SlideShare ist ein Scribd-Unternehmen logo
1 von 14
TYPES OF
CONTRACT
SHAHIN M B
S8
CIVIL ENGINEERING
TYPES
• Lump-sum Contract
• Cost Plus Fixed Fee Contract
• Cost Plus Bid Bid Fee Contract
• Guaranteed Maximum Contract
• Negotiated Contract
• Unit-price Contract
• Design Build
• Turn Key Contracts
Lump-sum Contract
• Traditional method of Contract.
• The contractor offers to do the whole work for a total
stipulated sum of money as shown in drawings and
described by specification.
• It is more suitable for works which contractor have
prior construction experience.
• This is considered when tender process will tend to be
slower and preparing a tender may be more expensive
for the contractor.
Lump-sum Contract(Contd.)
Advantages
• Owner is aware of the cost of the project before the
project construction starts.
• Project scope and limits are defined prior to the start
of construction.
• Contractual relation between all parties, owner and
Engineer are clearly defined.
• Best price for work obtained through competitive
process with cost of work established and agreed
upon.
Lump-sum Contract(Contd.)
Disadvantages
• The lack of time flexibility in this method may result in
delayed project implementation.
• Highly skilled Architect or Engineer is needed.
• Difficult to implement revisions or change in the work
on the later stage of the work.
Cost Plus fixed fee Contract
•All Cost for the work according to the specification is
reimbursed by the owner to the contractor.
•Contractor is paid a fixed sum which represents the profit
•The variation on the lump-sum fee is percentage fee
wherein fees is established by percentage of total cost
incurred by the contractor.
•Usually it is fixed as a sum.
Cost Plus Bid fee Contract
•Owner invites proposal from qualified contractor
in terms of past experience, performance , etc.
•All Cost for the work according to the
specification is reimbursed by the owner to the
contractor.
•The bid fee is calculated on the basis of project
scope.
Guaranteed Maximum Contract
•The contractor agrees to perform work within a
price ceiling. This is the maximum guaranteed
price.
•If the ceiling is exceeded, without change in scope
then the excess cost is borne by the contractor.
•If the work is accomplished under the ceiling then
the owner pays no more than the actual cost and
the profit is shared between the contractor and
the owner.
•This method gives greater flexibility for the owner
Negotiated Contract
The preselected contractors are invited upon on
the basis of
• Capability of the past experience in the specific
area
• Availability of the personnel to accomplish the
work in the specified time frame
• Bid (Estimate) Price
• Proposed method for compensation including
amount of fee.
Negotiated Contract (Contd.)
•The owner is then negotiating with the contract
including method of payment for the work, Bid,
etc.
•On the basis of circumstances it can be
competitive or non-competitive.
Unit Price Contract
•Based on the estimated quantities of the items
involved in the work.
•The cost per unit item is given by the contractor
and the estimated quantities of items are given by
the owner.
•The total cost of work can only be calculated only
after the completion of the work because
measurement is made on the basis of work
actually done.
Unit Price Contract (Contd.)
•The contractor is obliged to perform the work
actually required in the field at his quoted price
only.
•If the estimated quantity is exceeds, then there
should be increase in unit price , therefore it is
difficult to forecast the project cost.
Design Build
•It is a method to deliver a project in which the design and
construction services are contracted by a single entity
known as the design–builder or design–build contractor
•design–build relies on a single point of responsibility
contract and is used to minimize risks for the project
owner and to reduce the delivery schedule by
overlapping the design phase and construction phase of a
project.
•Contractor will be responsible for all of the work on the
project, regardless of the nature of the fault
Turn-key contracts
•A type of project that is constructed so that it could be
sold to any buyer as a completed product.
•This is contrasted with build to order, where the
constructor builds an item to the buyer's exact
specifications, or when an incomplete product is sold
with the assumption that the buyer would complete it.

Weitere ähnliche Inhalte

Was ist angesagt?

Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
jagadish108
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
Ashish Parihar
 

Was ist angesagt? (20)

Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Tender
TenderTender
Tender
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Contracts
ContractsContracts
Contracts
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Item rate contract
Item rate contractItem rate contract
Item rate contract
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
 

Andere mochten auch

Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
Ali Heydari
 
Contracts PowerPoint Presentation
Contracts PowerPoint PresentationContracts PowerPoint Presentation
Contracts PowerPoint Presentation
mbachnak
 
Essentials of a valid contract
Essentials of a valid contractEssentials of a valid contract
Essentials of a valid contract
Dr.Aravind TS
 
Important questions of business law for B.com Part 2
Important questions of business law for B.com Part 2Important questions of business law for B.com Part 2
Important questions of business law for B.com Part 2
ali0323
 
Quiz show contract law key terms
Quiz show contract law key termsQuiz show contract law key terms
Quiz show contract law key terms
Donna Kesot
 
Introduction to Contract Law
Introduction to Contract LawIntroduction to Contract Law
Introduction to Contract Law
theacademist
 
law of contract
law of contractlaw of contract
law of contract
Que Tomeyz
 
Six elements of a contract
Six elements of a contractSix elements of a contract
Six elements of a contract
nikkisinatra94
 

Andere mochten auch (20)

Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
Contracts PowerPoint Presentation
Contracts PowerPoint PresentationContracts PowerPoint Presentation
Contracts PowerPoint Presentation
 
Types of conract
Types of conractTypes of conract
Types of conract
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Essentials of a valid contract
Essentials of a valid contractEssentials of a valid contract
Essentials of a valid contract
 
ESSENTIAL ELEMENTS OF A CONTRACT
ESSENTIAL ELEMENTS OF A  CONTRACTESSENTIAL ELEMENTS OF A  CONTRACT
ESSENTIAL ELEMENTS OF A CONTRACT
 
Backpacking in India
Backpacking in IndiaBackpacking in India
Backpacking in India
 
Important questions of business law for B.com Part 2
Important questions of business law for B.com Part 2Important questions of business law for B.com Part 2
Important questions of business law for B.com Part 2
 
Contract Law Quiz (1)
Contract Law Quiz (1)Contract Law Quiz (1)
Contract Law Quiz (1)
 
Quiz show contract law key terms
Quiz show contract law key termsQuiz show contract law key terms
Quiz show contract law key terms
 
Essential elements of valid contract
Essential elements of valid contractEssential elements of valid contract
Essential elements of valid contract
 
Law of contract
Law of contract Law of contract
Law of contract
 
Introduction to Contract Law
Introduction to Contract LawIntroduction to Contract Law
Introduction to Contract Law
 
law of contract
law of contractlaw of contract
law of contract
 
Six elements of a contract
Six elements of a contractSix elements of a contract
Six elements of a contract
 
ESSENTIAL ELEMENTS OF A VALID CONTRACT
ESSENTIAL ELEMENTS OF A VALID CONTRACTESSENTIAL ELEMENTS OF A VALID CONTRACT
ESSENTIAL ELEMENTS OF A VALID CONTRACT
 
Contract law
Contract lawContract law
Contract law
 
Essential elements of a valid contract
Essential elements of a valid contractEssential elements of a valid contract
Essential elements of a valid contract
 
Business law slides
Business law slidesBusiness law slides
Business law slides
 
Business law ppt
Business law pptBusiness law ppt
Business law ppt
 

Ähnlich wie Types of Contract in Construction Management

Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptx
jairam131
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
Timun Loh
 
Contracts Management
Contracts Management Contracts Management
Contracts Management
Mohib Ullah
 

Ähnlich wie Types of Contract in Construction Management (20)

types-170309142854.pptx
types-170309142854.pptxtypes-170309142854.pptx
types-170309142854.pptx
 
Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptx
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Lecture 3.pptx
Lecture 3.pptxLecture 3.pptx
Lecture 3.pptx
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Negotiated contracts
Negotiated contractsNegotiated contracts
Negotiated contracts
 
3. Contract Pricing.pdf
3. Contract Pricing.pdf3. Contract Pricing.pdf
3. Contract Pricing.pdf
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?
 
Contracts Management
Contracts Management Contracts Management
Contracts Management
 
Contract costing
Contract costingContract costing
Contract costing
 
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr  ias 11 construction contract presentation by MOHSIN MUMTAZCfr  ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
 
3 Type of contracts.pdf
3 Type of contracts.pdf3 Type of contracts.pdf
3 Type of contracts.pdf
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Kürzlich hochgeladen (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Types of Contract in Construction Management

  • 1. TYPES OF CONTRACT SHAHIN M B S8 CIVIL ENGINEERING
  • 2. TYPES • Lump-sum Contract • Cost Plus Fixed Fee Contract • Cost Plus Bid Bid Fee Contract • Guaranteed Maximum Contract • Negotiated Contract • Unit-price Contract • Design Build • Turn Key Contracts
  • 3. Lump-sum Contract • Traditional method of Contract. • The contractor offers to do the whole work for a total stipulated sum of money as shown in drawings and described by specification. • It is more suitable for works which contractor have prior construction experience. • This is considered when tender process will tend to be slower and preparing a tender may be more expensive for the contractor.
  • 4. Lump-sum Contract(Contd.) Advantages • Owner is aware of the cost of the project before the project construction starts. • Project scope and limits are defined prior to the start of construction. • Contractual relation between all parties, owner and Engineer are clearly defined. • Best price for work obtained through competitive process with cost of work established and agreed upon.
  • 5. Lump-sum Contract(Contd.) Disadvantages • The lack of time flexibility in this method may result in delayed project implementation. • Highly skilled Architect or Engineer is needed. • Difficult to implement revisions or change in the work on the later stage of the work.
  • 6. Cost Plus fixed fee Contract •All Cost for the work according to the specification is reimbursed by the owner to the contractor. •Contractor is paid a fixed sum which represents the profit •The variation on the lump-sum fee is percentage fee wherein fees is established by percentage of total cost incurred by the contractor. •Usually it is fixed as a sum.
  • 7. Cost Plus Bid fee Contract •Owner invites proposal from qualified contractor in terms of past experience, performance , etc. •All Cost for the work according to the specification is reimbursed by the owner to the contractor. •The bid fee is calculated on the basis of project scope.
  • 8. Guaranteed Maximum Contract •The contractor agrees to perform work within a price ceiling. This is the maximum guaranteed price. •If the ceiling is exceeded, without change in scope then the excess cost is borne by the contractor. •If the work is accomplished under the ceiling then the owner pays no more than the actual cost and the profit is shared between the contractor and the owner. •This method gives greater flexibility for the owner
  • 9. Negotiated Contract The preselected contractors are invited upon on the basis of • Capability of the past experience in the specific area • Availability of the personnel to accomplish the work in the specified time frame • Bid (Estimate) Price • Proposed method for compensation including amount of fee.
  • 10. Negotiated Contract (Contd.) •The owner is then negotiating with the contract including method of payment for the work, Bid, etc. •On the basis of circumstances it can be competitive or non-competitive.
  • 11. Unit Price Contract •Based on the estimated quantities of the items involved in the work. •The cost per unit item is given by the contractor and the estimated quantities of items are given by the owner. •The total cost of work can only be calculated only after the completion of the work because measurement is made on the basis of work actually done.
  • 12. Unit Price Contract (Contd.) •The contractor is obliged to perform the work actually required in the field at his quoted price only. •If the estimated quantity is exceeds, then there should be increase in unit price , therefore it is difficult to forecast the project cost.
  • 13. Design Build •It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor •design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project. •Contractor will be responsible for all of the work on the project, regardless of the nature of the fault
  • 14. Turn-key contracts •A type of project that is constructed so that it could be sold to any buyer as a completed product. •This is contrasted with build to order, where the constructor builds an item to the buyer's exact specifications, or when an incomplete product is sold with the assumption that the buyer would complete it.