SlideShare ist ein Scribd-Unternehmen logo
1 von 28
Downloaden Sie, um offline zu lesen
Former NAS Moffett Field




Hangar 1 Proposed Removal Action



           Mike Schulz, PMP

    AMEC Earth & Environmental, Inc.

          November 12, 2009
             RAB Meeting



                                       1
AMEC Earth & Environmental


• Prime contractor to the
  Navy for Environmental
  Restoration and
  Construction services
• Prime contractor for
  restoration of the Pentagon
  and demolition of the
  World Trade Center
• Received Congressional
  Commendation (HR 368)
• Local office in Oakland, CA




                                           2
Project Objectives




• Control release of PCBs from Hangar 1 in accordance
  with CERCLA
• Implement EE/CA Alternative 10
   – Demolition of interior structures
   – Removal of contaminated siding
   – Application of weather-resistant coating to steel frame




                                                               3
Performance Criteria




•   Ensure worker and public safety
•   Prevent release of contaminants
•   Safe transportation of waste off-site
•   Proactive community relations program
•   Provide a weather-resistant coating with long-term
    effectiveness




                                                         4
Proposed Approach




• Experienced project team with excellent safety records
   – Nuprecon, LP (demolition and abatement)
   – Techno Coatings, Inc. (coating)
• Use of interior scaffold system to promote safety and
  contaminant control
• Use of the hangar shell as containment during interior
  demolition and coating
• Proposed coating system with proven performance
• Rigorous air monitoring program

                                                           5
Pre-Construction Activities


•   Work Plans
•   Permits and notifications
•   Biological survey
•   Baseline sampling (soil, sediment, water, air)
•   Coating condition survey




                                                     6
SITE PLAN




            7
TRUCKING ROUTE




                 8
Asbestos Abatement Plan




                          9
Asbestos Abatement Controls



•   Vacuum existing dust first
•   Install containment barriers
    and negative air pressure
•   Air monitoring supervised by
    Certified Industrial Hygienist
•   Post abatement inspection
    and clearance sampling
•   All work under direction of
    California Asbestos Consultant
•   Compliance with OHSA and
    Cal. Code of Regulations (CCR
    Title 8)



                                            10
Interior Demolition




•   NASA furnishings/equipment decontaminated and re-used
•   Combination of manual and machine demolition methods
•   Designed to protect structural integrity of the hangar
•   Man Cranes will be preserved
•   Door motors will be preserved

                                                             11
Interior Dust Control


•   Vacuum roofing prior to demolition
•   Water spray/mist suppression
•   Siding in place during demolition
•   Debris loading and waste packaging inside
    the hangar




                                                12
Siding Removal Plan


•   Phase work in 6 Zones    •   Work from roof to ground
•   Start on the south end   •   Maintain balanced loads




                                                            13
Scaffolding System

   •       Floor-mounted scaffold for siding removal
   •       Hanging scaffold for roof removal
   •       Integrated material/personnel hoists
   •       Designed by structural engineer               Material Hoist

ACCESS LADDERS OR STAIRS
PROVIDES ACCESS BETWEEN
LEVEL
PLANK LEVELS
LOCATED
ADJACENT
TO EXISTING
STRUCTURE ONLY
WITH ACCESS TO
STAIR TOWER


                                                       Transport Platform


                           PERSONNEL AND/OR
                            MATERIAL HOIST




                                                                            14
Siding Removal

•   FAA beacons and star remain operational
•   Manually remove roofing and siding
•   Individual panels unbolted from inside the hangar
•   100% clamp connection to secure panels
•   Roofing and siding
    lowered to scaffold
    and hangar floor via
    hoists




                                                        15
Siding Removal Dust Control

•   Wash down structure first
•   Sheeting installed on scaffold deck
    and floor
•   Water mist dust suppression
•   Panels removed manually and
    carefully lowered and packaged
    inside hangar
•   Operations adjusted during high
    winds




                                            16
Waste Management


• Demolition wastes will be
  recycled or disposed offsite
• All wastes managed per Cal. Code
  of Regulations Title 22
• Non-hazardous materials recycled
  as much as possible
• Waste transported by registered
  haulers
• Truck loads will be covered
• Disposal at permitted landfills
• Wash water filtered and treated
  on-site
• Treated water recycled or
  discharged to sanitary sewer



                                       17
Proposed Coating System


               CARBOMASTIC 15

1. Proven 30-year field
   history
2. Excellent performance
   in over-coating
   applications
3. Excellent penetration
   through rusted
   substrates
4. Low solvent content -
   does not soften
   existing coating

                                      18
Advantages of CM 15 Coating


5. Aluminum flakes (pigment) provide an excellent
   water barrier, corrosion protection, and UV
   protection
6. Ultra Low VOC emissions compliant with Bay Area
   Air Quality Management District regulations
7. Good color match with historic hangar siding color




                                                        19
Vandenberg Launch Tower


Space Launch Complex 6 – CM 15 coating has weathered
         the coastal environment for 20 years




                                                       20
Coating Procedures


• Prepare surface by high-pressure water cleaning per
  Society of Professional Coating (SSPC) specification SP-12
• Apply primer coat over rusted or degraded areas
• Apply full coat of CM 15 with airless spray
• Quality control per manufacturer requirements and SSPC
  specifications
• Inspectors certified by National Association of Corrosion
  Engineers and qualified by SSPC




                                                           21
WASHING/COATING CONTAINMENT


• Protect motors and seal
  vaults & drains
• Seal floor joints
• Coating applied with
  siding on to prevent
  overspray
• Containment screens
  erected from roof to
  floor




                                        22
Air Monitoring


• 100% worker air monitoring in the work
  zone
• Continuous site perimeter dust monitoring
   - 3 stations (1) upwind and (2) downwind
   - Datalogging dustTrak monitors
   - Instant notification & alarm capability
• Additional chemical-specific monitoring
• Data reviewed by Certified Industrial
  Hygienist




                                               23
Confirmation Sampling
                Confirmation Sampling



•   Soil sampling
•   Drain system sampling
•   Concrete wipe sampling
•   Results compared to
    baseline sampling and
    regulatory limits




                                        24
Historic Mitigation




• Man Crane, “Clam Shell”
  doors/motors, and star to
  be preserved
• Coating to match historic
  color
• Video documentation of
  the project to be donated
  to the Moffett Historic
  Museum


                                        25
Schedule



•   Work Plan approval Spring 2010
•   Start interior abatement/demolition Spring 2010
•   Start siding removal Fall 2010
•   Complete siding removal and coating Summer 2011
•   Complete confirmation sampling Summer 2011
•   Submit final report Winter 2011/2012




                                                      26
Community Relations




• Future RAB progress updates
    – Work plan completion
    – Mid-point of construction
    – Completion of construction
•   Fact sheets to be provided prior to construction
•   BRAC web site will provide project information
•   NASA/Ames Center briefings
•   Katz & Associates retained to assist with public
    communications


                                                       27
Questions




       Point of Contact

    Kathryn Stewart, P.E.
BRAC Environmental Coordinator
       (415) 743-4715
  Kathryn.Stewart@navy.mil




                                 28

Weitere ähnliche Inhalte

Was ist angesagt? (12)

25 herold 20160830 retrieval final
25 herold 20160830 retrieval final25 herold 20160830 retrieval final
25 herold 20160830 retrieval final
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
Max Sommers CV 2017
Max Sommers CV 2017Max Sommers CV 2017
Max Sommers CV 2017
 
Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologies
 
SOLTECH_SALTCAVERN_Auto
SOLTECH_SALTCAVERN_AutoSOLTECH_SALTCAVERN_Auto
SOLTECH_SALTCAVERN_Auto
 
ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013
 
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides 2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
 
VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration
 
3 swpp ps for const sites tonning ksa apr 2010
3 swpp ps for const sites   tonning ksa apr 20103 swpp ps for const sites   tonning ksa apr 2010
3 swpp ps for const sites tonning ksa apr 2010
 

Andere mochten auch

Fl Technics Kaunas Hangar Presentation for Clients
Fl Technics Kaunas Hangar Presentation for ClientsFl Technics Kaunas Hangar Presentation for Clients
Fl Technics Kaunas Hangar Presentation for Clients
FL Technics
 

Andere mochten auch (7)

Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Fl Technics Kaunas Hangar Presentation for Clients
Fl Technics Kaunas Hangar Presentation for ClientsFl Technics Kaunas Hangar Presentation for Clients
Fl Technics Kaunas Hangar Presentation for Clients
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
Hangar 1 RAB Presentation, Jan. 10, 2008
Hangar 1 RAB Presentation, Jan. 10, 2008Hangar 1 RAB Presentation, Jan. 10, 2008
Hangar 1 RAB Presentation, Jan. 10, 2008
 
Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
 

Ähnlich wie Moffett Hangar One Proposed Removal Action

Waste Management: Norms & Standards
Waste Management: Norms & StandardsWaste Management: Norms & Standards
Waste Management: Norms & Standards
SAMBRA_RMI
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
Travis Both
 

Ähnlich wie Moffett Hangar One Proposed Removal Action (20)

Hangar One Update 2010/07/08, Moffett Restoration Advisory Board
Hangar One Update 2010/07/08, Moffett Restoration Advisory BoardHangar One Update 2010/07/08, Moffett Restoration Advisory Board
Hangar One Update 2010/07/08, Moffett Restoration Advisory Board
 
2022 Spring Educational Workshop presentation on QA for CIR and CCPR
2022 Spring Educational Workshop presentation on QA for CIR and CCPR2022 Spring Educational Workshop presentation on QA for CIR and CCPR
2022 Spring Educational Workshop presentation on QA for CIR and CCPR
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf
 
Environmental Considerations in Construction
Environmental Considerations in ConstructionEnvironmental Considerations in Construction
Environmental Considerations in Construction
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
Waste Management: Norms & Standards
Waste Management: Norms & StandardsWaste Management: Norms & Standards
Waste Management: Norms & Standards
 
2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng
 
Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
Building enclosure design presentation 1
Building enclosure design presentation 1Building enclosure design presentation 1
Building enclosure design presentation 1
 
Groundwater Control for Construction
Groundwater Control for ConstructionGroundwater Control for Construction
Groundwater Control for Construction
 
Who Is Talon/LPE?
Who Is Talon/LPE?Who Is Talon/LPE?
Who Is Talon/LPE?
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Moffett Hangar One Removal Action Update
Moffett Hangar One Removal Action UpdateMoffett Hangar One Removal Action Update
Moffett Hangar One Removal Action Update
 
Targeted assessment program update Greg Connolly
Targeted assessment program update Greg ConnollyTargeted assessment program update Greg Connolly
Targeted assessment program update Greg Connolly
 
Moffett RAB Presentation: Vapor Intrusion Update
Moffett RAB Presentation: Vapor Intrusion UpdateMoffett RAB Presentation: Vapor Intrusion Update
Moffett RAB Presentation: Vapor Intrusion Update
 
P1_Elements-of-Proper-Landfill-Design-Operations-and-Maintenance.pdf
P1_Elements-of-Proper-Landfill-Design-Operations-and-Maintenance.pdfP1_Elements-of-Proper-Landfill-Design-Operations-and-Maintenance.pdf
P1_Elements-of-Proper-Landfill-Design-Operations-and-Maintenance.pdf
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
 
Detailing Air Barriers
Detailing Air BarriersDetailing Air Barriers
Detailing Air Barriers
 

Mehr von Steve Williams

Mehr von Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
 
Site 28 Supplemental Investigation
Site 28 Supplemental InvestigationSite 28 Supplemental Investigation
Site 28 Supplemental Investigation
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
 
Laser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringLaser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs Monitoring
 

Kürzlich hochgeladen

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Kürzlich hochgeladen (20)

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Moffett Hangar One Proposed Removal Action

  • 1. Former NAS Moffett Field Hangar 1 Proposed Removal Action Mike Schulz, PMP AMEC Earth & Environmental, Inc. November 12, 2009 RAB Meeting 1
  • 2. AMEC Earth & Environmental • Prime contractor to the Navy for Environmental Restoration and Construction services • Prime contractor for restoration of the Pentagon and demolition of the World Trade Center • Received Congressional Commendation (HR 368) • Local office in Oakland, CA 2
  • 3. Project Objectives • Control release of PCBs from Hangar 1 in accordance with CERCLA • Implement EE/CA Alternative 10 – Demolition of interior structures – Removal of contaminated siding – Application of weather-resistant coating to steel frame 3
  • 4. Performance Criteria • Ensure worker and public safety • Prevent release of contaminants • Safe transportation of waste off-site • Proactive community relations program • Provide a weather-resistant coating with long-term effectiveness 4
  • 5. Proposed Approach • Experienced project team with excellent safety records – Nuprecon, LP (demolition and abatement) – Techno Coatings, Inc. (coating) • Use of interior scaffold system to promote safety and contaminant control • Use of the hangar shell as containment during interior demolition and coating • Proposed coating system with proven performance • Rigorous air monitoring program 5
  • 6. Pre-Construction Activities • Work Plans • Permits and notifications • Biological survey • Baseline sampling (soil, sediment, water, air) • Coating condition survey 6
  • 10. Asbestos Abatement Controls • Vacuum existing dust first • Install containment barriers and negative air pressure • Air monitoring supervised by Certified Industrial Hygienist • Post abatement inspection and clearance sampling • All work under direction of California Asbestos Consultant • Compliance with OHSA and Cal. Code of Regulations (CCR Title 8) 10
  • 11. Interior Demolition • NASA furnishings/equipment decontaminated and re-used • Combination of manual and machine demolition methods • Designed to protect structural integrity of the hangar • Man Cranes will be preserved • Door motors will be preserved 11
  • 12. Interior Dust Control • Vacuum roofing prior to demolition • Water spray/mist suppression • Siding in place during demolition • Debris loading and waste packaging inside the hangar 12
  • 13. Siding Removal Plan • Phase work in 6 Zones • Work from roof to ground • Start on the south end • Maintain balanced loads 13
  • 14. Scaffolding System • Floor-mounted scaffold for siding removal • Hanging scaffold for roof removal • Integrated material/personnel hoists • Designed by structural engineer Material Hoist ACCESS LADDERS OR STAIRS PROVIDES ACCESS BETWEEN LEVEL PLANK LEVELS LOCATED ADJACENT TO EXISTING STRUCTURE ONLY WITH ACCESS TO STAIR TOWER Transport Platform PERSONNEL AND/OR MATERIAL HOIST 14
  • 15. Siding Removal • FAA beacons and star remain operational • Manually remove roofing and siding • Individual panels unbolted from inside the hangar • 100% clamp connection to secure panels • Roofing and siding lowered to scaffold and hangar floor via hoists 15
  • 16. Siding Removal Dust Control • Wash down structure first • Sheeting installed on scaffold deck and floor • Water mist dust suppression • Panels removed manually and carefully lowered and packaged inside hangar • Operations adjusted during high winds 16
  • 17. Waste Management • Demolition wastes will be recycled or disposed offsite • All wastes managed per Cal. Code of Regulations Title 22 • Non-hazardous materials recycled as much as possible • Waste transported by registered haulers • Truck loads will be covered • Disposal at permitted landfills • Wash water filtered and treated on-site • Treated water recycled or discharged to sanitary sewer 17
  • 18. Proposed Coating System CARBOMASTIC 15 1. Proven 30-year field history 2. Excellent performance in over-coating applications 3. Excellent penetration through rusted substrates 4. Low solvent content - does not soften existing coating 18
  • 19. Advantages of CM 15 Coating 5. Aluminum flakes (pigment) provide an excellent water barrier, corrosion protection, and UV protection 6. Ultra Low VOC emissions compliant with Bay Area Air Quality Management District regulations 7. Good color match with historic hangar siding color 19
  • 20. Vandenberg Launch Tower Space Launch Complex 6 – CM 15 coating has weathered the coastal environment for 20 years 20
  • 21. Coating Procedures • Prepare surface by high-pressure water cleaning per Society of Professional Coating (SSPC) specification SP-12 • Apply primer coat over rusted or degraded areas • Apply full coat of CM 15 with airless spray • Quality control per manufacturer requirements and SSPC specifications • Inspectors certified by National Association of Corrosion Engineers and qualified by SSPC 21
  • 22. WASHING/COATING CONTAINMENT • Protect motors and seal vaults & drains • Seal floor joints • Coating applied with siding on to prevent overspray • Containment screens erected from roof to floor 22
  • 23. Air Monitoring • 100% worker air monitoring in the work zone • Continuous site perimeter dust monitoring - 3 stations (1) upwind and (2) downwind - Datalogging dustTrak monitors - Instant notification & alarm capability • Additional chemical-specific monitoring • Data reviewed by Certified Industrial Hygienist 23
  • 24. Confirmation Sampling Confirmation Sampling • Soil sampling • Drain system sampling • Concrete wipe sampling • Results compared to baseline sampling and regulatory limits 24
  • 25. Historic Mitigation • Man Crane, “Clam Shell” doors/motors, and star to be preserved • Coating to match historic color • Video documentation of the project to be donated to the Moffett Historic Museum 25
  • 26. Schedule • Work Plan approval Spring 2010 • Start interior abatement/demolition Spring 2010 • Start siding removal Fall 2010 • Complete siding removal and coating Summer 2011 • Complete confirmation sampling Summer 2011 • Submit final report Winter 2011/2012 26
  • 27. Community Relations • Future RAB progress updates – Work plan completion – Mid-point of construction – Completion of construction • Fact sheets to be provided prior to construction • BRAC web site will provide project information • NASA/Ames Center briefings • Katz & Associates retained to assist with public communications 27
  • 28. Questions Point of Contact Kathryn Stewart, P.E. BRAC Environmental Coordinator (415) 743-4715 Kathryn.Stewart@navy.mil 28