Diese Präsentation wurde erfolgreich gemeldet.
Wir verwenden Ihre LinkedIn Profilangaben und Informationen zu Ihren Aktivitäten, um Anzeigen zu personalisieren und Ihnen relevantere Inhalte anzuzeigen. Sie können Ihre Anzeigeneinstellungen jederzeit ändern.
What is the Southeast Alaska
Mitigation Fund?
An In-Lieu Fee Program
Of Course!
Clean Water Act
(Compensation for
impacts to waters of
the U.S.)
• What is a water of the U.S.
 Wetlands
 Rivers and Str...
Mitigation
If you impact a water of the U.S. you
have to make up for that
(In relation to the Clean Water Act)
Fill a 1 Ac...
Three Mitigation Methods
• Mitigation Bank
• In-Lieu Fee
• Permitee Responsible (can be difficult)
– USACE approved mitiga...
What is the Southeast Alaska
Mitigation Fund?
An In-Lieu Fee Program
Based on Restoration
Southeast Alaska
Mitigation Fund (SAMF)
March 21, 2012: Draft Prospectus
May 29, 2012; COE Approves Draft Prospectus
Sept ...
Why?
• Community Desire to keep
mitigation funds in their
community
• No active restoration ILF
program in Southeast Alask...
SAMF
Freshwater and
Marine Credits
• Keep mitigation $$$ in
community
• Help reduce development costs
• Protect valued com...
Pat Creek
West Fork Assessment
(160 meter reach)
Project Name
Assessment Area Name
Assessment Area: acreage: 2.47 stream channel length (ft.): 500
average channel width (f...
rating FPU rating* FPU rating FPU
Floodplain Connectivity 3.50 8.63 3.50 8.63 0.00 0.00 0.0%
Bed Form Diversity 3.00 7.40 ...
Final Credit Calculation
($130,000 to $150,000)
Final Credit Calculation
The Southeast Alaska Mitigation Fund
The Southeast Alaska Mitigation Fund
The Southeast Alaska Mitigation Fund
The Southeast Alaska Mitigation Fund
Nächste SlideShare
Wird geladen in …5
×

The Southeast Alaska Mitigation Fund

An introduction to the Southeast Alaska Mitigation Fund

  • Loggen Sie sich ein, um Kommentare anzuzeigen.

  • Gehören Sie zu den Ersten, denen das gefällt!

The Southeast Alaska Mitigation Fund

  1. 1. What is the Southeast Alaska Mitigation Fund? An In-Lieu Fee Program Of Course!
  2. 2. Clean Water Act (Compensation for impacts to waters of the U.S.) • What is a water of the U.S.  Wetlands  Rivers and Streams  Tidal • Impacts regulated by the USACE  Generally over a tenth of acre requires mitigation
  3. 3. Mitigation If you impact a water of the U.S. you have to make up for that (In relation to the Clean Water Act) Fill a 1 Acre Wetland (Debits) Restore, Enhance, Create, Preserve (Credits)
  4. 4. Three Mitigation Methods • Mitigation Bank • In-Lieu Fee • Permitee Responsible (can be difficult) – USACE approved mitigation plan (12 required components) – Maintain in perpetuity (forever) USACE 12 Fundamental Components: objectives; site selection criteria; site protection instruments (e.g., conservation easements); baseline information (for impact and compensation sites); credit determination methodology; a mitigation work plan; a maintenance plan; ecological performance standards; monitoring requirements; a long- term management plan; an adaptive management plan; and financial assurances
  5. 5. What is the Southeast Alaska Mitigation Fund? An In-Lieu Fee Program Based on Restoration
  6. 6. Southeast Alaska Mitigation Fund (SAMF) March 21, 2012: Draft Prospectus May 29, 2012; COE Approves Draft Prospectus Sept 10, 2102: Prospectus Feb 23, 2013: COE requests additional content March 21, 2013: Meeting with COE and USFWS April 10, 2013: Revised Prospectus June 21, 2013: COE approves Prospectus Sept. 2013: Final Instrument Submitted Aug. 2014: Final Instrument Submitted Nov. 2014: COE IRT review Dec. 23, 2014: Additional changes requested Feb. 2014: Meeting with IRT (Anchorage) March 2015: Final Instrument resubmitted
  7. 7. Why? • Community Desire to keep mitigation funds in their community • No active restoration ILF program in Southeast Alaska • Provide developers the opportunity for quality restoration mitigation
  8. 8. SAMF Freshwater and Marine Credits • Keep mitigation $$$ in community • Help reduce development costs • Protect valued community resources • THE CATCH! can’t impact mitigation sites
  9. 9. Pat Creek
  10. 10. West Fork Assessment (160 meter reach)
  11. 11. Project Name Assessment Area Name Assessment Area: acreage: 2.47 stream channel length (ft.): 500 average channel width (ft.): 15 total buffer width excluding channel (ft.): 200 rating FPU rating FPU rating FPU Bank Height Ratio 1 3.00 7.40 3.00 7.40 0.00 0.00 0.0% Entrenchment Ratio 1 4.00 9.86 4.00 9.86 0.00 0.00 0.0% Percent Pool 1 4.00 9.86 4.00 9.86 0.00 0.00 0.0% Pool Max Depth Ratio 1 2.00 4.93 3.00 7.40 1.00 2.47 50.0% Width to Depth Ratio 1 2.00 4.93 4.00 9.86 2.00 4.93 100.0% Bank Erosion Hazard Index 1 3.00 7.40 3.00 7.40 0.00 0.00 0.0% Large Woody Debris (LWD) Density 1 6.00 14.79 6.00 14.79 0.00 0.00 0.0% Key LWD Pieces Density 1.5 2.00 4.93 6.00 14.79 4.00 9.86 200.0% Riparian Index 1 3.00 7.40 3.00 7.40 0.00 0.00 0.0% Fish Species Diversity 1 4.00 9.86 5.00 12.33 1.00 2.47 25.0% Public use & recognition 1 5.00 12.33 5.00 12.33 0.00 0.00 0.0% Subsistence & provisioning 1 3.00 7.40 3.00 7.40 0.00 0.00 0.0% 41.00 101.09 49.00 120.81 8.00 19.72 3.42 8.42 4.08 10.07 0.67 1.64 Longitude 6-digit HUC # Name(s) of Evaluator(s) Date Stream Assessment DateLatitude Southeast Alaska Watershed Coalition USACE Project # POA- Metrics Weight (1x-1.5x) Existing Projected Net Gain % Gain FPU total score average score Freshwater-Stream Credit Pat Creek
  12. 12. rating FPU rating* FPU rating FPU Floodplain Connectivity 3.50 8.63 3.50 8.63 0.00 0.00 0.0% Bed Form Diversity 3.00 7.40 3.50 8.63 0.50 1.23 16.7% Incision/Erosivity 2.50 6.16 3.50 8.63 1.00 2.47 40.0% Large Woody Debris 4.00 9.86 7.50 18.49 3.50 8.63 87.5% Biotic Integrity 3.50 8.63 4.00 9.86 0.50 1.23 14.3% Societal Value 4.00 5.48 4.00 5.48 0.00 0.00 0.0% Sum of avgs 20.50 46.16 26.00 59.72 5.50 13.56 29.4% 8.31 10.75 2.44 29.4% Parameters Weighted avg of avg FPU Credit Calculation-Stream Method Existing Projected Net gain % Gain FPU * The rating is equal to the average of the grouped parameters including any adjustment for Weighting of priority metrics.
  13. 13. Final Credit Calculation ($130,000 to $150,000)
  14. 14. Final Credit Calculation

×