08448380779 Call Girls In Friends Colony Women Seeking Men
Film production risk_assessment_ig5_
1. FILM PRODUCTION RISK ASSESSMENT
This document is intended as a basic template to assist in the completion of a risk assessment for film production activities.
Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained
from the Health & Safety Executive www.hse.gov.uk
When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls
already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further
action(s) to be considered will be determined by the level of risk assessment.
HAZARD IN WHICH SCENE PERSON WHO MAY PROPERTY THAT RISK CONTROLS RISK ASSESSMENT FURTHER ACTION
IS THIS HAZARD BE HARMED COULD BE ALREADY IN PLACE *See chart TO BE TAKEN
PRESENT? DAMAGED
Wet Floor Scene 1 Cast or Crew Production Signs when HIGH Cast and Crew must
equipment appropriate wear appropriate
footwear at all
time, stay alert.
Props Scene 2 Cast or Crew N/A MODERATE Stay alert when
filming, keeping
look out for props
Trailing All Scenes Cast or Crew All production Electrical tapes MODERATE Wires and leads
Wires/Cables equipments used to fix wires to kept to a minimum
the ground/walls
Cars Scene 3 Cast or Crew Equipment Barriers, Pavement Extreme Be aware of cars
within the car park
at hospital
entrance
2. Risk Assessment Chart
Hazard likelihood / Consequences RISK ASSESSMENT
VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get EXTREME
seriously hurt)
Could happen or mild consequences (i.e. someone could suffer a minor HIGH
injury)
Unlikely to happen or minor consequences (i.e. production could be slightly MODERATE
delayed)
Rarely happens and very insignificant consequences LOW