SlideShare ist ein Scribd-Unternehmen logo
1 von 15
HP BOILERS
HP BOILERS
Sr   Parameter                   OV     Unit     alarm                          Sr   Parameter                      OV       unit    alar
no                                                                              no                                                   m

1    Main steam pressure/Drum    85     Kg/cm2                                  22   Primary SH before Attmpt.      354      0c
     pressure
                                                                                23   ESP outlet flue gas            129      0c
2    Main steam temperature      463    0c
3    Drum level                  336    Mmwc                                    24   ESP 1A                         20/135   Ma

4    Oxygen                      8.56   %                                       25   ESP 1B                         40/160   Ma




                                                         OPERATING PARAMETERS
5    FD air                      36.5   M3/hr                                   26   85/46 PRV open %               15
6    Furnace draft               0      Mmwc
                                                                                27   PDM tank temperature           50       0c
7    ID Suction draft            26     Mmwc
                                                                                28   PDM tank level
8    FD Discharge dreaft         27     Mmwc
                                                                                29   Instrument air pressure
9    Pressure under grate        14     Mmwc
                                                                                30   Ash Hooper level
10   Draft Eco in                5      Mmwc
                                                                                31   Deaerator level
11   Draft eco out               40     Mmwc
                                                                                32   85/46 pressure                 42.5     Kg/c2
12   Draft dust coo outlet       55     Mmwc
13   Secondary air pressure                                                     33   CBD Conductivity

14   Load ID                     185    Amps                                    34   Deaerator water conductivity

15   Load FD                     24     Amps                                    35   Feed water Ph
16   FW temperature before Eco   131    0c
17   FW temperature after Eco    218    0c
18   Boiler outlet gas           377    0c
19   Eco outlet gas              197    0c
20   A                           143    0c
AIR COMPRESSORS


NPP :   KG KHOSLA MAKE                  SPL :    KG KHOSLA MAKE
        Double stage                             Double stage
        3H Y2TCER                                Air comp no 4,5,6
        RPM : 650                                RPM : 800
        Pr. : 7 kg/cm2                           Pr. : 7 kg/cm2
        Cap : 5.89 m3/min                        Cap : 51.41 m3/min
        Pr 1 st stage : 2 kg/cm2                 Pr 1 st stage : 2 kg/cm2
        pr 2 nd stage : 5.5 kg/cm2               pr 2 nd stage : 5.5 kg/cm2
        oil pr. : 2.5 kg/cm2                     oil pr. : 2.5 kg/cm2


                      SPL :   KG KHOSLA MAKE
                              Single stage
                              Air comp no 2
                              RPM : 560
                              Pr. : 7 kg/cm2
                              Cap : 11.01 m3/min
                              oil pr. : 2.5 kg/cm2
AIR COMPRESSORS

 Air compressors in power house are situated as follows Motor load: 230-250 A

1) 2 nos at old power plant

2) 2 nos at new power plant

3) 4 nos at specialty machine area

                                               cooler   2.5 kg/cm2

 Air comp no 2,6,4,5                                                           PROCESS
                                               cooler



                                                                 Coating plant
                                                    5 kg/cm2
AD        AD

                                      cooler
                                                   5 kg/cm2    Pulp mill , spl machines ,
                       RECIEVER                                Clo2 plant, power house
                         TANK
                                      cooler
SPECIALITY PUMP HOUSE DETAILS
                                                                              250 M3/HR
                                                                              4 K/C2
                                                  TW NO 9 / 6                 85 A




                                                                                            COATING PLANT
                     NEW POWER HOUSE




                                                                           AIR COMPRESSOR
                               M3/HR




                                                 55/ 150 LINE
                              2-2.5 K/C2
                              65-70 A




                                                                                                            PULP MILL
           SHUT               1 RUNNING                           1 RUNNING

TUBE WELL LINES:    3,4,8,16,20,22. 10,12,14,15,17              18,19   1,21
OPP office
10KG STEAM HEADER               rail     clo2
                     SM                           PULP MILL


      ABL




                            PRV 10/7                     10 KG
                                                         TG
             LIME KLIN




                                                                     From 46/17/7 prv
        Dorr plant    JMW APH          7 KG BTH
PDM


                               DEAERATOR

         OT                                 Suction

                                                      TO
                                                      HP
                                                      BOILERS


                                                      TO
                                                      ABL
                                                      BOILERS
 DARE.
  ABL




                                                      Suction




                      ABL          EFP1    85 KG      ABL
                      FP    EFP2           STEAM      STEAM
                                           FP         FP
ABL
deae. pump          LAY OUT FEED WATER (HP) SYSTEM
HP BOILER AND ABL FEED WATER




      HP BOILER 3                           HP BOILER 2         HP BOILER 1

ECO                                   ECO                 ECO
                      FROM ABL PUMP




                                            ABL
OPERATING PARAMETRES
Sr   Parameter                   OV            Sr   Parameter           OV
no                                             no


     ABL FEED PUMP                                  HP FEED PUMP
1    SUCTION PR                  2.7
                                                    STEAM
2    DISCHARGE PR                70      78    1    RPM                 2600

3    BALACING PR                 3.0           2    CONTROL OIL PR      2.3

4    ABL DEAERATOR WATER TEMP    100           3    LUB OIL TEMP        44

5    DEAERATOR PUMP PR                         4    INLET STEAM PR      54

6    DEAERATOR PUMP LOAD         13.5          5    EXH STEAM PR        1.6-
                                                                        2.0
7    BEARING TEMP MAX            60
                                               6    MOTOR LOAD          110
     HP FEED PUMP                              7    BOILER WATER COND   60-70   55   75


1    WATER TEMP                  108

2    FEED WATER COND             5-6

3    FEED WATER PH               9 -10

4    FEED PUMP SUC PR            1.3

5    DISCHARGE PR                100

6    BALANCING PR                1.4

7    PUMP NDE BEARING            40-45   70

8    PUMP DE BEARING TEMP        40-45   105
9    MOTOR WINDING               30-35

     MOTOR BEARING DE            35-40   85

     MOTOR NDE                           90

21
FLUE GAS PATH HP BOILER
                                                             SECONDARY AIR


         BOILER                   1 ST CYCLON                   2 ND CYCLON                   3RD CYCLON


                            TO GRATE
                                                                    HOT AIR OUT


                                              AIR PRE
            ESP                                                              ECONOMISER
                                              HEATER

                                                  FD AIR




                                 SCREW CONVEYERS

                           TO SUBMURGED ASH BELT
RATED FLOW RATE: ID FAN :97524 M3/HR AND FD FAN : 51876 M3/HR (AIR DENSITY 1.20 KG/M3 AT 20 DEG CEL)
ASH CONTENT V/S EXPECTED BOILER EFFICIENCY


Sr      ASH CONTENT %   COMUSTIBLE IN REFUSE   INDIRECT BOILER
no00                                           EFFICIENCY

1       15              8-9                    79.8-80.8
2       20              5-6                    83-83.6
                                                                 SULP
                                                                 HER
3       25              4.5-5                  83.6-84.1         %
4       30              5.4-6.4                82.4-83.4         1.8
5       35              8-9.5                  79.3-80
6       40              9.6-11.6               77.2-79
7       45              12-14                  74.2-74.8
18
SAFETY VALVES SETTINGS

JMW BOILER:        51 , 50 , 48       (RHS,LHS,SUPER HEATER)

BOILER NO 1,2,3:   94.8, 93.6, 91.2   (RHS,LHS,SUPER HEATER)

BOILER NO 7:       51, 50, 48.5       (RHS,LHS,SUPER HEATER)

ABL BOILER
OPERATING ALARMS ON PANEL
Sr   Parameter                    OV   Sr   Parameter                       O
no                                     no                                   V

     HP BOILER 1,2,3                        DRUM LEVEL HIGH


1    EMERGENCY TRIP                    1    MAIN STEAM TEMP HIGH

2    ID FAN TRIPPED                    2    MAIN STEAM TEMP LOW

3    FD FAN TRIPPED                    3    AIR FLOW LESS THAN 30 %

4    SA FAN TRIPPED                    4    FUEL PR LOW

5    COAL FEEDER 1 TRIPPED             5    AIR COMP 1 STOPPED
6    COAL FEEDER 2 TRIPPED             6    AIR COPMPRESSOR 2 STOPPED

7    COAL FEEDER 3 TRIPPED             7    DEAERATOR LEVEL LOW

     COAL FEEDER 4 TRIPPED                  EICM CERM RELAY MOTOR O/L

1    STOKER TRIPPED                    1    ESP1 FIELD 1 A TRIPPED

2    COAL FEEDRE NO 1 SPEED LOW        2    FIELD 1 B TRIPPED

3    COAL FEEDRE NO 2 SPEED LOW        3    ASH HOOPER LEVEL HIGH

4    COAL FEEDRE NO 3 SPEED LOW        4    RALV SC TRIPPED

5    COAL FEEDRE NO 4 SPEED LOW        5    ESP FIELD 1A 1B WORKING ALARM

6    INST AIR PRESSURE VERY LOW        6    O2 HIGH EXCESS AIR

7    DRUM PR HIGH                      7

8    DRUM PR VERY LOW                  8
9    DRUM LEVEL VERY LOW               9
OPERATING ALARMS ON PANEL
Sr   Parameter                         Sr   Parameter
no                                     no

     HP BOILER 1,2,3                        ABL BOILER
                                       1    EMERGENCY TRIP
1    MAIN STEAM HEADER PR LOW
                                       2    DRUM LEVEL LOW
2    86/46 LINE PR LOW
                                       3    DRUM LEVEL HIGH
3    PDM PUMP 1 STOP
                                       4    FURNACE PRESSURE HIGH
4    PDM PUMP 2 STOP                   5    FURNACE PRESSURE LOW
5    CBD1 COND LOW                     6    OVERHEAD TANK LEVEL LOW
6    CBD 2 COND LOW                    7    DRUM LEVEL LOW
7    CBD 3 COND LOW                         DRUM LEVEL VERY LOW

     DEAERATOR COND HIGH               1    DRUM LEVEL HIGH

1    FEED WATER PH LOW                 2    AIR FLOW LESS THAN 30 %
                                       3    C
2    FEED WATER PH HIGH

3

4

5

6

7

8

9
OPERATING INSTRUMENTS ON PANEL
Sr   Parameter                       Sr   Parameter
no                                   no

     HP BOILER 1,2,3                      DEAERATOE PRESSURE
                                          CONTROLLER
1    ID SUCTION DRAFT MMWC           1    DEAERATOR LEVEL CONTROLLER

2    FD DISCHARGE DRAFT MMWC         2

3    APH INLET DRAFT MMWC            3

4    AIR PH OUTLET                   4

5    ECON IN                         5

6    ECON OUT                        6

7    SA FAN                          7

     DEAERATOR LEVEL

1    APH OUTLET GAS TEMP             1

2    FURNACE DRAFT CONTROLLER        2

3    FEED WATER FLOW INTIGRATOR      3

4    STEAM FLOW INTIGRATOR           4

5    MAIN STEAM TEMP                 5
     CONTROLLER
                                     6
6    STEAM PR CONTROLLER
                                     7
7    OXYGEN CONTROLLER
                                     8
8    AIR FLOW CONTROLLER
                                     9
9    DRUM LEVEL FEED WATER
     CONTROLLER

Weitere Àhnliche Inhalte

Was ist angesagt?

High pressure boilers
High pressure boilersHigh pressure boilers
High pressure boilerssneh patel
 
Supercritical Power Plants
Supercritical Power PlantsSupercritical Power Plants
Supercritical Power PlantsErwan Yulianto
 
Seminar report on supercritical thenology
Seminar report on supercritical thenologySeminar report on supercritical thenology
Seminar report on supercritical thenologynirgudebhau111
 
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Raghab Gorain
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipatpratikguptateddy
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
ganesh ppts on supercritical thenology
ganesh ppts on supercritical thenologyganesh ppts on supercritical thenology
ganesh ppts on supercritical thenologynirgudebhau111
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boilerAshvani Shukla
 
Design of superheater for 210 MW thermal powerplant final
Design of superheater for 210 MW thermal powerplant finalDesign of superheater for 210 MW thermal powerplant final
Design of superheater for 210 MW thermal powerplant finalKundan Chakraborty
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Superhtr
SuperhtrSuperhtr
SuperhtrRavi Kumar
 
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@SSEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@SSamriddha Shil
 
Determining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler EfficiencyDetermining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler EfficiencyCleaver-Brooks
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSharshavardhan sivadi
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppeYash Shah
 

Was ist angesagt? (20)

High pressure boilers
High pressure boilersHigh pressure boilers
High pressure boilers
 
Supercritical Power Plants
Supercritical Power PlantsSupercritical Power Plants
Supercritical Power Plants
 
Seminar report on supercritical thenology
Seminar report on supercritical thenologySeminar report on supercritical thenology
Seminar report on supercritical thenology
 
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipat
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
ganesh ppts on supercritical thenology
ganesh ppts on supercritical thenologyganesh ppts on supercritical thenology
ganesh ppts on supercritical thenology
 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Design of superheater for 210 MW thermal powerplant final
Design of superheater for 210 MW thermal powerplant finalDesign of superheater for 210 MW thermal powerplant final
Design of superheater for 210 MW thermal powerplant final
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Superhtr
SuperhtrSuperhtr
Superhtr
 
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@SSEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
 
Determining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler EfficiencyDetermining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler Efficiency
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppe
 

Andere mochten auch

High Pressure Boilers
High Pressure BoilersHigh Pressure Boilers
High Pressure BoilersVanita Thakkar
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)sneh patel
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentationanshsmartstud
 
Boiler final
Boiler finalBoiler final
Boiler finalHet Patel
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilersTariq Jamshaid
 
Power plant high pressure boilers 1
Power plant high pressure boilers 1Power plant high pressure boilers 1
Power plant high pressure boilers 1PRANAV PATEL
 
Boiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharelBoiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharelansaluniversity3
 
High pressure boilers 050,18,48
High pressure boilers 050,18,48High pressure boilers 050,18,48
High pressure boilers 050,18,48Maharshi Soni
 
Boiler operation
Boiler operationBoiler operation
Boiler operationSakshi Vashist
 
Steam boilers
Steam boilersSteam boilers
Steam boilerssarat7
 
Industrial boilers Easy Explained A to Z with Design & Analysis
Industrial boilers Easy Explained A to Z with Design & AnalysisIndustrial boilers Easy Explained A to Z with Design & Analysis
Industrial boilers Easy Explained A to Z with Design & AnalysisHashim Hasnain Hadi
 
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash HandlingVanita Thakkar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantShikhar Sodhani
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station workingRonak Thakare
 

Andere mochten auch (20)

High Pressure Boilers
High Pressure BoilersHigh Pressure Boilers
High Pressure Boilers
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 
Boilers
BoilersBoilers
Boilers
 
Boiler final
Boiler finalBoiler final
Boiler final
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilers
 
Power plant high pressure boilers 1
Power plant high pressure boilers 1Power plant high pressure boilers 1
Power plant high pressure boilers 1
 
Boiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharelBoiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharel
 
High pressure boilers 050,18,48
High pressure boilers 050,18,48High pressure boilers 050,18,48
High pressure boilers 050,18,48
 
Boiler
BoilerBoiler
Boiler
 
Boiler operation
Boiler operationBoiler operation
Boiler operation
 
Steam boilers
Steam boilersSteam boilers
Steam boilers
 
Industrial boilers Easy Explained A to Z with Design & Analysis
Industrial boilers Easy Explained A to Z with Design & AnalysisIndustrial boilers Easy Explained A to Z with Design & Analysis
Industrial boilers Easy Explained A to Z with Design & Analysis
 
Safe Operation and Explosions in Boilers
Safe Operation and Explosions in BoilersSafe Operation and Explosions in Boilers
Safe Operation and Explosions in Boilers
 
Boiler Introduction
Boiler IntroductionBoiler Introduction
Boiler Introduction
 
Ppt on boilers
Ppt on boilersPpt on boilers
Ppt on boilers
 
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 

Ähnlich wie HP BOILERS OPERATING PARAMETERS

BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE Sakshi Vashist
 
Gas producer plant
Gas producer plantGas producer plant
Gas producer plantSakshi Vashist
 
Enterprise High Desity Cooling
Enterprise High Desity CoolingEnterprise High Desity Cooling
Enterprise High Desity Coolingmartyp01
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)PRAN-RFL Group
 
Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) SYED KHURSHID ALAM ARZOO
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiencyManohar Tatwawadi
 
conversion from HCFC to hydrocarbons
conversion from HCFC to hydrocarbonsconversion from HCFC to hydrocarbons
conversion from HCFC to hydrocarbonsUNEP OzonAction
 
Nfl nangal urea plant (1)
Nfl nangal urea  plant (1)Nfl nangal urea  plant (1)
Nfl nangal urea plant (1)Prem Baboo
 
Thermal cracking (2)
Thermal cracking (2)Thermal cracking (2)
Thermal cracking (2)Kumar
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingPRAN-RFL Group
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2Yuri Melliza
 
Power house specifications & operations
Power house specifications & operationsPower house specifications & operations
Power house specifications & operationsSakshi Vashist
 
Introduction of transcritical refrigeration cycle utilizing co2 a
Introduction of transcritical refrigeration cycle utilizing co2 aIntroduction of transcritical refrigeration cycle utilizing co2 a
Introduction of transcritical refrigeration cycle utilizing co2 aShine Kunnath
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2Yuri Melliza
 
TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE Manohar Tatwawadi
 

Ähnlich wie HP BOILERS OPERATING PARAMETERS (20)

BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE
 
Tg turbine
Tg turbineTg turbine
Tg turbine
 
Gas producer plant
Gas producer plantGas producer plant
Gas producer plant
 
IICHE, Kochi Regional Centre CHEM QUIZ 2013
IICHE, Kochi Regional Centre CHEM QUIZ 2013IICHE, Kochi Regional Centre CHEM QUIZ 2013
IICHE, Kochi Regional Centre CHEM QUIZ 2013
 
Enterprise High Desity Cooling
Enterprise High Desity CoolingEnterprise High Desity Cooling
Enterprise High Desity Cooling
 
K022 Series new.pdf
K022 Series new.pdfK022 Series new.pdf
K022 Series new.pdf
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)
 
Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation)
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
conversion from HCFC to hydrocarbons
conversion from HCFC to hydrocarbonsconversion from HCFC to hydrocarbons
conversion from HCFC to hydrocarbons
 
Nfl nangal urea plant (1)
Nfl nangal urea  plant (1)Nfl nangal urea  plant (1)
Nfl nangal urea plant (1)
 
Thermal cracking (2)
Thermal cracking (2)Thermal cracking (2)
Thermal cracking (2)
 
Oxygen Gas Plants India
Oxygen Gas Plants IndiaOxygen Gas Plants India
Oxygen Gas Plants India
 
GB1060 KOLD-DRAFT Commercial Ice Machines
GB1060 KOLD-DRAFT Commercial Ice MachinesGB1060 KOLD-DRAFT Commercial Ice Machines
GB1060 KOLD-DRAFT Commercial Ice Machines
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
 
Power house specifications & operations
Power house specifications & operationsPower house specifications & operations
Power house specifications & operations
 
Introduction of transcritical refrigeration cycle utilizing co2 a
Introduction of transcritical refrigeration cycle utilizing co2 aIntroduction of transcritical refrigeration cycle utilizing co2 a
Introduction of transcritical refrigeration cycle utilizing co2 a
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
 
TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE
 

Mehr von Sakshi Vashist

Puzzles to puzzle you
Puzzles to puzzle youPuzzles to puzzle you
Puzzles to puzzle youSakshi Vashist
 
Mind blowing puzzles
Mind blowing puzzlesMind blowing puzzles
Mind blowing puzzlesSakshi Vashist
 
400 challenging puzzles
400 challenging puzzles400 challenging puzzles
400 challenging puzzlesSakshi Vashist
 
400 infy puzzles
400 infy puzzles400 infy puzzles
400 infy puzzlesSakshi Vashist
 
Aptitude testing puzzles for freshers
Aptitude testing puzzles for freshersAptitude testing puzzles for freshers
Aptitude testing puzzles for freshersSakshi Vashist
 
MCC Motor Control Center 4
MCC Motor Control Center 4MCC Motor Control Center 4
MCC Motor Control Center 4Sakshi Vashist
 
MCC Motor Control Center 3
MCC Motor Control Center 3MCC Motor Control Center 3
MCC Motor Control Center 3Sakshi Vashist
 
MCC Motor Control Center 2
MCC Motor Control Center 2MCC Motor Control Center 2
MCC Motor Control Center 2Sakshi Vashist
 
MCC Motor Control Center 1
MCC Motor Control Center 1MCC Motor Control Center 1
MCC Motor Control Center 1Sakshi Vashist
 
Residential Surge Protection 3
Residential Surge Protection 3Residential Surge Protection 3
Residential Surge Protection 3Sakshi Vashist
 
Residential Surge Protection 2
Residential Surge Protection 2Residential Surge Protection 2
Residential Surge Protection 2Sakshi Vashist
 
Residential Surge Protection 1
Residential Surge Protection 1Residential Surge Protection 1
Residential Surge Protection 1Sakshi Vashist
 
Plc operation part 4
Plc operation part 4Plc operation part 4
Plc operation part 4Sakshi Vashist
 
Plc operation part 3
Plc operation part 3Plc operation part 3
Plc operation part 3Sakshi Vashist
 
Plc operation part 2
Plc operation part 2Plc operation part 2
Plc operation part 2Sakshi Vashist
 
PLC operation part 1
PLC operation part 1PLC operation part 1
PLC operation part 1Sakshi Vashist
 
variable frequency drive (VFD) installation
variable frequency drive (VFD) installationvariable frequency drive (VFD) installation
variable frequency drive (VFD) installationSakshi Vashist
 
Power plant instrumentation
Power plant instrumentationPower plant instrumentation
Power plant instrumentationSakshi Vashist
 
All about paper making process
All about paper making processAll about paper making process
All about paper making processSakshi Vashist
 
About ballarpur industries limited
About ballarpur industries limitedAbout ballarpur industries limited
About ballarpur industries limitedSakshi Vashist
 

Mehr von Sakshi Vashist (20)

Puzzles to puzzle you
Puzzles to puzzle youPuzzles to puzzle you
Puzzles to puzzle you
 
Mind blowing puzzles
Mind blowing puzzlesMind blowing puzzles
Mind blowing puzzles
 
400 challenging puzzles
400 challenging puzzles400 challenging puzzles
400 challenging puzzles
 
400 infy puzzles
400 infy puzzles400 infy puzzles
400 infy puzzles
 
Aptitude testing puzzles for freshers
Aptitude testing puzzles for freshersAptitude testing puzzles for freshers
Aptitude testing puzzles for freshers
 
MCC Motor Control Center 4
MCC Motor Control Center 4MCC Motor Control Center 4
MCC Motor Control Center 4
 
MCC Motor Control Center 3
MCC Motor Control Center 3MCC Motor Control Center 3
MCC Motor Control Center 3
 
MCC Motor Control Center 2
MCC Motor Control Center 2MCC Motor Control Center 2
MCC Motor Control Center 2
 
MCC Motor Control Center 1
MCC Motor Control Center 1MCC Motor Control Center 1
MCC Motor Control Center 1
 
Residential Surge Protection 3
Residential Surge Protection 3Residential Surge Protection 3
Residential Surge Protection 3
 
Residential Surge Protection 2
Residential Surge Protection 2Residential Surge Protection 2
Residential Surge Protection 2
 
Residential Surge Protection 1
Residential Surge Protection 1Residential Surge Protection 1
Residential Surge Protection 1
 
Plc operation part 4
Plc operation part 4Plc operation part 4
Plc operation part 4
 
Plc operation part 3
Plc operation part 3Plc operation part 3
Plc operation part 3
 
Plc operation part 2
Plc operation part 2Plc operation part 2
Plc operation part 2
 
PLC operation part 1
PLC operation part 1PLC operation part 1
PLC operation part 1
 
variable frequency drive (VFD) installation
variable frequency drive (VFD) installationvariable frequency drive (VFD) installation
variable frequency drive (VFD) installation
 
Power plant instrumentation
Power plant instrumentationPower plant instrumentation
Power plant instrumentation
 
All about paper making process
All about paper making processAll about paper making process
All about paper making process
 
About ballarpur industries limited
About ballarpur industries limitedAbout ballarpur industries limited
About ballarpur industries limited
 

KĂŒrzlich hochgeladen

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 

KĂŒrzlich hochgeladen (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 

HP BOILERS OPERATING PARAMETERS

  • 2. HP BOILERS Sr Parameter OV Unit alarm Sr Parameter OV unit alar no no m 1 Main steam pressure/Drum 85 Kg/cm2 22 Primary SH before Attmpt. 354 0c pressure 23 ESP outlet flue gas 129 0c 2 Main steam temperature 463 0c 3 Drum level 336 Mmwc 24 ESP 1A 20/135 Ma 4 Oxygen 8.56 % 25 ESP 1B 40/160 Ma OPERATING PARAMETERS 5 FD air 36.5 M3/hr 26 85/46 PRV open % 15 6 Furnace draft 0 Mmwc 27 PDM tank temperature 50 0c 7 ID Suction draft 26 Mmwc 28 PDM tank level 8 FD Discharge dreaft 27 Mmwc 29 Instrument air pressure 9 Pressure under grate 14 Mmwc 30 Ash Hooper level 10 Draft Eco in 5 Mmwc 31 Deaerator level 11 Draft eco out 40 Mmwc 32 85/46 pressure 42.5 Kg/c2 12 Draft dust coo outlet 55 Mmwc 13 Secondary air pressure 33 CBD Conductivity 14 Load ID 185 Amps 34 Deaerator water conductivity 15 Load FD 24 Amps 35 Feed water Ph 16 FW temperature before Eco 131 0c 17 FW temperature after Eco 218 0c 18 Boiler outlet gas 377 0c 19 Eco outlet gas 197 0c 20 A 143 0c
  • 3. AIR COMPRESSORS NPP : KG KHOSLA MAKE SPL : KG KHOSLA MAKE Double stage Double stage 3H Y2TCER Air comp no 4,5,6 RPM : 650 RPM : 800 Pr. : 7 kg/cm2 Pr. : 7 kg/cm2 Cap : 5.89 m3/min Cap : 51.41 m3/min Pr 1 st stage : 2 kg/cm2 Pr 1 st stage : 2 kg/cm2 pr 2 nd stage : 5.5 kg/cm2 pr 2 nd stage : 5.5 kg/cm2 oil pr. : 2.5 kg/cm2 oil pr. : 2.5 kg/cm2 SPL : KG KHOSLA MAKE Single stage Air comp no 2 RPM : 560 Pr. : 7 kg/cm2 Cap : 11.01 m3/min oil pr. : 2.5 kg/cm2
  • 4. AIR COMPRESSORS  Air compressors in power house are situated as follows Motor load: 230-250 A 1) 2 nos at old power plant 2) 2 nos at new power plant 3) 4 nos at specialty machine area cooler 2.5 kg/cm2 Air comp no 2,6,4,5 PROCESS cooler Coating plant 5 kg/cm2 AD AD cooler 5 kg/cm2 Pulp mill , spl machines , RECIEVER Clo2 plant, power house TANK cooler
  • 5. SPECIALITY PUMP HOUSE DETAILS 250 M3/HR 4 K/C2 TW NO 9 / 6 85 A COATING PLANT NEW POWER HOUSE AIR COMPRESSOR M3/HR 55/ 150 LINE 2-2.5 K/C2 65-70 A PULP MILL SHUT 1 RUNNING 1 RUNNING TUBE WELL LINES: 3,4,8,16,20,22. 10,12,14,15,17 18,19 1,21
  • 6. OPP office 10KG STEAM HEADER rail clo2 SM PULP MILL ABL PRV 10/7 10 KG TG LIME KLIN From 46/17/7 prv Dorr plant JMW APH 7 KG BTH
  • 7. PDM DEAERATOR OT Suction TO HP BOILERS TO ABL BOILERS DARE. ABL Suction ABL EFP1 85 KG ABL FP EFP2 STEAM STEAM FP FP ABL deae. pump LAY OUT FEED WATER (HP) SYSTEM
  • 8. HP BOILER AND ABL FEED WATER HP BOILER 3 HP BOILER 2 HP BOILER 1 ECO ECO ECO FROM ABL PUMP ABL
  • 9. OPERATING PARAMETRES Sr Parameter OV Sr Parameter OV no no ABL FEED PUMP HP FEED PUMP 1 SUCTION PR 2.7 STEAM 2 DISCHARGE PR 70 78 1 RPM 2600 3 BALACING PR 3.0 2 CONTROL OIL PR 2.3 4 ABL DEAERATOR WATER TEMP 100 3 LUB OIL TEMP 44 5 DEAERATOR PUMP PR 4 INLET STEAM PR 54 6 DEAERATOR PUMP LOAD 13.5 5 EXH STEAM PR 1.6- 2.0 7 BEARING TEMP MAX 60 6 MOTOR LOAD 110 HP FEED PUMP 7 BOILER WATER COND 60-70 55 75 1 WATER TEMP 108 2 FEED WATER COND 5-6 3 FEED WATER PH 9 -10 4 FEED PUMP SUC PR 1.3 5 DISCHARGE PR 100 6 BALANCING PR 1.4 7 PUMP NDE BEARING 40-45 70 8 PUMP DE BEARING TEMP 40-45 105 9 MOTOR WINDING 30-35 MOTOR BEARING DE 35-40 85 MOTOR NDE 90 21
  • 10. FLUE GAS PATH HP BOILER SECONDARY AIR BOILER 1 ST CYCLON 2 ND CYCLON 3RD CYCLON TO GRATE HOT AIR OUT AIR PRE ESP ECONOMISER HEATER FD AIR SCREW CONVEYERS TO SUBMURGED ASH BELT RATED FLOW RATE: ID FAN :97524 M3/HR AND FD FAN : 51876 M3/HR (AIR DENSITY 1.20 KG/M3 AT 20 DEG CEL)
  • 11. ASH CONTENT V/S EXPECTED BOILER EFFICIENCY Sr ASH CONTENT % COMUSTIBLE IN REFUSE INDIRECT BOILER no00 EFFICIENCY 1 15 8-9 79.8-80.8 2 20 5-6 83-83.6 SULP HER 3 25 4.5-5 83.6-84.1 % 4 30 5.4-6.4 82.4-83.4 1.8 5 35 8-9.5 79.3-80 6 40 9.6-11.6 77.2-79 7 45 12-14 74.2-74.8 18
  • 12. SAFETY VALVES SETTINGS JMW BOILER: 51 , 50 , 48 (RHS,LHS,SUPER HEATER) BOILER NO 1,2,3: 94.8, 93.6, 91.2 (RHS,LHS,SUPER HEATER) BOILER NO 7: 51, 50, 48.5 (RHS,LHS,SUPER HEATER) ABL BOILER
  • 13. OPERATING ALARMS ON PANEL Sr Parameter OV Sr Parameter O no no V HP BOILER 1,2,3 DRUM LEVEL HIGH 1 EMERGENCY TRIP 1 MAIN STEAM TEMP HIGH 2 ID FAN TRIPPED 2 MAIN STEAM TEMP LOW 3 FD FAN TRIPPED 3 AIR FLOW LESS THAN 30 % 4 SA FAN TRIPPED 4 FUEL PR LOW 5 COAL FEEDER 1 TRIPPED 5 AIR COMP 1 STOPPED 6 COAL FEEDER 2 TRIPPED 6 AIR COPMPRESSOR 2 STOPPED 7 COAL FEEDER 3 TRIPPED 7 DEAERATOR LEVEL LOW COAL FEEDER 4 TRIPPED EICM CERM RELAY MOTOR O/L 1 STOKER TRIPPED 1 ESP1 FIELD 1 A TRIPPED 2 COAL FEEDRE NO 1 SPEED LOW 2 FIELD 1 B TRIPPED 3 COAL FEEDRE NO 2 SPEED LOW 3 ASH HOOPER LEVEL HIGH 4 COAL FEEDRE NO 3 SPEED LOW 4 RALV SC TRIPPED 5 COAL FEEDRE NO 4 SPEED LOW 5 ESP FIELD 1A 1B WORKING ALARM 6 INST AIR PRESSURE VERY LOW 6 O2 HIGH EXCESS AIR 7 DRUM PR HIGH 7 8 DRUM PR VERY LOW 8 9 DRUM LEVEL VERY LOW 9
  • 14. OPERATING ALARMS ON PANEL Sr Parameter Sr Parameter no no HP BOILER 1,2,3 ABL BOILER 1 EMERGENCY TRIP 1 MAIN STEAM HEADER PR LOW 2 DRUM LEVEL LOW 2 86/46 LINE PR LOW 3 DRUM LEVEL HIGH 3 PDM PUMP 1 STOP 4 FURNACE PRESSURE HIGH 4 PDM PUMP 2 STOP 5 FURNACE PRESSURE LOW 5 CBD1 COND LOW 6 OVERHEAD TANK LEVEL LOW 6 CBD 2 COND LOW 7 DRUM LEVEL LOW 7 CBD 3 COND LOW DRUM LEVEL VERY LOW DEAERATOR COND HIGH 1 DRUM LEVEL HIGH 1 FEED WATER PH LOW 2 AIR FLOW LESS THAN 30 % 3 C 2 FEED WATER PH HIGH 3 4 5 6 7 8 9
  • 15. OPERATING INSTRUMENTS ON PANEL Sr Parameter Sr Parameter no no HP BOILER 1,2,3 DEAERATOE PRESSURE CONTROLLER 1 ID SUCTION DRAFT MMWC 1 DEAERATOR LEVEL CONTROLLER 2 FD DISCHARGE DRAFT MMWC 2 3 APH INLET DRAFT MMWC 3 4 AIR PH OUTLET 4 5 ECON IN 5 6 ECON OUT 6 7 SA FAN 7 DEAERATOR LEVEL 1 APH OUTLET GAS TEMP 1 2 FURNACE DRAFT CONTROLLER 2 3 FEED WATER FLOW INTIGRATOR 3 4 STEAM FLOW INTIGRATOR 4 5 MAIN STEAM TEMP 5 CONTROLLER 6 6 STEAM PR CONTROLLER 7 7 OXYGEN CONTROLLER 8 8 AIR FLOW CONTROLLER 9 9 DRUM LEVEL FEED WATER CONTROLLER