Introduction of a substation
• Intermediate link between Generating station & Consumers.
• An Electrical Substation is a subsidiary station of an electricity Generation, Transmission And
Distribution System where voltage is transformed high to low or reverse using transformer.
• Examples of Substation:-
 400kV/220kV substation
 220kV/132kV substation
 132kV/33kV substation
 33kV/11kV substation
 11kV/.4kV substation
33/11KV TT Nagar Substation
 Established in 2002.
 This substation is used 33KV as input and converted it into 11KV through Power transformer.
 Approximate 52000 people of Tatya tope nagar and Ambedkar nagar get the electricity from
this substation.
 In this substation there are 3 substation operator, 3 line man under 1 JE.
 In 2004 Meharbaan Singh Ka Purva was added with TT Nagar Substation with the same 33KV
supply.
SINGLE LINE DIAGRAM
Outgoing feeders
132KV incoming 11KV outgoing
132KV is step down to Tatya tope Nagar
33KV in Barra 8 and Ambedkar Nagar
then get as incoming 16 Village
33KV in TT nagar, 33KV is
supplied to Meharbaan Singh Ka
Purva.
Equipment used in Substation
 Lightning Arresters
 Potential transformer
 Current Transformer
 Bus-Bars
 Isolators
 Insulators
 Circuit Breakers
 Protective Relays
 Grounding
 Power Transformer
 Switchgear
 Batteries
 Fire fighting system
Lightning Arresters
 Lightening arrestors are the instrument that are used in the incoming feeders so that to
prevent the high voltage entering the main station.
 To prevent any damage lightening arrestors are used.
Potential Transformer (P.T)
 Potential transformers used in the bus connected both side of the bus.
 The potential transformer uses a bus isolator to protect itself.
 The main use of this transformer is to measure the voltage through the bus.
 To get the detail information of the voltage passing through the bus to the instrument.
Current Transformer
 It steps down the current level of the line for following purposes:
 CT’s are basically used to take the readings of the currents entering the substation.
 This transformer steps down the current from 800 amps to 1 amp.
Bus-Bars
 Carry electrical supply
 Maximum load
Isolators
 Isolator is the devices used to protect the S/S from any fault on the incoming feeder.
 They are also helpful while maintenance is to be done in substation.
Insulators
 The main function of the insulators is to provide perfect insulation between the live conductors
and the supports.
Types of Insulators are
 Pin type insulators
 Suspension type insulators
 Strain insulators
 Shackle insulators
 Stay insulators
Circuit Breakers
 A circuit breaker can make or break a circuit either manually or automatically under no load, full load or
short circuit conditions.
Circuit Breaker are of
types
 Oil Circuit Breaker
 Vacuum Circuit Breaker
 SF6 Circuit Breaker
 Air Blast Circuit Breaker
Oil Circuit Breaker
 Oil circuit breaker which employ insulating oil for arc extinction.
 Buchholz Relay is also used to protect the P.T.
SF6 Circuit Breaker
 In this hexafluoride gas is used as arc quenching medium.
 The SF6 is an electro-negative gas and has a strong tendency to absorb free electrons.
Protective Relays
 These are the devices that detect the fault and initiates the operation of the circuit breaker
to isolate the defective element from rest of the element.
They are basically of two types
Electromagnetic type
Induction type
Grounding
 It is used to protect the system from extra voltage.
 Types of grounding are
 Resistance Grounding
 Reactance Grounding
 Resonant Grounding
 But commonly people used the
mixture of coal and salt and coal,
as a grounding material.
Power Transformer
 Transformer’s are basically used to step up and step down and vice versa.
 Now basically small substation used transformer to reduce the voltage or step down the
voltage.
 It is easier to installed single three phase transformer instead of 3 single phase transformer.
 In This Power Transformer from the incoming 33KV is Provided and we get 11KV as O/P after
step down.
 It’s rating is 10MVA, we can also used 3.15MVA or 5MVA rating of transformer.
 In 33/11KV substation delta-star connection’s are used.
Transformer Oil
 This is used for protection and cooling purpose.
 It’s mineral oil obtained by refine crude petroleum. It serves the following purpose.
 Provide additional insulation.
 Carries away the heat generated in the core & coils.
 Protects the paper from dirt & moisture for this Breather is used.
 Transformer oil is very costly.
Maintenance of Transformers
 Check Oil level in main tank.
 Check the colour of silica gel in breather.
i. It must be blue in colour.
ii. If it is turns pink then replace.
 Check On load Tap Changer Lower/Raise trail by Local & Remote.
 Trip trail by draining oil in Buchholz relay.
 Check Earth resistance ,provide watering arrangement for earthling pits.
 Clean the bushings.
Attend the oil leakages.
Note Temperature of Oil & leakage.
Batteries
 Batteries are used in substation as an auxiliary power supply to provide power for
lightning, heating ventilation and communication equipment.
 Several batteries are connected in series.
 All latest equipment’s are now also design as they can operate with DC voltage also.
Switchgear
 This is first part of protection or controlling.
 This type of equipment is directly linked to the reliability of the electricity supply.
 It act as controller to control the output supply.
 This is also used to know how much power is consumed in the area as well as in
substation.
 To repair any faulty part firstly isolate from control room then through isolator which is
placed there.
Fire Fighting System
 This is used to protect the equipment’s of the substation from any accident.
 Basically Dry Carbon-Di-Oxide is used.
 But sand is also used for instant protection.
Important Terms
 Tripping – Power goes due to over load. It is for the protection of components.
 Shut down – Power is cut due to maintenance in progress. It is done manually.
 Break down – Power goes due to any fault in the line. When fault is removed , power is
back.
 Roasting – Power is cut deliberately on order of higher authority due to shortage of
power.
Name: Shubham Sachan
Registration No: 11104846
Section: E3108

Weitere ähnliche Inhalte

Was ist angesagt?

SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.pptMarcWorld
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Sourabh sharma
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
Electrical Protection Schemes in detail
Electrical Protection Schemes in detailElectrical Protection Schemes in detail
Electrical Protection Schemes in detailSlides Hub
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationSubhrajit Ghosh
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Presentation training
Presentation trainingPresentation training
Presentation trainingSrajan Raj
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurdilkhush009
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 

Was ist angesagt? (20)

SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
Electrical Protection Schemes in detail
Electrical Protection Schemes in detailElectrical Protection Schemes in detail
Electrical Protection Schemes in detail
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 

Andere mochten auch

33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
132kv Substation
132kv Substation132kv Substation
132kv Substationguestecdd58
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-StationTowfiqur Rahman
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentationkumarmayursinha
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ramGRBabu Naidu
 
Training report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, TundlaTraining report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, Tundlashashanksltor
 
Rembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterRembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterGaleria Regina Oliveira
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurR-One Power
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTRajashekar Gurrala
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionZunAib Ali
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentationAnjali Khandelwal
 
12 steps to achieve excellence in debt collection and recovery
12 steps to achieve excellence in debt collection and recovery12 steps to achieve excellence in debt collection and recovery
12 steps to achieve excellence in debt collection and recoveryEXUS
 

Andere mochten auch (20)

33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
Sub ststion
Sub ststionSub ststion
Sub ststion
 
Training report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, TundlaTraining report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, Tundla
 
Rembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterRembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan Sluijter
 
My ppt
My pptMy ppt
My ppt
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
HVDC presentation
HVDC presentationHVDC presentation
HVDC presentation
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmission
 
Substations
Substations Substations
Substations
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 
12 steps to achieve excellence in debt collection and recovery
12 steps to achieve excellence in debt collection and recovery12 steps to achieve excellence in debt collection and recovery
12 steps to achieve excellence in debt collection and recovery
 

Ähnlich wie Presentation on KESCO sub-station, kanpur

Abhishek_Kesco_ppt.pptx
Abhishek_Kesco_ppt.pptxAbhishek_Kesco_ppt.pptx
Abhishek_Kesco_ppt.pptxdsdfdfdg
 
the substation components study
the substation components study the substation components study
the substation components study Krishnaveni Reddy
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training reportMuntazir Mehdi
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...Rishabhlko
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPLAbhishek Roy
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation pptKamal Tiwari
 
power house training seminar
power house training seminarpower house training seminar
power house training seminarParas kumar
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...rohit nadella
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfHariomgupta90
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving stationH.C.Naveen Kumar
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
West bengal state electricity distribution limited vocational traning
West bengal state electricity distribution limited vocational traningWest bengal state electricity distribution limited vocational traning
West bengal state electricity distribution limited vocational traningAMARJEETKUMAR166
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptsrijan tripathi
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportArijit Basu
 

Ähnlich wie Presentation on KESCO sub-station, kanpur (20)

Abhishek_Kesco_ppt.pptx
Abhishek_Kesco_ppt.pptxAbhishek_Kesco_ppt.pptx
Abhishek_Kesco_ppt.pptx
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
the substation components study
the substation components study the substation components study
the substation components study
 
ntpc
ntpcntpc
ntpc
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation ppt
 
power house training seminar
power house training seminarpower house training seminar
power house training seminar
 
substation internship report
substation internship report substation internship report
substation internship report
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
West bengal state electricity distribution limited vocational traning
West bengal state electricity distribution limited vocational traningWest bengal state electricity distribution limited vocational traning
West bengal state electricity distribution limited vocational traning
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) ppt
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 

Mehr von Shubham Sachan

Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Shubham Sachan
 
Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Shubham Sachan
 
A new game to reign the skies
A new game to reign the skiesA new game to reign the skies
A new game to reign the skiesShubham Sachan
 
Comparison performance of ipfc copy
Comparison performance of ipfc   copyComparison performance of ipfc   copy
Comparison performance of ipfc copyShubham Sachan
 
Automatic room light controlling Capstone Report
Automatic room light controlling Capstone ReportAutomatic room light controlling Capstone Report
Automatic room light controlling Capstone ReportShubham Sachan
 
Automatic control of electrical Appliances
Automatic control of electrical AppliancesAutomatic control of electrical Appliances
Automatic control of electrical AppliancesShubham Sachan
 
Training report by shubham sachan
Training report by shubham sachanTraining report by shubham sachan
Training report by shubham sachanShubham Sachan
 

Mehr von Shubham Sachan (9)

Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...
 
Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...
 
520planning
520planning520planning
520planning
 
Synopsis ele 522
Synopsis ele 522Synopsis ele 522
Synopsis ele 522
 
A new game to reign the skies
A new game to reign the skiesA new game to reign the skies
A new game to reign the skies
 
Comparison performance of ipfc copy
Comparison performance of ipfc   copyComparison performance of ipfc   copy
Comparison performance of ipfc copy
 
Automatic room light controlling Capstone Report
Automatic room light controlling Capstone ReportAutomatic room light controlling Capstone Report
Automatic room light controlling Capstone Report
 
Automatic control of electrical Appliances
Automatic control of electrical AppliancesAutomatic control of electrical Appliances
Automatic control of electrical Appliances
 
Training report by shubham sachan
Training report by shubham sachanTraining report by shubham sachan
Training report by shubham sachan
 

Kürzlich hochgeladen

Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Kürzlich hochgeladen (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Presentation on KESCO sub-station, kanpur

  • 1. Kanpur Electricity Supply Authority Name: Shubham Sachan Registration No: 11104846 Section: E3108
  • 2. Introduction of a substation • Intermediate link between Generating station & Consumers. • An Electrical Substation is a subsidiary station of an electricity Generation, Transmission And Distribution System where voltage is transformed high to low or reverse using transformer. • Examples of Substation:-  400kV/220kV substation  220kV/132kV substation  132kV/33kV substation  33kV/11kV substation  11kV/.4kV substation
  • 3. 33/11KV TT Nagar Substation  Established in 2002.  This substation is used 33KV as input and converted it into 11KV through Power transformer.  Approximate 52000 people of Tatya tope nagar and Ambedkar nagar get the electricity from this substation.  In this substation there are 3 substation operator, 3 line man under 1 JE.  In 2004 Meharbaan Singh Ka Purva was added with TT Nagar Substation with the same 33KV supply.
  • 4.
  • 6. Outgoing feeders 132KV incoming 11KV outgoing 132KV is step down to Tatya tope Nagar 33KV in Barra 8 and Ambedkar Nagar then get as incoming 16 Village 33KV in TT nagar, 33KV is supplied to Meharbaan Singh Ka Purva.
  • 7. Equipment used in Substation  Lightning Arresters  Potential transformer  Current Transformer  Bus-Bars  Isolators  Insulators  Circuit Breakers  Protective Relays  Grounding  Power Transformer  Switchgear  Batteries  Fire fighting system
  • 8. Lightning Arresters  Lightening arrestors are the instrument that are used in the incoming feeders so that to prevent the high voltage entering the main station.  To prevent any damage lightening arrestors are used.
  • 9. Potential Transformer (P.T)  Potential transformers used in the bus connected both side of the bus.  The potential transformer uses a bus isolator to protect itself.  The main use of this transformer is to measure the voltage through the bus.  To get the detail information of the voltage passing through the bus to the instrument.
  • 10. Current Transformer  It steps down the current level of the line for following purposes:  CT’s are basically used to take the readings of the currents entering the substation.  This transformer steps down the current from 800 amps to 1 amp.
  • 11. Bus-Bars  Carry electrical supply  Maximum load
  • 12. Isolators  Isolator is the devices used to protect the S/S from any fault on the incoming feeder.  They are also helpful while maintenance is to be done in substation.
  • 13. Insulators  The main function of the insulators is to provide perfect insulation between the live conductors and the supports. Types of Insulators are  Pin type insulators  Suspension type insulators  Strain insulators  Shackle insulators  Stay insulators
  • 14. Circuit Breakers  A circuit breaker can make or break a circuit either manually or automatically under no load, full load or short circuit conditions. Circuit Breaker are of types  Oil Circuit Breaker  Vacuum Circuit Breaker  SF6 Circuit Breaker  Air Blast Circuit Breaker
  • 15. Oil Circuit Breaker  Oil circuit breaker which employ insulating oil for arc extinction.  Buchholz Relay is also used to protect the P.T.
  • 16. SF6 Circuit Breaker  In this hexafluoride gas is used as arc quenching medium.  The SF6 is an electro-negative gas and has a strong tendency to absorb free electrons.
  • 17. Protective Relays  These are the devices that detect the fault and initiates the operation of the circuit breaker to isolate the defective element from rest of the element. They are basically of two types Electromagnetic type Induction type
  • 18. Grounding  It is used to protect the system from extra voltage.  Types of grounding are  Resistance Grounding  Reactance Grounding  Resonant Grounding  But commonly people used the mixture of coal and salt and coal, as a grounding material.
  • 20.  Transformer’s are basically used to step up and step down and vice versa.  Now basically small substation used transformer to reduce the voltage or step down the voltage.  It is easier to installed single three phase transformer instead of 3 single phase transformer.  In This Power Transformer from the incoming 33KV is Provided and we get 11KV as O/P after step down.  It’s rating is 10MVA, we can also used 3.15MVA or 5MVA rating of transformer.  In 33/11KV substation delta-star connection’s are used.
  • 21. Transformer Oil  This is used for protection and cooling purpose.  It’s mineral oil obtained by refine crude petroleum. It serves the following purpose.  Provide additional insulation.  Carries away the heat generated in the core & coils.  Protects the paper from dirt & moisture for this Breather is used.  Transformer oil is very costly.
  • 22. Maintenance of Transformers  Check Oil level in main tank.  Check the colour of silica gel in breather. i. It must be blue in colour. ii. If it is turns pink then replace.  Check On load Tap Changer Lower/Raise trail by Local & Remote.  Trip trail by draining oil in Buchholz relay.  Check Earth resistance ,provide watering arrangement for earthling pits.  Clean the bushings. Attend the oil leakages. Note Temperature of Oil & leakage.
  • 23. Batteries  Batteries are used in substation as an auxiliary power supply to provide power for lightning, heating ventilation and communication equipment.  Several batteries are connected in series.  All latest equipment’s are now also design as they can operate with DC voltage also.
  • 24. Switchgear  This is first part of protection or controlling.  This type of equipment is directly linked to the reliability of the electricity supply.  It act as controller to control the output supply.  This is also used to know how much power is consumed in the area as well as in substation.  To repair any faulty part firstly isolate from control room then through isolator which is placed there.
  • 25. Fire Fighting System  This is used to protect the equipment’s of the substation from any accident.  Basically Dry Carbon-Di-Oxide is used.  But sand is also used for instant protection.
  • 26. Important Terms  Tripping – Power goes due to over load. It is for the protection of components.  Shut down – Power is cut due to maintenance in progress. It is done manually.  Break down – Power goes due to any fault in the line. When fault is removed , power is back.  Roasting – Power is cut deliberately on order of higher authority due to shortage of power.