REPRESENTATIVES INVOLVED IN
TENDERS AND CONTRACT
V.SHIVA PRAKASH
141576
TENDER AND CONTRACT DEFINED
 TENDER: Tendering is the process by which bids
are invited from interested contractors to carry
out specific packages of construction work.
 CONTRACT: An agreement enforceable by law
is a contract. Every promise and every set of
promises, forming the consideration for each
other, is an agreement
IMPORTANT PERSONS IN A PROJECT
Client Or Owner
Project Manager
Lead Consultant
Cost Consultant
Consultant
Main Contractor
Senior Estimator Commercial Manager
Building Manager
Cost Planner
Subcontractor
Suppliers
CLIENT OR OWNER
 The client is the person for whom the project is
carried out. In the case of notifiable projects, clients
must appoint a competent project manager. Those
clients without construction expertise must rely on the
project manager advice on how best to meet their
duties, but the project manager will need the clients
support and input to be able to carry out their work
effectively. The client remains responsible for
ensuring that client duties are met.
Duties
1. Verify the competence and resources of all
organisations and internal teams the client
engages or allocates to the project
2. Ensure that suitable management
arrangements are made for the project
3. Ensure sufficient time and resources are
allowed for all stages of the project
4. Provide the pre-construction information to the
designers and contractors
Project Manager
 A project manager is the person who has the
overall responsibility for the successful initiation,
planning, design, execution, monitoring,
controlling and closure of a project. The project
manager must have a combination of skills
including an ability to ask penetrating questions,
detect unstated assumptions and resolve
conflicts, as well as more general management
skills.
Roles and Responsibilities
Key Participants:
 Project Manager
 Assistant PM
Roles and Responsibilities :
 Prepare documents
 Manage process on client behalf
 Evaluate and recommend contract award
 Negotiate contract
Contd..
 The project manager will take the help of the
Lead Consultant,Cost Consultant,Consultant for
the completion of the process of documentation
Project Manager
Lead
Consultant
Cost
Consultant
Consultant
Lead Consultant
Key Participants :
1. Senior Architect
Roles and Responsibilities:
 Manage and coordinate documentation
 Prepare addendum responses
Cost Consultant
Key Participants
 Quantity Surveyor
Roles and Responsibilities
 Prepare pre-tender estimate
 Evaluate submissions
Consultant
Key Participants :
 Senior Engineer
Roles and Responsibilities:
 Prepare documentation
 Provide addendum responses
Main Contractor
• Create packages from documents
Senior Estimator
Commercial
Manager
• Manage distribution of packages
to subcontractors
Building
Manager
• Evaluate project risks
(commercial and construction)
• Submit
Cost Planner
Contd…
 Under the main contractor Senior Estimator
Commercial Manager, Building Manager , Cost
Planner are the key participants.
The sub contractor, supplier also will be under the
control of the main contractor
Contd..
 The main role of sub contractor if there is Prepare
and submit price based on documents
 The main role of supplier is Submit supply costs of
goods & materials as per documents

Weitere ähnliche Inhalte

Was ist angesagt?

Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract Venuri Lakshani
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessPrateek Kashyap
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentationArchDuty
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)Pang Khai Shuen
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Sow Wei Henn
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Estimating seminar 1 slides
Estimating seminar 1 slidesEstimating seminar 1 slides
Estimating seminar 1 slidesDoreen Yeo
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement methodhiewliming
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaGuta Mengesha
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 

Was ist angesagt? (20)

Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
 
Contract management
Contract managementContract management
Contract management
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Estimating seminar 1 slides
Estimating seminar 1 slidesEstimating seminar 1 slides
Estimating seminar 1 slides
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
 
Procurement types
Procurement typesProcurement types
Procurement types
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 

Ähnlich wie Persons involved in tenders and contract

Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docxManuSood11
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem
 
Engineering Services Consultant Your Guide to Success in Complex Projects.pptx
Engineering Services Consultant Your Guide to Success in Complex Projects.pptxEngineering Services Consultant Your Guide to Success in Complex Projects.pptx
Engineering Services Consultant Your Guide to Success in Complex Projects.pptxCanadaEngineeringSer
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiMd Mehadi Hasan
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Al-Dara Engineering Consultants.
Al-Dara Engineering Consultants. Al-Dara Engineering Consultants.
Al-Dara Engineering Consultants. takweenengineering
 
construction owners rep companies
construction owners rep companies construction owners rep companies
construction owners rep companies William Brooks
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdfAikaterineSmith
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.Lilian Nwachukwu
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)Rajesh Rai
 
Construction Contracts Common Interest Developments
Construction Contracts Common Interest DevelopmentsConstruction Contracts Common Interest Developments
Construction Contracts Common Interest DevelopmentsConstruction Cicerone
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PMJoyce Wong
 

Ähnlich wie Persons involved in tenders and contract (20)

Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 
PMC .docx
PMC .docxPMC .docx
PMC .docx
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docx
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
 
TOPIC1.pdf
TOPIC1.pdfTOPIC1.pdf
TOPIC1.pdf
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016
 
Engineering Services Consultant Your Guide to Success in Complex Projects.pptx
Engineering Services Consultant Your Guide to Success in Complex Projects.pptxEngineering Services Consultant Your Guide to Success in Complex Projects.pptx
Engineering Services Consultant Your Guide to Success in Complex Projects.pptx
 
111
111111
111
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Al-Dara Engineering Consultants.
Al-Dara Engineering Consultants. Al-Dara Engineering Consultants.
Al-Dara Engineering Consultants.
 
construction owners rep companies
construction owners rep companies construction owners rep companies
construction owners rep companies
 
ProjectManager_Construction
ProjectManager_ConstructionProjectManager_Construction
ProjectManager_Construction
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)
 
Construction Contracts Common Interest Developments
Construction Contracts Common Interest DevelopmentsConstruction Contracts Common Interest Developments
Construction Contracts Common Interest Developments
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PM
 

Mehr von shiva prakash

Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Buildingshiva prakash
 
private vs partnership
private vs partnershipprivate vs partnership
private vs partnershipshiva prakash
 
Private equity vs PPP
Private equity vs PPPPrivate equity vs PPP
Private equity vs PPPshiva prakash
 
Appraisal of outer ring road(hyderabad) project
Appraisal of outer ring road(hyderabad) projectAppraisal of outer ring road(hyderabad) project
Appraisal of outer ring road(hyderabad) projectshiva prakash
 

Mehr von shiva prakash (7)

Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Building
 
Pervious Concrete
Pervious ConcretePervious Concrete
Pervious Concrete
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
private vs partnership
private vs partnershipprivate vs partnership
private vs partnership
 
Private equity vs PPP
Private equity vs PPPPrivate equity vs PPP
Private equity vs PPP
 
Appraisal of outer ring road(hyderabad) project
Appraisal of outer ring road(hyderabad) projectAppraisal of outer ring road(hyderabad) project
Appraisal of outer ring road(hyderabad) project
 
Mentoring
MentoringMentoring
Mentoring
 

Kürzlich hochgeladen

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 

Kürzlich hochgeladen (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Persons involved in tenders and contract

  • 1. REPRESENTATIVES INVOLVED IN TENDERS AND CONTRACT V.SHIVA PRAKASH 141576
  • 2. TENDER AND CONTRACT DEFINED  TENDER: Tendering is the process by which bids are invited from interested contractors to carry out specific packages of construction work.  CONTRACT: An agreement enforceable by law is a contract. Every promise and every set of promises, forming the consideration for each other, is an agreement
  • 3. IMPORTANT PERSONS IN A PROJECT Client Or Owner Project Manager Lead Consultant Cost Consultant Consultant Main Contractor Senior Estimator Commercial Manager Building Manager Cost Planner Subcontractor Suppliers
  • 4. CLIENT OR OWNER  The client is the person for whom the project is carried out. In the case of notifiable projects, clients must appoint a competent project manager. Those clients without construction expertise must rely on the project manager advice on how best to meet their duties, but the project manager will need the clients support and input to be able to carry out their work effectively. The client remains responsible for ensuring that client duties are met.
  • 5. Duties 1. Verify the competence and resources of all organisations and internal teams the client engages or allocates to the project 2. Ensure that suitable management arrangements are made for the project 3. Ensure sufficient time and resources are allowed for all stages of the project 4. Provide the pre-construction information to the designers and contractors
  • 6. Project Manager  A project manager is the person who has the overall responsibility for the successful initiation, planning, design, execution, monitoring, controlling and closure of a project. The project manager must have a combination of skills including an ability to ask penetrating questions, detect unstated assumptions and resolve conflicts, as well as more general management skills.
  • 7. Roles and Responsibilities Key Participants:  Project Manager  Assistant PM Roles and Responsibilities :  Prepare documents  Manage process on client behalf  Evaluate and recommend contract award  Negotiate contract
  • 8. Contd..  The project manager will take the help of the Lead Consultant,Cost Consultant,Consultant for the completion of the process of documentation Project Manager Lead Consultant Cost Consultant Consultant
  • 9. Lead Consultant Key Participants : 1. Senior Architect Roles and Responsibilities:  Manage and coordinate documentation  Prepare addendum responses
  • 10. Cost Consultant Key Participants  Quantity Surveyor Roles and Responsibilities  Prepare pre-tender estimate  Evaluate submissions
  • 11. Consultant Key Participants :  Senior Engineer Roles and Responsibilities:  Prepare documentation  Provide addendum responses
  • 12. Main Contractor • Create packages from documents Senior Estimator Commercial Manager • Manage distribution of packages to subcontractors Building Manager • Evaluate project risks (commercial and construction) • Submit Cost Planner
  • 13. Contd…  Under the main contractor Senior Estimator Commercial Manager, Building Manager , Cost Planner are the key participants. The sub contractor, supplier also will be under the control of the main contractor
  • 14. Contd..  The main role of sub contractor if there is Prepare and submit price based on documents  The main role of supplier is Submit supply costs of goods & materials as per documents