What originally began as a means to provide plantings to disguise aboveground features on the project, evolved into a public educational area which is anticipated to include rain gardens, porous pavements, and a bicycle and pedestrian path. The process that the County, its engineers, and the community stakeholders participated in to shape the CSO project restoration into a design that will meet the project needs of all involved will be discussed, in addition to “lessons learned”.
Strategies for Landing an Oracle DBA Job as a Fresher
Education & Outreach CSO044 - NYWEA 2012
1. Working Together:
A Case Study Involving Community Stakeholders During
the Design of the CSO 044 Conveyance Project
Onondaga County, New York
Presenter: Co-Authors:
Kristin Angello, PE Nicholas Capozza
Malcolm Pirnie, the Water Division of ARCADIS Onondaga County Department
of Water Environment
Presented at: Protection
New York Water Environment Association
84th Annual Meeting Donald Geisser, PE
New York, NY Malcolm Pirnie, the Water
February 7, 2011 Division of ARCADIS
Joanne Mahoney, Onondaga County Executive
5. Project Issues
• Deep excavation (approximately 40 feet)
• Installation of steel sheeting
• Heavy equipment in close proximity to
residences
• Loss of normal vehicular access to properties
• Closure of several roads and sidewalks
5
7. Identify Community Leaders
• Neighborhood organizations
• Community Centers
• Prominent Faith Centers
• Schools
• Syracuse United Neighbors (SUN)
• Partnership for Onondaga Creek
7
8. Community Learns why the Project
is Important
• Will improve the health of the creek
• Court-mandated project
• Can provide the community with an opportunity
to “build it better”
• Also a chance to explain anticipated disruptions
8
9. Project Team Learns what is
Important to the Community
• Construction Traffic
• Idling Trucks
• Dust Control
• Aboveground Features
• Information and Communication
9
10. Construction Traffic
• Included the City ordinance in the Project
Documents
▫ Limited construction traffic to City of Syracuse
Designated Truck Routes
• Required Contractor and subcontractors to
adhere to ordinance
10
11. Idling Trucks
• City ordinance did not exist
• Required Contractor and his subcontractors to
turn off trucks if not part of active construction
11
12. Dust control
• Requirements to control dust included in the
Project Documents and enforced during
construction
12
16. Information and Communication
• Multiple workshops throughout design
• Presented project at SUN meetings
• Construction updates provided at SUN meetings
16
17. Project Restoration
• Bioretention basin
• Bioinfiltration swales
• Recycling of captured stormwater to perform
supplemental conveyance flushing
17
20. Additional Community Meetings
• Educated the community on the importance of
stormwater management
• Discussed project restoration
• Facilitated a brainstorming discussion as to how
the community wanted their neighborhood
restored
20
21. The Community Spoke…
• Trail for Education and Demonstration
▫ Porous walkway/bike way
▫ Exercise, walking and educational opportunities
▫ Rain gardens
▫ Educational stations
▫ Butterfly garden
21
25. Lessons Learned - Successes
• Communication and Education
• Start early
• Work with established community groups
▫ Establish relationships and advocates
▫ Have youth and community leadership speak and
present at the public meetings
25
26. Lessons Learned - Improvements
• Start earlier
• Ensure you’re meeting with the right
stakeholders
26
27. Acknowledgements
• Onondaga County
• CDM/C&S, A Joint Venture
• Landscape & Prospect
• Onondaga Environmental Institute
• Onondaga Earth Corps
27
Midland RTF is a wet weather storage and treatment facility: 2.5MG storage followed by 330 cfs of treatment (vortex separators, followed by high-rate disinfection)
These are the items the project team perceived to be issues to the community
We wanted to work with the leaders early on to understand how to provide the best communication to the public
Identify community leaders and neighborhood organizationsIdeas as to where to look – community centers, etc.In our project area, two main groups had already established themselves in the community: SUN (which works to….) and POC (which works to…)
It’s difficult to enforce what’s going on off-site; we and the CPM let the contractor know this was a big priority for the residents, and the CPM checked in with SUN to see if the community felt there were any issues.
This is not our site! This is what we were trying to avoid
The community leaders indicated displeasure from community members about aboveground vents and fenced areas that were installed under the RTF project.
The vents and control cabinets are associated with the existing conveyance flushing system. The cabinets and fencing needed to remain, however, the vents were revised to be at-grade structures which would be not be visibly obtrusive
We worked with the team’s landscape architect to develop a plan to improve aesthetics with respect to the fenced areas. The fenced areas could not be completely hidden with shrubs due to safety and operation concerns. The control cabinets and fence posts will be painted green, and the chain link fence fabric will be replaced with green vinyl coated fabric. Plantings and shrubs will also be provided to redirect the focus of the eye.
How did we address the community’s concerns?Construction management team provided updates on the construction at SUN meetings
The community leaders and project team wanted to incorporate elements of green infrastructure into project restoration
This is where the public outreach really took a turn. We started out incorporating green infrastructure and LID practices; however, the community leaders wanted to look at how to improve the green space. OEI is a local non-profit organization focused on advancing environmental education, planning, and restoration in Central New York. OEC is a youth organization focused on revitalizing the urban environment through urban forestry, green infrastructure and outreach efforts. Since OEI and OEC were focused on the same goal (educating the public about Green Infrastructure) Onondaga County reached out to them for assistance with facilitating community planning discussions. This is where the County Executive really made a commitment to work with the communities and implement Green Infrastructure. It wasn’t originally a part of the project, but the County Executive’s office supported the community’s desire to improve their environment through stormwater management.
The purpose of the add’l community meetings was to….. (fade in picture): one of the key success factors in the community meeting was the manner in which the education portion was presented: enthusiastic, educated, young community members led the education portion of the program
The community was so enthused about what they learned, they decided to restore their area in a way that could educate others about green infrastructure. There was discussion about having this be a destination for school field trips
Discuss each item in detail and how it relates to stormwater management and education. Rain gardens will receive flow from catch basins that are tributary to combined sewers. Porous pavement pathway will be used – will serve as a means to keep a dirt path from forming. Along the way, there will be educational signage relating to green infrastructure. While the butterfly gardens don’t add any true stormwater management benefits, the community wanted these as a way to beautify their area. Onondaga Earth Corps will solicit volunteers from the community to plant the rain gardens. The remaining work (including preparation of the rain garden beds) will be completed by the County’s project contractor.
Could sum up the lessons in the first bullet – this is key. Remember, communication is 2 ways: it’s important to convey your message, but also be sure the community feels that they are being heardAfter you have established relationships with the community leaders, use them as advocates for the project. The community respects and trusts them already – show the community that you trust them, too, by giving them pieces to present at “your” public meeting
We were working with a compressed schedule; however, we should have started earlier on the restoration meetings. By the time these meetings were held, the project was already out to bid. It wasn’t until the restoration meetings were being held that the immediate residents attended a meeting.
The public outreach on this project was truly a team effort, and we’d be remiss if we didn’t recognize….