MAHADEOPURI MINE
•WESTERN COALFIELDS LIMITED
•PENCH AREAPrepared by.
1)Shri Bambhaniya Suraj Manajibhai(BE MINING ENGINEER)
2)Shri Chaudhari Haresh Bhagvanbhai(BE MINING ENGINEER)
GENRAL INFORMATION OF MAHADEVPURI MINE
General Information :- Latitude :-22°16’96’’
Longitude :-480°46’41’’
Name of Mine :- Mahadeopuri Mine WCL-Pench Area Parasia,Chindwara, (M.P)
Name of Manager :- Shri S.M.Jaiswal
1. This mine having two Incline, one is used for haulage roadways and other as
traveling road ways,
2. Coal is transported from underground to surface with the help of direct haulage
3. Coal produced is transported to Sorani Thermal power station either by road or
by railways near by board gauge riding
4. Daily out put is 250 tones
5. It is situated near half km from Parasiya and about 26 km from Chhindwara
GEOLOGY
Mahadeopuri project is a part of Sial Ghogri Block, within this were 23 bore hole
with a meterage of 4630mts. Covered by Deccan trap Basalt
Regional Geology :-
AGE PROMOTION THICKNESS IN METERS
MINIMUM
THICKNESS IN METERS
MAXIMUM
Sub Recent Soil 0.50 8.50
Upper eretaceous to
Eosins
Decen traps with
interppean beds
20.50 87.07
Jurassia Jabalpur Unconformity 0.60 14.77
Permian Motors
Barakar
12.47
58.20
143.30
140.40
Lower Permian Talchirs 7.60
METHOD OF WORKING
Board & pillar with panel system
Presently there is a section/district
Number of seam :II (A + B) seam-21D Section
Mine Openings
MODE NAME OF
ENTRY
SIZE W x H GRADIENT LENGHTH/DEPT
H
PURPOSE
Incline No.1 Incline 4.27x2.40m. 1 in 5 100m Fan traveling
Incline No.2 Incline 4.27x2.40m. 1 in 5 100m Haulage
Shaft Air Shaft 5.70m. Vertical 36.3m Intake
DETAILS OF SEAM
1) I (A + B) Seam top seam-Maximum working have been done.
2) I C Seam middle –working have been done.
3) II (A + B) Bottom seam –Presently working is being done.
Sr.No Seam Degree of
Gassiness
Average
Thickness
Gradient Gallery
Size W x
H(m)
RMR
1 I (A + B) I 2.49 1 in 8.24 4.20 x
2.20
44
2 I C I 1.85 1 In 8.24 4.20 x
2.20
40
3 II (A + B) I 2.01 1 in 8.24 4.20 x
2.20
36.45
WORKING DIAGRAM OF MAHADEOPURI MINE
AIR CIRCUIT DIAGRAM OF MAHADEOPURI MINE
HAULAGE SYSTEM
1. Surface haulage
2. Endless haulage in 8L/MD
3. Direct haulage 6L/21D
Main surface haulage :
Gradient of Incline :1 in 8
Length of Incline :2.75m
Engine :- 1.Power :- 120KW
2.Moter installed : 100KW/550V
3.Rope Length :- 1000m/800m
4.Rope size :- 26mm
5.Rope speed :- 2.5meter per second
6.Drive RPM :- 960RPM
7.Date of installation :- July-1990
Safety Features In Haulage :-
1) Brecks
2) Rope Winding Pulley
3) Signaling System
4) Run Away Switch
5) Stop Bock
6) Rope Guide Pulley
7) Track Fish Plate
8) Zaje Rail
9) Back Stay (Kutta)
10)Showman Clips
11) Man Holes
12) Safety Hook
13) Rope kaple
DETAILS OF SDL
1.Their are used side loaders in conjunction with coal tube. Total 3nos.
2. Remote control operation with pilot core circuit diode and resistance,10W ,
300HM fitted in gate end box this circuit is completed by foot switch and push.
3. Bottom assembly operated by the operator, light fitting are provided in rear and at
front of the machines.
4. Audio visual alarm has been provided in each and every machine
5. In Addition to this going bell is also fitted with machines.
DRILLING
1. Drilling is done by 1.5HP, 125V, 450RPM(CHANDA RANA) coal drill machine
2. Gallery size :- 4.2m x 3m
3. Drill hole :- 12holes in are face
4. Drill hole Length :- 1.5m
5.Drill hole diameter:- 34-36mm
6.Drilling pattern:-Wedge cut
BLASTING
Blasting is done with the help of the(Copper tube) Electric delay detonator
Delay detonator no. 1,2,3, of 25ms are used.
EXPLOSIVE
P5 permitted explosive are used of class-II
Slurry type explosive
Cartridge :- 1) Diameter - 32mm
2) Weight - 185gram
3) Per hole used cartridge is 3nos
4) Cartridge and other stoming material for 1 face blasting
…………… approx. 6kg explosive charge.
SYSTEMATIC SUPPORT RULES (SSR)
1 SSR under regulation 108 of the coal mines regulation 1957 for development working
2 This is based on the RMR of roof rock of Seam
3 The roof shall be supported by full column ground roof bolts with resin installed at maximum interval of 1.0m in the same
row(four bolts in a row)
4 The distance between the bolts and the side pillar shall not be more than 0.6m
5 Spacing between the two rows shall not be more than 1.0m
6 The bolts in a row shall be strengthened by used of W strap/steel channels of suitable specification if required.
7 Junction shall be supported by rows of bolts as specified for those of development working within 10m
8 The junction shall be reduced to 0.75m in case of resin grouted bolts and 0.65m in case of cement grouted bolts to
accommodate 25% extra support.
9 Vertical props at intervals not exceeding 1.2m with suitable laggings put tightly against the side of pillar.
10 The props may be set in recesses in floor and roof close to the side.
11 All faults, visible slips, breaks and other geological disturbances in the roof shall be supported by cogs at intervals of
2.4m on either side of such disturbances and with crossbars across there a interval not exceeding 1.2m
OPEN CAST MINE BLASTING AT BADKUHI MINES
1. Visit to Badkuhi open cast mines dip hole blasting on date :-19/12/2016
2. Blasting of 100 holes at 14:00
a) Burden width is 4.5m & spacing width is 4m
b) Drilling in black shale
c) Drill by pneumatic machine of tier mounted
d) Specification of drill hole :
1)hole diameter :15omm
2)hole depth :6m
e) Specification of explosive :
1) They are two type of explosive are used 1.booster 2.colum explosive
2) The diameter pf explosive is 125mm & weight is 6.25kg
3) The explosive is class 2 type and division 6
4)Company of explosive manufacture is Shakti column,UN class-1
f) Tpyes of detonator are used in Badkuhi mines
1)Nonel –Electric detonator(NONEL)
2)DTH(down through hole & TLD(Tronx line delay)
3)DTH is 8 to 10 mlenght by shock tube
4)Delay time is 250ms of allumium tube & 25ms of plastic tube
OUR TEAM MEMBER
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh ds
SATYANARAYANA I
 
HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)
Pushon Ghosh
 

Was ist angesagt? (20)

Extraction of developed pillars by opencast mine: acase study
Extraction of developed pillars by opencast mine:   acase studyExtraction of developed pillars by opencast mine:   acase study
Extraction of developed pillars by opencast mine: acase study
 
Blasting concepts (1)
Blasting concepts (1)Blasting concepts (1)
Blasting concepts (1)
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCL
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh ds
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
Mine hazards(2162294)
Mine hazards(2162294)Mine hazards(2162294)
Mine hazards(2162294)
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drill
 
coal mining training report
coal mining training report coal mining training report
coal mining training report
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Explosives and accesories
Explosives and accesoriesExplosives and accesories
Explosives and accesories
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Mine explosions
Mine explosionsMine explosions
Mine explosions
 
HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
Shrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat StopingShrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat Stoping
 
Underground metal mining methods
Underground metal mining methodsUnderground metal mining methods
Underground metal mining methods
 
Blasting
BlastingBlasting
Blasting
 

Andere mochten auch (7)

Travel With Technology
Travel With TechnologyTravel With Technology
Travel With Technology
 
National mineral development corporation
National mineral development corporationNational mineral development corporation
National mineral development corporation
 
Transportaion
TransportaionTransportaion
Transportaion
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Conveyors
ConveyorsConveyors
Conveyors
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 

Ähnlich wie Mahadevpuri ug mine

Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)
Gautam Sharma
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
VR M
 
61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx
Vevietpomata
 
ZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill Rig
Owen Ji
 

Ähnlich wie Mahadevpuri ug mine (20)

unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.pptunit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
Satyajeet
SatyajeetSatyajeet
Satyajeet
 
Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
 
61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx
 
Ug mine planning
Ug mine planningUg mine planning
Ug mine planning
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Tirap report
Tirap report Tirap report
Tirap report
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
ZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill Rig
 
BORED pile and pile cap design.ppt
BORED pile and pile cap design.pptBORED pile and pile cap design.ppt
BORED pile and pile cap design.ppt
 
Gulshan rahangdale
Gulshan rahangdaleGulshan rahangdale
Gulshan rahangdale
 
A study into the feasibility of application of longwall top coal caving (ltc...
A study into the feasibility of application of longwall  top coal caving (ltc...A study into the feasibility of application of longwall  top coal caving (ltc...
A study into the feasibility of application of longwall top coal caving (ltc...
 
Criteria for selection of Board and pillar for multiple seams
Criteria for selection of Board and pillar for multiple seamsCriteria for selection of Board and pillar for multiple seams
Criteria for selection of Board and pillar for multiple seams
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall mining
 

Kürzlich hochgeladen

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 

Kürzlich hochgeladen (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 

Mahadevpuri ug mine

  • 1. MAHADEOPURI MINE •WESTERN COALFIELDS LIMITED •PENCH AREAPrepared by. 1)Shri Bambhaniya Suraj Manajibhai(BE MINING ENGINEER) 2)Shri Chaudhari Haresh Bhagvanbhai(BE MINING ENGINEER)
  • 2. GENRAL INFORMATION OF MAHADEVPURI MINE General Information :- Latitude :-22°16’96’’ Longitude :-480°46’41’’ Name of Mine :- Mahadeopuri Mine WCL-Pench Area Parasia,Chindwara, (M.P) Name of Manager :- Shri S.M.Jaiswal 1. This mine having two Incline, one is used for haulage roadways and other as traveling road ways, 2. Coal is transported from underground to surface with the help of direct haulage 3. Coal produced is transported to Sorani Thermal power station either by road or by railways near by board gauge riding 4. Daily out put is 250 tones 5. It is situated near half km from Parasiya and about 26 km from Chhindwara
  • 3. GEOLOGY Mahadeopuri project is a part of Sial Ghogri Block, within this were 23 bore hole with a meterage of 4630mts. Covered by Deccan trap Basalt Regional Geology :- AGE PROMOTION THICKNESS IN METERS MINIMUM THICKNESS IN METERS MAXIMUM Sub Recent Soil 0.50 8.50 Upper eretaceous to Eosins Decen traps with interppean beds 20.50 87.07 Jurassia Jabalpur Unconformity 0.60 14.77 Permian Motors Barakar 12.47 58.20 143.30 140.40 Lower Permian Talchirs 7.60
  • 4. METHOD OF WORKING Board & pillar with panel system Presently there is a section/district Number of seam :II (A + B) seam-21D Section Mine Openings MODE NAME OF ENTRY SIZE W x H GRADIENT LENGHTH/DEPT H PURPOSE Incline No.1 Incline 4.27x2.40m. 1 in 5 100m Fan traveling Incline No.2 Incline 4.27x2.40m. 1 in 5 100m Haulage Shaft Air Shaft 5.70m. Vertical 36.3m Intake
  • 5. DETAILS OF SEAM 1) I (A + B) Seam top seam-Maximum working have been done. 2) I C Seam middle –working have been done. 3) II (A + B) Bottom seam –Presently working is being done. Sr.No Seam Degree of Gassiness Average Thickness Gradient Gallery Size W x H(m) RMR 1 I (A + B) I 2.49 1 in 8.24 4.20 x 2.20 44 2 I C I 1.85 1 In 8.24 4.20 x 2.20 40 3 II (A + B) I 2.01 1 in 8.24 4.20 x 2.20 36.45
  • 6. WORKING DIAGRAM OF MAHADEOPURI MINE
  • 7. AIR CIRCUIT DIAGRAM OF MAHADEOPURI MINE
  • 8. HAULAGE SYSTEM 1. Surface haulage 2. Endless haulage in 8L/MD 3. Direct haulage 6L/21D Main surface haulage : Gradient of Incline :1 in 8 Length of Incline :2.75m Engine :- 1.Power :- 120KW 2.Moter installed : 100KW/550V 3.Rope Length :- 1000m/800m 4.Rope size :- 26mm 5.Rope speed :- 2.5meter per second 6.Drive RPM :- 960RPM 7.Date of installation :- July-1990 Safety Features In Haulage :- 1) Brecks 2) Rope Winding Pulley 3) Signaling System 4) Run Away Switch 5) Stop Bock 6) Rope Guide Pulley 7) Track Fish Plate 8) Zaje Rail 9) Back Stay (Kutta) 10)Showman Clips 11) Man Holes 12) Safety Hook 13) Rope kaple
  • 9. DETAILS OF SDL 1.Their are used side loaders in conjunction with coal tube. Total 3nos. 2. Remote control operation with pilot core circuit diode and resistance,10W , 300HM fitted in gate end box this circuit is completed by foot switch and push. 3. Bottom assembly operated by the operator, light fitting are provided in rear and at front of the machines. 4. Audio visual alarm has been provided in each and every machine 5. In Addition to this going bell is also fitted with machines.
  • 10. DRILLING 1. Drilling is done by 1.5HP, 125V, 450RPM(CHANDA RANA) coal drill machine 2. Gallery size :- 4.2m x 3m 3. Drill hole :- 12holes in are face 4. Drill hole Length :- 1.5m 5.Drill hole diameter:- 34-36mm 6.Drilling pattern:-Wedge cut
  • 11. BLASTING Blasting is done with the help of the(Copper tube) Electric delay detonator Delay detonator no. 1,2,3, of 25ms are used. EXPLOSIVE P5 permitted explosive are used of class-II Slurry type explosive Cartridge :- 1) Diameter - 32mm 2) Weight - 185gram 3) Per hole used cartridge is 3nos 4) Cartridge and other stoming material for 1 face blasting …………… approx. 6kg explosive charge.
  • 12. SYSTEMATIC SUPPORT RULES (SSR) 1 SSR under regulation 108 of the coal mines regulation 1957 for development working 2 This is based on the RMR of roof rock of Seam 3 The roof shall be supported by full column ground roof bolts with resin installed at maximum interval of 1.0m in the same row(four bolts in a row) 4 The distance between the bolts and the side pillar shall not be more than 0.6m 5 Spacing between the two rows shall not be more than 1.0m 6 The bolts in a row shall be strengthened by used of W strap/steel channels of suitable specification if required. 7 Junction shall be supported by rows of bolts as specified for those of development working within 10m 8 The junction shall be reduced to 0.75m in case of resin grouted bolts and 0.65m in case of cement grouted bolts to accommodate 25% extra support. 9 Vertical props at intervals not exceeding 1.2m with suitable laggings put tightly against the side of pillar. 10 The props may be set in recesses in floor and roof close to the side. 11 All faults, visible slips, breaks and other geological disturbances in the roof shall be supported by cogs at intervals of 2.4m on either side of such disturbances and with crossbars across there a interval not exceeding 1.2m
  • 13. OPEN CAST MINE BLASTING AT BADKUHI MINES 1. Visit to Badkuhi open cast mines dip hole blasting on date :-19/12/2016 2. Blasting of 100 holes at 14:00 a) Burden width is 4.5m & spacing width is 4m b) Drilling in black shale c) Drill by pneumatic machine of tier mounted d) Specification of drill hole : 1)hole diameter :15omm 2)hole depth :6m e) Specification of explosive : 1) They are two type of explosive are used 1.booster 2.colum explosive 2) The diameter pf explosive is 125mm & weight is 6.25kg 3) The explosive is class 2 type and division 6 4)Company of explosive manufacture is Shakti column,UN class-1 f) Tpyes of detonator are used in Badkuhi mines 1)Nonel –Electric detonator(NONEL) 2)DTH(down through hole & TLD(Tronx line delay) 3)DTH is 8 to 10 mlenght by shock tube 4)Delay time is 250ms of allumium tube & 25ms of plastic tube