen to the
most variable process step
and identified for further
analysis and improvement
Using the Model with changes
Inferences
• “Yanking” the queue for the non working hours can reduce
the load on the system
• Cross training can be a significant leverage
• Overlapping shift timings can greatly impact the SLA’s as
well as the effective team utilization.
• The initial step of study and response is also identified as the
potential area for improvement
- 26 -
Key Takeaways
- 27 -
• Involve subject matter experience
–Meaningless (statistical) relationships should be
discarded
–Expected (statistical) relationships can be verified
• GIGO
–Review and feedback cycle
• Be clear on objectives and expectations from simulation
• Ensure adequate interactions between
–Model builder, Management, Practitioners
• Train personnel operating the model
–To know how to use it – make appropriate inferences
–To know when it is not working – seek help
• Check against known results
Tips and Tricks on Model usage in Project
Management
- 28 -
Service Transition
- 29 -
•Right turnaround time to
promise
•Right SLA
•Right Volume
Capacity Management
- 30 -
16 People handle 71 work requests
Is this Ok
If volume increases by 20% then
how many resources?? By when??
Capacity during Service
Continuity?? SLA during SCON
Setting Up Service Delivery
- 31 -
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
Engineer
5
Resource Overlapping
VS
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
No Overlapping
Dependency Management
- 32 -
Dependency on customer answers
Common Examples of Controlled Factors: Enough?????
- 33 -
Sl No Y Parameter
(Outputs)
X ( Controllable
factors)
Impacted Sub Processes
Monitored
1 % SLA Met by
Priority
Skill of Resources in a
team/Shift
Optimal No of
Resources in a
shift/team
Usage of Knowledge
Database
TAT of Resolution for each Incidents
TAT of Response for each of the
incidents
Assignment Time for each incident
No of backlog incidents per day
2 Utilization of
Resources
Skill of Resources in a
team/Shift
Optimal No of
Resources in a
shift/team
Usage of Knowledge
Database
TAT of Resolution for each Incidents
TAT of Response for each of the
incidents
Assignment Time for each incident
No of backlog incidents per day
What is Critical!!!!:2013 Malayasian GP Pitstop2.05Secs
Time Difference between Winner and 2nd :4.2secs
- 34 -
Pit stops not mandatory
Critical Sub Process can be outside the chain of direct delivery process step
Watch Out for
- 35 -
Misaligned Goals: Improvement in Productivity in T&M
- 36 -
Swamped by information
- 37 -
Measurements at in-appropriate granularity
- 38 -
Measurement is a function of work complexity and Need for information not
convenience
Measurement does not always mean a permanent measurement system
Propagate beyond Delivery and Interweave
- 39 -
24X7 support is driven by transport: Do they do
capacity management???
Questions
- 40 -
References
• Using Process Performance Models to enhance CAM in CMMI for SVC-
Mukul Madan and Chinmay Pradhan; Presented at SEPG NA 2011
• Service Management: Operations, Strategy, and Information Technology-
- James A. Fitzsimmons, Mona J. Fitzsimmons
• Introduction To Operations Research- Billy Gilett
• Process Model User Guide and Tutorial. http://www.processmodel.com/
• CMMI® for Services, Version 1.3 – CMMI Product Team (CMU/SEI-
2010-TR-034)
• Improving Organizational Alignment Leveraging High Maturity Principles:
Sankararaman D: HMBP 2012
- 41 -
Please feel free to write in.
Chinmay Pradhan
QAI Global
Chinmay.Pradhan@qaiglobal.com
- 42 -

Weitere ähnliche Inhalte

Was ist angesagt?

Realizing CMMI Spirit in Agile Form
Realizing CMMI Spirit in Agile FormRealizing CMMI Spirit in Agile Form
Realizing CMMI Spirit in Agile FormVernon Stinebaker
 
RPALM for SAP S/4 Journey
RPALM for SAP S/4 JourneyRPALM for SAP S/4 Journey
RPALM for SAP S/4 JourneyMatt Angerer
 
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...DĂŠlio Almeida
 
matt heinzelman software quality assurance presentation technical & tool
matt heinzelman software quality assurance presentation technical & toolmatt heinzelman software quality assurance presentation technical & tool
matt heinzelman software quality assurance presentation technical & toolCuongHoang80
 
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL
 
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...DĂŠlio Almeida
 
Agile transformation best practices
Agile transformation best practicesAgile transformation best practices
Agile transformation best practicesAllyson Chiarini
 
6.0 Auxiliary Agile and Lean Frameworks
6.0 Auxiliary Agile and Lean Frameworks6.0 Auxiliary Agile and Lean Frameworks
6.0 Auxiliary Agile and Lean FrameworksDavidMcLachlan1
 
Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)Deepak R
 
Ms project training ver 01
Ms project training ver 01Ms project training ver 01
Ms project training ver 01Isidro Sid Calayag
 
Agile transformation strategy
Agile transformation strategyAgile transformation strategy
Agile transformation strategyajit.alwe
 
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringPernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringGlobal Business Events
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)Pradipta Mallick
 
CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3DilekOzdemirci
 
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...DavidMcLachlan1
 

Was ist angesagt? (20)

Realizing CMMI Spirit in Agile Form
Realizing CMMI Spirit in Agile FormRealizing CMMI Spirit in Agile Form
Realizing CMMI Spirit in Agile Form
 
RPALM for SAP S/4 Journey
RPALM for SAP S/4 JourneyRPALM for SAP S/4 Journey
RPALM for SAP S/4 Journey
 
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
 
matt heinzelman software quality assurance presentation technical & tool
matt heinzelman software quality assurance presentation technical & toolmatt heinzelman software quality assurance presentation technical & tool
matt heinzelman software quality assurance presentation technical & tool
 
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
 
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
 
Cutover Plan V2
Cutover Plan V2Cutover Plan V2
Cutover Plan V2
 
Agile transformation best practices
Agile transformation best practicesAgile transformation best practices
Agile transformation best practices
 
Ccpm+
Ccpm+Ccpm+
Ccpm+
 
6.0 Auxiliary Agile and Lean Frameworks
6.0 Auxiliary Agile and Lean Frameworks6.0 Auxiliary Agile and Lean Frameworks
6.0 Auxiliary Agile and Lean Frameworks
 
Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)
 
Ms project training ver 01
Ms project training ver 01Ms project training ver 01
Ms project training ver 01
 
Agile transformation strategy
Agile transformation strategyAgile transformation strategy
Agile transformation strategy
 
Agile Scrum training
Agile Scrum trainingAgile Scrum training
Agile Scrum training
 
Agile And Cmmi
Agile And CmmiAgile And Cmmi
Agile And Cmmi
 
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringPernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global Offshoring
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)
 
Sap implementation
Sap implementationSap implementation
Sap implementation
 
CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3
 
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
 

Ähnlich wie Hi Maturity in the CMMI Services Context

Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnzLecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnzAhmadSajjad34
 
The Ins and Outs of CTMS Data Migration
The Ins and Outs of CTMS Data MigrationThe Ins and Outs of CTMS Data Migration
The Ins and Outs of CTMS Data MigrationPerficient
 
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...Sencha
 
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...AgileNetwork
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaEnergySec
 
Software Project Management lecture 12
Software Project Management lecture 12Software Project Management lecture 12
Software Project Management lecture 12Syed Muhammad Hammad
 
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...guestc990b6
 
Creation of Information Systems.pptx
Creation of Information Systems.pptxCreation of Information Systems.pptx
Creation of Information Systems.pptxjoelphillipGranada2
 
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdfBinNguynVn3
 
Software engineering jwfiles 3
Software engineering jwfiles 3Software engineering jwfiles 3
Software engineering jwfiles 3Azhar Shaik
 
Ch20ed12romney
Ch20ed12romneyCh20ed12romney
Ch20ed12romneywoyaoni
 
CC06 - Systems development lifecycle.ppt
CC06 - Systems development lifecycle.pptCC06 - Systems development lifecycle.ppt
CC06 - Systems development lifecycle.pptcolorsclosetmk
 
3. System development life cycle.ppt
3. System development life cycle.ppt3. System development life cycle.ppt
3. System development life cycle.pptcalf_ville86
 
Process models
Process modelsProcess models
Process modelsPreeti Mishra
 
Software Engineering (Requirements Engineering & Software Maintenance)
Software Engineering (Requirements Engineering  & Software Maintenance)Software Engineering (Requirements Engineering  & Software Maintenance)
Software Engineering (Requirements Engineering & Software Maintenance)ShudipPal
 
Magic of agile
Magic of agileMagic of agile
Magic of agileSubodh Kumar
 

Ähnlich wie Hi Maturity in the CMMI Services Context (20)

Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnzLecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
 
The Ins and Outs of CTMS Data Migration
The Ins and Outs of CTMS Data MigrationThe Ins and Outs of CTMS Data Migration
The Ins and Outs of CTMS Data Migration
 
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
 
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six Sigma
 
Software Project Management lecture 12
Software Project Management lecture 12Software Project Management lecture 12
Software Project Management lecture 12
 
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
 
Creation of Information Systems.pptx
Creation of Information Systems.pptxCreation of Information Systems.pptx
Creation of Information Systems.pptx
 
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
 
Software engineering jwfiles 3
Software engineering jwfiles 3Software engineering jwfiles 3
Software engineering jwfiles 3
 
Utils_Presentation_Richard U
Utils_Presentation_Richard UUtils_Presentation_Richard U
Utils_Presentation_Richard U
 
Ch20ed12romney
Ch20ed12romneyCh20ed12romney
Ch20ed12romney
 
Deploying at will - SEI
 Deploying at will - SEI Deploying at will - SEI
Deploying at will - SEI
 
CC06 - Systems development lifecycle.ppt
CC06 - Systems development lifecycle.pptCC06 - Systems development lifecycle.ppt
CC06 - Systems development lifecycle.ppt
 
3. System development life cycle.ppt
3. System development life cycle.ppt3. System development life cycle.ppt
3. System development life cycle.ppt
 
Seminar on Project Management by Rj
Seminar on Project Management by RjSeminar on Project Management by Rj
Seminar on Project Management by Rj
 
Process models
Process modelsProcess models
Process models
 
Software Engineering (Requirements Engineering & Software Maintenance)
Software Engineering (Requirements Engineering  & Software Maintenance)Software Engineering (Requirements Engineering  & Software Maintenance)
Software Engineering (Requirements Engineering & Software Maintenance)
 
Chapter 04
Chapter 04Chapter 04
Chapter 04
 
Magic of agile
Magic of agileMagic of agile
Magic of agile
 

Mehr von SPIN Chennai

Suresh spincon chennai 2019 saa s nation - india's trillion dollar opportu...
Suresh spincon chennai 2019    saa s nation - india's trillion dollar opportu...Suresh spincon chennai 2019    saa s nation - india's trillion dollar opportu...
Suresh spincon chennai 2019 saa s nation - india's trillion dollar opportu...SPIN Chennai
 
Cast cloud april_2019
Cast cloud april_2019Cast cloud april_2019
Cast cloud april_2019SPIN Chennai
 
Chandra mouli health care automaton apr 2019
Chandra mouli health care automaton   apr 2019Chandra mouli health care automaton   apr 2019
Chandra mouli health care automaton apr 2019SPIN Chennai
 
Swami ibm deck
Swami ibm deckSwami ibm deck
Swami ibm deckSPIN Chennai
 
Automation 360 meera seshadri
Automation 360 meera seshadriAutomation 360 meera seshadri
Automation 360 meera seshadriSPIN Chennai
 
Infosys agile scale_hyper_prod_platforms
Infosys agile scale_hyper_prod_platformsInfosys agile scale_hyper_prod_platforms
Infosys agile scale_hyper_prod_platformsSPIN Chennai
 
Bill curtis Beyond process - a challenge for SEPGs
Bill curtis Beyond process - a challenge for SEPGsBill curtis Beyond process - a challenge for SEPGs
Bill curtis Beyond process - a challenge for SEPGsSPIN Chennai
 
GDPR Demystified
GDPR DemystifiedGDPR Demystified
GDPR DemystifiedSPIN Chennai
 
Industry 4.0
Industry 4.0Industry 4.0
Industry 4.0SPIN Chennai
 
Cloud computing and innovations
Cloud computing and  innovationsCloud computing and  innovations
Cloud computing and innovationsSPIN Chennai
 
Transforming learning into an experience
Transforming learning into an experienceTransforming learning into an experience
Transforming learning into an experienceSPIN Chennai
 
Centre for Innovation - IIT Madras
Centre for Innovation - IIT MadrasCentre for Innovation - IIT Madras
Centre for Innovation - IIT MadrasSPIN Chennai
 
Consistent quality in the era of constant change
Consistent quality in the era of constant changeConsistent quality in the era of constant change
Consistent quality in the era of constant changeSPIN Chennai
 
Quality in the new delivery paradigm
Quality in the new delivery paradigmQuality in the new delivery paradigm
Quality in the new delivery paradigmSPIN Chennai
 
Tortoise and Hare
Tortoise and HareTortoise and Hare
Tortoise and HareSPIN Chennai
 
bimodal it - kumar
bimodal it - kumarbimodal it - kumar
bimodal it - kumarSPIN Chennai
 
Simple approach to roadmap in the cloud
Simple approach to roadmap in the cloudSimple approach to roadmap in the cloud
Simple approach to roadmap in the cloudSPIN Chennai
 
IT past present and promosed land
IT past present and promosed landIT past present and promosed land
IT past present and promosed landSPIN Chennai
 
Trends and innovation in Fintech
Trends and innovation in FintechTrends and innovation in Fintech
Trends and innovation in FintechSPIN Chennai
 
Role of CIO in Automation
Role of CIO in AutomationRole of CIO in Automation
Role of CIO in AutomationSPIN Chennai
 

Mehr von SPIN Chennai (20)

Suresh spincon chennai 2019 saa s nation - india's trillion dollar opportu...
Suresh spincon chennai 2019    saa s nation - india's trillion dollar opportu...Suresh spincon chennai 2019    saa s nation - india's trillion dollar opportu...
Suresh spincon chennai 2019 saa s nation - india's trillion dollar opportu...
 
Cast cloud april_2019
Cast cloud april_2019Cast cloud april_2019
Cast cloud april_2019
 
Chandra mouli health care automaton apr 2019
Chandra mouli health care automaton   apr 2019Chandra mouli health care automaton   apr 2019
Chandra mouli health care automaton apr 2019
 
Swami ibm deck
Swami ibm deckSwami ibm deck
Swami ibm deck
 
Automation 360 meera seshadri
Automation 360 meera seshadriAutomation 360 meera seshadri
Automation 360 meera seshadri
 
Infosys agile scale_hyper_prod_platforms
Infosys agile scale_hyper_prod_platformsInfosys agile scale_hyper_prod_platforms
Infosys agile scale_hyper_prod_platforms
 
Bill curtis Beyond process - a challenge for SEPGs
Bill curtis Beyond process - a challenge for SEPGsBill curtis Beyond process - a challenge for SEPGs
Bill curtis Beyond process - a challenge for SEPGs
 
GDPR Demystified
GDPR DemystifiedGDPR Demystified
GDPR Demystified
 
Industry 4.0
Industry 4.0Industry 4.0
Industry 4.0
 
Cloud computing and innovations
Cloud computing and  innovationsCloud computing and  innovations
Cloud computing and innovations
 
Transforming learning into an experience
Transforming learning into an experienceTransforming learning into an experience
Transforming learning into an experience
 
Centre for Innovation - IIT Madras
Centre for Innovation - IIT MadrasCentre for Innovation - IIT Madras
Centre for Innovation - IIT Madras
 
Consistent quality in the era of constant change
Consistent quality in the era of constant changeConsistent quality in the era of constant change
Consistent quality in the era of constant change
 
Quality in the new delivery paradigm
Quality in the new delivery paradigmQuality in the new delivery paradigm
Quality in the new delivery paradigm
 
Tortoise and Hare
Tortoise and HareTortoise and Hare
Tortoise and Hare
 
bimodal it - kumar
bimodal it - kumarbimodal it - kumar
bimodal it - kumar
 
Simple approach to roadmap in the cloud
Simple approach to roadmap in the cloudSimple approach to roadmap in the cloud
Simple approach to roadmap in the cloud
 
IT past present and promosed land
IT past present and promosed landIT past present and promosed land
IT past present and promosed land
 
Trends and innovation in Fintech
Trends and innovation in FintechTrends and innovation in Fintech
Trends and innovation in Fintech
 
Role of CIO in Automation
Role of CIO in AutomationRole of CIO in Automation
Role of CIO in Automation
 

KĂźrzlich hochgeladen

Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...pr788182
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 

KĂźrzlich hochgeladen (20)

Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 

Hi Maturity in the CMMI Services Context

  • 1. - 1 - “Hi Maturity in the CMMI Services Context" Chinmay Pradhan QAI Global
  • 2. CMMI For Services - 2 - • Helps Build Better Services • Looks at Services from Strategic perspective • Applicable across broad spectrum of work done • Aligned and Leverages existing service management frameworks eg ITIL, CoBIT etc
  • 3. Snapshot of Services Where CMMI SVC has been applied - 3 - • Majority is for Application Management •Production Support •Change Requests •Bug Fixes • Other Non Conventional work types are also catching up Work Types WIth SVC Implemented Application Management and Support Training Services Risk Consutling ERP Configuration ERP Support Staff Augumentation BPO
  • 4. Service System • Services are useful intangible and non-storable results delivered through the operation of a service system. Âť CMMI SVC • Services are characterized by –Simultaneity –Heterogeneity • A Service System is a combination of –People using •Tools and Resources to execute –Process Steps to complete an service operation - 4 -
  • 5. Service Components: Elements that help deliver a Service - 5 - Work products Work Processes Tools Infrastructure People Streamlined Service Delivery
  • 6. Modeling in an Application Support Service - 6 -
  • 7. Typical Expectations - 7 - Year-on-Year Savings Technical Complexity
  • 8. Assumed system - 8 - No of Requests per Day • Based on actual average TAT per step and priority •Helped analyze the capacity required per day and hence plan for the month • Was simple to use and understand But!!!
  • 9. In Reality…. - 9 - 19 4 • Events are dynamic with multiple factors affecting the performance • The inflow of tickets changes constantly • The performance for each of the steps is not fixed, but variable An animated view of the service system
  • 10. In Reality…. • There were far too many dynamic factors to be considered in the entire resolution process like –If a high Priority ticket came in all others have to be dropped till this is fixed –If resources are busy then tickets will be in queue –The Process Performance is a function of the complexity and not just the priority, • Additional complexity: can have high priority simple tickets and also complex tickets. - 10 -
  • 11. - 11 - … to control the Key Process Outputs Key Process Inputs: Control these … Output Variability “Outputs inherit variability from inputs.” Sub Process and its Impact
  • 12. One approach for Modeling Such a System - 12 -
  • 13. Let’s Take an example The Service System we have picked up is –Service to resolve Production support requests for large banking application –There are 2 different kinds of requests that come in to the queue, Type 1 and Type 2. Each having its own priorities and SLA’s –The Service provides a 6X18 hr support. Some of the challenges faced by the service system are –The resource allocation and utilization vis a vis the SLA performance is sub optimal i.e if the SLA compliance is comfortable then there is low utilization –Team composition and shift allocation - 13 -
  • 14. Creating the Model The service system was aptly described by a queue based system. To model such a system we required: • Standard Simulation Modeling Tool. E.g Process Model • Resources with the knowledge of such modeling and the skill to use the tools • Process maps of actual events • Map of all possible occurring conditions i.e high priority gets picked first, there are shifts with breaks, • Actual data with respect to the –Request classifications i.e no of type 1 and type 2, breakup of their priorities. –The Turnaround time for each process steps –Waiting time if any - 14 -
  • 15. The data required – Not very different from what is typically collected • The data collected were –A sample of the actual turnaround time for each process steps by their priorities and types –Request incoming patterns; quite an eye opener. –Operating condition were • Shifts of 9am to 6pm, 6pm to 3am • Till now separate teams work on separate types • If high priority request comes it is picked up immediately - 15 -
  • 16. The Model Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 - 16 - •Daily incoming pattern described as statistical distributions for each type of request •Data was entered for the entire time period for support i.e 9 am to 6pm and then 6pm to 3 am •Requests had priority assigned using probabilities •Requests arrive at a system before they are assigned and allocated across
  • 17. The Model Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 - 17 - •Current team assignment was depicted using the shift timings •One Resource was to complete the whole request before he or she was free • Before the shift started or during breaks the queues will build up •If a high priority ticket enters the system, it will get addressed immediately •SLA are established for all ticket categories and priorities
  • 18. Using the Model with current team settings - 18 - •Shift 1 •Engineer Group 1 (4 Resources) •Engineer Group 3(4 Resources) •Shift 2 •Engineer Group 2(4 Resources) •Engineer Group 4( 4 Resources) •Average idle time of 15% for Eng 1 and 14% for Eng 3
  • 19. Using the Model with current team settings - 19 - •Average SLA at 95% CI is predicted to be •Type 1 •P1 92% •P2 91% •P3 89% •Type 2 •P1 89% •P2 74% •P3 98% With a target of 90% compliance there could be quite some misses
  • 20. Evaluating Strategies : • The Model was used to • Simulate various scenarios and Identify –Evaluate available strategies to improve Utilization and SLA compliance –Identify the potential areas of improvement in the process steps. - 20 -
  • 21. Evaluating Strategies • One of the things noticed in the setup was the queue that was getting built up in the non working period of 3 am to 9 am. • Since the data for the inflow had not been analyzed before it was not realized that the engineers used to start work with the queue that was leading to SLA’s being breached • What would be the impact if the team did not have the queue? • Also it was noticed that there was typically some free resources in the day in the first shift but the second shift was tight. • What if we overlap shift timings? • What if we cross skill the people in the night shift so that anyone free can take in the other queue? - 21 -
  • 22. Changes Made in the rules • The inflow was modified to evaluate the impact of yanking away the requests logged during the non working hours. • One of the resources was cross trained and assigned to both the queue so that requests can be resolved from both. • The timings of this resource were made on an overlapping slot of 2pm to 11 pm so that there is an availability in both the shifts. - 22 -
  • 23. Using the Model with changes - 23 - •Shift 1 •Engineer Group 1 (4 Resources) •Engineer Group 3(2 Resources) •Shift 2 •Engineer Group 2(2 Resources) •Engineer Group 4( 1 Resources) •Mid Shift •Engineer 5 ( 1 Resource) •A reduction of 6 resources from the team •Average un-utilization was the highest for Eng 4 at 53% for the only person there Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 Engineer 5
  • 24. - 24 - •Average SLA at 95% CI Predicted •Type 1 •P1 93% •P2 88% •P3 90% •Type 2 •P1 93% •P2 88% •P3 100% SLA Compliance much healthier Using the Model with changes
  • 25. - 25 - 0.00 10.00 20.00 30.00 40.00 50.00 60.00 StudyandResponse StudyandResponse2 Analysis Debugg Analysis2 Debugg2 Storage PercentofTotalMinutes Top 7 Hot SpotsTop 7 Hot Spots Percentage of NVA Minutes Percentage of BVA Minutes Percentage of VA Minutes •The Study and Response Process Step was seen to the most variable process step and identified for further analysis and improvement Using the Model with changes
  • 26. Inferences • “Yanking” the queue for the non working hours can reduce the load on the system • Cross training can be a significant leverage • Overlapping shift timings can greatly impact the SLA’s as well as the effective team utilization. • The initial step of study and response is also identified as the potential area for improvement - 26 -
  • 27. Key Takeaways - 27 - • Involve subject matter experience –Meaningless (statistical) relationships should be discarded –Expected (statistical) relationships can be verified • GIGO –Review and feedback cycle • Be clear on objectives and expectations from simulation • Ensure adequate interactions between –Model builder, Management, Practitioners • Train personnel operating the model –To know how to use it – make appropriate inferences –To know when it is not working – seek help • Check against known results
  • 28. Tips and Tricks on Model usage in Project Management - 28 -
  • 29. Service Transition - 29 - •Right turnaround time to promise •Right SLA •Right Volume
  • 30. Capacity Management - 30 - 16 People handle 71 work requests Is this Ok If volume increases by 20% then how many resources?? By when?? Capacity during Service Continuity?? SLA during SCON
  • 31. Setting Up Service Delivery - 31 - Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 Engineer 5 Resource Overlapping VS Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 No Overlapping
  • 32. Dependency Management - 32 - Dependency on customer answers
  • 33. Common Examples of Controlled Factors: Enough????? - 33 - Sl No Y Parameter (Outputs) X ( Controllable factors) Impacted Sub Processes Monitored 1 % SLA Met by Priority Skill of Resources in a team/Shift Optimal No of Resources in a shift/team Usage of Knowledge Database TAT of Resolution for each Incidents TAT of Response for each of the incidents Assignment Time for each incident No of backlog incidents per day 2 Utilization of Resources Skill of Resources in a team/Shift Optimal No of Resources in a shift/team Usage of Knowledge Database TAT of Resolution for each Incidents TAT of Response for each of the incidents Assignment Time for each incident No of backlog incidents per day
  • 34. What is Critical!!!!:2013 Malayasian GP Pitstop2.05Secs Time Difference between Winner and 2nd :4.2secs - 34 - Pit stops not mandatory Critical Sub Process can be outside the chain of direct delivery process step
  • 36. Misaligned Goals: Improvement in Productivity in T&M - 36 -
  • 38. Measurements at in-appropriate granularity - 38 - Measurement is a function of work complexity and Need for information not convenience Measurement does not always mean a permanent measurement system
  • 39. Propagate beyond Delivery and Interweave - 39 - 24X7 support is driven by transport: Do they do capacity management???
  • 41. References • Using Process Performance Models to enhance CAM in CMMI for SVC- Mukul Madan and Chinmay Pradhan; Presented at SEPG NA 2011 • Service Management: Operations, Strategy, and Information Technology- - James A. Fitzsimmons, Mona J. Fitzsimmons • Introduction To Operations Research- Billy Gilett • Process Model User Guide and Tutorial. http://www.processmodel.com/ • CMMIÂŽ for Services, Version 1.3 – CMMI Product Team (CMU/SEI- 2010-TR-034) • Improving Organizational Alignment Leveraging High Maturity Principles: Sankararaman D: HMBP 2012 - 41 -
  • 42. Please feel free to write in. Chinmay Pradhan QAI Global Chinmay.Pradhan@qaiglobal.com - 42 -