• Earlier notification S.O.-801 (E) by the Ministry of
  Environment and Forests (MoEF), New Delhi of July 7,
  2004 had brought new construction projects like hotels,
  office / commercial, residential complexes and Industrial
  Estates etc. under the rule of Environmental Clearance.


• The criteria for the applicability of this notification for new
  construction projects were:
     Meant for 1000 persons or more OR
     Discharging sewage more than 50 KL/day OR
     Investment more than Rs. 50 crores
Now Governed by
• Environment Impact Assessment Notification S.O.1533
  Dated 14/09/2006

                         Supersedes
• Earlier notification S.O.60(E), dated 27/01/1994and
  various amendments thereafter (upto July 4, 2004)

                        Applicable to
• New projects –Greenfield, Expansion or modernization
  projects
• 8 categories of industrial/developmental activities have
  been identified in the Schedule. The criteria are
  generally based on capacity/area/scale of operations
• Category 8 is for Construction/Building/Townships/Area
  development projects and is subdivided as:
     8a –Building and Construction Projects
     8b –Townships and Area development Projects
• All projects classified under two categories:
    – Category A: Will require clearance from MoEF based on
      recommendations by the Environmental Appraisal Committee
      (EAC)
    – Category B: Will require clearance from the State EIA Authority
      (SEIAA) based on the State Environmental Appraisal Committee
      (SEAC)


• The SEIAA will be constituted by Central Government
  based on nominations from State

• As earlier, no site development as well as construction
  can begin until EC is obtained
• Steps involved in obtaining the Environmental Clearance
  are:
   – Application for Prior EC has to be made in Form 1 (and Form 1A
     for construction projects). Form 1A is for Item 8 construction
     projects. Conceptual Plan to be provided

   – Screening –Category B projects (SEAC), whether EIA is required
     or not. Category B1 and B2. MoEF to issue guidelines for this. All
     projects under Item 8b classified as Cat. B1 (Cat. B1 projects
     would require EIA –so all construction projects may not escape
     EIA entirely !)

   – Scoping –For Category A and B1 projects –TOR for EIA to be
     issued by EAC/SEAC. Scoping not required for Item 8 Cat. B
     projects. Appraisal based only on Form 1 & 1A

   – Public Hearing –Not applicable to all projects under Item 8 (even
     Cat. B1)
•   Appraisal –For Item 8 projects –based on Form 1 & 1A
    (Cat. B2) + EIA Report for Cat. B1.
     – To be done by SEAC Within 60 days of receipt of complete
       application

     – To be placed before Competent Authority within next 15 days


•   Issue of Prior Environmental Clearance
     – Decision to be communicated to applicant within 45 days of receipt
       of recommendations from SEAC

     – Total period –105 days from date of completed application (about
       3.5 months)

     – Provision for conditional EC has been made –but based on
       recommendations of SEAC (to made public documents after
       expiry of stipulated period)

     – Other clearances NOT required for submitting application (unless
       legally or technically required)
• Validity of EC –5 years for completion of construction
  (extendable by another 5 years)

• Half-yearly compliance report (to EC conditions) to be
  submitted to regulatory authority (1st June and 1st Dec)

• Compliance reports can be received by,
     • On application
     • Website of regulatory authority

• Pending cases –provisions may be relaxed by MoEF or
  continued upto1 year. No relaxation in list of Schedule 1
•   The criteria have been changed to Built-up area instead of investment,
    quantity of sewage discharge and number of occupants

•   Construction projects not required to go to MoEF/EAC –only at SEAC

•   EIA not required if categorized as B2 project

•   Public Hearing not required

•   Upper limit of built-up area raised to 1,50,000 sq. m. (from 1,00,000 sq.
    m. earlier) under Item 8a.

•   Construction projects in cities with population ≥ 30 lakhs NOT required
    now to go to MoEF

•   For construction projects, appraisal can be done in the absence of other
    clearances. However, EC will be given only after submitting approved
    scheme / building plans and other statutory approvals to SEAC (or EAC
    if SEAC is not constituted?)
•   Environmental Clearance not required for projects less than
    20,000 sq. m. of built-up area

•   All Environmental Clearances for construction projects from
    SEAC(State level)

•   Category B1 (Townships and Area development –Item 8b)
    projects will require EIA study. All other projects will require only
    Form 1 and Form 1A

•   Public Hearing not required for any construction project (Item 8)

•   Form 1A is a detailed questionnaire, almost a mini-EIA based on
    secondary environmental data along with a detailed Environment
    Management Plan and Environmental Monitoring Plan and also a
    Disaster Management Plan.

•   May not circumvent the need for professional and expert
    guidance in filling up the applications
Contact Details:

Optima Engineers and Developers
                (099798-75918)

2/B, Siddha Shila Appt, Opp Jivan Bharti School,
             Nanpura, Surat -395001.




                                                      Disclaimer:
                                    This presentation is for general guidance only
                                    and based on Optima Engineers and developers'
                                    interpretation. We will not be liable for omissions
                                    or misinterpretations, if any.

Weitere ähnliche Inhalte

Was ist angesagt?

Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearanceMohit Singh
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .onkar solshe
 
Environmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceEnvironmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceAjay Bidyarthy
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguardDr Deepak Kumar Tripathi
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentKashmeera N.A.
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-IndiaKezar Ali. Shah
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessmentParth Patel
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentIntan Ayuna
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2B. BHASKAR
 
Construction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptxConstruction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptxSoubhagya Tripathy
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment studyArvind Kumar
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
 
Environmental Considerations in Construction
Environmental Considerations in ConstructionEnvironmental Considerations in Construction
Environmental Considerations in ConstructionSJMIT,now NMAMIT NITTE
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006Tej Kiran
 

Was ist angesagt? (20)

Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearance
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
 
Environmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceEnvironmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of Governance
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-India
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2
 
EIA
EIAEIA
EIA
 
Construction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptxConstruction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptx
 
EIA 2020
EIA 2020EIA 2020
EIA 2020
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
 
Eia sem 40_02
Eia sem 40_02Eia sem 40_02
Eia sem 40_02
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Environmental Considerations in Construction
Environmental Considerations in ConstructionEnvironmental Considerations in Construction
Environmental Considerations in Construction
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006
 

Ähnlich wie Environmental clearance for construction projects optima

Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airportsAbhishek Kumar Sinha
 
170280106122_Vegada_Vipul_EIA_Presentation.pptx
170280106122_Vegada_Vipul_EIA_Presentation.pptx170280106122_Vegada_Vipul_EIA_Presentation.pptx
170280106122_Vegada_Vipul_EIA_Presentation.pptxAnandkumarJoshi2
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009Jenson Samraj
 
Environmental management in real estate by Dr RL meena
Environmental management in real estate by Dr RL meenaEnvironmental management in real estate by Dr RL meena
Environmental management in real estate by Dr RL meenaDr. RL Meena
 
Eia 2020 kulvendra patel
Eia 2020  kulvendra patelEia 2020  kulvendra patel
Eia 2020 kulvendra patelKulvendra Patel
 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB SimhaADDA
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECB. BHASKAR
 
The Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentThe Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentDr Georgette Kluiters
 
Major Subdivision Review Process
Major Subdivision  Review ProcessMajor Subdivision  Review Process
Major Subdivision Review Processgscplanning
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessmentconsumeractiongroup
 
Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Kartikey Joshi
 
Regulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in BangaloreRegulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in Bangalorepiasi sinha
 
Public sector planning club, October 2016, Nottingham
Public sector planning club, October 2016, NottinghamPublic sector planning club, October 2016, Nottingham
Public sector planning club, October 2016, NottinghamBrowne Jacobson LLP
 
Eia procedural-guideline
Eia procedural-guidelineEia procedural-guideline
Eia procedural-guidelineHussaini Omale
 
Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Processgscplanning
 

Ähnlich wie Environmental clearance for construction projects optima (20)

Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
Hrc nmmc guidelines
Hrc nmmc guidelinesHrc nmmc guidelines
Hrc nmmc guidelines
 
Eia regulations
Eia regulationsEia regulations
Eia regulations
 
170280106122_Vegada_Vipul_EIA_Presentation.pptx
170280106122_Vegada_Vipul_EIA_Presentation.pptx170280106122_Vegada_Vipul_EIA_Presentation.pptx
170280106122_Vegada_Vipul_EIA_Presentation.pptx
 
Eia 2020
Eia 2020 Eia 2020
Eia 2020
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009
 
Environmental management in real estate by Dr RL meena
Environmental management in real estate by Dr RL meenaEnvironmental management in real estate by Dr RL meena
Environmental management in real estate by Dr RL meena
 
Eia 1994
Eia 1994Eia 1994
Eia 1994
 
EIA.pptx
EIA.pptxEIA.pptx
EIA.pptx
 
Eia 2020 kulvendra patel
Eia 2020  kulvendra patelEia 2020  kulvendra patel
Eia 2020 kulvendra patel
 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB Simha
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
 
The Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentThe Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact Assessment
 
Major Subdivision Review Process
Major Subdivision  Review ProcessMajor Subdivision  Review Process
Major Subdivision Review Process
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.
 
Regulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in BangaloreRegulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in Bangalore
 
Public sector planning club, October 2016, Nottingham
Public sector planning club, October 2016, NottinghamPublic sector planning club, October 2016, Nottingham
Public sector planning club, October 2016, Nottingham
 
Eia procedural-guideline
Eia procedural-guidelineEia procedural-guideline
Eia procedural-guideline
 
Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Process
 

KĂźrzlich hochgeladen

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 

KĂźrzlich hochgeladen (20)

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 

Environmental clearance for construction projects optima

  • 1.
  • 2. • Earlier notification S.O.-801 (E) by the Ministry of Environment and Forests (MoEF), New Delhi of July 7, 2004 had brought new construction projects like hotels, office / commercial, residential complexes and Industrial Estates etc. under the rule of Environmental Clearance. • The criteria for the applicability of this notification for new construction projects were: Meant for 1000 persons or more OR Discharging sewage more than 50 KL/day OR Investment more than Rs. 50 crores
  • 3. Now Governed by • Environment Impact Assessment Notification S.O.1533 Dated 14/09/2006 Supersedes • Earlier notification S.O.60(E), dated 27/01/1994and various amendments thereafter (upto July 4, 2004) Applicable to • New projects –Greenfield, Expansion or modernization projects • 8 categories of industrial/developmental activities have been identified in the Schedule. The criteria are generally based on capacity/area/scale of operations
  • 4. • Category 8 is for Construction/Building/Townships/Area development projects and is subdivided as: 8a –Building and Construction Projects 8b –Townships and Area development Projects
  • 5. • All projects classified under two categories: – Category A: Will require clearance from MoEF based on recommendations by the Environmental Appraisal Committee (EAC) – Category B: Will require clearance from the State EIA Authority (SEIAA) based on the State Environmental Appraisal Committee (SEAC) • The SEIAA will be constituted by Central Government based on nominations from State • As earlier, no site development as well as construction can begin until EC is obtained
  • 6. • Steps involved in obtaining the Environmental Clearance are: – Application for Prior EC has to be made in Form 1 (and Form 1A for construction projects). Form 1A is for Item 8 construction projects. Conceptual Plan to be provided – Screening –Category B projects (SEAC), whether EIA is required or not. Category B1 and B2. MoEF to issue guidelines for this. All projects under Item 8b classified as Cat. B1 (Cat. B1 projects would require EIA –so all construction projects may not escape EIA entirely !) – Scoping –For Category A and B1 projects –TOR for EIA to be issued by EAC/SEAC. Scoping not required for Item 8 Cat. B projects. Appraisal based only on Form 1 & 1A – Public Hearing –Not applicable to all projects under Item 8 (even Cat. B1)
  • 7. • Appraisal –For Item 8 projects –based on Form 1 & 1A (Cat. B2) + EIA Report for Cat. B1. – To be done by SEAC Within 60 days of receipt of complete application – To be placed before Competent Authority within next 15 days • Issue of Prior Environmental Clearance – Decision to be communicated to applicant within 45 days of receipt of recommendations from SEAC – Total period –105 days from date of completed application (about 3.5 months) – Provision for conditional EC has been made –but based on recommendations of SEAC (to made public documents after expiry of stipulated period) – Other clearances NOT required for submitting application (unless legally or technically required)
  • 8. • Validity of EC –5 years for completion of construction (extendable by another 5 years) • Half-yearly compliance report (to EC conditions) to be submitted to regulatory authority (1st June and 1st Dec) • Compliance reports can be received by, • On application • Website of regulatory authority • Pending cases –provisions may be relaxed by MoEF or continued upto1 year. No relaxation in list of Schedule 1
  • 9. • The criteria have been changed to Built-up area instead of investment, quantity of sewage discharge and number of occupants • Construction projects not required to go to MoEF/EAC –only at SEAC • EIA not required if categorized as B2 project • Public Hearing not required • Upper limit of built-up area raised to 1,50,000 sq. m. (from 1,00,000 sq. m. earlier) under Item 8a. • Construction projects in cities with population ≥ 30 lakhs NOT required now to go to MoEF • For construction projects, appraisal can be done in the absence of other clearances. However, EC will be given only after submitting approved scheme / building plans and other statutory approvals to SEAC (or EAC if SEAC is not constituted?)
  • 10. • Environmental Clearance not required for projects less than 20,000 sq. m. of built-up area • All Environmental Clearances for construction projects from SEAC(State level) • Category B1 (Townships and Area development –Item 8b) projects will require EIA study. All other projects will require only Form 1 and Form 1A • Public Hearing not required for any construction project (Item 8) • Form 1A is a detailed questionnaire, almost a mini-EIA based on secondary environmental data along with a detailed Environment Management Plan and Environmental Monitoring Plan and also a Disaster Management Plan. • May not circumvent the need for professional and expert guidance in filling up the applications
  • 11. Contact Details: Optima Engineers and Developers (099798-75918) 2/B, Siddha Shila Appt, Opp Jivan Bharti School, Nanpura, Surat -395001. Disclaimer: This presentation is for general guidance only and based on Optima Engineers and developers' interpretation. We will not be liable for omissions or misinterpretations, if any.