IPP Utility Scale Solar PV Project Development Roadmap
•
22 gefällt mir
•
4,455 views
Fadi Maalouf, PMP
Folgen
IPP Solar PV Project Development Roadmap 8-Phase Bankable Approach
Weniger lesen
Mehr lesen
Umweltschutz
Melden
Teilen
Melden
Teilen
1 von 24
Empfohlen
Developing Solar Projects
Developing Solar Projects
alejolop
Guide to Solar Project Implementation
Guide to Solar Project Implementation
Gensol Engineering Limited
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
Leonardo ENERGY
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
Puneet Jaggi
Solar Power Plant System Sizing
Solar Power Plant System Sizing
firstgreen
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
Gensol Engineering Limited
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PV
Eversheds Sutherland
Solar Power Project Development
Solar Power Project Development
firstgreen
Empfohlen
Developing Solar Projects
Developing Solar Projects
alejolop
Guide to Solar Project Implementation
Guide to Solar Project Implementation
Gensol Engineering Limited
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
Leonardo ENERGY
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
Puneet Jaggi
Solar Power Plant System Sizing
Solar Power Plant System Sizing
firstgreen
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
Gensol Engineering Limited
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PV
Eversheds Sutherland
Solar Power Project Development
Solar Power Project Development
firstgreen
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Private Consultants
Photovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - Design
Leonardo ENERGY
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
Gensol Engineering Limited
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
Gensol Engineering Limited
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Gensol Engineering Limited
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Enerco Energy Solutions LLP
10 mw solar power plant
10 mw solar power plant
Rusiru Sanjaya
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
Nageswar Rao
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
Gensol Engineering Limited
Gensol - EPC Services
Gensol - EPC Services
Gensol Engineering Limited
Solar Project Management
Solar Project Management
firstgreen
Gensol Permits Procurement Services
Gensol Permits Procurement Services
Gensol Engineering Limited
Gensol Lender's Engineer Services
Gensol Lender's Engineer Services
Gensol Engineering Limited
List of Clearances for Solar Project
List of Clearances for Solar Project
Gensol Engineering Limited
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
Gensol Engineering Limited
Optimizing Operation & Maintenance Practices for Solar Power Plant
Optimizing Operation & Maintenance Practices for Solar Power Plant
Gensol Engineering Limited
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
RESolve Energy Consultants
March 5 solar energy investment opportunities in the philippines ruth p bri...
March 5 solar energy investment opportunities in the philippines ruth p bri...
Greenergy Solutions Inc.
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
Leonardo ENERGY
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentation
Audrey Mwala
Where did it go wrong?
Where did it go wrong?
Association for Project Management
PV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial Model
Fadi Maalouf, PMP
Weitere ähnliche Inhalte
Was ist angesagt?
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Private Consultants
Photovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - Design
Leonardo ENERGY
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
Gensol Engineering Limited
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
Gensol Engineering Limited
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Gensol Engineering Limited
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Enerco Energy Solutions LLP
10 mw solar power plant
10 mw solar power plant
Rusiru Sanjaya
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
Nageswar Rao
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
Gensol Engineering Limited
Gensol - EPC Services
Gensol - EPC Services
Gensol Engineering Limited
Solar Project Management
Solar Project Management
firstgreen
Gensol Permits Procurement Services
Gensol Permits Procurement Services
Gensol Engineering Limited
Gensol Lender's Engineer Services
Gensol Lender's Engineer Services
Gensol Engineering Limited
List of Clearances for Solar Project
List of Clearances for Solar Project
Gensol Engineering Limited
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
Gensol Engineering Limited
Optimizing Operation & Maintenance Practices for Solar Power Plant
Optimizing Operation & Maintenance Practices for Solar Power Plant
Gensol Engineering Limited
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
RESolve Energy Consultants
March 5 solar energy investment opportunities in the philippines ruth p bri...
March 5 solar energy investment opportunities in the philippines ruth p bri...
Greenergy Solutions Inc.
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
Leonardo ENERGY
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentation
Audrey Mwala
Was ist angesagt?
(20)
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Photovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - Design
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
10 mw solar power plant
10 mw solar power plant
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
Gensol - EPC Services
Gensol - EPC Services
Solar Project Management
Solar Project Management
Gensol Permits Procurement Services
Gensol Permits Procurement Services
Gensol Lender's Engineer Services
Gensol Lender's Engineer Services
List of Clearances for Solar Project
List of Clearances for Solar Project
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
Optimizing Operation & Maintenance Practices for Solar Power Plant
Optimizing Operation & Maintenance Practices for Solar Power Plant
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
March 5 solar energy investment opportunities in the philippines ruth p bri...
March 5 solar energy investment opportunities in the philippines ruth p bri...
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentation
Ähnlich wie IPP Utility Scale Solar PV Project Development Roadmap
Where did it go wrong?
Where did it go wrong?
Association for Project Management
PV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial Model
Fadi Maalouf, PMP
Enhancing performance using a programme dashboard
Enhancing performance using a programme dashboard
Association for Project Management
Construction plan 29.08. 14
Construction plan 29.08. 14
Winter Sonata
Substation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon Sourcing
John William
South Africa Gas Markets, 2012
South Africa Gas Markets, 2012
ReportsnReports
Songa Offshore Q2 2013 results presentation
Songa Offshore Q2 2013 results presentation
TradeWindsnews
Noise Oversight Committee notes
Noise Oversight Committee notes
GilbertodePiento
Financial_Management_Class_Notes (1).pdf
Financial_Management_Class_Notes (1).pdf
SIMBARASHEMABHEKA
Financial_Management_Class_Notes.pdf
Financial_Management_Class_Notes.pdf
SIMBARASHEMABHEKA
Example-Business Project Sponsor Meeting
Example-Business Project Sponsor Meeting
Peter Zhou
Global Carbon Footprint Management Market Analysis By Size, Share, Demand For...
Global Carbon Footprint Management Market Analysis By Size, Share, Demand For...
Vipin Mishra
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
Kinshook Chaturvedi
Tumazos march 31 2016 web
Tumazos march 31 2016 web
SemafoCorporate
Lcap for schools
Lcap for schools
Dr. Paul A. Rodriguez
BMO - Investor Presentation
BMO - Investor Presentation
SemafoCorporate
Covestv12 primeiro ultimo_arg
Covestv12 primeiro ultimo_arg
Isaquel Silva
Start Your Own Business of Fiberglass Transparent LPG Cylinder with Our Step-...
Start Your Own Business of Fiberglass Transparent LPG Cylinder with Our Step-...
Ajjay Kumar Gupta
IFC - Solar Developer's Guide - Web
IFC - Solar Developer's Guide - Web
Sohail Alam
Solar power generation
Solar power generation
Angel Dass
Ähnlich wie IPP Utility Scale Solar PV Project Development Roadmap
(20)
Where did it go wrong?
Where did it go wrong?
PV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial Model
Enhancing performance using a programme dashboard
Enhancing performance using a programme dashboard
Construction plan 29.08. 14
Construction plan 29.08. 14
Substation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon Sourcing
South Africa Gas Markets, 2012
South Africa Gas Markets, 2012
Songa Offshore Q2 2013 results presentation
Songa Offshore Q2 2013 results presentation
Noise Oversight Committee notes
Noise Oversight Committee notes
Financial_Management_Class_Notes (1).pdf
Financial_Management_Class_Notes (1).pdf
Financial_Management_Class_Notes.pdf
Financial_Management_Class_Notes.pdf
Example-Business Project Sponsor Meeting
Example-Business Project Sponsor Meeting
Global Carbon Footprint Management Market Analysis By Size, Share, Demand For...
Global Carbon Footprint Management Market Analysis By Size, Share, Demand For...
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
Tumazos march 31 2016 web
Tumazos march 31 2016 web
Lcap for schools
Lcap for schools
BMO - Investor Presentation
BMO - Investor Presentation
Covestv12 primeiro ultimo_arg
Covestv12 primeiro ultimo_arg
Start Your Own Business of Fiberglass Transparent LPG Cylinder with Our Step-...
Start Your Own Business of Fiberglass Transparent LPG Cylinder with Our Step-...
IFC - Solar Developer's Guide - Web
IFC - Solar Developer's Guide - Web
Solar power generation
Solar power generation
Mehr von Fadi Maalouf, PMP
Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6
Fadi Maalouf, PMP
Green Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOA
Fadi Maalouf, PMP
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOH
Fadi Maalouf, PMP
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model Toolkit
Fadi Maalouf, PMP
SunBurn Test Presentation
SunBurn Test Presentation
Fadi Maalouf, PMP
SunBurn Test
SunBurn Test
Fadi Maalouf, PMP
Project Finance Management Plan
Project Finance Management Plan
Fadi Maalouf, PMP
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
Fadi Maalouf, PMP
Dii Toolkit Initiative
Dii Toolkit Initiative
Fadi Maalouf, PMP
Strategic Business Plan for IPP / EPC Renewable Energy Company
Strategic Business Plan for IPP / EPC Renewable Energy Company
Fadi Maalouf, PMP
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
Fadi Maalouf, PMP
Unirac PV Racking Basics
Unirac PV Racking Basics
Fadi Maalouf, PMP
Mehr von Fadi Maalouf, PMP
(12)
Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6
Green Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOA
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model Toolkit
SunBurn Test Presentation
SunBurn Test Presentation
SunBurn Test
SunBurn Test
Project Finance Management Plan
Project Finance Management Plan
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
Dii Toolkit Initiative
Dii Toolkit Initiative
Strategic Business Plan for IPP / EPC Renewable Energy Company
Strategic Business Plan for IPP / EPC Renewable Energy Company
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
Unirac PV Racking Basics
Unirac PV Racking Basics
Kürzlich hochgeladen
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
9953056974 Low Rate Call Girls In Saket, Delhi NCR
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
Suhani Kapoor
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
GeorgeDiamandis11
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
ranjana rawat
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
9953056974 Low Rate Call Girls In Saket, Delhi NCR
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
ranjana rawat
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
Dr. Salem Baidas
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Pooja Nehwal
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
GeorgeDiamandis11
Sustainable Packaging
Sustainable Packaging
Dr. Salem Baidas
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
ranjana rawat
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
Amil baba
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
ranjana rawat
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
SUHANI PANDEY
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
itadmin50
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
Kürzlich hochgeladen
(20)
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
Sustainable Packaging
Sustainable Packaging
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
IPP Utility Scale Solar PV Project Development Roadmap
1.
IPP Solar PV
Project Development Roadmap Bankable Approach ! 1 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
2.
Document History2 IPP Solar
PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 Document Title / Number Rev. Description Of Change Effective Date IPP Solar PV Project Development Roadmap PV-Project-Development-Roadmap-fm1700417-R1 R1 Initial Release – Draft For Information 17-Apr-2017 IPP Solar PV Project Development Roadmap PV-Project-Development-Roadmap-fm170502-R2 R2 2nd Release – Minor Edits & Improvements 2-May-2017 F2M2 Name Designation Signature Date Fadi Maalouf Director 2-May-2017 DOCUMENT CHANGE HISTORY RECORD SHEET
3.
Outline Introduction IPP
Solar PV Project Development Roadmap 8-Phase Bankable Approach Contact 3 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
4.
4 IPP Solar PV
Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 IPP Solar PV Project Development Roadmap Introduction The Purpose Of This Presentation Is To Provide A Concise1 Overview IPP Utility Scale Solar PV Project Development Process, Cradle To Grave. As Much As Possible, The Roadmap Is Described In Generic Nature, Since The Development Process Is Unique To The Jurisdiction Of Development. Nonetheless, Major Elements Of The Process Remain Valid For Most Developments. The Presentation Does Not Address All The Fine Details. However, Key Critical Components Are Highlighted And Discussed. In a Cross-Border Multi-Stakeholder Development Process, It Is Important to: Understand Scope of Work & Compliance Necessities Meticulously Plan Execute With Monitoring & Control In Place A Successful & Bankable Approach Is Achieved When Expertise Are Integrated With Good Communication, Negotiation, Risk Management, & Competitiveness. 1 This PPT is the short version. Layout is dense as slides were compacted !
5.
IPP Solar PV
Project Development Roadmap5 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 Phase 1 • Business Development Phase 2 • Pre- Feasibility Study Phase 3 • Feasibility Study Phase 4 • Contracts & Financial Close Phase 5 • Detailed Design & Permitting Phase 6 • Procurement & Construction Phase 7 • Testing & Acceptance Phase 8 • O&M Gate 1 • Corp RM Doc 1 Gate 2 • Corp RM Doc 2 Gate 3 • Corp RM Doc 3 Gate 4 • Corp RM Doc 4 Gate 5 • Corp RM Doc 5 Gate 62 • Corp RM Doc 6 Gate 7 • Corp RM Doc 7 Gate 8 • Corp RM Doc 8
6.
IPP Solar PV
Project Development Roadmap Phase 1: Business Development Project Opportunity Identification & Pre-Screening (Documented Sales Funnel Process, CRM) Alignment with Corporate Vision, Mission, & Strategic Business Plan Risk Management Compliance Gateway: Initial Assessment Geographical Market Risk Clearance Site Identification, Direct Proposal or PPP or Receipt of RFQ / RFP / ITB Concept Development, Rough Order of Magnitude Corporate Risk Thresholds & Approval Matrix Clearance Go-NoGo Techno-Commercial Review & Assessment Form e.g site particulars, project structure, regulatory framework & risks, grid access & infrastructure, off-taker due diligence, initial finance plan / benchmark term sheet, competitiveness Go-NoGo & Bid-Win BD Committee Approval for Next Phase: 2 Required Resources Required Budget 6 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
7.
IPP Solar PV
Project Development Roadmap Phase 2: Pre-Feasibility Study Site Visit (Initial Survey) to Identify Key Constraints & Challenges, Land Lease/Access, Including Boundary Areas Concerns Conceptual Design & Assessment of Various Technical Solutions, Including grid Connection Project Estimated Cost Plan (Development/Capex/Opex/Finance) Estimated Energy Yield, PVsyst, P50 Based on Credible Solar Resource Data Estimated Energy Tariff based on Incentives/FIT/N.Meter/PPA/Lease/ESCO Pre-Feasibility Financial Model Development & Est. IRR, w/ Benchmark Term Sheet Initial Sensitivity/Scenario Analysis Model (1D & 2D Tables, +/- up to 30% parameter variances) Identification of Initial Environmental and Social Impacts Initial Licensing & Permitting Roadmap & Estimated Cost, Success Factors including Estimated Timelines Overall Market Review Including Regulatory Changes/Risks Identification of Project Stakeholders and Respective Agreement/Contracts Types Selection of Project Structure (SPV/etc.) and Shareholders Options (PPP/PE/etc.) High Level Project Schedule/Program, with Key Milestones Risks & Opportunities Register, with Proposed Mitigation & Realization Measures Pre-Feasibility Study & Financial Model BD Committee Approval for Next Phase: 3 7 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
8.
IPP Solar PV
Project Development Roadmap Phase 2: Pre-Feasibility Study Sample Template: Pre-Feasibility Financial Model (www.slideshare.net/solaruae) 8 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 2.999049054 $500.00 $525.00 $550.00 $575.00 $600.00 $625.00 $650.00 $675.00 $700.00 $725.00 $750.00 $775.00 $800.00 $825.00 $850.00 $875.00 $900.00 $925.00 $950.00 $975.00 $1,000.00 $1,025.00 $1,050.00 $1,075.00 $1,100.00 $1,125.00 $1,150.00 $1,175.00 $1,200.00 $1,225.00 $1,250.00 $1,275.00 $1,300.00 $1,325.00 $1,350.00 $1,375.00 $1,400.00 $1,425.00 $0.00 1.3839 1.4598 1.5357 1.6116 1.6875 1.7633 1.8392 1.9151 1.9910 2.0668 2.1427 2.2186 2.2945 2.3704 2.4462 2.5221 2.5980 2.6739 2.7497 2.8256 2.9015 2.9774 3.0533 3.1291 3.2050 3.2809 3.3568 3.4326 3.5085 3.5844 3.6603 3.7361 3.8120 3.8879 3.9638 4.0397 4.1155 4.1914 $1.00 1.4420 1.5179 1.5938 1.6696 1.7455 1.8214 1.8973 1.9731 2.0490 2.1249 2.2008 2.2767 2.3525 2.4284 2.5043 2.5802 2.6560 2.7319 2.8078 2.8837 2.9595 3.0354 3.1113 3.1872 3.2631 3.3389 3.4148 3.4907 3.5666 3.6424 3.7183 3.7942 3.8701 3.9460 4.0218 4.0977 4.1736 4.2495 $2.00 1.5001 1.5759 1.6518 1.7277 1.8036 1.8794 1.9553 2.0312 2.1071 2.1829 2.2588 2.3347 2.4106 2.4865 2.5623 2.6382 2.7141 2.7900 2.8658 2.9417 3.0176 3.0935 3.1694 3.2452 3.3211 3.3970 3.4729 3.5487 3.6246 3.7005 3.7764 3.8523 3.9281 4.0040 4.0799 4.1558 4.2316 4.3075 $3.00 1.5581 1.6340 1.7099 1.7857 1.8616 1.9375 2.0134 2.0892 2.1651 2.2410 2.3169 2.3928 2.4686 2.5445 2.6204 2.6963 2.7721 2.8480 2.9239 2.9998 3.0757 3.1515 3.2274 3.3033 3.3792 3.4550 3.5309 3.6068 3.6827 3.7585 3.8344 3.9103 3.9862 4.0621 4.1379 4.2138 4.2897 4.3656 $4.00 1.6162 1.6920 1.7679 1.8438 1.9197 1.9955 2.0714 2.1473 2.2232 2.2991 2.3749 2.4508 2.5267 2.6026 2.6784 2.7543 2.8302 2.9061 2.9819 3.0578 3.1337 3.2096 3.2855 3.3613 3.4372 3.5131 3.5890 3.6648 3.7407 3.8166 3.8925 3.9684 4.0442 4.1201 4.1960 4.2719 4.3477 4.4236 $5.00 1.6742 1.7501 1.8260 1.9018 1.9777 2.0536 2.1295 2.2053 2.2812 2.3571 2.4330 2.5089 2.5847 2.6606 2.7365 2.8124 2.8882 2.9641 3.0400 3.1159 3.1918 3.2676 3.3435 3.4194 3.4953 3.5711 3.6470 3.7229 3.7988 3.8747 3.9505 4.0264 4.1023 4.1782 4.2540 4.3299 4.4058 4.4817 $6.00 1.7323 1.8081 1.8840 1.9599 2.0358 2.1116 2.1875 2.2634 2.3393 2.4152 2.4910 2.5669 2.6428 2.7187 2.7945 2.8704 2.9463 3.0222 3.0981 3.1739 3.2498 3.3257 3.4016 3.4774 3.5533 3.6292 3.7051 3.7809 3.8568 3.9327 4.0086 4.0845 4.1603 4.2362 4.3121 4.3880 4.4638 4.5397 $7.00 1.7903 1.8662 1.9421 2.0179 2.0938 2.1697 2.2456 2.3215 2.3973 2.4732 2.5491 2.6250 2.7008 2.7767 2.8526 2.9285 3.0043 3.0802 3.1561 3.2320 3.3079 3.3837 3.4596 3.5355 3.6114 3.6872 3.7631 3.8390 3.9149 3.9908 4.0666 4.1425 4.2184 4.2943 4.3701 4.4460 4.5219 4.5978 $8.00 1.8484 1.9242 2.0001 2.0760 2.1519 2.2277 2.3036 2.3795 2.4554 2.5313 2.6071 2.6830 2.7589 2.8348 2.9106 2.9865 3.0624 3.1383 3.2142 3.2900 3.3659 3.4418 3.5177 3.5935 3.6694 3.7453 3.8212 3.8971 3.9729 4.0488 4.1247 4.2006 4.2764 4.3523 4.4282 4.5041 4.5799 4.6558 $9.00 1.9064 1.9823 2.0582 2.1340 2.2099 2.2858 2.3617 2.4376 2.5134 2.5893 2.6652 2.7411 2.8169 2.8928 2.9687 3.0446 3.1205 3.1963 3.2722 3.3481 3.4240 3.4998 3.5757 3.6516 3.7275 3.8033 3.8792 3.9551 4.0310 4.1069 4.1827 4.2586 4.3345 4.4104 4.4862 4.5621 4.6380 4.7139 $10.00 1.9645 2.0403 2.1162 2.1921 2.2680 2.3439 2.4197 2.4956 2.5715 2.6474 2.7232 2.7991 2.8750 2.9509 3.0267 3.1026 3.1785 3.2544 3.3303 3.4061 3.4820 3.5579 3.6338 3.7096 3.7855 3.8614 3.9373 4.0132 4.0890 4.1649 4.2408 4.3167 4.3925 4.4684 4.5443 4.6202 4.6961 4.7719 $11.00 2.0225 2.0984 2.1743 2.2502 2.3260 2.4019 2.4778 2.5537 2.6295 2.7054 2.7813 2.8572 2.9330 3.0089 3.0848 3.1607 3.2366 3.3124 3.3883 3.4642 3.5401 3.6159 3.6918 3.7677 3.8436 3.9195 3.9953 4.0712 4.1471 4.2230 4.2988 4.3747 4.4506 4.5265 4.6023 4.6782 4.7541 4.8300 $12.00 2.0806 2.1564 2.2323 2.3082 2.3841 2.4600 2.5358 2.6117 2.6876 2.7635 2.8393 2.9152 2.9911 3.0670 3.1429 3.2187 3.2946 3.3705 3.4464 3.5222 3.5981 3.6740 3.7499 3.8257 3.9016 3.9775 4.0534 4.1293 4.2051 4.2810 4.3569 4.4328 4.5086 4.5845 4.6604 4.7363 4.8122 4.8880 $13.00 2.1386 2.2145 2.2904 2.3663 2.4421 2.5180 2.5939 2.6698 2.7456 2.8215 2.8974 2.9733 3.0492 3.1250 3.2009 3.2768 3.3527 3.4285 3.5044 3.5803 3.6562 3.7320 3.8079 3.8838 3.9597 4.0356 4.1114 4.1873 4.2632 4.3391 4.4149 4.4908 4.5667 4.6426 4.7185 4.7943 4.8702 4.9461 $14.00 2.1967 2.2726 2.3484 2.4243 2.5002 2.5761 2.6519 2.7278 2.8037 2.8796 2.9554 3.0313 3.1072 3.1831 3.2590 3.3348 3.4107 3.4866 3.5625 3.6383 3.7142 3.7901 3.8660 3.9419 4.0177 4.0936 4.1695 4.2454 4.3212 4.3971 4.4730 4.5489 4.6247 4.7006 4.7765 4.8524 4.9283 5.0041 $15.00 2.2547 2.3306 2.4065 2.4824 2.5582 2.6341 2.7100 2.7859 2.8617 2.9376 3.0135 3.0894 3.1653 3.2411 3.3170 3.3929 3.4688 3.5446 3.6205 3.6964 3.7723 3.8482 3.9240 3.9999 4.0758 4.1517 4.2275 4.3034 4.3793 4.4552 4.5310 4.6069 4.6828 4.7587 4.8346 4.9104 4.9863 5.0622 $16.00 2.3128 2.3887 2.4645 2.5404 2.6163 2.6922 2.7680 2.8439 2.9198 2.9957 3.0716 3.1474 3.2233 3.2992 3.3751 3.4509 3.5268 3.6027 3.6786 3.7544 3.8303 3.9062 3.9821 4.0580 4.1338 4.2097 4.2856 4.3615 4.4373 4.5132 4.5891 4.6650 4.7409 4.8167 4.8926 4.9685 5.0444 5.1202 $17.00 2.3708 2.4467 2.5226 2.5985 2.6743 2.7502 2.8261 2.9020 2.9778 3.0537 3.1296 3.2055 3.2814 3.3572 3.4331 3.5090 3.5849 3.6607 3.7366 3.8125 3.8884 3.9643 4.0401 4.1160 4.1919 4.2678 4.3436 4.4195 4.4954 4.5713 4.6472 4.7230 4.7989 4.8748 4.9507 5.0265 5.1024 5.1783 $18.00 2.4289 2.5048 2.5806 2.6565 2.7324 2.8083 2.8841 2.9600 3.0359 3.1118 3.1877 3.2635 3.3394 3.4153 3.4912 3.5670 3.6429 3.7188 3.7947 3.8706 3.9464 4.0223 4.0982 4.1741 4.2499 4.3258 4.4017 4.4776 4.5534 4.6293 4.7052 4.7811 4.8570 4.9328 5.0087 5.0846 5.1605 5.2363 $19.00 2.4869 2.5628 2.6387 2.7146 2.7904 2.8663 2.9422 3.0181 3.0940 3.1698 3.2457 3.3216 3.3975 3.4733 3.5492 3.6251 3.7010 3.7768 3.8527 3.9286 4.0045 4.0804 4.1562 4.2321 4.3080 4.3839 4.4597 4.5356 4.6115 4.6874 4.7633 4.8391 4.9150 4.9909 5.0668 5.1426 5.2185 5.2944 $20.00 2.5450 2.6209 2.6967 2.7726 2.8485 2.9244 3.0002 3.0761 3.1520 3.2279 3.3038 3.3796 3.4555 3.5314 3.6073 3.6831 3.7590 3.8349 3.9108 3.9867 4.0625 4.1384 4.2143 4.2902 4.3660 4.4419 4.5178 4.5937 4.6696 4.7454 4.8213 4.8972 4.9731 5.0489 5.1248 5.2007 5.2766 5.3524 $21.00 2.6030 2.6789 2.7548 2.8307 2.9065 2.9824 3.0583 3.1342 3.2101 3.2859 3.3618 3.4377 3.5136 3.5894 3.6653 3.7412 3.8171 3.8930 3.9688 4.0447 4.1206 4.1965 4.2723 4.3482 4.4241 4.5000 4.5758 4.6517 4.7276 4.8035 4.8794 4.9552 5.0311 5.1070 5.1829 5.2587 5.3346 5.4105 $22.00 2.6611 2.7370 2.8128 2.8887 2.9646 3.0405 3.1164 3.1922 3.2681 3.3440 3.4199 3.4957 3.5716 3.6475 3.7234 3.7992 3.8751 3.9510 4.0269 4.1028 4.1786 4.2545 4.3304 4.4063 4.4821 4.5580 4.6339 4.7098 4.7857 4.8615 4.9374 5.0133 5.0892 5.1650 5.2409 5.3168 5.3927 5.4686 $23.00 2.7191 2.7950 2.8709 2.9468 3.0226 3.0985 3.1744 3.2503 3.3262 3.4020 3.4779 3.5538 3.6297 3.7055 3.7814 3.8573 3.9332 4.0091 4.0849 4.1608 4.2367 4.3126 4.3884 4.4643 4.5402 4.6161 4.6920 4.7678 4.8437 4.9196 4.9955 5.0713 5.1472 5.2231 5.2990 5.3748 5.4507 5.5266 $24.00 2.7772 2.8531 2.9289 3.0048 3.0807 3.1566 3.2325 3.3083 3.3842 3.4601 3.5360 3.6118 3.6877 3.7636 3.8395 3.9154 3.9912 4.0671 4.1430 4.2189 4.2947 4.3706 4.4465 4.5224 4.5982 4.6741 4.7500 4.8259 4.9018 4.9776 5.0535 5.1294 5.2053 5.2811 5.3570 5.4329 5.5088 5.5847 $25.00 2.8352 2.9111 2.9870 3.0629 3.1388 3.2146 3.2905 3.3664 3.4423 3.5181 3.5940 3.6699 3.7458 3.8216 3.8975 3.9734 4.0493 4.1252 4.2010 4.2769 4.3528 4.4287 4.5045 4.5804 4.6563 4.7322 4.8081 4.8839 4.9598 5.0357 5.1116 5.1874 5.2633 5.3392 5.4151 5.4910 5.5668 5.6427 $26.00 2.8933 2.9692 3.0450 3.1209 3.1968 3.2727 3.3486 3.4244 3.5003 3.5762 3.6521 3.7279 3.8038 3.8797 3.9556 4.0315 4.1073 4.1832 4.2591 4.3350 4.4108 4.4867 4.5626 4.6385 4.7144 4.7902 4.8661 4.9420 5.0179 5.0937 5.1696 5.2455 5.3214 5.3972 5.4731 5.5490 5.6249 5.7008 $27.00 2.9513 3.0272 3.1031 3.1790 3.2549 3.3307 3.4066 3.4825 3.5584 3.6342 3.7101 3.7860 3.8619 3.9378 4.0136 4.0895 4.1654 4.2413 4.3171 4.3930 4.4689 4.5448 4.6206 4.6965 4.7724 4.8483 4.9242 5.0000 5.0759 5.1518 5.2277 5.3035 5.3794 5.4553 5.5312 5.6071 5.6829 5.7588 $28.00 3.0094 3.0853 3.1612 3.2370 3.3129 3.3888 3.4647 3.5405 3.6164 3.6923 3.7682 3.8440 3.9199 3.9958 4.0717 4.1476 4.2234 4.2993 4.3752 4.4511 4.5269 4.6028 4.6787 4.7546 4.8305 4.9063 4.9822 5.0581 5.1340 5.2098 5.2857 5.3616 5.4375 5.5134 5.5892 5.6651 5.7410 5.8169 $29.00 3.0675 3.1433 3.2192 3.2951 3.3710 3.4468 3.5227 3.5986 3.6745 3.7503 3.8262 3.9021 3.9780 4.0539 4.1297 4.2056 4.2815 4.3574 4.4332 4.5091 4.5850 4.6609 4.7368 4.8126 4.8885 4.9644 5.0403 5.1161 5.1920 5.2679 5.3438 5.4196 5.4955 5.5714 5.6473 5.7232 5.7990 5.8749 $30.00 3.1255 3.2014 3.2773 3.3531 3.4290 3.5049 3.5808 3.6566 3.7325 3.8084 3.8843 3.9602 4.0360 4.1119 4.1878 4.2637 4.3395 4.4154 4.4913 4.5672 4.6430 4.7189 4.7948 4.8707 4.9466 5.0224 5.0983 5.1742 5.2501 5.3259 5.4018 5.4777 5.5536 5.6295 5.7053 5.7812 5.8571 5.9330 LCOE ($ ¢/kWh) Sensitivitiy Analysis - CAPEX & WACC 2.999049054 $500.00 $525.00 $550.00 $575.00 $600.00 $625.00 $650.00 $675.00 $700.00 $725.00 $750.00 $775.00 $800.00 $825.00 $850.00 $875.00 $900.00 $925.00 $950.00 $975.00 $1,000.00 $1,025.00 $1,050.00 $1,075.00 $1,100.00 $1,125.00 $1,150.00 $1,175.00 $1,200.00 $1,225.00 $1,250.00 $1,275.00 $1,300.00 $1,325.00 $1,350.00 $1,375.00 $1,400.00 $1,425.00 1.00% 1.5154 1.5735 1.6317 1.6899 1.7480 1.8062 1.8643 1.9225 1.9807 2.0388 2.0970 2.1551 2.2133 2.2715 2.3296 2.3878 2.4459 2.5041 2.5623 2.6204 2.6786 2.7367 2.7949 2.8531 2.9112 2.9694 3.0275 3.0857 3.1439 3.2020 3.2602 3.3183 3.3765 3.4347 3.4928 3.5510 3.6091 3.6673 1.10% 1.5312 1.5901 1.6490 1.7078 1.7667 1.8256 1.8844 1.9433 2.0021 2.0610 2.1199 2.1787 2.2376 2.2965 2.3553 2.4142 2.4730 2.5319 2.5908 2.6496 2.7085 2.7674 2.8262 2.8851 2.9440 3.0028 3.0617 3.1205 3.1794 3.2383 3.2971 3.3560 3.4149 3.4737 3.5326 3.5914 3.6503 3.7092 1.20% 1.5472 1.6067 1.6663 1.7259 1.7855 1.8450 1.9046 1.9642 2.0237 2.0833 2.1429 2.2025 2.2620 2.3216 2.3812 2.4407 2.5003 2.5599 2.6195 2.6790 2.7386 2.7982 2.8577 2.9173 2.9769 3.0364 3.0960 3.1556 3.2152 3.2747 3.3343 3.3939 3.4534 3.5130 3.5726 3.6322 3.6917 3.7513 1.30% 1.5632 1.6235 1.6837 1.7440 1.8043 1.8646 1.9249 1.9852 2.0454 2.1057 2.1660 2.2263 2.2866 2.3469 2.4072 2.4674 2.5277 2.5880 2.6483 2.7086 2.7689 2.8291 2.8894 2.9497 3.0100 3.0703 3.1306 3.1908 3.2511 3.3114 3.3717 3.4320 3.4923 3.5526 3.6128 3.6731 3.7334 3.7937 1.40% 1.5793 1.6403 1.7013 1.7623 1.8233 1.8843 1.9453 2.0063 2.0673 2.1283 2.1893 2.2503 2.3113 2.3723 2.4333 2.4943 2.5553 2.6163 2.6773 2.7383 2.7993 2.8603 2.9213 2.9823 3.0433 3.1043 3.1653 3.2263 3.2873 3.3483 3.4093 3.4703 3.5313 3.5923 3.6533 3.7143 3.7753 3.8363 1.50% 1.5954 1.6571 1.7189 1.7806 1.8423 1.9040 1.9658 2.0275 2.0892 2.1509 2.2127 2.2744 2.3361 2.3978 2.4596 2.5213 2.5830 2.6447 2.7064 2.7682 2.8299 2.8916 2.9533 3.0151 3.0768 3.1385 3.2002 3.2620 3.3237 3.3854 3.4471 3.5089 3.5706 3.6323 3.6940 3.7558 3.8175 3.8792 1.60% 1.6116 1.6741 1.7365 1.7990 1.8614 1.9239 1.9864 2.0488 2.1113 2.1737 2.2362 2.2986 2.3611 2.4235 2.4860 2.5484 2.6109 2.6733 2.7358 2.7982 2.8607 2.9231 2.9856 3.0480 3.1105 3.1729 3.2354 3.2978 3.3603 3.4227 3.4852 3.5476 3.6101 3.6725 3.7350 3.7974 3.8599 3.9223 1.70% 1.6279 1.6911 1.7543 1.8175 1.8807 1.9439 2.0070 2.0702 2.1334 2.1966 2.2598 2.3230 2.3861 2.4493 2.5125 2.5757 2.6389 2.7021 2.7652 2.8284 2.8916 2.9548 3.0180 3.0812 3.1443 3.2075 3.2707 3.3339 3.3971 3.4603 3.5234 3.5866 3.6498 3.7130 3.7762 3.8394 3.9025 3.9657 1.80% 1.6443 1.7082 1.7722 1.8361 1.9000 1.9639 2.0278 2.0918 2.1557 2.2196 2.2835 2.3474 2.4114 2.4753 2.5392 2.6031 2.6670 2.7310 2.7949 2.8588 2.9227 2.9866 3.0506 3.1145 3.1784 3.2423 3.3062 3.3702 3.4341 3.4980 3.5619 3.6258 3.6897 3.7537 3.8176 3.8815 3.9454 4.0093 1.90% 1.6608 1.7254 1.7901 1.8548 1.9194 1.9841 2.0487 2.1134 2.1781 2.2427 2.3074 2.3720 2.4367 2.5014 2.5660 2.6307 2.6953 2.7600 2.8247 2.8893 2.9540 3.0186 3.0833 3.1480 3.2126 3.2773 3.3420 3.4066 3.4713 3.5359 3.6006 3.6653 3.7299 3.7946 3.8592 3.9239 3.9886 4.0532 2.00% 1.6773 1.7427 1.8081 1.8735 1.9389 2.0043 2.0697 2.1351 2.2005 2.2660 2.3314 2.3968 2.4622 2.5276 2.5930 2.6584 2.7238 2.7892 2.8546 2.9200 2.9854 3.0508 3.1162 3.1816 3.2471 3.3125 3.3779 3.4433 3.5087 3.5741 3.6395 3.7049 3.7703 3.8357 3.9011 3.9665 4.0319 4.0973 2.10% 1.6939 1.7600 1.8262 1.8924 1.9585 2.0247 2.0908 2.1570 2.2231 2.2893 2.3555 2.4216 2.4878 2.5539 2.6201 2.6862 2.7524 2.8186 2.8847 2.9509 3.0170 3.0832 3.1493 3.2155 3.2817 3.3478 3.4140 3.4801 3.5463 3.6124 3.6786 3.7448 3.8109 3.8771 3.9432 4.0094 4.0755 4.1417 2.20% 1.7106 1.7775 1.8444 1.9113 1.9782 2.0451 2.1120 2.1789 2.2459 2.3128 2.3797 2.4466 2.5135 2.5804 2.6473 2.7142 2.7811 2.8481 2.9150 2.9819 3.0488 3.1157 3.1826 3.2495 3.3164 3.3834 3.4503 3.5172 3.5841 3.6510 3.7179 3.7848 3.8517 3.9186 3.9856 4.0525 4.1194 4.1863 2.50% 1.7610 1.8302 1.8994 1.9686 2.0378 2.1070 2.1762 2.2454 2.3146 2.3838 2.4530 2.5222 2.5914 2.6606 2.7298 2.7990 2.8683 2.9375 3.0067 3.0759 3.1451 3.2143 3.2835 3.3527 3.4219 3.4911 3.5603 3.6295 3.6987 3.7679 3.8371 3.9063 3.9755 4.0447 4.1139 4.1831 4.2523 4.3215 2.70% 1.7950 1.8657 1.9365 2.0072 2.0780 2.1487 2.2195 2.2902 2.3610 2.4318 2.5025 2.5733 2.6440 2.7148 2.7855 2.8563 2.9270 2.9978 3.0686 3.1393 3.2101 3.2808 3.3516 3.4223 3.4931 3.5638 3.6346 3.7053 3.7761 3.8469 3.9176 3.9884 4.0591 4.1299 4.2006 4.2714 4.3421 4.4129 2.80% 1.8120 1.8836 1.9551 2.0267 2.0982 2.1697 2.2413 2.3128 2.3843 2.4559 2.5274 2.5990 2.6705 2.7420 2.8136 2.8851 2.9566 3.0282 3.0997 3.1713 3.2428 3.3143 3.3859 3.4574 3.5289 3.6005 3.6720 3.7436 3.8151 3.8866 3.9582 4.0297 4.1012 4.1728 4.2443 4.3159 4.3874 4.4589 2.90% 1.8292 1.9015 1.9739 2.0462 2.1185 2.1908 2.2632 2.3355 2.4078 2.4801 2.5524 2.6248 2.6971 2.7694 2.8417 2.9141 2.9864 3.0587 3.1310 3.2034 3.2757 3.3480 3.4203 3.4927 3.5650 3.6373 3.7096 3.7820 3.8543 3.9266 3.9989 4.0713 4.1436 4.2159 4.2882 4.3605 4.4329 4.5052 3.00% 1.8464 1.9196 1.9927 2.0658 2.1389 2.2120 2.2851 2.3582 2.4314 2.5045 2.5776 2.6507 2.7238 2.7969 2.8701 2.9432 3.0163 3.0894 3.1625 3.2356 3.3087 3.3819 3.4550 3.5281 3.6012 3.6743 3.7474 3.8205 3.8937 3.9668 4.0399 4.1130 4.1861 4.2592 4.3323 4.4055 4.4786 4.5517 3.10% 1.8637 1.9377 2.0116 2.0855 2.1594 2.2333 2.3072 2.3811 2.4550 2.5289 2.6028 2.6768 2.7507 2.8246 2.8985 2.9724 3.0463 3.1202 3.1941 3.2680 3.3419 3.4159 3.4898 3.5637 3.6376 3.7115 3.7854 3.8593 3.9332 4.0071 4.0811 4.1550 4.2289 4.3028 4.3767 4.4506 4.5245 4.5984 3.20% 1.8811 1.9558 2.0305 2.1052 2.1799 2.2547 2.3294 2.4041 2.4788 2.5535 2.6282 2.7029 2.7776 2.8523 2.9271 3.0018 3.0765 3.1512 3.2259 3.3006 3.3753 3.4500 3.5247 3.5994 3.6742 3.7489 3.8236 3.8983 3.9730 4.0477 4.1224 4.1971 4.2718 4.3465 4.4213 4.4960 4.5707 4.6454 3.30% 1.8985 1.9741 2.0496 2.1251 2.2006 2.2761 2.3516 2.4271 2.5027 2.5782 2.6537 2.7292 2.8047 2.8802 2.9557 3.0313 3.1068 3.1823 3.2578 3.3333 3.4088 3.4843 3.5599 3.6354 3.7109 3.7864 3.8619 3.9374 4.0129 4.0885 4.1640 4.2395 4.3150 4.3905 4.4660 4.5415 4.6171 4.6926 3.30% 1.8985 1.9741 2.0496 2.1251 2.2006 2.2761 2.3516 2.4271 2.5027 2.5782 2.6537 2.7292 2.8047 2.8802 2.9557 3.0313 3.1068 3.1823 3.2578 3.3333 3.4088 3.4843 3.5599 3.6354 3.7109 3.7864 3.8619 3.9374 4.0129 4.0885 4.1640 4.2395 4.3150 4.3905 4.4660 4.5415 4.6171 4.6926 3.40% 1.9161 1.9924 2.0687 2.1450 2.2213 2.2977 2.3740 2.4503 2.5266 2.6030 2.6793 2.7556 2.8319 2.9082 2.9846 3.0609 3.1372 3.2135 3.2899 3.3662 3.4425 3.5188 3.5951 3.6715 3.7478 3.8241 3.9004 3.9768 4.0531 4.1294 4.2057 4.2820 4.3584 4.4347 4.5110 4.5873 4.6637 4.7400 3.50% 1.9336 2.0108 2.0879 2.1650 2.2422 2.3193 2.3964 2.4736 2.5507 2.6278 2.7050 2.7821 2.8592 2.9364 3.0135 3.0907 3.1678 3.2449 3.3221 3.3992 3.4763 3.5535 3.6306 3.7077 3.7849 3.8620 3.9391 4.0163 4.0934 4.1705 4.2477 4.3248 4.4019 4.4791 4.5562 4.6334 4.7105 4.7876 3.60% 1.9513 2.0292 2.1072 2.1851 2.2631 2.3410 2.4190 2.4969 2.5749 2.6528 2.7308 2.8087 2.8867 2.9646 3.0426 3.1205 3.1985 3.2764 3.3544 3.4324 3.5103 3.5883 3.6662 3.7442 3.8221 3.9001 3.9780 4.0560 4.1339 4.2119 4.2898 4.3678 4.4457 4.5237 4.6016 4.6796 4.7575 4.8355 3.70% 1.9690 2.0477 2.1265 2.2053 2.2841 2.3628 2.4416 2.5204 2.5992 2.6779 2.7567 2.8355 2.9142 2.9930 3.0718 3.1506 3.2293 3.3081 3.3869 3.4657 3.5444 3.6232 3.7020 3.7808 3.8595 3.9383 4.0171 4.0958 4.1746 4.2534 4.3322 4.4109 4.4897 4.5685 4.6473 4.7260 4.8048 4.8836 3.60% 1.9513 2.0292 2.1072 2.1851 2.2631 2.3410 2.4190 2.4969 2.5749 2.6528 2.7308 2.8087 2.8867 2.9646 3.0426 3.1205 3.1985 3.2764 3.3544 3.4324 3.5103 3.5883 3.6662 3.7442 3.8221 3.9001 3.9780 4.0560 4.1339 4.2119 4.2898 4.3678 4.4457 4.5237 4.6016 4.6796 4.7575 4.8355 3.80% 1.9867 2.0663 2.1459 2.2255 2.3051 2.3847 2.4643 2.5439 2.6235 2.7031 2.7827 2.8623 2.9419 3.0215 3.1011 3.1807 3.2603 3.3399 3.4195 3.4991 3.5787 3.6583 3.7379 3.8175 3.8971 3.9767 4.0563 4.1359 4.2155 4.2951 4.3747 4.4543 4.5339 4.6135 4.6931 4.7727 4.8523 4.9319 3.90% 2.0046 2.0850 2.1654 2.2459 2.3263 2.4067 2.4871 2.5676 2.6480 2.7284 2.8089 2.8893 2.9697 3.0501 3.1306 3.2110 3.2914 3.3719 3.4523 3.5327 3.6131 3.6936 3.7740 3.8544 3.9349 4.0153 4.0957 4.1761 4.2566 4.3370 4.4174 4.4979 4.5783 4.6587 4.7391 4.8196 4.9000 4.9804 4.00% 2.0225 2.1037 2.1850 2.2663 2.3475 2.4288 2.5101 2.5913 2.6726 2.7538 2.8351 2.9164 2.9976 3.0789 3.1601 3.2414 3.3227 3.4039 3.4852 3.5665 3.6477 3.7290 3.8102 3.8915 3.9728 4.0540 4.1353 4.2166 4.2978 4.3791 4.4603 4.5416 4.6229 4.7041 4.7854 4.8666 4.9479 5.0292 4.20% 2.0585 2.1414 2.2244 2.3073 2.3902 2.4732 2.5561 2.6391 2.7220 2.8050 2.8879 2.9708 3.0538 3.1367 3.2197 3.3026 3.3856 3.4685 3.5514 3.6344 3.7173 3.8003 3.8832 3.9661 4.0491 4.1320 4.2150 4.2979 4.3809 4.4638 4.5467 4.6297 4.7126 4.7956 4.8785 4.9614 5.0444 5.1273 4.40% 2.0947 2.1794 2.2640 2.3487 2.4333 2.5179 2.6026 2.6872 2.7718 2.8565 2.9411 3.0258 3.1104 3.1950 3.2797 3.3643 3.4489 3.5336 3.6182 3.7029 3.7875 3.8721 3.9568 4.0414 4.1260 4.2107 4.2953 4.3800 4.4646 4.5492 4.6339 4.7185 4.8031 4.8878 4.9724 5.0571 5.1417 5.2263 4.60% 2.1313 2.2176 2.3040 2.3903 2.4767 2.5630 2.6494 2.7357 2.8221 2.9084 2.9948 3.0811 3.1675 3.2538 3.3402 3.4265 3.5129 3.5992 3.6856 3.7719 3.8583 3.9446 4.0309 4.1173 4.2036 4.2900 4.3763 4.4627 4.5490 4.6354 4.7217 4.8081 4.8944 4.9808 5.0671 5.1535 5.2398 5.3262 4.80% 2.1680 2.2561 2.3442 2.4322 2.5203 2.6084 2.6965 2.7846 2.8726 2.9607 3.0488 3.1369 3.2249 3.3130 3.4011 3.4892 3.5773 3.6653 3.7534 3.8415 3.9296 4.0176 4.1057 4.1938 4.2819 4.3700 4.4580 4.5461 4.6342 4.7223 4.8103 4.8984 4.9865 5.0746 5.1627 5.2507 5.3388 5.4269 5.00% 2.2050 2.2948 2.3847 2.4745 2.5643 2.6541 2.7440 2.8338 2.9236 3.0134 3.1032 3.1931 3.2829 3.3727 3.4625 3.5523 3.6422 3.7320 3.8218 3.9116 4.0014 4.0913 4.1811 4.2709 4.3607 4.4506 4.5404 4.6302 4.7200 4.8098 4.8997 4.9895 5.0793 5.1691 5.2589 5.3488 5.4386 5.5284 5.20% 2.2423 2.3339 2.4254 2.5170 2.6086 2.7002 2.7918 2.8833 2.9749 3.0665 3.1581 3.2497 3.3412 3.4328 3.5244 3.6160 3.7076 3.7991 3.8907 3.9823 4.0739 4.1655 4.2570 4.3486 4.4402 4.5318 4.6234 4.7149 4.8065 4.8981 4.9897 5.0813 5.1728 5.2644 5.3560 5.4476 5.5392 5.6307 5.40% 2.2798 2.3731 2.4665 2.5598 2.6532 2.7465 2.8399 2.9332 3.0266 3.1200 3.2133 3.3067 3.4000 3.4934 3.5867 3.6801 3.7734 3.8668 3.9601 4.0535 4.1468 4.2402 4.3336 4.4269 4.5203 4.6136 4.7070 4.8003 4.8937 4.9870 5.0804 5.1737 5.2671 5.3604 5.4538 5.5472 5.6405 5.7339 5.60% 2.3175 2.4126 2.5078 2.6029 2.6981 2.7932 2.8884 2.9835 3.0786 3.1738 3.2689 3.3641 3.4592 3.5544 3.6495 3.7446 3.8398 3.9349 4.0301 4.1252 4.2204 4.3155 4.4106 4.5058 4.6009 4.6961 4.7912 4.8863 4.9815 5.0766 5.1718 5.2669 5.3621 5.4572 5.5523 5.6475 5.7426 5.8378 5.80% 2.3555 2.4524 2.5494 2.6463 2.7432 2.8402 2.9371 3.0341 3.1310 3.2280 3.3249 3.4219 3.5188 3.6158 3.7127 3.8096 3.9066 4.0035 4.1005 4.1974 4.2944 4.3913 4.4883 4.5852 4.6822 4.7791 4.8761 4.9730 5.0699 5.1669 5.2638 5.3608 5.4577 5.5547 5.6516 5.7486 5.8455 5.9425 6.00% 2.3936 2.4924 2.5912 2.6899 2.7887 2.8875 2.9862 3.0850 3.1838 3.2825 3.3813 3.4800 3.5788 3.6776 3.7763 3.8751 3.9739 4.0726 4.1714 4.2702 4.3689 4.4677 4.5664 4.6652 4.7640 4.8627 4.9615 5.0603 5.1590 5.2578 5.3566 5.4553 5.5541 5.6529 5.7516 5.8504 5.9491 6.0479 6.20% 2.4321 2.5327 2.6333 2.7338 2.8344 2.9350 3.0356 3.1362 3.2368 3.3374 3.4380 3.5386 3.6392 3.7398 3.8404 3.9410 4.0416 4.1422 4.2428 4.3434 4.4440 4.5446 4.6452 4.7458 4.8464 4.9470 5.0475 5.1481 5.2487 5.3493 5.4499 5.5505 5.6511 5.7517 5.8523 5.9529 6.0535 6.1541 6.40% 2.4707 2.5731 2.6756 2.7780 2.8805 2.9829 3.0853 3.1878 3.2902 3.3927 3.4951 3.5976 3.7000 3.8024 3.9049 4.0073 4.1098 4.2122 4.3146 4.4171 4.5195 4.6220 4.7244 4.8268 4.9293 5.0317 5.1342 5.2366 5.3391 5.4415 5.5439 5.6464 5.7488 5.8513 5.9537 6.0561 6.1586 6.2610 6.60% 2.5095 2.6138 2.7182 2.8225 2.9268 3.0311 3.1354 3.2397 3.3440 3.4483 3.5526 3.6569 3.7612 3.8655 3.9698 4.0741 4.1784 4.2827 4.3870 4.4913 4.5956 4.6999 4.8042 4.9085 5.0128 5.1171 5.2214 5.3257 5.4300 5.5343 5.6386 5.7429 5.8472 5.9515 6.0558 6.1601 6.2644 6.3687 6.80% 2.5486 2.6548 2.7610 2.8671 2.9733 3.0795 3.1857 3.2918 3.3980 3.5042 3.6104 3.7165 3.8227 3.9289 4.0350 4.1412 4.2474 4.3536 4.4597 4.5659 4.6721 4.7783 4.8844 4.9906 5.0968 5.2030 5.3091 5.4153 5.5215 5.6277 5.7338 5.8400 5.9462 6.0523 6.1585 6.2647 6.3709 6.4770 7.00% 2.5879 2.6960 2.8040 2.9121 3.0201 3.1282 3.2363 3.3443 3.4524 3.5604 3.6685 3.7765 3.8846 3.9927 4.1007 4.2088 4.3168 4.4249 4.5330 4.6410 4.7491 4.8571 4.9652 5.0733 5.1813 5.2894 5.3974 5.5055 5.6136 5.7216 5.8297 5.9377 6.0458 6.1539 6.2619 6.3700 6.4780 6.5861 7.20% 2.6274 2.7373 2.8473 2.9573 3.0672 3.1772 3.2871 3.3971 3.5070 3.6170 3.7270 3.8369 3.9469 4.0568 4.1668 4.2768 4.3867 4.4967 4.6066 4.7166 4.8265 4.9365 5.0465 5.1564 5.2664 5.3763 5.4863 5.5963 5.7062 5.8162 5.9261 6.0361 6.1461 6.2560 6.3660 6.4759 6.5859 6.6958 7.40% 2.6671 2.7789 2.8908 3.0027 3.1145 3.2264 3.3383 3.4502 3.5620 3.6739 3.7858 3.8976 4.0095 4.1214 4.2332 4.3451 4.4570 4.5689 4.6807 4.7926 4.9045 5.0163 5.1282 5.2401 5.3519 5.4638 5.5757 5.6876 5.7994 5.9113 6.0232 6.1350 6.2469 6.3588 6.4706 6.5825 6.6944 6.8063 7.60% 2.7069 2.8207 2.9345 3.0483 3.1621 3.2759 3.3897 3.5035 3.6173 3.7311 3.8449 3.9587 4.0725 4.1863 4.3001 4.4139 4.5277 4.6414 4.7552 4.8690 4.9828 5.0966 5.2104 5.3242 5.4380 5.5518 5.6656 5.7794 5.8932 6.0070 6.1208 6.2346 6.3484 6.4622 6.5759 6.6897 6.8035 6.9173 7.80% 2.7470 2.8628 2.9785 3.0942 3.2099 3.3257 3.4414 3.5571 3.6729 3.7886 3.9043 4.0201 4.1358 4.2515 4.3673 4.4830 4.5987 4.7144 4.8302 4.9459 5.0616 5.1774 5.2931 5.4088 5.5246 5.6403 5.7560 5.8717 5.9875 6.1032 6.2189 6.3347 6.4504 6.5661 6.6819 6.7976 6.9133 7.0290 8.00% 2.7873 2.9050 3.0227 3.1403 3.2580 3.3757 3.4934 3.6110 3.7287 3.8464 3.9641 4.0818 4.1994 4.3171 4.4348 4.5525 4.6702 4.7878 4.9055 5.0232 5.1409 5.2585 5.3762 5.4939 5.6116 5.7293 5.8469 5.9646 6.0823 6.2000 6.3177 6.4353 6.5530 6.6707 6.7884 6.9060 7.0237 7.1414 8.20% 2.8278 2.9474 3.0670 3.1867 3.3063 3.4259 3.5456 3.6652 3.7849 3.9045 4.0241 4.1438 4.2634 4.3831 4.5027 4.6223 4.7420 4.8616 4.9812 5.1009 5.2205 5.3402 5.4598 5.5794 5.6991 5.8187 5.9384 6.0580 6.1776 6.2973 6.4169 6.5365 6.6562 6.7758 6.8955 7.0151 7.1347 7.2544 8.40% 2.8684 2.9900 3.1116 3.2332 3.3548 3.4764 3.5981 3.7197 3.8413 3.9629 4.0845 4.2061 4.3277 4.4493 4.5709 4.6925 4.8142 4.9358 5.0574 5.1790 5.3006 5.4222 5.5438 5.6654 5.7870 5.9086 6.0302 6.1519 6.2735 6.3951 6.5167 6.6383 6.7599 6.8815 7.0031 7.1247 7.2463 7.3680 8.60% 2.9092 3.0328 3.1564 3.2800 3.4036 3.5272 3.6508 3.7744 3.8980 4.0216 4.1451 4.2687 4.3923 4.5159 4.6395 4.7631 4.8867 5.0103 5.1339 5.2575 5.3811 5.5047 5.6282 5.7518 5.8754 5.9990 6.1226 6.2462 6.3698 6.4934 6.6170 6.7406 6.8642 6.9878 7.1113 7.2349 7.3585 7.4821 8.80% 2.9502 3.0758 3.2014 3.3270 3.4526 3.5782 3.7037 3.8293 3.9549 4.0805 4.2061 4.3317 4.4572 4.5828 4.7084 4.8340 4.9596 5.0852 5.2108 5.3363 5.4619 5.5875 5.7131 5.8387 5.9643 6.0899 6.2154 6.3410 6.4666 6.5922 6.7178 6.8434 6.9690 7.0945 7.2201 7.3457 7.4713 7.5969 9.00% 2.9914 3.1190 3.2466 3.3742 3.5018 3.6293 3.7569 3.8845 4.0121 4.1397 4.2673 4.3949 4.5225 4.6501 4.7777 4.9052 5.0328 5.1604 5.2880 5.4156 5.5432 5.6708 5.7984 5.9260 6.0535 6.1811 6.3087 6.4363 6.5639 6.6915 6.8191 6.9467 7.0743 7.2019 7.3294 7.4570 7.5846 7.7122 9.20% 3.0327 3.1623 3.2920 3.4216 3.5512 3.6808 3.8104 3.9400 4.0696 4.1992 4.3288 4.4584 4.5880 4.7176 4.8472 4.9768 5.1064 5.2360 5.3656 5.4952 5.6248 5.7544 5.8840 6.0136 6.1432 6.2728 6.4025 6.5321 6.6617 6.7913 6.9209 7.0505 7.1801 7.3097 7.4393 7.5689 7.6985 7.8281 9.40% 3.0743 3.2059 3.3375 3.4691 3.6008 3.7324 3.8640 3.9957 4.1273 4.2589 4.3905 4.5222 4.6538 4.7854 4.9171 5.0487 5.1803 5.3119 5.4436 5.5752 5.7068 5.8385 5.9701 6.1017 6.2334 6.3650 6.4966 6.6282 6.7599 6.8915 7.0231 7.1548 7.2864 7.4180 7.5496 7.6813 7.8129 7.9445 9.60% 3.1159 3.2496 3.3833 3.5169 3.6506 3.7842 3.9179 4.0516 4.1852 4.3189 4.4526 4.5862 4.7199 4.8536 4.9872 5.1209 5.2546 5.3882 5.5219 5.6555 5.7892 5.9229 6.0565 6.1902 6.3239 6.4575 6.5912 6.7249 6.8585 6.9922 7.1259 7.2595 7.3932 7.5268 7.6605 7.7942 7.9278 8.0615 9.80% 3.1578 3.2935 3.4292 3.5649 3.7006 3.8363 3.9720 4.1077 4.2434 4.3791 4.5148 4.6506 4.7863 4.9220 5.0577 5.1934 5.3291 5.4648 5.6005 5.7362 5.8719 6.0076 6.1434 6.2791 6.4148 6.5505 6.6862 6.8219 6.9576 7.0933 7.2290 7.3647 7.5004 7.6362 7.7719 7.9076 8.0433 8.1790 10.00% 3.1997 3.3375 3.4753 3.6130 3.7508 3.8886 4.0263 4.1641 4.3019 4.4396 4.5774 4.7151 4.8529 4.9907 5.1284 5.2662 5.4040 5.5417 5.6795 5.8173 5.9550 6.0928 6.2305 6.3683 6.5061 6.6438 6.7816 6.9194 7.0571 7.1949 7.3327 7.4704 7.6082 7.7459 7.8837 8.0215 8.1592 8.2970 LCOE ($ ¢/kWh) Sensitivitiy Analysis - CAPEX & Annual Specifc Energy Yield kWh/kWp 2.999049054 $500.00 $525.00 $550.00 $575.00 $600.00 $625.00 $650.00 $675.00 $700.00 $725.00 $750.00 $775.00 $800.00 $825.00 $850.00 $875.00 $900.00 $925.00 $950.00 $975.00 $1,000.00 $1,025.00 $1,050.00 $1,075.00 $1,100.00 $1,125.00 $1,150.00 $1,175.00 $1,200.00 $1,225.00 $1,250.00 $1,275.00 $1,300.00 $1,325.00 $1,350.00 $1,375.00 $1,400.00 $1,425.00 1000 4.0035 4.1628 4.3222 4.4815 4.6408 4.8002 4.9595 5.1189 5.2782 5.4376 5.5969 5.7562 5.9156 6.0749 6.2343 6.3936 6.5530 6.7123 6.8716 7.0310 7.1903 7.3497 7.5090 7.6683 7.8277 7.9870 8.1464 8.3057 8.4651 8.6244 8.7837 8.9431 9.1024 9.2618 9.4211 9.5805 9.7398 9.8991 1025 3.9058 4.0613 4.2167 4.3722 4.5276 4.6831 4.8386 4.9940 5.1495 5.3049 5.4604 5.6158 5.7713 5.9268 6.0822 6.2377 6.3931 6.5486 6.7040 6.8595 7.0149 7.1704 7.3259 7.4813 7.6368 7.7922 7.9477 8.1031 8.2586 8.4141 8.5695 8.7250 8.8804 9.0359 9.1913 9.3468 9.5022 9.6577 1050 3.8128 3.9646 4.1163 4.2681 4.4198 4.5716 4.7234 4.8751 5.0269 5.1786 5.3304 5.4821 5.6339 5.7856 5.9374 6.0892 6.2409 6.3927 6.5444 6.6962 6.8479 6.9997 7.1514 7.3032 7.4549 7.6067 7.7585 7.9102 8.0620 8.2137 8.3655 8.5172 8.6690 8.8207 8.9725 9.1242 9.2760 9.4278 1075 3.7242 3.8724 4.0206 4.1688 4.3171 4.4653 4.6135 4.7617 4.9100 5.0582 5.2064 5.3546 5.5029 5.6511 5.7993 5.9475 6.0958 6.2440 6.3922 6.5404 6.6887 6.8369 6.9851 7.1333 7.2816 7.4298 7.5780 7.7262 7.8745 8.0227 8.1709 8.3192 8.4674 8.6156 8.7638 8.9121 9.0603 9.2085 1100 3.6395 3.7844 3.9292 4.0741 4.2189 4.3638 4.5087 4.6535 4.7984 4.9432 5.0881 5.2329 5.3778 5.5227 5.6675 5.8124 5.9572 6.1021 6.2469 6.3918 6.5367 6.6815 6.8264 6.9712 7.1161 7.2609 7.4058 7.5507 7.6955 7.8404 7.9852 8.1301 8.2749 8.4198 8.5647 8.7095 8.8544 8.9992 1125 3.5586 3.7003 3.8419 3.9836 4.1252 4.2668 4.4085 4.5501 4.6917 4.8334 4.9750 5.1167 5.2583 5.3999 5.5416 5.6832 5.8248 5.9665 6.1081 6.2498 6.3914 6.5330 6.6747 6.8163 6.9579 7.0996 7.2412 7.3829 7.5245 7.6661 7.8078 7.9494 8.0911 8.2327 8.3743 8.5160 8.6576 8.7992 1150 3.4813 3.6198 3.7584 3.8970 4.0355 4.1741 4.3126 4.4512 4.5897 4.7283 4.8669 5.0054 5.1440 5.2825 5.4211 5.5597 5.6982 5.8368 5.9753 6.1139 6.2525 6.3910 6.5296 6.6681 6.8067 6.9452 7.0838 7.2224 7.3609 7.4995 7.6380 7.7766 7.9152 8.0537 8.1923 8.3308 8.4694 8.6080 1175 3.4072 3.5428 3.6784 3.8140 3.9497 4.0853 4.2209 4.3565 4.4921 4.6277 4.7633 4.8989 5.0345 5.1701 5.3058 5.4414 5.5770 5.7126 5.8482 5.9838 6.1194 6.2550 6.3906 6.5263 6.6619 6.7975 6.9331 7.0687 7.2043 7.3399 7.4755 7.6111 7.7468 7.8824 8.0180 8.1536 8.2892 8.4248 1200 3.3362 3.4690 3.6018 3.7346 3.8674 4.0002 4.1329 4.2657 4.3985 4.5313 4.6641 4.7969 4.9297 5.0624 5.1952 5.3280 5.4608 5.5936 5.7264 5.8591 5.9919 6.1247 6.2575 6.3903 6.5231 6.6559 6.7886 6.9214 7.0542 7.1870 7.3198 7.4526 7.5854 7.7181 7.8509 7.9837 8.1165 8.2493 1225 3.2681 3.3982 3.5283 3.6584 3.7884 3.9185 4.0486 4.1787 4.3087 4.4388 4.5689 4.6990 4.8290 4.9591 5.0892 5.2193 5.3493 5.4794 5.6095 5.7396 5.8696 5.9997 6.1298 6.2599 6.3900 6.5200 6.6501 6.7802 6.9103 7.0403 7.1704 7.3005 7.4306 7.5606 7.6907 7.8208 7.9509 8.0809 1250 3.2028 3.3303 3.4577 3.5852 3.7127 3.8401 3.9676 4.0951 4.2226 4.3500 4.4775 4.6050 4.7325 4.8599 4.9874 5.1149 5.2424 5.3698 5.4973 5.6248 5.7523 5.8797 6.0072 6.1347 6.2622 6.3896 6.5171 6.6446 6.7720 6.8995 7.0270 7.1545 7.2819 7.4094 7.5369 7.6644 7.7918 7.9193 1275 3.1400 3.2650 3.3899 3.5149 3.6399 3.7648 3.8898 4.0148 4.1398 4.2647 4.3897 4.5147 4.6397 4.7646 4.8896 5.0146 5.1396 5.2645 5.3895 5.5145 5.6395 5.7644 5.8894 6.0144 6.1394 6.2643 6.3893 6.5143 6.6393 6.7642 6.8892 7.0142 7.1392 7.2641 7.3891 7.5141 7.6391 7.7640 1300 3.0796 3.2022 3.3247 3.4473 3.5699 3.6924 3.8150 3.9376 4.0602 4.1827 4.3053 4.4279 4.5504 4.6730 4.7956 4.9182 5.0407 5.1633 5.2859 5.4084 5.5310 5.6536 5.7762 5.8987 6.0213 6.1439 6.2664 6.3890 6.5116 6.6342 6.7567 6.8793 7.0019 7.1244 7.2470 7.3696 7.4922 7.6147 1325 3.0215 3.1417 3.2620 3.3823 3.5025 3.6228 3.7430 3.8633 3.9836 4.1038 4.2241 4.3443 4.4646 4.5848 4.7051 4.8254 4.9456 5.0659 5.1861 5.3064 5.4267 5.5469 5.6672 5.7874 5.9077 6.0279 6.1482 6.2685 6.3887 6.5090 6.6292 6.7495 6.8698 6.9900 7.1103 7.2305 7.3508 7.4711 1350 2.9655 3.0836 3.2016 3.3196 3.4377 3.5557 3.6737 3.7918 3.9098 4.0278 4.1458 4.2639 4.3819 4.4999 4.6180 4.7360 4.8540 4.9721 5.0901 5.2081 5.3262 5.4442 5.5622 5.6803 5.7983 5.9163 6.0344 6.1524 6.2704 6.3884 6.5065 6.6245 6.7425 6.8606 6.9786 7.0966 7.2147 7.3327 1375 2.9116 3.0275 3.1434 3.2593 3.3752 3.4910 3.6069 3.7228 3.8387 3.9546 4.0705 4.1864 4.3022 4.4181 4.5340 4.6499 4.7658 4.8817 4.9976 5.1134 5.2293 5.3452 5.4611 5.5770 5.6929 5.8088 5.9246 6.0405 6.1564 6.2723 6.3882 6.5041 6.6200 6.7358 6.8517 6.9676 7.0835 7.1994 1400 2.8596 2.9734 3.0873 3.2011 3.3149 3.4287 3.5425 3.6563 3.7702 3.8840 3.9978 4.1116 4.2254 4.3392 4.4530 4.5669 4.6807 4.7945 4.9083 5.0221 5.1359 5.2498 5.3636 5.4774 5.5912 5.7050 5.8188 5.9327 6.0465 6.1603 6.2741 6.3879 6.5017 6.6156 6.7294 6.8432 6.9570 7.0708 1425 2.8095 2.9213 3.0331 3.1449 3.2567 3.3685 3.4804 3.5922 3.7040 3.8158 3.9276 4.0395 4.1513 4.2631 4.3749 4.4867 4.5986 4.7104 4.8222 4.9340 5.0458 5.1577 5.2695 5.3813 5.4931 5.6049 5.7168 5.8286 5.9404 6.0522 6.1640 6.2759 6.3877 6.4995 6.6113 6.7231 6.8349 6.9468 1450 2.7610 2.8709 2.9808 3.0907 3.2006 3.3105 3.4204 3.5303 3.6401 3.7500 3.8599 3.9698 4.0797 4.1896 4.2995 4.4094 4.5193 4.6292 4.7391 4.8490 4.9588 5.0687 5.1786 5.2885 5.3984 5.5083 5.6182 5.7281 5.8380 5.9479 6.0578 6.1676 6.2775 6.3874 6.4973 6.6072 6.7171 6.8270 1475 2.7142 2.8222 2.9303 3.0383 3.1463 3.2544 3.3624 3.4704 3.5784 3.6865 3.7945 3.9025 4.0106 4.1186 4.2266 4.3346 4.4427 4.5507 4.6587 4.7668 4.8748 4.9828 5.0909 5.1989 5.3069 5.4149 5.5230 5.6310 5.7390 5.8471 5.9551 6.0631 6.1711 6.2792 6.3872 6.4952 6.6033 6.7113 1500 2.6690 2.7752 2.8814 2.9877 3.0939 3.2001 3.3064 3.4126 3.5188 3.6250 3.7313 3.8375 3.9437 4.0499 4.1562 4.2624 4.3686 4.4749 4.5811 4.6873 4.7935 4.8998 5.0060 5.1122 5.2185 5.3247 5.4309 5.5371 5.6434 5.7496 5.8558 5.9621 6.0683 6.1745 6.2807 6.3870 6.4932 6.5994 1525 2.6252 2.7297 2.8342 2.9387 3.0432 3.1477 3.2521 3.3566 3.4611 3.5656 3.6701 3.7746 3.8791 3.9836 4.0880 4.1925 4.2970 4.4015 4.5060 4.6105 4.7150 4.8195 4.9239 5.0284 5.1329 5.2374 5.3419 5.4464 5.5509 5.6553 5.7598 5.8643 5.9688 6.0733 6.1778 6.2823 6.3868 6.4912 1550 2.5829 2.6857 2.7885 2.8913 2.9941 3.0969 3.1997 3.3025 3.4053 3.5081 3.6109 3.7137 3.8165 3.9193 4.0221 4.1249 4.2277 4.3305 4.4333 4.5361 4.6389 4.7417 4.8445 4.9473 5.0501 5.1529 5.2557 5.3585 5.4613 5.5641 5.6669 5.7697 5.8725 5.9753 6.0781 6.1809 6.2837 6.3865 1575 2.5419 2.6431 2.7442 2.8454 2.9466 3.0477 3.1489 3.2501 3.3512 3.4524 3.5536 3.6548 3.7559 3.8571 3.9583 4.0594 4.1606 4.2618 4.3629 4.4641 4.5653 4.6665 4.7676 4.8688 4.9700 5.0711 5.1723 5.2735 5.3746 5.4758 5.5770 5.6782 5.7793 5.8805 5.9817 6.0828 6.1840 6.2852 1600 2.5022 2.6018 2.7013 2.8009 2.9005 3.0001 3.0997 3.1993 3.2989 3.3985 3.4981 3.5976 3.6972 3.7968 3.8964 3.9960 4.0956 4.1952 4.2948 4.3944 4.4940 4.5935 4.6931 4.7927 4.8923 4.9919 5.0915 5.1911 5.2907 5.3903 5.4898 5.5894 5.6890 5.7886 5.8882 5.9878 6.0874 6.1870 1625 2.4637 2.5617 2.6598 2.7578 2.8559 2.9540 3.0520 3.1501 3.2481 3.3462 3.4442 3.5423 3.6404 3.7384 3.8365 3.9345 4.0326 4.1306 4.2287 4.3268 4.4248 4.5229 4.6209 4.7190 4.8170 4.9151 5.0132 5.1112 5.2093 5.3073 5.4054 5.5034 5.6015 5.6996 5.7976 5.8957 5.9937 6.0918 1650 2.4263 2.5229 2.6195 2.7161 2.8126 2.9092 3.0058 3.1023 3.1989 3.2955 3.3921 3.4886 3.5852 3.6818 3.7783 3.8749 3.9715 4.0681 4.1646 4.2612 4.3578 4.4543 4.5509 4.6475 4.7441 4.8406 4.9372 5.0338 5.1303 5.2269 5.3235 5.4201 5.5166 5.6132 5.7098 5.8063 5.9029 5.9995 1675 2.3901 2.4853 2.5804 2.6755 2.7707 2.8658 2.9609 3.0560 3.1512 3.2463 3.3414 3.4366 3.5317 3.6268 3.7219 3.8171 3.9122 4.0073 4.1025 4.1976 4.2927 4.3879 4.4830 4.5781 4.6732 4.7684 4.8635 4.9586 5.0538 5.1489 5.2440 5.3392 5.4343 5.5294 5.6245 5.7197 5.8148 5.9099 1700 2.3550 2.4487 2.5424 2.6362 2.7299 2.8236 2.9174 3.0111 3.1048 3.1986 3.2923 3.3860 3.4798 3.5735 3.6672 3.7609 3.8547 3.9484 4.0421 4.1359 4.2296 4.3233 4.4171 4.5108 4.6045 4.6983 4.7920 4.8857 4.9794 5.0732 5.1669 5.2606 5.3544 5.4481 5.5418 5.6356 5.7293 5.8230 1725 2.3209 2.4132 2.5056 2.5980 2.6903 2.7827 2.8751 2.9675 3.0598 3.1522 3.2446 3.3369 3.4293 3.5217 3.6141 3.7064 3.7988 3.8912 3.9836 4.0759 4.1683 4.2607 4.3530 4.4454 4.5378 4.6302 4.7225 4.8149 4.9073 4.9997 5.0920 5.1844 5.2768 5.3691 5.4615 5.5539 5.6463 5.7386 1750 2.2877 2.3788 2.4698 2.5609 2.6519 2.7430 2.8340 2.9251 3.0161 3.1072 3.1982 3.2893 3.3803 3.4714 3.5624 3.6535 3.7445 3.8356 3.9266 4.0177 4.1088 4.1998 4.2909 4.3819 4.4730 4.5640 4.6551 4.7461 4.8372 4.9282 5.0193 5.1103 5.2014 5.2924 5.3835 5.4745 5.5656 5.6567 1775 2.2555 2.3452 2.4350 2.5248 2.6146 2.7043 2.7941 2.8839 2.9736 3.0634 3.1532 3.2430 3.3327 3.4225 3.5123 3.6020 3.6918 3.7816 3.8713 3.9611 4.0509 4.1407 4.2304 4.3202 4.4100 4.4997 4.5895 4.6793 4.7690 4.8588 4.9486 5.0384 5.1281 5.2179 5.3077 5.3974 5.4872 5.5770 1800 2.2242 2.3127 2.4012 2.4897 2.5782 2.6668 2.7553 2.8438 2.9323 3.0209 3.1094 3.1979 3.2864 3.3750 3.4635 3.5520 3.6405 3.7291 3.8176 3.9061 3.9946 4.0831 4.1717 4.2602 4.3487 4.4372 4.5258 4.6143 4.7028 4.7913 4.8799 4.9684 5.0569 5.1454 5.2340 5.3225 5.4110 5.4995 1825 2.1937 2.2810 2.3683 2.4556 2.5429 2.6302 2.7175 2.8049 2.8922 2.9795 3.0668 3.1541 3.2414 3.3287 3.4160 3.5033 3.5907 3.6780 3.7653 3.8526 3.9399 4.0272 4.1145 4.2018 4.2891 4.3765 4.4638 4.5511 4.6384 4.7257 4.8130 4.9003 4.9876 5.0749 5.1623 5.2496 5.3369 5.4242 1850 2.1640 2.2502 2.3363 2.4224 2.5086 2.5947 2.6808 2.7670 2.8531 2.9392 3.0253 3.1115 3.1976 3.2837 3.3699 3.4560 3.5421 3.6283 3.7144 3.8005 3.8867 3.9728 4.0589 4.1451 4.2312 4.3173 4.4034 4.4896 4.5757 4.6618 4.7480 4.8341 4.9202 5.0064 5.0925 5.1786 5.2648 5.3509 1875 2.1352 2.2202 2.3051 2.3901 2.4751 2.5601 2.6451 2.7301 2.8150 2.9000 2.9850 3.0700 3.1550 3.2400 3.3249 3.4099 3.4949 3.5799 3.6649 3.7499 3.8348 3.9198 4.0048 4.0898 4.1748 4.2598 4.3447 4.4297 4.5147 4.5997 4.6847 4.7696 4.8546 4.9396 5.0246 5.1096 5.1946 5.2795 1900 2.1071 2.1910 2.2748 2.3587 2.4425 2.5264 2.6103 2.6941 2.7780 2.8619 2.9457 3.0296 3.1135 3.1973 3.2812 3.3651 3.4489 3.5328 3.6167 3.7005 3.7844 3.8682 3.9521 4.0360 4.1198 4.2037 4.2876 4.3714 4.4553 4.5392 4.6230 4.7069 4.7908 4.8746 4.9585 5.0423 5.1262 5.2101 1925 2.0797 2.1625 2.2453 2.3281 2.4108 2.4936 2.5764 2.6592 2.7419 2.8247 2.9075 2.9903 3.0730 3.1558 3.2386 3.3214 3.4041 3.4869 3.5697 3.6525 3.7352 3.8180 3.9008 3.9836 4.0663 4.1491 4.2319 4.3147 4.3974 4.4802 4.5630 4.6458 4.7285 4.8113 4.8941 4.9769 5.0596 5.1424 1950 2.0531 2.1348 2.2165 2.2982 2.3799 2.4616 2.5433 2.6251 2.7068 2.7885 2.8702 2.9519 3.0336 3.1153 3.1971 3.2788 3.3605 3.4422 3.5239 3.6056 3.6873 3.7691 3.8508 3.9325 4.0142 4.0959 4.1776 4.2593 4.3411 4.4228 4.5045 4.5862 4.6679 4.7496 4.8313 4.9131 4.9948 5.0765 1975 2.0271 2.1078 2.1884 2.2691 2.3498 2.4305 2.5112 2.5918 2.6725 2.7532 2.8339 2.9146 2.9952 3.0759 3.1566 3.2373 3.3179 3.3986 3.4793 3.5600 3.6407 3.7213 3.8020 3.8827 3.9634 4.0441 4.1247 4.2054 4.2861 4.3668 4.4475 4.5281 4.6088 4.6895 4.7702 4.8509 4.9315 5.0122 2000 2.0017 2.0814 2.1611 2.2407 2.3204 2.4001 2.4798 2.5594 2.6391 2.7188 2.7984 2.8781 2.9578 3.0375 3.1171 3.1968 3.2765 3.3561 3.4358 3.5155 3.5952 3.6748 3.7545 3.8342 3.9138 3.9935 4.0732 4.1529 4.2325 4.3122 4.3919 4.4715 4.5512 4.6309 4.7106 4.7902 4.8699 4.9496 2025 1.9770 2.0557 2.1344 2.2131 2.2918 2.3705 2.4491 2.5278 2.6065 2.6852 2.7639 2.8426 2.9213 3.0000 3.0786 3.1573 3.2360 3.3147 3.3934 3.4721 3.5508 3.6295 3.7082 3.7868 3.8655 3.9442 4.0229 4.1016 4.1803 4.2590 4.3377 4.4163 4.4950 4.5737 4.6524 4.7311 4.8098 4.8885 2050 1.9529 2.0306 2.1084 2.1861 2.2638 2.3416 2.4193 2.4970 2.5747 2.6525 2.7302 2.8079 2.8856 2.9634 3.0411 3.1188 3.1966 3.2743 3.3520 3.4297 3.5075 3.5852 3.6629 3.7407 3.8184 3.8961 3.9738 4.0516 4.1293 4.2070 4.2848 4.3625 4.4402 4.5179 4.5957 4.6734 4.7511 4.8289 2075 1.9294 2.0062 2.0830 2.1598 2.2365 2.3133 2.3901 2.4669 2.5437 2.6205 2.6973 2.7741 2.8509 2.9277 3.0045 3.0813 3.1580 3.2348 3.3116 3.3884 3.4652 3.5420 3.6188 3.6956 3.7724 3.8492 3.9260 4.0028 4.0795 4.1563 4.2331 4.3099 4.3867 4.4635 4.5403 4.6171 4.6939 4.7707 2100 1.9064 1.9823 2.0582 2.1340 2.2099 2.2858 2.3617 2.4376 2.5134 2.5893 2.6652 2.7411 2.8169 2.8928 2.9687 3.0446 3.1205 3.1963 3.2722 3.3481 3.4240 3.4998 3.5757 3.6516 3.7275 3.8033 3.8792 3.9551 4.0310 4.1069 4.1827 4.2586 4.3345 4.4104 4.4862 4.5621 4.6380 4.7139 2125 1.8840 1.9590 2.0340 2.1089 2.1839 2.2589 2.3339 2.4089 2.4839 2.5588 2.6338 2.7088 2.7838 2.8588 2.9338 3.0088 3.0837 3.1587 3.2337 3.3087 3.3837 3.4587 3.5336 3.6086 3.6836 3.7586 3.8336 3.9086 3.9836 4.0585 4.1335 4.2085 4.2835 4.3585 4.4335 4.5085 4.5834 4.6584 2150 1.8621 1.9362 2.0103 2.0844 2.1585 2.2326 2.3068 2.3809 2.4550 2.5291 2.6032 2.6773 2.7514 2.8255 2.8997 2.9738 3.0479 3.1220 3.1961 3.2702 3.3443 3.4184 3.4926 3.5667 3.6408 3.7149 3.7890 3.8631 3.9372 4.0114 4.0855 4.1596 4.2337 4.3078 4.3819 4.4560 4.5301 4.6043 2175 1.8407 1.9139 1.9872 2.0605 2.1337 2.2070 2.2802 2.3535 2.4268 2.5000 2.5733 2.6465 2.7198 2.7931 2.8663 2.9396 3.0129 3.0861 3.1594 3.2326 3.3059 3.3792 3.4524 3.5257 3.5989 3.6722 3.7455 3.8187 3.8920 3.9652 4.0385 4.1118 4.1850 4.2583 4.3315 4.4048 4.4781 4.5513 2200 1.8198 1.8922 1.9646 2.0370 2.1095 2.1819 2.2543 2.3268 2.3992 2.4716 2.5440 2.6165 2.6889 2.7613 2.8338 2.9062 2.9786 3.0510 3.1235 3.1959 3.2683 3.3408 3.4132 3.4856 3.5580 3.6305 3.7029 3.7753 3.8478 3.9202 3.9926 4.0650 4.1375 4.2099 4.2823 4.3548 4.4272 4.4996 2225 1.7993 1.8709 1.9425 2.0142 2.0858 2.1574 2.2290 2.3006 2.3722 2.4438 2.5155 2.5871 2.6587 2.7303 2.8019 2.8735 2.9451 3.0168 3.0884 3.1600 3.2316 3.3032 3.3748 3.4464 3.5181 3.5897 3.6613 3.7329 3.8045 3.8761 3.9478 4.0194 4.0910 4.1626 4.2342 4.3058 4.3774 4.4491 2250 1.7793 1.8501 1.9210 1.9918 2.0626 2.1334 2.2042 2.2751 2.3459 2.4167 2.4875 2.5583 2.6291 2.7000 2.7708 2.8416 2.9124 2.9832 3.0541 3.1249 3.1957 3.2665 3.3373 3.4082 3.4790 3.5498 3.6206 3.6914 3.7622 3.8331 3.9039 3.9747 4.0455 4.1163 4.1872 4.2580 4.3288 4.3996 2275 1.7598 1.8298 1.8998 1.9699 2.0399 2.1100 2.1800 2.2501 2.3201 2.3901 2.4602 2.5302 2.6003 2.6703 2.7403 2.8104 2.8804 2.9505 3.0205 3.0905 3.1606 3.2306 3.3007 3.3707 3.4407 3.5108 3.5808 3.6509 3.7209 3.7909 3.8610 3.9310 4.0011 4.0711 4.1412 4.2112 4.2812 4.3513 2300 1.7406 1.8099 1.8792 1.9485 2.0178 2.0870 2.1563 2.2256 2.2949 2.3642 2.4334 2.5027 2.5720 2.6413 2.7106 2.7798 2.8491 2.9184 2.9877 3.0569 3.1262 3.1955 3.2648 3.3341 3.4033 3.4726 3.5419 3.6112 3.6805 3.7497 3.8190 3.8883 3.9576 4.0269 4.0961 4.1654 4.2347 4.3040 2325 1.7219 1.7905 1.8590 1.9275 1.9961 2.0646 2.1331 2.2017 2.2702 2.3387 2.4073 2.4758 2.5443 2.6129 2.6814 2.7499 2.8185 2.8870 2.9555 3.0241 3.0926 3.1611 3.2297 3.2982 3.3667 3.4353 3.5038 3.5724 3.6409 3.7094 3.7780 3.8465 3.9150 3.9836 4.0521 4.1206 4.1892 4.2577 2350 1.7036 1.7714 1.8392 1.9070 1.9748 2.0426 2.1104 2.1782 2.2460 2.3139 2.3817 2.4495 2.5173 2.5851 2.6529 2.7207 2.7885 2.8563 2.9241 2.9919 3.0597 3.1275 3.1953 3.2631 3.3309 3.3987 3.4665 3.5343 3.6022 3.6700 3.7378 3.8056 3.8734 3.9412 4.0090 4.0768 4.1446 4.2124 2375 1.6857 1.7528 1.8199 1.8869 1.9540 2.0211 2.0882 2.1553 2.2224 2.2895 2.3566 2.4237 2.4908 2.5579 2.6250 2.6920 2.7591 2.8262 2.8933 2.9604 3.0275 3.0946 3.1617 3.2288 3.2959 3.3630 3.4301 3.4971 3.5642 3.6313 3.6984 3.7655 3.8326 3.8997 3.9668 4.0339 4.1010 4.1681 2400 1.6681 1.7345 1.8009 1.8673 1.9337 2.0001 2.0665 2.1329 2.1993 2.2656 2.3320 2.3984 2.4648 2.5312 2.5976 2.6640 2.7304 2.7968 2.8632 2.9296 2.9960 3.0624 3.1288 3.1951 3.2615 3.3279 3.3943 3.4607 3.5271 3.5935 3.6599 3.7263 3.7927 3.8591 3.9255 3.9919 4.0583 4.1246 2425 1.6509 1.7166 1.7823 1.8480 1.9137 1.9795 2.0452 2.1109 2.1766 2.2423 2.3080 2.3737 2.4394 2.5051 2.5708 2.6365 2.7022 2.7680 2.8337 2.8994 2.9651 3.0308 3.0965 3.1622 3.2279 3.2936 3.3593 3.4250 3.4907 3.5565 3.6222 3.6879 3.7536 3.8193 3.8850 3.9507 4.0164 4.0821 2450 1.6341 1.6991 1.7641 1.8292 1.8942 1.9593 2.0243 2.0893 2.1544 2.2194 2.2844 2.3495 2.4145 2.4796 2.5446 2.6096 2.6747 2.7397 2.8047 2.8698 2.9348 2.9999 3.0649 3.1299 3.1950 3.2600 3.3251 3.3901 3.4551 3.5202 3.5852 3.6502 3.7153 3.7803 3.8454 3.9104 3.9754 4.0405 2475 1.6176 1.6819 1.7463 1.8107 1.8751 1.9395 2.0038 2.0682 2.1326 2.1970 2.2614 2.3258 2.3901 2.4545 2.5189 2.5833 2.6477 2.7120 2.7764 2.8408 2.9052 2.9696 3.0339 3.0983 3.1627 3.2271 3.2915 3.3558 3.4202 3.4846 3.5490 3.6134 3.6778 3.7421 3.8065 3.8709 3.9353 3.9997 CAPEX LCOE ($ ¢/kWh) Sensitivitiy Analysis - CAPEX & OPEX OPEX CAPEX WACC CAPEX AnnualSpecifcEnergyYieldkWh/kWp Sensitivity Analysis 1D & 2D Tables Sensitivity Analysis 3D Charts Model Inputs & Outputs Summary Output Parameters Charts
9.
IPP Solar PV
Project Development Roadmap Phase 3: Feasibility Study Developed the Prefeasibility Study in to Detailed Report. Assign Suitably Qualified & Experienced Study Team, Create Responsibility Matrix for the Team, to Include the Assigned Feasibility Study Deliverables and Their Associated TimeLine / Program. Hold Weekly Progress Review Meetings. Utilize Site Specific Data for all Parameters, including Design, Financing and Execution. Establish a Detailed Risk Register and Keep Updating with Mitigation Measures Throughout the Development of this Phase. Develop the Design Including Surveys (Topo, Geotech), Site Plans, SLDs, Schematics, Grid Connection with Grid Impact Study Where Necessary, Solar Resource Measurement (Preferred 1 Yr On Site, & 10/20 Yr Bankable Satellite Data) & Energy Yield (P90), Initial Equipment Selections, Cost Plan, and O&M requirements. Create Detailed Permitting & Licensing Roadmap and Initiate Discussions with Stakeholders and all AHJ (Authorities Having Jurisdiction) to obtain consents or initials NOCs. Produce Requirements Matrix, Schedule/Program, and Estimate Accurate Costs. Establish Initial ESIA and Relevant EHS requirements. Include TIS where necessary. Include Applicable Requirements of Financing Institutions (e.g. Equator Principles, etc.) Produce Detailed Financial Model and Scenario / Sensitivity Analysis Which Cover All Variables Thresholds and Obtain Commitment from Respective Stakeholders. The Detailed Financial Model Shall Cover: IRR, LCOE, CAPEX, OPEX, D/E Gearing Ratio, CFADS, DSRA, MRA, DSCR, LLCR, PLCR, EBL, WC, SBWC, PPA/Tariffs, ECA, Incentives If Any, Senior Debt Sources/ Model & Rates (Fixed, Libor + Margin, Mini Perm, Int. Swap) etc. 9 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
10.
IPP Solar PV
Project Development Roadmap Phase 3: Feasibility Study Finalize and Obtain Initial Consent for All Access Requirements (land, roads, LUP, ROW, community, etc.) Finalize Level 2 or 3 Project Program and Obtain Stakeholders Buy In. Determine the Project Company (SPV) Legal, Tax, Insurance, Accounting/Reporting Requirements, including setup and operation costs. Details must include offshore/onshore setup requirements/plan w/ respective banks accounts, etc. Finalize the finance plan with equity and shareholders contribution, debt sources and obtains committed pricing levels. Keep the Financial Model Updated as details gets secured. Procure an External Financial Advisor, if necessary, to lead the discussion with shortlisted funding institutions, term sheets, as well as further optimized financial engineering. Update the Financing Plan with Financing Institutions Offers & Commitments. Identify all Types of Warranties and Guarantees Which are Necessary for Bankable Project (non-recourse, or limited Recourse). Validate and Obtain Stakeholders Buy and Commitments. These may include EPCs, Major Equipment Vendors, ECA, MLIA, MIGA Offtaker, Local State / Government, etc. Incorporate These in to Contracts. Procure the Owners Technical Advisor (OE) and Legal Advisors, to support the process of Contracts Drafting, Tendering, Implementation & Acceptance (ITB, MFS, EPC, O&M, PPA, LLA, SHA, SPV, etc.) Execute Corporate Risk Management Docs & Obtain Corporate Approval For the Feasibility Study to Conclude that Project is Feasible & Economically Viable. 10 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
11.
Contracts Success Factors Expertise & Know-How Good Communication Negotiation Risk Management Competitiveness SPV SHA Land Lease Grid Connect. PPA Utilities Connect. ECA MIGA Gov. Credit Support InsuranceEBL Hedging Senior Debt Lender(s) O&M EPC OE/IE Legal Advisor Fin. Advisor IPP Solar PV
Project Development Roadmap Phase 4: Contracts & Financial Close Contracts Overview 11 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
12.
IPP Solar PV
Project Development Roadmap Phase 4: Contracts & Financial Close Key Consideration For SPV Contracts (Shortlist) – Head of Terms Waterfall, Term Details Matter ! 12 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 EPC O&M PPA Lender(s) Sr. Debt Fin. Scope Of Work Scope Of Work Term & Phases MLA & Senior Lenders Price Basis Price Basis Development Security Approved Banks Warranties Warranties Conditions Precedent to Closing Term Facilities, Incl. Standby LNTP & NTP LNTP & NTP Documents Delivered After Closing Equity Contributions & Retention Soil & Ground Risk Soil & Ground Risk Min. Functional Specifications Equity Bridge Loan Guaranteed PR, Pdc, Pac Guaranteed PR Testing & Acceptance Facilities Ranking, Facilities Availability Bonds Bonds Metering Interest, Periods, Repayment Profile Risk Allocation Risk Allocation Billing & Payment Refinancing, If applicable Testing, Acceptance & Handover Performance Appraisal Sale & Purchase Obligations Margin, Commitment, Upfront Fees Contract & Payments Milestones Payment Plan & Milestones Localization Min DSCR @ P50 @ P90 Order Of Precedence Order Of Precedence Interconnection Conditions DSCR for Div. Pay / DSCR For Default Design Spare Parts, Consumables Interfaces LLCR & PLCR Licenses & Permits Licenses & Permits Approvals True Up & Max GR Insurance Insurance Operations & Maintenance DSRA & MRA/MMRA Variations Variations LDs for Delay (PCOD) Credit Guarantee(s) / Support LDs Performance & Delay LDs Performance Offtaker Credit Guarantee / Support Development & CAPEX & OPEX Set Off Set Off Novation Selected EPC DLP Training Insurance PCOD & Completion Liabilities Incl. Limit & Decennial Liabilities Incl. Limit & Decennial Liabilities SPV Accounts & Distribution Indemnification Indemnification Indemnification CTA Assignment Assignment Assignment Hedging Termination Termination Termination Securities Dispute Resolution Dispute Resolution Dispute Resolution Default Arbitration & Place Arbitration & Place Arbitration & Place Conditions Precedent For Drawdown Governing Law & Jurisdiction Governing Law & Jurisdiction Governing Law & Jurisdiction Governing Law & Jurisdiction
13.
IPP Solar PV
Project Development Roadmap Phase 4: Contracts & Financial Close Finalize Detailed Project Implementation Program. Continue to Keep Accurate Track of All Development Expenses (direct, indirect, incl. man- hours). These are Reportable & Chargeable to SPV (subject to Audit & by LTA). Prepare Detailed Sub-Program for Contracting Approach. Determine Cross-Contracts Dependencies, Critical Path, & Respective Conditions Precedent for Execution. Prepare Docs Register & Docs Packages & Submit to AHJ to Obtain Initial Preliminary Permits, such as Planning, LUP, Access, TIS, LLA, ESIA, Grid Connection, Generation & Operator Licenses, Construction. Allow Ample Time for the Processes. Final Permits such as Final Construction will be Obtained in the Next Phase upon completion of Detailed Design. Amend Design Based on AHJ Comments or Conditional Approval, as well as Other Stakeholders Requirements (Development Banks or Other Financing Institutions). Prepare & Execute ITB for EPC & O&M. Rank, Negotiate & Select Shortlisted Preferred Bidder(s). ITB is Preceded by Stringent Prequalification Process. EPC & O&M shall be fixed Price Turnkey Contracts “Fully Wrapped”. Finalize Bankable Energy Yield Report (PVsyst P50 & P90). The Model shall be Audited by Approved 3rd Party Independent Specialist. Finalize Financial Model, Its Cost Plans (Development, SPV, CAPEX, OPEX), Quarterly Proforma Cashflow, & Scenario Analysis. The Model Input & Output Parameters Shall Meet Financing Institutions Acceptable Thresholds. Prepare & Execute OE/IE Contract. Prepare & Coordinate with LTA and LLA. 13 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
14.
IPP Solar PV
Project Development Roadmap Phase 4: Contracts & Financial Close Prepare & Negotiate Gird Connection Agreement and PPA Agreement. Finalize Project Risk Register. Risk are Categorized (Technical, Commercial, Financial, Legal, Execution), Qualified, Quantified, Mitigated, Weighted, & Assigned Owners. Complete Technical-Commercial Due Diligence Report (OE/IE/LTA), as Required by Stakeholders. Incorporate Agreed Comments in to Design & Contracts. Negotiate Markups/Comments/Deviations, & Complete All Contracts Negotiations. Make Sure All Contracts are Acceptable to and Signed Off by Financing Institution(s). Head of Term & Other Details like Equipment Selection (3-5 options shortlisted) & Warranties must be Bankable & inline w/ Financing Institutions Acceptable Thresholds & Guidelines (Reputed Manufacturer, Long Term Financial Stability Forecast, Proven Excellent Track Record, Certified Products, Local Regulatory Compliant (AVL), Class A & No Vague Warranty Terms incl. Performance, 3rd Part Insurance Coverage, Eff./Tech Performance Inline w/ Highest Tier, Suitable for Project Environmental Conditions, Serviceability, MTBF, etc.) Prepare & Execute Insurance Program Contracts (Limited Notice to Proceed – LNTP) Execute EPC & O&M Contracts (LNTP subject to Financial Close) Execute Gird Connection Agreement and PPA (LNTP subject to Financial Close). Prepare Shareholders’ POAs & RBDs (notarized/legalized) & Execute SHA & Incorporate SPV as a Legal Entity. All Projects Agreements & Contracts shall be in Name of SPV. Ensure SPV’s operations are setup as well: Office Lease and Fitout Contracts, HR, IT & Cloud Services, Accounting & Finance, Banking, Business Insurances PI/D&O/PPL/WC/EAR/CAR, Healthcare Insurance, QMS & PMO Processes & Procedures. Negotiate & Finalize Lenders’ & Fin. Services Contracts (Senior Debt, Equity Bridge Loan, Hedging, Swaps, Guarantees, Upfront / Closing Fees, Annual Fees, etc.). Execute Contracts & Term Sheets. Upon Achieving Financial Close, Update Corporate Risk Management Docs with Finalized and/or Amended Terms of the Feasibility Study Approval. Obtain Corporate Approval For the Issuing NTPs (Notice to Proceed) for All Contracts. 14 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017
15.
IPP Solar PV
Project Development Roadmap Phase 5: Detailed Design & Permitting SPV Issues NTPs (Notice to Proceed) for All Contracts. SPV’s Vital KPI is Maintaining a Solid Contract & Claims Management Team Throughout the Development Phases. EPC to Produce a Comprehensive Project Execution Plan (PEP) & Sub-Plans. The First Focus is Org Chart (Back Office & Site), Document Control System, Baseline Program & Cashflow. EPC to Produce Design Management Plan incl. WBS for DPPS (Design Permitting Procurement Schedule). DPPS Shall List all DD Docs w/ Respective Production Timeline linked to Packages Submission to AHJ as well as to Procurement Initiation. EPC to Incorporate Adequate Review Cycles for Relevant Stakeholders. 15 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 WORK PACKAGE DETAILS WBS WP Code No. Work Package Description ************************************ Permit Description Group Area Package Manager LeadDesigner ******************* EXT.Designer QS ******************* Permit Coordinator AuthorityHaving Jurisdiction (AHJ) Planned ************************* Actual / Forecast DESIGN PERMITTING 30% (Stage C- D) Design Complete 60% (Stage E) Design Complete 90% (Stage F1) Design Complete IFC (Stage F2) Design Complete Package Design Available Scope Review / Prepare BoQ (weeks) Package Design available for Permitting & OE/IE/LTA Submission Prepare Permit Package (weeks) Issue Design for Permit Package to OE/IE/LTA Cycle 1 (weeks) OE/IE/LTA Permit Package Incorp. Comments & Re-Submit & Receive Approval PERMITTING PROCUREMENT Submit Design Permit Package to AJJ Cycle 1 (Weeks) AHJ Permit Package Incorp. Comments Re-Submit to AHJ AHJ Permit Approval & Issuance Prepare Tender Package (weeks) HOLD For Permit Approval YES/NO *************** DESIGN STAGE Issue Tender Tender Period (weeks) Procurement Phase Continues…..
16.
IPP Solar PV
Project Development Roadmap Phase 5: Detailed Design & Permitting Ensure that EPC’s Design Management Plan (DMP) Its Document Register (Deliverables Schedule) are Updated with Previous Development Phases Approved Comments / Changes & is Regulatory Compliant. Expert Understanding of Local Code Compliance incl. Sustainability is an Extremely Critical KPI for Project Success & Bankability. DMP Must be Submitted for Approval by OE/IE/LTA Another Bankability KPI (initial screening at PQ phase) is a Well Defined Design Management Procedure (SOP). The Procedure Shall Cover: Roles/Responsibilities, Process Flow Chart w/ Gates, Work Instructions for Sub Processes, Progress % and Stages Definition (30%/60%/90%/IFC, Concept/Basic/Detailed/IFC) Templates/Forms/Checklist/Logs, Delivery Process Flow Charts, RFI & Change Control Process, Safety In Design, Risk Register, Approval Process Flow, Interface & Coordination. Thorough Understanding of Design Deliverables SOW is a vital KPI. EPC Shall Deliver a Complete Design Production Schedule (Document Register), w/ Proper Monitoring & Tracking Controls. A Typical Design Deliverables Document Register as Follows: . 16 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 DISCIPLINE: XXXXXXXXXXX Planned Issue Date Current % of Completion DESIGN PHASE: XXXXXXXX S/N Doc. Number Doc. Title Scale Size Final Rev. 30% 60% 90% OE/ IE/ LTA AHJ IFC General Sheets: Details: Schematics/SLDs: Layouts/Plans: Elevations/Sections: Schedules: Calculation: Studies/Reports: Specifications: Continues……
17.
IPP Solar PV
Project Development Roadmap Phase 5: Detailed Design & Permitting Key Considerations for Bankable Design (Shortlist) 17 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 Competitive LCOE vs. Optimized Design Balance CAPEX/OPEX vs. Value Eng’g Quality Assured vs. Scope/Schedule/Cost CAD Format is Compliant w/ Local Codes Site Solar Resource is Measured 1 Yr (hourly) Solar Resource Checked vs Satellite 20 Yr Satellite Solar Resource is Credible DB, P50/90 PV Field Layout Optimized (tilt/orientation) PV Field Layout Meets O&M & FLS Reqmnt PV Field Shading Loss (row/nearby) <1.5% PV Soiling Loss Calc’d Based on Site Cond. & Adopted Cleaning Plan PV Eff, Deg<0.6% TR., LID, PID, +Tol, FT, ELT, IECs, ISO 2859-1, BOM, CDF, All Validated PVsyst Uses Validated met/pan/ond Files All Auxiliary Power Consumption Calc’d & Accounted For in PVsyst Energy Yield Est Comply w/ IEC 62548 PV Design Requirements Topo & Geotech Studies Results Adhered To Civil/Structural Design & Materials Suitable for Site Soil & Environmental Conditions (Corrosion, Seismic, Wind, etc), PE Stamped Drainage & Flooding Prevention is Included, Based on Site Environmental Conditions Electrical Studies PSS/E (GIS, LF, VD, SC, HR, CR, TRNS) & Eqpt Rated Accordingly HAZOP Study per IEC 61882, if Required Electrical Protection Measures Correct & are In Line w/ Int’l Standards & Local Code Grounding/Earthing/Lightning Protection is Correct for the Site Conditions PV String Voltage vs. Min/Max Temp vs. Inverter Thresholds Voc/Vp is Adequate Total Cables Loss DC, AC Calc < 1.5% & 1.0 % Inverter Sizing is Correct (MPPT Window, Power Ratio, PF Range, A.Temp, Eff, etc.), IECs Comp. XFMR & S/G Selection/Sizing/Protection Correct Cables Management & Trenches Code Compl. MV/HV Net & S/S Comply w/ Trans/Dist Code All Eqpt Interfaces I&C/Comm/Alarms are Incl. & Correct, Detailed Interface Matrix is Validated Security Sys. CCTV, Acc Con, Intrusion, Fence, Lighting , Adequate for Risks & Insurance Tariff Grade Metering System is Compliant SCADA System is Included per Industry Stds. SCADA Grid Interface is Thoroughly Engineered for Local Code Compliance Weather Station(s) Instruments Classes Correct. Equipment IP Validated for Site Conditions All Equipment Selection Meets Restricted / Approved Vendor List (by AHJ) Overall Design and All Equipment Meet Set Min Func/Perf Specs (MFS/MPS), Warranties, Long Term Servicing & Spare Parts Availability.
18.
IPP Solar PV
Project Development Roadmap Phase 5: Detailed Design & Permitting Ensure that EPC’s Permitting Plan and Its Schedule are Updated with Previous Development Phases Approved Comments/Changes & is Regulatory Compliant. Expert Understanding of Permitting Process is an Extremely Critical KPI for Project Success & Bankability. A Permitting Flow Chart is a Also Mandatory Deliverable to Demonstrate Interfaces & Sequencing. Execute the Permitting Plan. The Permits are in 3 Groups: NOC/Planning, Pre-Construction, Construction & Commissioning. The typical permits are (obtained during project phases): 18 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 PERMITTING MASTER SCHEDULE S. No. Type of Permit Authority (AHJ) Permit Owner Information Required for Application *************************************************** Design Packages Required Predecessor Successor Durations (Weeks) Start Planned ********** Actual Finish Planned *********** Actual Permit Status • SPV Incorporation Licenses • SPV Generation License • Equipment Import Permit • Land/Plot Affection Plan • Land Lease Agreement • Land Use Permit (UPC) • Various Appointment Letters • Various NOCs from AHJs • Environmental Permit (ESIA) • Traffic Control Permit (TIS) • EHS Permit (SSEHSP) • Mobilization Permit • Grading Permit • Excavation/Shoring Permit • PV Structural Design Permit • Building ARC Design Permit • Building STR Design Permit • Building MEP Design Permit • Building/Construction Permit • LV Design Permit • LV Shop Dwg Permit • MV/HV Design Permit • MV/HV Shop Dwg Permit • Substation ARC Design Permit • Substation STR Design Permit • Substation MEP Design Permit • Grid/SCADA Interface Design Permit • U/G Cable / OHL Route Permit • Fire/Life/Safety Design Permit • Fire/Life/Safety Shop Dwg Permit • ICT Design Permit • Security Systems Design Permit • Infra/Road Design Permit • Drainage Design Permit • Water Conn. Design Permit • Sewerage Design Permit • Various AHJs Inspections App. • Building Completion Permit • HV/MV Energization Permit • LV Energization Permit • Others, etc.
19.
IPP Solar PV
Project Development Roadmap Phase 6: Procurement & Construction EPC Shall Produce Project Procurement & Subcontracting Plan (PPSP) Which Must be Submitted for Approval by OE/IE/LTA, It Includes Responsibilities Matrix, Vendor/Subcon Prequal Process, Vendor/Subcon EHS & QA/QC & Closeout Requirements. Design Permitting Procurement Schedule (DPPS) is also an Integral Part of PPP. The PPSP Shall cover Procurement from Cradle to Grave: PPP Includes Logistics Tracker Schedule Which Integrates the 5-Level Commissioning Requirements: 19 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 PERMITTING PROCUREMENT Submit Design Permit Package to AJJ Cycle 1 (Weeks) AHJ Permit Package Incorp. Comments Re-Submit to AHJ AHJ Permit Approval & Issuance Prepare Tender Package (weeks) HOLD For Permit Approval YES/NO *************** DESIGN STAGE Issue Tender To PQ Vendors & Subcons Tender Period (weeks) Procurement Phase Continues….. PROCUREMENT Tender Return Technical Eval (weeks) Technical Eval Completed Commercial Eval (weeks) Commercial Eval Completed Final Negotiation (weeks) Submit Recomm. to Award (RTA) RTA Approval (weeks) RTA Approved Finalize Subcon (weeks) Award Subcon Material Submittal (weeks) MS Approval Lead Period (weeks) Commence on Site Project No. Log Date: LOGISTICS TRACKER SCHEDULE WBS ID Package Name Logistics Chain Package Current Status Summary PM/CM Package Owner Name Proc & Logistics Officers Names Vendor & Contacts Origin Contract No. & Date Delivery Time EXW - Weeks L1 HOLD for FAT Y/N L1 HOLD for TPI Y/N FAT / TPI / Routine Test Participate Cos. & Names FAT / TPI / Routine Test Time Weeks FAT / TPI / Routine Test Start Date FAT / TPI / Routine Test Pass Date Marine Insurance Notify Y/N Factory Release Date LOGISTICS TRACKER SCHEDULE Freight Time Weeks Freight Mode Sea / Air / Courier Package Mode Bulk / Containerized / Palletized Frieght Service Provider & Contacts B/L or AWB Received Y/N Point of Entry Seaport or Airport ETD Date ETA Date Customs Duties Exemption Y/N Port Clearance Date Oversized Cargo Police Escort Required Y/N Delivery Alert Sent to Site Y/N Goods Unloading Requirement (loose cartons, forklift, crane, etc.) Goods Receipt at Site Date LOGISTICS TRACKER SCHEDULE L2 Site Inspection Date & Report No. L2 Site Inspection Participants Cos. & Names Site Storage Location - Laydown Area Lot No. or Store No. TOTAL Planned Delivery Time Weeks Planned Delivery Date TOTAL Current Estimated Delivery Time Weeks TOTAL Current Float Time Weeks Negative Float or Variance Notification to Package Owner Date TOTAL Actual Delivery Time Weeks
20.
IPP Solar PV
Project Development Roadmap Phase 6: Procurement & Construction EPC Shall Produce Project Execution Plan (PEP) Which Includes Construction Execution Management (CEMP) & Shall be Submitted for Approval by OE/IE/LTA. EPC’s CEMP Shall be Validated to Comply with Finance Contracts, PPA, Insurance, Land Lease, & Applicable AHJs Standards. During Construction, EPC to Continuously Report to & Undertake Inspections by OE/IE/LTA. Various Elements of CEMP will Require AHJs Approvals (Permits & Inspections). EPC’s CEMP shall Include the Following: 20 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 Responsibilities Matrix Interface Matrix Updated Program Level 4 or 5 Detailed Lookahead Subprogram 4/8 Weeks Project Communication & Reporting Plan Risk Plan w/ Updated Risk Register Mobilization & Site Logistics Plan Construction Waste Management Plan Site Specific EHS Plan, Safety First Project Quality Plan Project Commissioning Plan Project Close Out Plan IPP OE/IEProcure Const. Permit AHJ Design IPD Construction Success Based On Integrated Project Delivery (IPD) EHS QC
21.
IPP Solar PV
Project Development Roadmap Phase 7: Testing & Acceptance Early on Post NTP, EPC Shall Produce Project Testing & Commissioning Plan (PTCP) Which Shall be Submitted for Approval by OE/IE/LTA/AHJ. Ensure Plan is Compliant w/ Contracts (EPC, PPA, Grid Connection, Sr. Debt Finance, etc.). The Testing & Acceptance Approach Shall Follow 5-Level Std Approach. Level 1 (Factory Acceptance Test / 3rd Party Inspection) & 2 are Integrated w/ Procurement. Level 3 & 4 (Site Acceptance Test) are Integrated w/ Construction. 90 Days Prior IST (Integrated Systems Test), EPC Shall Produce Final Plan. Prior to IST, Closeout Activities Shall be Completed (Training, As-Built, Snag/Punch List, O&M Manuals, S. Parts, Project Dossier) The Guaranteed Performance Ratio PRg & Plant Annual Availability Ag shall be Repeated During 2 Yrs EPC Warranty (DLP) at End of Yr1 & Yr2 (EPC undertakes First 2 Yrs of O&M). EPC Contract Completion Acceptance Milestones are: 21 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 At Origin FAT 3rd Party Inspection (TPI) Level 1 At Site Material Receipt Inspection Level 2 Installation Verification Pre- Commission ITP Pac & Pdc Level 3 SAT (Packages) Level 4 IST PRg Ag Level 5 Installation Verification Pre- Commission ITP Pac & Pdc Level 3 SAT (Packages) Level 4 IST PRg Ag Level 5 Annual PRg1 DF1 Ag1 Th. Imaging O&M Year 1 Annual PRg2 DF2 Ag2 Th. Imaging O&M Year 2 Mechanical Completion Practical Completion Provisional Completion PCOD Final Completion Interim Completion
22.
IPP Solar PV
Project Development Roadmap Phase 7: Testing & Acceptance 22 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 Key Considerations for 5-Level Testing & Acceptance (Shortlist) General EPC to Produce Detailed Testing, Commissioning, & Acceptance Program EPC to Ensure Compliance of Giving Timely Advance Notices to OE/IE/LTA/AHJ for Witnessing Inspections & Tests (all levels) Level 1 Witnessed FAT/TPI for PV Modules Flash Test. EL Test, BOM & CDF, Batch Acceptance Sampling per ISO 2859-1 Level S-4 TPI for PV Mounting Structure Mill Certificates & Protection Coating Gauge Witnessed FAT for Inverters, Transformers, Reactors, Switchgears, Gen-Sets, UPSs, Chillers Witnessed FAT for MV/HV Cables Routine Test Report for Type Approved Certified Materials & Check Validity of Certificates TPI Calibration Certificates (e.g. Energy Meters & Meteo Sensors) Level 2 Detailed Material Receipt & Inspection Report (MRIR) for All Materials, No Exceptions Regular Inspections for Laydown & Storage Areas, Validate Compliance w/ Eqpt Manufacturers’ Requirements Level 3 Implement Inspection & Test Plan (ITP), covering all Systems Packages All Site Testing Instruments/Meters w/ Valid Calibration Certificates ITP to Comply w/ IEC 60364-6, LV Electrical Installations – Part 6: Verification ITP to Comply w/ IEC 62446-1:2016, PV Systems - Part 1: Grid Conn. Sys. - Doc, Commg. Tests and Inspection. HV/MV Equipment Tests per IEC Pac & Pdc Installed Capacity Validation Level 4 Start up Tests per IEC 62446 & 60346 SAT w/ Pre-Approved Protocols for All Systems (Inverter, Transformer, Reactors, Switchgear, UPS, Gen-Sets, Grid Emulation, SCADA & Grid Interfaces, FLS, HVAC, Security, Meteo Stn) Level 5 100% Plant Availability (Ag) / Reliability Run, 3 Days Integrated Systems Test in Line w/ IPP Code (e.g Voltage / Frequency / PF / Reactive Power Thresholds Compliance Tests, etc.) PRg Test IEC 61724, Weather Corrected, 10 Days
23.
IPP Solar PV
Project Development Roadmap Phase 8: O&M Prior to PCOD, SPV Shall be Fully Staffed & Operational. At Start of Level 4 Commissioning, Limited NTP is Issued for Turnkey O&M Contract. It Is Crucial to Integrate O&M Early On Prior to Project Commercial Operation Date (PCOD). This Ensures Training & Familiarization of Systems During Commissioning & Testing Phase. Provisional Completion (PCOD) Triggers Full NTP for O&M Contract. O&M Contractor Prepares Comprehensive O&M Plan for the Approval of OE/IE/LTA. It Covers: It Is Common Practice that EPC Undertakes O&M During 2 Yrs Defect Liability Period (DLP). Prior to DLP Expiry & EPC Final Completion, EPC’s O&M Contract can be Negotiated & Extended for Another Term (3-5 Yrs, renewable), or Competitively Tendered. If New O&M is Awarded, Then Extreme Due Diligence Shall be Executed to Ensure Smooth & Well Planned Technical & Contractual Handover Between Parties. At Plant End of Life (20/25 yrs), SPV Decommissions the Plant (N.B. recycling) & Restores the Site, as per its Obligation Under PPA and Land Lease Agreement. Then, SPV Liquidates as per its SHA. 23 IPP Solar PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017 Org Chart Roles & Responsibilities & Interfaces O&M Concept & Operations Approach Working Hours & Shifts Approach Preventive Maintenance Corrective Maintenance Maint. Tasks Freq. & Response Times Spare Parts & Consumables Mgmt Tools & Machinery Approach Warranties & Claims Mgmt PV Cleaning Method Statement Performance Monitoring, Analysis, & Optimization Performance Guarantees & Tests Communications & Reporting Site Specific EHS Plan QA/QC Approach Processes & Procedures Procurement/Subcons/SLAs Approach Regulatory Compliance Training
24.
Contact24 Contact: Fadi Maalouf www.linkedin.com/in/fadimaalouf www.slideshare.net/solaruae www.twitter.com/solaruae IPP Solar
PV Project Development Roadmap ©Fadi Maalouf Ref.: IPP-PV-Roadmap-fm170502-R2 2-May-2017