…Operational expert committed to lasting change
“The F.A.D.E.S Solution”
Process Improvement Methodology
By: LCC, LLC (Founder – Wayne Oliver)
& John Sisti (CMQ/QE)
GETTING STARTED
• Are their any Enterprise Environmental Factors /EEF’s to be aware of?
(Conditions, not under the immediate control of the team, that influence or
constrain a project)
• Did you check to see if any Organizational Process Assets / OPA’s exist?
(Polices, procedures, and knowledge bases that are specific to the
organization)
• Do you have upper management sponsorship for this effort?
• Will you pre-assign initial resources?
• Did you assign a Project Manager?
• Consider a 5 “S” project as an option before starting the process?
(Sort, Shine, Set in Order, Standardize, Sustain)
…operational expert committed to lasting change
What is Quality?
• PMI defines quality as the degree to which a set of inherent
characteristics fulfills requirements
• What is the FADES Process? A hybrid improvement process which
incorporates Process Improvement (PDCA), Project Management (PMBOK),
Lean, Six Sigma and other tools
• F = Focus
• A = Analyze
• D = Develop
• E = Execute
• S = Sustain
• My objective is to reduce waste, improve quality and increase
margins
…operational expert committed to lasting change
F.A.D.E.S. PROCESS
(+)PLUS SUSTAIN
…operational expert committed to lasting change
FOCUS
•Phase 1
oChoose a problem and describe it.
•Output
oDefine high level project requirements and scope
oCreate a charter, gain approval
oIdentify Stakeholders
oA written statement of the problem
•STEPS
o1A Generate a list of problems – Brainstorming
o1B Select One Problem – Multi-vote or Selection Grid
o1C Verify and define the problem – Problem Statement or Impact Analysis
…operational expert committed to lasting change
ANALYZE
• Phase 2
o Learn about the problem from data
• Output
o A list of the most influential factors
o Root Cause Analysis (Five Why’s)
o Cost Benefit Analysis
o Baseline data
• Steps
o 2A Decide what you need to know - Checklist
o 2B Collect data, baselines and patterns – Data gathering plan, Survey, Sampling,
Check sheet
o 2C - Determine the most influential factors – Pareto Analysis, Fishbone Diagram,
Flow chart, Process Map and Linear Regression
…operational expert committed to lasting change
ABC COMPANY – PRODUCT FLOWCHART (Example)
Sales enters order
Receiving
enters
inserts into
Maestro
Package is
built in
Maestro and
closed for
IHD
Information is
entered into
Maestro for
Receiving and
Schedule
Pullsample For
Target Direct Sales/
CS
Weigh Verify
incoming procedure
Accept or reject
count
Refuse Load
Locate material in
racking
Material is staged
outside warehouse
Customer
sells into
zones on
UVP side
Paper Work Orders
created
Pick Ticket is created
Alphaliner Set-up
Wrap created in
house
Press Process
Printing in-house
or Outside Client
Ship to outside
Vendor
File Created for DAL
DAL’s Created
Pallet Plagues
Created
Scheduling Creates
priority and machine
Muller 227 set up
Kansa Set-up
Material is pulled
from Warehouse
Post press
production
Material Palletized
Pallet ShagedMail or Ship
Ship to customer
Mail Verified by
USPS
Loaded on USPS
Trucks
Deliver to SCF
Customer Service
Load on our trucks
USPS or Our
Trucks
Deliver to DDU for
Discounts
USPS to DDU
In-Home
ABC COMPANY PRODUCT FLOW – 1/22/15
Load on our Trucks
Deliver to SCF for
Discounts
…operational expert committed to lasting change
FISHBONE “ISHIKAWA” DIAGRAM (Example)
…operational expert committed to lasting change
Histogram / Pareto Principle (Example)
…operational expert committed to lasting change
0
2
4
6
8
10
12
14
16
18
Multi-vote Histogram
DEVELOP
• Phase III
o Develop a solution and a plan
• Output
o A solution for the problem
o Define Success
o Create metrics
o A plan for implementing the solution and subsidy plans
o Create Cost Management Plan
o Create a Risk Management Plan or FMEA
o Create a Communications Plan
o Create other PMBOK subsidy plans as required
• Steps
o Generate a list of promising solutions
o Select one solution
o Create WBS
o Develop an implementation plan
o Create a MS Project Gantt Chart
…operational expert committed to lasting change
EXECUTE
• PHASE IV
o Implement the plan, monitor results, adjust as needed
• Output
o Gain Organizational Commitment to plans
o An Executed Plan
o A record of Impact
o Earned Value Analysis
• Steps
o Gain sponsor commitment
o Execute the plan
o Assign additional resources as required
o Monitor the Impact
…operational expert committed to last change
Earned Value Management (Formula’s)
• Planned Value - % planned completion
• Earned Value - % complete x BAC
• Cost Variance - CV = EV-PC
• Schedule Variance - SV = EV-PV
• Cost Performance Index - CPI = EV/PV
• Schedule Performance Index - SPI = EV/PV
• Estimate at Completion - EAC = BAC/CPI
• Estimate to Completion - ETC = EAC-AC
• Variance at Completion - VAC = BAC-EAC
…operational expert committed to lasting change
SUSTAIN
•PHASE V
oEnsure a disciplined, repeatable process
oMust be able at all levels of OPERATIONAL LEADERSHIP - to sustain the “LCC
Process” in the current year, and years beyond.
•Output
oLessons Learned
oTeam Recognition
•Steps
oClose any Procurements
oEvaluate Mistake Proofing (Poka-Yoke)
oInstitute a Gemba Walk/Board as a SOP
…operational expert committed to last change
…operational expert committed to last change
Poka-yoke (Mistake-proof example)
Decision time to
use the process ?
Y
E
S

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 
Management control of projects
Management control of projectsManagement control of projects
Management control of projectsSai Mahesh
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsRory McKenna
 
12 projectprocurementmanagement
12 projectprocurementmanagement12 projectprocurementmanagement
12 projectprocurementmanagementDhamo daran
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementHossam Maghrabi
 
Audit Planning - Considerations
Audit Planning - ConsiderationsAudit Planning - Considerations
Audit Planning - ConsiderationsRyan Vaz
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceLewisFowlerLLC
 
Telco Implementation Project Management
Telco Implementation Project ManagementTelco Implementation Project Management
Telco Implementation Project Managementanwarizal
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesJoshua Render
 
Pmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost managementPmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost managementYudha Pratama, PMP
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality managementejlp12
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Social Media Project
Social Media ProjectSocial Media Project
Social Media ProjectTyroneEdmonds
 

Was ist angesagt? (20)

PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
Management control of projects
Management control of projectsManagement control of projects
Management control of projects
 
Six sigma
Six sigmaSix sigma
Six sigma
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications Professionals
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Six sigma
Six sigmaSix sigma
Six sigma
 
12 projectprocurementmanagement
12 projectprocurementmanagement12 projectprocurementmanagement
12 projectprocurementmanagement
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk Management
 
Audit Planning - Considerations
Audit Planning - ConsiderationsAudit Planning - Considerations
Audit Planning - Considerations
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance
 
Telco Implementation Project Management
Telco Implementation Project ManagementTelco Implementation Project Management
Telco Implementation Project Management
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Pmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost managementPmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost management
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
Project implementation
Project implementationProject implementation
Project implementation
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Cost management
Cost managementCost management
Cost management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Social Media Project
Social Media ProjectSocial Media Project
Social Media Project
 
Quality engineering
Quality engineeringQuality engineering
Quality engineering
 

Andere mochten auch

An experiment to verify ohm’s law
An experiment to verify ohm’s lawAn experiment to verify ohm’s law
An experiment to verify ohm’s lawbernadettevania
 
Ozel ders-vermek-istiyorum
Ozel ders-vermek-istiyorumOzel ders-vermek-istiyorum
Ozel ders-vermek-istiyorumzeynep_zyn40
 
053 5 jul. 2015 am دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا
053 5 jul. 2015 am   دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا053 5 jul. 2015 am   دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا
053 5 jul. 2015 am دروس من راعوث. (1) عندما نُخْرِج الله من حساباتناIbrahimia Church Ftriends
 
القس كرم لمعى الوصية العاشرة لا تشته
القس كرم لمعى      الوصية العاشرة لا تشتهالقس كرم لمعى      الوصية العاشرة لا تشته
القس كرم لمعى الوصية العاشرة لا تشتهIbrahimia Church Ftriends
 
Jim ziegler the prosperity equation
Jim ziegler the prosperity equationJim ziegler the prosperity equation
Jim ziegler the prosperity equationSean Bradley
 
Dac presentation april_2012_final
Dac presentation april_2012_finalDac presentation april_2012_final
Dac presentation april_2012_finalCNOServices
 
Minggu 1,2,3
Minggu 1,2,3Minggu 1,2,3
Minggu 1,2,3hazmilplv
 
Psbe2 08 research methods 2011-2012 - week 5
Psbe2 08 research methods 2011-2012 - week 5Psbe2 08 research methods 2011-2012 - week 5
Psbe2 08 research methods 2011-2012 - week 5Vlady Fckfb
 
Lucy in the Sky with Diamonds
Lucy in the Sky with DiamondsLucy in the Sky with Diamonds
Lucy in the Sky with Diamondsssclasstorremar
 
Professional Presentation Needs Assessment
Professional Presentation Needs AssessmentProfessional Presentation Needs Assessment
Professional Presentation Needs Assessmentmooremi
 
презентация производство
презентация производствопрезентация производство
презентация производствоChe127
 

Andere mochten auch (20)

An experiment to verify ohm’s law
An experiment to verify ohm’s lawAn experiment to verify ohm’s law
An experiment to verify ohm’s law
 
Part 2
Part 2Part 2
Part 2
 
Ozel ders-vermek-istiyorum
Ozel ders-vermek-istiyorumOzel ders-vermek-istiyorum
Ozel ders-vermek-istiyorum
 
053 5 jul. 2015 am دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا
053 5 jul. 2015 am   دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا053 5 jul. 2015 am   دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا
053 5 jul. 2015 am دروس من راعوث. (1) عندما نُخْرِج الله من حساباتنا
 
القس كرم لمعى الوصية العاشرة لا تشته
القس كرم لمعى      الوصية العاشرة لا تشتهالقس كرم لمعى      الوصية العاشرة لا تشته
القس كرم لمعى الوصية العاشرة لا تشته
 
Jim ziegler the prosperity equation
Jim ziegler the prosperity equationJim ziegler the prosperity equation
Jim ziegler the prosperity equation
 
Dac presentation april_2012_final
Dac presentation april_2012_finalDac presentation april_2012_final
Dac presentation april_2012_final
 
Minggu 1,2,3
Minggu 1,2,3Minggu 1,2,3
Minggu 1,2,3
 
Psbe2 08 research methods 2011-2012 - week 5
Psbe2 08 research methods 2011-2012 - week 5Psbe2 08 research methods 2011-2012 - week 5
Psbe2 08 research methods 2011-2012 - week 5
 
Road map to cmm
Road map to cmmRoad map to cmm
Road map to cmm
 
Evaluation 2
Evaluation 2Evaluation 2
Evaluation 2
 
R.rodriguez prova
R.rodriguez provaR.rodriguez prova
R.rodriguez prova
 
1 1 bias
1 1 bias1 1 bias
1 1 bias
 
Lucy in the Sky with Diamonds
Lucy in the Sky with DiamondsLucy in the Sky with Diamonds
Lucy in the Sky with Diamonds
 
Professional Presentation Needs Assessment
Professional Presentation Needs AssessmentProfessional Presentation Needs Assessment
Professional Presentation Needs Assessment
 
Ebook ar komp & orkomp
Ebook ar komp & orkompEbook ar komp & orkomp
Ebook ar komp & orkomp
 
Easy Comunication
Easy ComunicationEasy Comunication
Easy Comunication
 
How does
How doesHow does
How does
 
Future directions
Future directionsFuture directions
Future directions
 
презентация производство
презентация производствопрезентация производство
презентация производство
 

Ähnlich wie LLCprocessimprovement

QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overviewhandbook
 
Successfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionSuccessfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionHuron Consulting Group
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1Toe Myint Naing
 
Problem Solving Toolkit_Final v1.0
Problem Solving Toolkit_Final v1.0Problem Solving Toolkit_Final v1.0
Problem Solving Toolkit_Final v1.0lee_anderson40
 
Project Management_c
Project Management_cProject Management_c
Project Management_crynmif
 
BBK and Performance Improvement LLC - Introduction to the New BBK
BBK and Performance Improvement LLC - Introduction to the New BBKBBK and Performance Improvement LLC - Introduction to the New BBK
BBK and Performance Improvement LLC - Introduction to the New BBKBBK
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagementDhamo daran
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507larrypenni
 
Project assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedProject assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedTerje Sæbø
 
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...UNDP Climate
 
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseESTIEM
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
LSS Intro
LSS IntroLSS Intro
LSS Introevansjr
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 

Ähnlich wie LLCprocessimprovement (20)

Six sigma
Six sigmaSix sigma
Six sigma
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
 
Successfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionSuccessfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend Solution
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
 
Problem Solving Toolkit_Final v1.0
Problem Solving Toolkit_Final v1.0Problem Solving Toolkit_Final v1.0
Problem Solving Toolkit_Final v1.0
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Project Management_c
Project Management_cProject Management_c
Project Management_c
 
BBK and Performance Improvement LLC - Introduction to the New BBK
BBK and Performance Improvement LLC - Introduction to the New BBKBBK and Performance Improvement LLC - Introduction to the New BBK
BBK and Performance Improvement LLC - Introduction to the New BBK
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
Session 22 4th edition PMP
Session 22 4th edition PMPSession 22 4th edition PMP
Session 22 4th edition PMP
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507
 
Project assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedProject assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expected
 
Process development and implementation
Process development and implementationProcess development and implementation
Process development and implementation
 
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
 
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
LSS Intro
LSS IntroLSS Intro
LSS Intro
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 

Kürzlich hochgeladen

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 

Kürzlich hochgeladen (20)

Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 

LLCprocessimprovement

  • 1. …Operational expert committed to lasting change “The F.A.D.E.S Solution” Process Improvement Methodology By: LCC, LLC (Founder – Wayne Oliver) & John Sisti (CMQ/QE)
  • 2. GETTING STARTED • Are their any Enterprise Environmental Factors /EEF’s to be aware of? (Conditions, not under the immediate control of the team, that influence or constrain a project) • Did you check to see if any Organizational Process Assets / OPA’s exist? (Polices, procedures, and knowledge bases that are specific to the organization) • Do you have upper management sponsorship for this effort? • Will you pre-assign initial resources? • Did you assign a Project Manager? • Consider a 5 “S” project as an option before starting the process? (Sort, Shine, Set in Order, Standardize, Sustain) …operational expert committed to lasting change
  • 3. What is Quality? • PMI defines quality as the degree to which a set of inherent characteristics fulfills requirements • What is the FADES Process? A hybrid improvement process which incorporates Process Improvement (PDCA), Project Management (PMBOK), Lean, Six Sigma and other tools • F = Focus • A = Analyze • D = Develop • E = Execute • S = Sustain • My objective is to reduce waste, improve quality and increase margins …operational expert committed to lasting change
  • 4. F.A.D.E.S. PROCESS (+)PLUS SUSTAIN …operational expert committed to lasting change
  • 5. FOCUS •Phase 1 oChoose a problem and describe it. •Output oDefine high level project requirements and scope oCreate a charter, gain approval oIdentify Stakeholders oA written statement of the problem •STEPS o1A Generate a list of problems – Brainstorming o1B Select One Problem – Multi-vote or Selection Grid o1C Verify and define the problem – Problem Statement or Impact Analysis …operational expert committed to lasting change
  • 6. ANALYZE • Phase 2 o Learn about the problem from data • Output o A list of the most influential factors o Root Cause Analysis (Five Why’s) o Cost Benefit Analysis o Baseline data • Steps o 2A Decide what you need to know - Checklist o 2B Collect data, baselines and patterns – Data gathering plan, Survey, Sampling, Check sheet o 2C - Determine the most influential factors – Pareto Analysis, Fishbone Diagram, Flow chart, Process Map and Linear Regression …operational expert committed to lasting change
  • 7. ABC COMPANY – PRODUCT FLOWCHART (Example) Sales enters order Receiving enters inserts into Maestro Package is built in Maestro and closed for IHD Information is entered into Maestro for Receiving and Schedule Pullsample For Target Direct Sales/ CS Weigh Verify incoming procedure Accept or reject count Refuse Load Locate material in racking Material is staged outside warehouse Customer sells into zones on UVP side Paper Work Orders created Pick Ticket is created Alphaliner Set-up Wrap created in house Press Process Printing in-house or Outside Client Ship to outside Vendor File Created for DAL DAL’s Created Pallet Plagues Created Scheduling Creates priority and machine Muller 227 set up Kansa Set-up Material is pulled from Warehouse Post press production Material Palletized Pallet ShagedMail or Ship Ship to customer Mail Verified by USPS Loaded on USPS Trucks Deliver to SCF Customer Service Load on our trucks USPS or Our Trucks Deliver to DDU for Discounts USPS to DDU In-Home ABC COMPANY PRODUCT FLOW – 1/22/15 Load on our Trucks Deliver to SCF for Discounts …operational expert committed to lasting change
  • 8. FISHBONE “ISHIKAWA” DIAGRAM (Example) …operational expert committed to lasting change
  • 9. Histogram / Pareto Principle (Example) …operational expert committed to lasting change 0 2 4 6 8 10 12 14 16 18 Multi-vote Histogram
  • 10. DEVELOP • Phase III o Develop a solution and a plan • Output o A solution for the problem o Define Success o Create metrics o A plan for implementing the solution and subsidy plans o Create Cost Management Plan o Create a Risk Management Plan or FMEA o Create a Communications Plan o Create other PMBOK subsidy plans as required • Steps o Generate a list of promising solutions o Select one solution o Create WBS o Develop an implementation plan o Create a MS Project Gantt Chart …operational expert committed to lasting change
  • 11. EXECUTE • PHASE IV o Implement the plan, monitor results, adjust as needed • Output o Gain Organizational Commitment to plans o An Executed Plan o A record of Impact o Earned Value Analysis • Steps o Gain sponsor commitment o Execute the plan o Assign additional resources as required o Monitor the Impact …operational expert committed to last change
  • 12. Earned Value Management (Formula’s) • Planned Value - % planned completion • Earned Value - % complete x BAC • Cost Variance - CV = EV-PC • Schedule Variance - SV = EV-PV • Cost Performance Index - CPI = EV/PV • Schedule Performance Index - SPI = EV/PV • Estimate at Completion - EAC = BAC/CPI • Estimate to Completion - ETC = EAC-AC • Variance at Completion - VAC = BAC-EAC …operational expert committed to lasting change
  • 13. SUSTAIN •PHASE V oEnsure a disciplined, repeatable process oMust be able at all levels of OPERATIONAL LEADERSHIP - to sustain the “LCC Process” in the current year, and years beyond. •Output oLessons Learned oTeam Recognition •Steps oClose any Procurements oEvaluate Mistake Proofing (Poka-Yoke) oInstitute a Gemba Walk/Board as a SOP …operational expert committed to last change
  • 14. …operational expert committed to last change Poka-yoke (Mistake-proof example) Decision time to use the process ? Y E S