1. Installation Restoration Sites 26 and 28
Abiotic / Biotic Treatability Study
Restoration Advisory Board Meeting
May 13, 2010
2. IR Site 26 Treatability Study
Purpose of Treatability Test
Determine if combined abiotic/biotic treatment is a viable remedial alternative
for mitigating the remaining chlorinated ethenes (CEs) present in the upper
portion of the A-aquifer at IR Site 26.
Treatability Study Method:
Conduct Pilot Test in area of highest CE concentration in upper A-Aquifer at
Site 26
Pilot Test Method:
Install wells in Pilot Test area
Determine baseline conditions in pilot test area
Inject EHC® into Aquifer
Measure Distribution of EHC®
Measure changes in pilot test area geochemistry
Measure changes in pilot test area CE concentrations
2
3.
4.
5.
6. Biologically Mediated Oxidation - Reduction
Work Growth
Light bulb Protein Synthesis
Motors Reproduction
Resistor
Electron Donor Reduced
Electron Acceptor
Oxidized
Reduced
Battery Oxidized
Ground
CnHn CO2 + H2O H2O + CO2 O2
Fe(II) Fe(III) HNO2 NO3
Fe(II) As(III) As(V)
Fe(0)
Mn(II) Mn(IV)
FeS2 Fe(III)+SO4
Fe (II) Fe (III)
H2S H2O +SO4
S- + H 2 O SO4
H2 H2O
CH4 CO2
7. Biological Reductive Dechlorination of Chlorinated Ethenes
ORP
0
- 50
H Cl
H H H
Cl H
H Cl HH
Cl H
H Cl Cl
HH
- 150 C C C C C C
H
H Cl HH
Cl
H
H Cl HH
Cl H Cl
H H H
Cl
- 200
PCE PCE PCE
TCE TCE TCE
- 250 cis 1,2 -DCE cis 1,2 -DCE cis 1,2 -DCE
VC VC VC
Ethene Ethene Ethene
-300
Ethane Ethane Ethane
8. O H Abiotic Pathway
H
O H
H
H
O H
Fe0 Fe
0
Fe2+
H
O H Fe0
Fe2+
Fe0
Fe 2+ Fe
0
Fe2+ H
O H
H O
Fe2+
Cl Cl
H
C C
Cl Cl
O H
H
O H
H
Tetrachloroethene
Dichloroacetylene
Chloroacetylene
Acetylene
Ethene
Ethane
26. Preliminary Conclusions Site 26 TS
• pH, ORP, SC, T, in the treatment area are within the range
considered appropriate for biotic and abiotic degradation of the CEs
• DO, nitrate, arsenic, manganese, iron, sulfate and methane reducing
conditions have been established in the treatment area.
• Degradation of CEs is occurring.
• Cis 1,2-DCE stall is not occurring.
• Complete conversion of CEs to non-toxic degradation products is
occurring.
• Dechlorinating microbial culture (DHC) is present in the treatment
area.
26
27. 26 Treatability Study Schedule
June 28, 2010 – 4th Quarter GW Sampling Event
August 25, 2010 -Draft Treatability Study Results Technical Memorandum
October 27, 2010 -Final Treatability Study Results Technical Memorandum
27
28. Expanded Pilot Test (Site 28) Methodology
Evaluate Three Technologies:
In Situ Anaerobic Biotic/Abiotic Degradation (ISABA)
EHC
In Situ Anaerobic Biostimulation with Bioaugmentation (ISABB) Process
Sodium Lactate & SDC-9
Emulsified Oil & SDC-9
Conduct Concurrent Pilot Tests in Three High Concentration Areas:
Building 88 Area
Traffic Island Area
Well W9-18 Area
28
30. Site 28 Pilot Test Schedule
February 2010 - Work Plans Finalized
March 2010 - MIPs Investigation
May 2010 -Treatability Study Progress Report
June, 2010 – Monitoring Well Installation
July, 2010 - Substrate Injection
August 2010 to July 2011 - Performance Monitoring
October 2011 – Treatability Study Final Report
30