Suche senden
Hochladen
Assignment 101
•
Als DOCX, PDF herunterladen
•
0 gefällt mir
•
193 views
Sisira Kumara
Folgen
Melden
Teilen
Melden
Teilen
1 von 6
Jetzt herunterladen
Empfohlen
Report on Project Management of a particular project
Report on Project Management of a particular project
Kartik Raghuvanshi
Copy of rain garden
Copy of rain garden
gardenmaint
AutoControls using Matlab and Simulink
AutoControls using Matlab and Simulink
Michael Davis
Pert2 management
Pert2 management
Ahmed Gamal
Pert management
Pert management
Ahmed Gamal
Lab sheet 4 bti1022
Lab sheet 4 bti1022
alish sha
Lec 2 construction management
Lec 2 construction management
Ahmed Gamal
Garch model assignment
Garch model assignment
MA AiMi
Empfohlen
Report on Project Management of a particular project
Report on Project Management of a particular project
Kartik Raghuvanshi
Copy of rain garden
Copy of rain garden
gardenmaint
AutoControls using Matlab and Simulink
AutoControls using Matlab and Simulink
Michael Davis
Pert2 management
Pert2 management
Ahmed Gamal
Pert management
Pert management
Ahmed Gamal
Lab sheet 4 bti1022
Lab sheet 4 bti1022
alish sha
Lec 2 construction management
Lec 2 construction management
Ahmed Gamal
Garch model assignment
Garch model assignment
MA AiMi
2SC4051(SPICE MODEL)
2SC4051(SPICE MODEL)
Tsuyoshi Horigome
Z mega product
Z mega product
Brij Consulting, LLC
Z mega product
Z mega product
Brij Consulting, LLC
EE201_Assignment2
EE201_Assignment2
Khaled Mohammed
Assembly line balancing
Assembly line balancing
MANJUNATH N
Pert
Pert
Sulman Ahmed
Presentation on eco
Presentation on eco
Pradeepdsbs
Dam31303 lab sheet 4
Dam31303 lab sheet 4
alish sha
Canadian Solar
Canadian Solar
Tsuyoshi Horigome
Svelte
Svelte
University of Moratuwa, Katubedda, Sri Lanka
HOW TO < 今日
HOW TO < 今日
kawarasho
함정의 초기단계 설계영역탐색(design space exploration)의 효과적 적용
함정의 초기단계 설계영역탐색(design space exploration)의 효과적 적용
Jinwon Park
Parapetti provvisori mh18
Parapetti provvisori mh18
Davide Piscopiello
Parapetto mh100
Parapetto mh100
Davide Piscopiello
Parapetto montante mh011_eco
Parapetto montante mh011_eco
Davide Piscopiello
Research Blast: A new study on luxury consumers and digital
Research Blast: A new study on luxury consumers and digital
Branded Ltd
365반찬
365반찬
미래 강
Parapetto anticaduta mh18_maxi
Parapetto anticaduta mh18_maxi
Davide Piscopiello
Parapetti di protezione_mh15
Parapetti di protezione_mh15
Davide Piscopiello
Parapetto sicurezza mh12
Parapetto sicurezza mh12
Davide Piscopiello
Digital Matters & Music Matters 2012 Wrap Report
Digital Matters & Music Matters 2012 Wrap Report
Branded Ltd
Parapetto anticaduta mh78
Parapetto anticaduta mh78
Davide Piscopiello
Weitere ähnliche Inhalte
Was ist angesagt?
2SC4051(SPICE MODEL)
2SC4051(SPICE MODEL)
Tsuyoshi Horigome
Z mega product
Z mega product
Brij Consulting, LLC
Z mega product
Z mega product
Brij Consulting, LLC
EE201_Assignment2
EE201_Assignment2
Khaled Mohammed
Assembly line balancing
Assembly line balancing
MANJUNATH N
Pert
Pert
Sulman Ahmed
Presentation on eco
Presentation on eco
Pradeepdsbs
Dam31303 lab sheet 4
Dam31303 lab sheet 4
alish sha
Canadian Solar
Canadian Solar
Tsuyoshi Horigome
Svelte
Svelte
University of Moratuwa, Katubedda, Sri Lanka
HOW TO < 今日
HOW TO < 今日
kawarasho
함정의 초기단계 설계영역탐색(design space exploration)의 효과적 적용
함정의 초기단계 설계영역탐색(design space exploration)의 효과적 적용
Jinwon Park
Was ist angesagt?
(12)
2SC4051(SPICE MODEL)
2SC4051(SPICE MODEL)
Z mega product
Z mega product
Z mega product
Z mega product
EE201_Assignment2
EE201_Assignment2
Assembly line balancing
Assembly line balancing
Pert
Pert
Presentation on eco
Presentation on eco
Dam31303 lab sheet 4
Dam31303 lab sheet 4
Canadian Solar
Canadian Solar
Svelte
Svelte
HOW TO < 今日
HOW TO < 今日
함정의 초기단계 설계영역탐색(design space exploration)의 효과적 적용
함정의 초기단계 설계영역탐색(design space exploration)의 효과적 적용
Andere mochten auch
Parapetti provvisori mh18
Parapetti provvisori mh18
Davide Piscopiello
Parapetto mh100
Parapetto mh100
Davide Piscopiello
Parapetto montante mh011_eco
Parapetto montante mh011_eco
Davide Piscopiello
Research Blast: A new study on luxury consumers and digital
Research Blast: A new study on luxury consumers and digital
Branded Ltd
365반찬
365반찬
미래 강
Parapetto anticaduta mh18_maxi
Parapetto anticaduta mh18_maxi
Davide Piscopiello
Parapetti di protezione_mh15
Parapetti di protezione_mh15
Davide Piscopiello
Parapetto sicurezza mh12
Parapetto sicurezza mh12
Davide Piscopiello
Digital Matters & Music Matters 2012 Wrap Report
Digital Matters & Music Matters 2012 Wrap Report
Branded Ltd
Parapetto anticaduta mh78
Parapetto anticaduta mh78
Davide Piscopiello
Parapetti anticaduta mh 60 it
Parapetti anticaduta mh 60 it
Davide Piscopiello
Bamboo sector development+standardization presentation inbar wk 2014 11
Bamboo sector development+standardization presentation inbar wk 2014 11
Werner Kosemund
GfKs "Asian Sponsorship Survey"
GfKs "Asian Sponsorship Survey"
Branded Ltd
Nissan Global Media Center: Brand as Content Creator: The Why’s and the How’s...
Nissan Global Media Center: Brand as Content Creator: The Why’s and the How’s...
Branded Ltd
Platform presentation: Key developments in LINE's collaborations with brands
Platform presentation: Key developments in LINE's collaborations with brands
Branded Ltd
Platform interview: How Sina Weibo builds brands
Platform interview: How Sina Weibo builds brands
Branded Ltd
Andere mochten auch
(16)
Parapetti provvisori mh18
Parapetti provvisori mh18
Parapetto mh100
Parapetto mh100
Parapetto montante mh011_eco
Parapetto montante mh011_eco
Research Blast: A new study on luxury consumers and digital
Research Blast: A new study on luxury consumers and digital
365반찬
365반찬
Parapetto anticaduta mh18_maxi
Parapetto anticaduta mh18_maxi
Parapetti di protezione_mh15
Parapetti di protezione_mh15
Parapetto sicurezza mh12
Parapetto sicurezza mh12
Digital Matters & Music Matters 2012 Wrap Report
Digital Matters & Music Matters 2012 Wrap Report
Parapetto anticaduta mh78
Parapetto anticaduta mh78
Parapetti anticaduta mh 60 it
Parapetti anticaduta mh 60 it
Bamboo sector development+standardization presentation inbar wk 2014 11
Bamboo sector development+standardization presentation inbar wk 2014 11
GfKs "Asian Sponsorship Survey"
GfKs "Asian Sponsorship Survey"
Nissan Global Media Center: Brand as Content Creator: The Why’s and the How’s...
Nissan Global Media Center: Brand as Content Creator: The Why’s and the How’s...
Platform presentation: Key developments in LINE's collaborations with brands
Platform presentation: Key developments in LINE's collaborations with brands
Platform interview: How Sina Weibo builds brands
Platform interview: How Sina Weibo builds brands
Ähnlich wie Assignment 101
Lecture7_2021_v2.pdf
Lecture7_2021_v2.pdf
ssuserc9da59
Push And Pull Production Systems Chap7 Ppt)
Push And Pull Production Systems Chap7 Ppt)
3abooodi
Costing assignment.docx
Costing assignment.docx
ssuserdcbf4e
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
Vignesh Sekar
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Muzaffar Ahmad
Part 3 Residuals.pdf
Part 3 Residuals.pdf
SajawalNawaz5
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pankaj Rathod
Crashing
Crashing
Binura Dodangoda
Log11 uitwerking opdrachten
Log11 uitwerking opdrachten
Arthur van der Molen
Unit 2 prodn
Unit 2 prodn
Tufail Ahmed
project designa.docx
project designa.docx
Mahamad Jawhar
Applied Operation Research (AOR) Replacement Theory
Applied Operation Research (AOR) Replacement Theory
Rekha Rani
Engineering Economy Final review-2011
Engineering Economy Final review-2011
Le Nguyen Truong Giang
Theory of cost
Theory of cost
MuhammadMukitulBari
2.-Replacement-and-Retention.pdf
2.-Replacement-and-Retention.pdf
18010YeashRahman
Ch09 solution w_kieso_ifrs 1st edi.
Ch09 solution w_kieso_ifrs 1st edi.
Fergieta Prahasdhika
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
Peter Laurinec
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET Journal
Practice topic 9 - answers (1)
Practice topic 9 - answers (1)
IrfanKhan679364
Econ789 chapter009
Econ789 chapter009
sakanor
Ähnlich wie Assignment 101
(20)
Lecture7_2021_v2.pdf
Lecture7_2021_v2.pdf
Push And Pull Production Systems Chap7 Ppt)
Push And Pull Production Systems Chap7 Ppt)
Costing assignment.docx
Costing assignment.docx
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Part 3 Residuals.pdf
Part 3 Residuals.pdf
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Crashing
Crashing
Log11 uitwerking opdrachten
Log11 uitwerking opdrachten
Unit 2 prodn
Unit 2 prodn
project designa.docx
project designa.docx
Applied Operation Research (AOR) Replacement Theory
Applied Operation Research (AOR) Replacement Theory
Engineering Economy Final review-2011
Engineering Economy Final review-2011
Theory of cost
Theory of cost
2.-Replacement-and-Retention.pdf
2.-Replacement-and-Retention.pdf
Ch09 solution w_kieso_ifrs 1st edi.
Ch09 solution w_kieso_ifrs 1st edi.
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
Practice topic 9 - answers (1)
Practice topic 9 - answers (1)
Econ789 chapter009
Econ789 chapter009
Assignment 101
1.
ASSIGNMENT - 101 Table
; Cost/Time Data Activity Normal Duration Weeks Normal Cost per Week Rs. Crashed Duration Weeks Crashed Cost per Week Rs. 1 - 2 5 4000 3 7000 1 - 3 5 3000 1 8000 2 - 4 10 4000 5 7000 3 - 4 7 4000 2 15000 2 - 6 6 3000 2 10000 4 - 6 11 6000 5 9000 4 - 5 6 3000 4 6000 6 – 7 5 2000 1 12000 5 - 7 4 2000 1 9000 Answers a) Activity Normal Duration Weeks Crashed Duration Weeks Duration after Crash weeks (Normal Duration-Crashed Duration) 1 - 2 5 3 2 1 - 3 5 1 4 2 - 4 10 5 5 3 - 4 7 2 5 2 - 6 6 2 4 4 - 6 11 5 6 4 - 5 6 4 2 6 – 7 5 1 4 5 - 7 4 1 3
2.
Net work Diagram
for crashed case scenarios EF=2 ES=2 4 EF=6 ES=15 4 EF=19 LF=19 2 5 EF=7 6 ES=9 3 4 ES=4 2 ES=0 5 EF=9 ES=9 ES=11 Net work Diagram for normal case scenarios ES=5 6 EF=11 ES=26 5 EF=31 LF=31 5 10 EF=15 11ES=15 4 5 ES=5 ES=15 6 ES=0 7 EF=12 ES=21 Answer ( b) crashed case scenarios Activity Duration ES EF(ES+Du) LS(LF-Du) LF TF(LF-ES-D) FF 1 - 2 2 0 2 2 4 2 0 1 - 3 4 0 4 0 4 0 0 2 - 4 5 2 7 4 9 2 2 3 - 4 5 4 9 4 9 0 0 2 - 6 4 2 6 11 15 7 9 4 - 6 6 9 15 9 15 0 0 4 - 5 2 9 11 14 16 5 0 6 – 7 4 15 19 15 19 0 0 5 - 7 3 11 14 16 19 5 5 1 2 3 4 6 5 7 1 2 3 4 6 5 7
3.
2 Answer (
b) Normal case scenarios Activity Duration ES EF(ES+Du) LS(LF-Du) LF TF(LF-ES-D) FF 1 - 2 5 0 5 0 5 0 0 1 - 3 5 0 5 3 8 3 0 2 - 4 10 5 15 5 15 0 0 3 - 4 7 4 11 8 15 4 3 2 - 6 6 5 11 20 26 15 15 4 - 6 11 15 26 15 26 0 0 4 - 5 6 15 21 21 27 6 0 6 – 7 5 26 31 26 31 0 0 5 - 7 4 21 25 10 31 6 6 Answer ( c) Project Cost crashed case scenarios Activity Duration Weeks (After crashed) Normal Cost per Week Rs. Normal cost Crashed Duration Weeks Crashed Cost per Week Rs. Crashed cost 1 - 2 2 4000 8000 3 7000 21000 1 - 3 4 3000 12000 1 8000 8000 2 - 4 5 4000 20000 5 7000 35000 3 - 4 5 4000 20000 2 15000 30000 2 - 6 4 3000 12000 2 10000 20000 4 - 6 6 6000 36000 5 9000 45000 4 - 5 2 3000 6000 4 6000 24000 6 – 7 4 2000 8000 1 12000 12000 5 - 7 3 2000 6000 1 9000 9000 Total 128,000.00 204,000.00 Total Project Cost = Normal cost +Crashed cost = 128,000.00 + 204,000.00 = 332,000.00
4.
Normal Case scenarios Activity
Normal Duration Weeks Normal Cost per Week Rs. Normal cost 1 - 2 5 4000 20,000.00 1 - 3 5 3000 15,000.00 2 - 4 10 4000 40,000.00 3 - 4 7 4000 28,000.00 2 - 6 6 3000 18,000.00 4 - 6 11 6000 66,000.00 4 - 5 6 3000 18,000.00 6 – 7 5 2000 10,000.00 5 - 7 4 2000 8,000.00 Total =223,000.00 Total Project Cost = Normal cost = 223,000.00 Answer d) Least cost scenario By considering Net work Diagram for crashed case scenarios EF=2 ES=2 4 EF=6 ES=15 4 EF=19 LF=19 2 5 EF=7 6 ES=9 3 4 ES=4 2 ES=0 5 EF=9 ES=9 ES=11 Critical Path Without affecting critical path ,the activity 1 -2 can be done less crashed duration (1 week) ,the following activities can be done without crashed Activity 2 -6 = 6 Weeks , 4 -5 =6 Weeks , 5 – 7 = 4 weeks 1 2 3 4 6 5 7 1 3 4 6 7
5.
Least Cost Calculation Activity
Duration Weeks (After crashed) Normal Cost per Week Rs. Normal cost Rs Crashed Duration Weeks Crashed Cost per Week Rs. Crashed cost Rs 1 - 2 4 4000 16000 1 7000 7000 1 - 3 4 3000 12000 1 8000 8000 2 - 4 5 4000 20000 5 7000 35000 3 - 4 5 4000 20000 2 15000 30000 2 - 6 6 3000 18000 - - - 4 - 6 6 6000 36000 5 9000 45000 4 - 5 6 3000 18000 6 – 7 4 2000 8000 1 12000 12000 5 - 7 4 2000 8000 Total = 156,000.00 137,000.00 Total Project Cost = Normal cost +Crashed cost = 156,000.00 + 137,000.00 = 293,000.00 Method of Duration Total no of weeks Project Cost Normal 31 223,000.00 Crashed 19 332,000.00 Normal + Crashed 19 293,000.00 By considering above option 3 is considered as least cost scenarios because It is within crashed duration period less cost . Total Project least Cost = 293,000.00 Answer e) Activity Duration ES EF(ES+Du) LS(LF-Du) LF TF(LF-ES-D) FF 1 - 2 4 0 4 0 4 0 0 1 - 3 4 0 4 0 4 0 0 2 - 4 5 4 9 4 9 0 0 3 - 4 5 4 9 4 9 0 0 2 - 6 6 4 10 9 15 5 5 4 - 6 6 9 15 9 15 0 0 4 - 5 6 9 15 9 15 0 0 6 – 7 4 15 19 15 19 0 0 5 - 7 4 15 19 15 19 0 0