SlideShare ist ein Scribd-Unternehmen logo
1 von 21
Six Sigma Project Presentation
Project Title: Green Belt (Name):
Page 2
Six Sigma DMAIC Methodology
Define
Identify Project CTQs Y to X drill down. Project CTQs
Develop Team Charter Approved Charter
Overview Map High Level Process Map, SIPOC
Measure
Select CTQ Characteristics Y Project Y
Define Performance Standards Y Customer, Performance Standard for Project Y
Measurement System Analysis Y Attribute R&R, Capability Indices Approved Measurement System
Identify X’s Detailed Mapping, Fishbone Process Capability for Project Y
Pareto, FDM Prioritized List of all Xs
Analyze
Establish Process Capability Y
Define Performance Objectives Y Benchmarking, Brainstorming Improvement Goal for Project Y
Identify Vital X’s X Graphical Analysis, FMEA List of Vital Few Xs
Hypothesis Tests, Regression
Improve
Screen Potential Causes X Brainstorming,
Discover Variable Relationships X Regression, Proposed Solution
Establish Operating Tolerances Y, X Simulation, Pilot Piloted Solution
Control
MSA for X Y, X Test/Retest, Attribute R&R Verified Measurement System on
Xs in Actual Application
Process Capability Y, X Capability Indices Process Capability Y, X
Implement Process Control X Control Charts, Sustained Solution,
Mistake Proof, FMEA Documentation
Step Description Focus Tools Deliverables
Page 3
Content
s
 Define Phase - Business Case.
 Define Phase - Team Structure.
 Define Phase - Key elements of the charter.
 Define Phase - COPIS and process overview flow.
 Measure Phase – Measurement system assessment.
 Measure Phase - Current Performance and Target Performance.
 Measure Phase - Identification of X’s - Tools used and key findings.
 Measure Phase - Identified X’s and prioritized list.
 Analyze Phase - Tools used and key findings.
 Analyze Phase - List of Vital X’s
 Improve Phase - Tools used and key results.
 Control Phase - Tools used to ensure sustenance of improvements..
Page 4
Project: Charter - Business Case
Planned Start Date: Planned Closure :
Business Case (Compelling Reasons for doing the project)
What if we don’t do this project?
Explain what are the consequences/ losses if this project is not done.
What if we do this project?
Explain the benefits.
Why this project and why not some other?
Explain why this project is more appropriate than others.
Page 5
Team, Mentor, Customers, Stakeholders & Sponsors:
Sponsor (s):
Champion (s):
Team Leader (Green Belt):
Team Members :
Team Members – Others (Extended Team):
Customer (s):
Stake Holder (s):
Project: Charter - Team
Page 6
Problem Statement: Objective Statement:
AS IS (Current Status): TO BE (Desired Status):
“IN” Scope “Out of” Scope
Project: Charter – Problem, Objective, SCOPE
Page 7
Big Y: (Organization Strategic Intent) –
Small Y (Division or Function Key Result Area):
Present Cost of Operations
• Prevention:
• Appraisal:
• Failure:
• Opportunity:
• Cash Flow:
• Productivity
Future Cost of Operations:
• Prevention:
• Appraisal:
• Failure:
• Opportunity:
• Cash flow
• Productivity
Investments (Annualized)
• Training:
• Software:
• Time of Resources:
• Others:
Projected Savings:
Project: Charter – ROI
Page 8
Approver Role Name Date Approval
Champion/Sponsor
Mentor (MBB/BB if any)
Review Sign Offs
Review of Phase Date Mentor Sponsor Champion .
• Define:
• Measure:
• Analyze:
• Improve/Design
• Control/Verify
• Closure
Project: Charter – Reviews and Approvals
SC PO I
C O P I S
Fill up these text
boxes
Process Overview – Flow
Fill up these text
boxes
Fill up these text
boxes
Fill up these text
boxes
Fill up
these
text boxes
Fill up
these
text boxes
Fill up
these
text boxes
Fill up
these
text boxes
Fill up
these
text boxes
Page 10
Methodology Used for Estimating Financial Benefits
Explain here what methodology is used to calculate financial benefits. In
case benefits are intangible, explain why it still makes sense to go ahead
with the project.
Page 11
Measure Phase - Measurement System Analysis (How did you verify
data reliability?)
Page 12
CTQ Definitions
CTQ :
Specification Limits :
Unit :
Opportunities for Error Per Unit :
Defect :
USL :
LSL :
Present Performance (Underlined Items applicable only For Continuous Data)
Mean :
Median :
Std. Deviation :
DPU : DPMO :
Sigma Level (Z) :
Target Performance (Underlined Items applicable only For Continuous Data)
Mean :
Median :
Std. Deviation :
DPU : DPMO :
Sigma Level (Z) :
Measure Phase - Current performance and target performance
Page 13
Measure Phase – Current performance and target performance
If you have used measures other than sigma level, mention here.
Page 14
Measure Phase – Identification and prioritization of X’s - Summary
along with techniques used (use multiple slides as required)
Page 15
Measure Phase Key findings (Identified X’s and the prioritized list)
Page 16
Analyze Phase – Summary along with techniques used (use
multiple slides as required)
Page 17
Analyze Phase – Key Findings (List of Vital X’s)
Page 18
Improve Phase – Summary along with techniques used (use
multiple slides as required)
Page 19
Improve Phase – Key Results
Page 20
Control Phase – Summary along with techniques used (use
multiple slides as required)
Page 21
Control Phase –
How did you verify/ensure sustenance of improvements?

Weitere ähnliche Inhalte

Was ist angesagt?

ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM
 
Introduction to Lean Six Sigma
Introduction to Lean Six SigmaIntroduction to Lean Six Sigma
Introduction to Lean Six SigmaGoLeanSixSigma.com
 
Six Sigma By :Rajeev
Six Sigma By :RajeevSix Sigma By :Rajeev
Six Sigma By :Rajeevrajeev
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Kaustav Lahiri
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 
Lean six sigma green belt project improvement
Lean six sigma  green belt project improvementLean six sigma  green belt project improvement
Lean six sigma green belt project improvementAnkurSharma820
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Abhay Yadav
 
Lean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptxLean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptxMohammad Amr
 
Six Sigma Green Belt for Beginners in a Nutshell
Six Sigma Green Belt for Beginners in a NutshellSix Sigma Green Belt for Beginners in a Nutshell
Six Sigma Green Belt for Beginners in a NutshellMentor Global Delhi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Six Sigma Green Belt
Six Sigma Green BeltSix Sigma Green Belt
Six Sigma Green BeltRaju N
 
DMAIC Methodolgy
DMAIC MethodolgyDMAIC Methodolgy
DMAIC MethodolgyBharath M
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageAnand Subramaniam
 

Was ist angesagt? (20)

ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
 
Dmaic
DmaicDmaic
Dmaic
 
Introduction to Lean Six Sigma
Introduction to Lean Six SigmaIntroduction to Lean Six Sigma
Introduction to Lean Six Sigma
 
Six Sigma By :Rajeev
Six Sigma By :RajeevSix Sigma By :Rajeev
Six Sigma By :Rajeev
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Lean six sigma green belt project improvement
Lean six sigma  green belt project improvementLean six sigma  green belt project improvement
Lean six sigma green belt project improvement
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
 
Lean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptxLean Six Sigma Yellow Belt.pptx
Lean Six Sigma Yellow Belt.pptx
 
Six Sigma Green Belt for Beginners in a Nutshell
Six Sigma Green Belt for Beginners in a NutshellSix Sigma Green Belt for Beginners in a Nutshell
Six Sigma Green Belt for Beginners in a Nutshell
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Six Sigma Green Belt
Six Sigma Green BeltSix Sigma Green Belt
Six Sigma Green Belt
 
DMAIC Methodolgy
DMAIC MethodolgyDMAIC Methodolgy
DMAIC Methodolgy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 

Andere mochten auch

Introduction to Lean Six Sigma in Government
Introduction to Lean Six Sigma in GovernmentIntroduction to Lean Six Sigma in Government
Introduction to Lean Six Sigma in GovernmentLean Agility Inc.
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakharMohammad IFTAKHAR
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Skillogic Solutions
 
Six Sigma Green Belt Training Part 8
Six Sigma Green Belt Training Part 8Six Sigma Green Belt Training Part 8
Six Sigma Green Belt Training Part 8Skillogic Solutions
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Skillogic Solutions
 
Lean Six Sigma Green Belt Training Part 3
Lean Six Sigma Green Belt Training Part 3Lean Six Sigma Green Belt Training Part 3
Lean Six Sigma Green Belt Training Part 3Skillogic Solutions
 

Andere mochten auch (9)

Introduction to Lean Six Sigma in Government
Introduction to Lean Six Sigma in GovernmentIntroduction to Lean Six Sigma in Government
Introduction to Lean Six Sigma in Government
 
Ui Mockup
Ui MockupUi Mockup
Ui Mockup
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Lean Six Sigma Green Belt Outline
Lean Six Sigma Green Belt OutlineLean Six Sigma Green Belt Outline
Lean Six Sigma Green Belt Outline
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7
 
Six Sigma Green Belt Training Part 8
Six Sigma Green Belt Training Part 8Six Sigma Green Belt Training Part 8
Six Sigma Green Belt Training Part 8
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
Lean Six Sigma Green Belt Training Part 3
Lean Six Sigma Green Belt Training Part 3Lean Six Sigma Green Belt Training Part 3
Lean Six Sigma Green Belt Training Part 3
 

Ähnlich wie Six sigma green belt project template

Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Six Sigma For Managers 185
Six Sigma For Managers 185Six Sigma For Managers 185
Six Sigma For Managers 185Anjoum .
 
Six Sigma For Managers
Six Sigma For ManagersSix Sigma For Managers
Six Sigma For Managersajjulazer
 
Six sigma for beginners
Six sigma for beginnersSix sigma for beginners
Six sigma for beginnersJasbir Arora
 
DMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxDMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxKristofMC
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajalAJAL A J
 
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxName of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxrosemarybdodson23141
 
Project Progress Overview .docx
Project Progress Overview  .docxProject Progress Overview  .docx
Project Progress Overview .docxwoodruffeloisa
 

Ähnlich wie Six sigma green belt project template (20)

Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Six Sigma For Managers
Six Sigma For Managers   Six Sigma For Managers
Six Sigma For Managers
 
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
 
BOM DMAIC TEMPLATE
BOM DMAIC TEMPLATEBOM DMAIC TEMPLATE
BOM DMAIC TEMPLATE
 
15 Deliv template
15 Deliv template15 Deliv template
15 Deliv template
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Six Sigma For Managers 185
Six Sigma For Managers 185Six Sigma For Managers 185
Six Sigma For Managers 185
 
Six Sigma For Managers
Six Sigma For ManagersSix Sigma For Managers
Six Sigma For Managers
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
Six sigma for beginners
Six sigma for beginnersSix sigma for beginners
Six sigma for beginners
 
DMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxDMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptx
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
6sigmaweb
6sigmaweb6sigmaweb
6sigmaweb
 
DFSS short
DFSS shortDFSS short
DFSS short
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxName of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docx
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Project Progress Overview .docx
Project Progress Overview  .docxProject Progress Overview  .docx
Project Progress Overview .docx
 

Mehr von Shankaran Rd

Operation Research
Operation ResearchOperation Research
Operation ResearchShankaran Rd
 
Project management
Project managementProject management
Project managementShankaran Rd
 
Six sigma dmaic tree
Six sigma dmaic treeSix sigma dmaic tree
Six sigma dmaic treeShankaran Rd
 
Six sigma statistics
Six sigma statisticsSix sigma statistics
Six sigma statisticsShankaran Rd
 
Mba internship formats
Mba internship formatsMba internship formats
Mba internship formatsShankaran Rd
 
Operations management
Operations managementOperations management
Operations managementShankaran Rd
 
Servant leadership
Servant leadershipServant leadership
Servant leadershipShankaran Rd
 
Business plan essentials
Business plan essentialsBusiness plan essentials
Business plan essentialsShankaran Rd
 

Mehr von Shankaran Rd (10)

Operation Research
Operation ResearchOperation Research
Operation Research
 
Project management
Project managementProject management
Project management
 
Lean Six Sigma
Lean Six SigmaLean Six Sigma
Lean Six Sigma
 
Six sigma dmaic tree
Six sigma dmaic treeSix sigma dmaic tree
Six sigma dmaic tree
 
Six sigma statistics
Six sigma statisticsSix sigma statistics
Six sigma statistics
 
Project guidance
Project guidanceProject guidance
Project guidance
 
Mba internship formats
Mba internship formatsMba internship formats
Mba internship formats
 
Operations management
Operations managementOperations management
Operations management
 
Servant leadership
Servant leadershipServant leadership
Servant leadership
 
Business plan essentials
Business plan essentialsBusiness plan essentials
Business plan essentials
 

Kürzlich hochgeladen

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 

Kürzlich hochgeladen (20)

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 

Six sigma green belt project template

  • 1. Six Sigma Project Presentation Project Title: Green Belt (Name):
  • 2. Page 2 Six Sigma DMAIC Methodology Define Identify Project CTQs Y to X drill down. Project CTQs Develop Team Charter Approved Charter Overview Map High Level Process Map, SIPOC Measure Select CTQ Characteristics Y Project Y Define Performance Standards Y Customer, Performance Standard for Project Y Measurement System Analysis Y Attribute R&R, Capability Indices Approved Measurement System Identify X’s Detailed Mapping, Fishbone Process Capability for Project Y Pareto, FDM Prioritized List of all Xs Analyze Establish Process Capability Y Define Performance Objectives Y Benchmarking, Brainstorming Improvement Goal for Project Y Identify Vital X’s X Graphical Analysis, FMEA List of Vital Few Xs Hypothesis Tests, Regression Improve Screen Potential Causes X Brainstorming, Discover Variable Relationships X Regression, Proposed Solution Establish Operating Tolerances Y, X Simulation, Pilot Piloted Solution Control MSA for X Y, X Test/Retest, Attribute R&R Verified Measurement System on Xs in Actual Application Process Capability Y, X Capability Indices Process Capability Y, X Implement Process Control X Control Charts, Sustained Solution, Mistake Proof, FMEA Documentation Step Description Focus Tools Deliverables
  • 3. Page 3 Content s  Define Phase - Business Case.  Define Phase - Team Structure.  Define Phase - Key elements of the charter.  Define Phase - COPIS and process overview flow.  Measure Phase – Measurement system assessment.  Measure Phase - Current Performance and Target Performance.  Measure Phase - Identification of X’s - Tools used and key findings.  Measure Phase - Identified X’s and prioritized list.  Analyze Phase - Tools used and key findings.  Analyze Phase - List of Vital X’s  Improve Phase - Tools used and key results.  Control Phase - Tools used to ensure sustenance of improvements..
  • 4. Page 4 Project: Charter - Business Case Planned Start Date: Planned Closure : Business Case (Compelling Reasons for doing the project) What if we don’t do this project? Explain what are the consequences/ losses if this project is not done. What if we do this project? Explain the benefits. Why this project and why not some other? Explain why this project is more appropriate than others.
  • 5. Page 5 Team, Mentor, Customers, Stakeholders & Sponsors: Sponsor (s): Champion (s): Team Leader (Green Belt): Team Members : Team Members – Others (Extended Team): Customer (s): Stake Holder (s): Project: Charter - Team
  • 6. Page 6 Problem Statement: Objective Statement: AS IS (Current Status): TO BE (Desired Status): “IN” Scope “Out of” Scope Project: Charter – Problem, Objective, SCOPE
  • 7. Page 7 Big Y: (Organization Strategic Intent) – Small Y (Division or Function Key Result Area): Present Cost of Operations • Prevention: • Appraisal: • Failure: • Opportunity: • Cash Flow: • Productivity Future Cost of Operations: • Prevention: • Appraisal: • Failure: • Opportunity: • Cash flow • Productivity Investments (Annualized) • Training: • Software: • Time of Resources: • Others: Projected Savings: Project: Charter – ROI
  • 8. Page 8 Approver Role Name Date Approval Champion/Sponsor Mentor (MBB/BB if any) Review Sign Offs Review of Phase Date Mentor Sponsor Champion . • Define: • Measure: • Analyze: • Improve/Design • Control/Verify • Closure Project: Charter – Reviews and Approvals
  • 9. SC PO I C O P I S Fill up these text boxes Process Overview – Flow Fill up these text boxes Fill up these text boxes Fill up these text boxes Fill up these text boxes Fill up these text boxes Fill up these text boxes Fill up these text boxes Fill up these text boxes
  • 10. Page 10 Methodology Used for Estimating Financial Benefits Explain here what methodology is used to calculate financial benefits. In case benefits are intangible, explain why it still makes sense to go ahead with the project.
  • 11. Page 11 Measure Phase - Measurement System Analysis (How did you verify data reliability?)
  • 12. Page 12 CTQ Definitions CTQ : Specification Limits : Unit : Opportunities for Error Per Unit : Defect : USL : LSL : Present Performance (Underlined Items applicable only For Continuous Data) Mean : Median : Std. Deviation : DPU : DPMO : Sigma Level (Z) : Target Performance (Underlined Items applicable only For Continuous Data) Mean : Median : Std. Deviation : DPU : DPMO : Sigma Level (Z) : Measure Phase - Current performance and target performance
  • 13. Page 13 Measure Phase – Current performance and target performance If you have used measures other than sigma level, mention here.
  • 14. Page 14 Measure Phase – Identification and prioritization of X’s - Summary along with techniques used (use multiple slides as required)
  • 15. Page 15 Measure Phase Key findings (Identified X’s and the prioritized list)
  • 16. Page 16 Analyze Phase – Summary along with techniques used (use multiple slides as required)
  • 17. Page 17 Analyze Phase – Key Findings (List of Vital X’s)
  • 18. Page 18 Improve Phase – Summary along with techniques used (use multiple slides as required)
  • 19. Page 19 Improve Phase – Key Results
  • 20. Page 20 Control Phase – Summary along with techniques used (use multiple slides as required)
  • 21. Page 21 Control Phase – How did you verify/ensure sustenance of improvements?