OMEGAMORGAN 
MOVING THE 
SELLEWOOD BRIDGE
Rigging Job of the Year
Project Overview 
•The 87-year old Sellwood Bridge in Portland, Oregon 
Weight: 3,400 Tons 
Length: 1,100 Feet 
•Busiest 2 lane bridge in Oregon, with over 30,000 vehicle crossings per day
Location
Location
Limitations 
•The Project was a firm-fixed price bid. According to Multnomah County, the government entity responsible for the bridge, Omega Morgan’s solution saved millions of dollars by reducing up to a year of construction time for the new bridge. 
•The Bridge’s Main Contractor (Slayden / Sundt) hired Omega Morgan to relocate the bridge so it could remain open to traffic during the construction of a new $308 million bridge. 
•The Bridge’s location provided significant additional challenges given surrounding infrastructure (both public and private.) 
•The project required minimal traffic disruption.
Limitations
Limitations
Innovation & Ingenuity 
•Innovation & Ingenuity Required: 
•The Bridge was required to be relocated very specifically 
1.East End - Shifted 33 Feet North 
2.West End - Shifted 66 Feet North 
3.Entire span shifted 2 Feet East 
•New techniques demonstrated 
•Creative Application of Old Techniques 
•Newly Designed Equipment 
•Modification to Standard Equipment 
•Resources Used Economically
Innovations & Ingenuity
Innovations & Ingenuity
Innovations & Ingenuity
Innovations & Ingenuity
Engineering & Planning 
•Physical Characteristics 
•1,100 Feet Long 
•3,400 Tons 
•87 years old 
•Site Characteristics 
•Intruding surrounding infrastructure 
•Unstable ground causing existing bents to fail 
•Critical bridge construction timeline and required minimal traffic disruption (less than five day shut down) 
•Winter job schedule; potential for rain, snow or ice 
•Job Schedule 
•Job was completed on time and ahead of schedule (5 days closure planned, 4 days utilized.) 
•Demonstrated Professionalism 
•Crews worked tirelessly in cooperation with public and private partners and earned the award for the demolition of the relocated span.
-30 
-20 
-10 
0 
10 
20 
30 
40 
50 
60 
9:00:00 AM 
9:50:00 AM 
10:40:00 AM 
Bent 18 
January 19, 2013 
9:00AM – 11:00AM 
SG21RAW 
SG18RAW
-40 
-20 
0 
20 
40 
60 
80 
100 
120 
2:00:00 PM 
2:50:00 PM 
3:40:00 PM 
Bent 18 January 19, 2013 2:00PM – 4:00PM 
SG21RAW 
SG18RAW
Safety 
•Safety program: 
•Safety Manager included in planning process and execution of the job. Complete safety plan required and completed by Multnomah County and Slayden / Sundt. 
•Proper use of equipment: 
•Slide gear set up provided for safe, timely execution of project. 
•Results: 
•As a result of careful planning and execution, there were zero recordable injuries on the job.
2014 CRW - Omega Morgan Rigging Job of the Year
2014 CRW - Omega Morgan Rigging Job of the Year

Weitere ähnliche Inhalte

Was ist angesagt?

Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Crosstown TO
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Crosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Crosstown TO
 
Forest hill station open house
Forest hill station open house Forest hill station open house
Forest hill station open house Crosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Project - WTS Concrete
Project - WTS ConcreteProject - WTS Concrete
Project - WTS ConcreteDamian Brandon
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017Crosstown TO
 
Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Crosstown TO
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Crosstown TO
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Crosstown TO
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Steve Groombridge
 

Was ist angesagt? (20)

Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Forest hill station open house
Forest hill station open house Forest hill station open house
Forest hill station open house
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
 
Project - WTS Concrete
Project - WTS ConcreteProject - WTS Concrete
Project - WTS Concrete
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Tsps
TspsTsps
Tsps
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
injo slip update
injo slip updateinjo slip update
injo slip update
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)
 

Ähnlich wie 2014 CRW - Omega Morgan Rigging Job of the Year

Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zachary Maddox
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionascemiami-dade
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Evanston project briefing 4 22 13
Evanston project briefing 4 22 13Evanston project briefing 4 22 13
Evanston project briefing 4 22 13cityofevanston
 
Evanston project briefing 4 22 13
Evanston project briefing 4 22 13Evanston project briefing 4 22 13
Evanston project briefing 4 22 13cityofevanston
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Crosstown TO
 
POWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTION
POWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTIONPOWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTION
POWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTIONiQHub
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Soumalya Bag
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSSaritaJoshi5
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 

Ähnlich wie 2014 CRW - Omega Morgan Rigging Job of the Year (20)

Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progression
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
Evanston project briefing 4 22 13
Evanston project briefing 4 22 13Evanston project briefing 4 22 13
Evanston project briefing 4 22 13
 
Evanston project briefing 4 22 13
Evanston project briefing 4 22 13Evanston project briefing 4 22 13
Evanston project briefing 4 22 13
 
Tokyo Sky Tree
Tokyo Sky TreeTokyo Sky Tree
Tokyo Sky Tree
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
 
POWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTION
POWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTIONPOWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTION
POWER FOR FRAC SAND MINES DURING CONSTRUCTION & EARLY PRODUCTION
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Project Brief
Project BriefProject Brief
Project Brief
 
PLS 2018: Newport Bridge Feature Lighting Case Study
PLS 2018: Newport Bridge Feature Lighting Case StudyPLS 2018: Newport Bridge Feature Lighting Case Study
PLS 2018: Newport Bridge Feature Lighting Case Study
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONS
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 

Mehr von Specialized Carriers & Rigging Association

2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...Specialized Carriers & Rigging Association
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...Specialized Carriers & Rigging Association
 

Mehr von Specialized Carriers & Rigging Association (20)

2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business
 
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
 
2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert
 
2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing
 
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
 
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
 
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
 
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
 
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)
 
2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)
 
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
 
2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting
 
2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting
 
2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting
 
2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting
 

Kürzlich hochgeladen

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 

Kürzlich hochgeladen (20)

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 

2014 CRW - Omega Morgan Rigging Job of the Year

  • 1. OMEGAMORGAN MOVING THE SELLEWOOD BRIDGE
  • 2. Rigging Job of the Year
  • 3. Project Overview •The 87-year old Sellwood Bridge in Portland, Oregon Weight: 3,400 Tons Length: 1,100 Feet •Busiest 2 lane bridge in Oregon, with over 30,000 vehicle crossings per day
  • 6. Limitations •The Project was a firm-fixed price bid. According to Multnomah County, the government entity responsible for the bridge, Omega Morgan’s solution saved millions of dollars by reducing up to a year of construction time for the new bridge. •The Bridge’s Main Contractor (Slayden / Sundt) hired Omega Morgan to relocate the bridge so it could remain open to traffic during the construction of a new $308 million bridge. •The Bridge’s location provided significant additional challenges given surrounding infrastructure (both public and private.) •The project required minimal traffic disruption.
  • 9. Innovation & Ingenuity •Innovation & Ingenuity Required: •The Bridge was required to be relocated very specifically 1.East End - Shifted 33 Feet North 2.West End - Shifted 66 Feet North 3.Entire span shifted 2 Feet East •New techniques demonstrated •Creative Application of Old Techniques •Newly Designed Equipment •Modification to Standard Equipment •Resources Used Economically
  • 14. Engineering & Planning •Physical Characteristics •1,100 Feet Long •3,400 Tons •87 years old •Site Characteristics •Intruding surrounding infrastructure •Unstable ground causing existing bents to fail •Critical bridge construction timeline and required minimal traffic disruption (less than five day shut down) •Winter job schedule; potential for rain, snow or ice •Job Schedule •Job was completed on time and ahead of schedule (5 days closure planned, 4 days utilized.) •Demonstrated Professionalism •Crews worked tirelessly in cooperation with public and private partners and earned the award for the demolition of the relocated span.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. -30 -20 -10 0 10 20 30 40 50 60 9:00:00 AM 9:50:00 AM 10:40:00 AM Bent 18 January 19, 2013 9:00AM – 11:00AM SG21RAW SG18RAW
  • 26. -40 -20 0 20 40 60 80 100 120 2:00:00 PM 2:50:00 PM 3:40:00 PM Bent 18 January 19, 2013 2:00PM – 4:00PM SG21RAW SG18RAW
  • 27. Safety •Safety program: •Safety Manager included in planning process and execution of the job. Complete safety plan required and completed by Multnomah County and Slayden / Sundt. •Proper use of equipment: •Slide gear set up provided for safe, timely execution of project. •Results: •As a result of careful planning and execution, there were zero recordable injuries on the job.