HARBOURFRONT CYCLEWAY FEASIBILITY STUDY ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Prepared by: Hong Kong Cycling Alliance    Revision 3.0 Further consideration has also been given to the comments received by us at the Harbourfront Commission on 7 th  September 2011.
Response to comments “ The Cycleway is only for the cyclists in Hong Kong” The Cycleway will give connectivity to the entire harbourfront for everybody visiting the attractions, as well as it being an attraction itself.
Response to comments “ It’s impossible to enjoy the view while cycling” Cycling is a great way to see the surrounding views, particularly when on segregated routes when little other traffic is around.
Response to comments “ you can't imagine a guy going from Shau Kei Wan up to Soho, even if he did, he would have to drop off his bike and walk the two kilometers uphill to where he’s going” Cycling is a great way to improve public health and can be a great alternative to cramped & claustrophobic public transport. Going from the cycleway up to Soho is actually the easiest part of the journey, using the mid-levels escalator, as everyone else does.
Response to comments “ Hong Kong is different to other cycling cites around the world” Hong Kong is different and unique, just like every other city is.  So if they have all overcome barriers and local conditions, and everywhere has, so can we .
Response to comments “ It is not the policy of the government to encourage cycling as transport” Martins answer.
Response to comments “ there isn’t room for adding a cycleway on the harbourfront” We have identified a route already, and a flexible approach means that we can find a way. The currently designed Central - Wanchai cycle track on the Harbourfront development already finds its way along the harbourfront, crossing pedestrian paths and making its way through the park. We can extend this concept throughout the harbourfront cycleway.
Response to comments “ there isn’t space for a cycleway along the harbourfront” Flexible designs mean that the cycleway can change it’s style and follow the most suitable locations as it progresses along the route.
Response to comments “ the roads in Hong Kong are too busy” The isolated sections of roads we are suggesting to use are quiet, seldom used roads. Mixed-use car and cycle sections have been minimised in the design of the route.
Response to comments “ Hong Kong Island is a dense urban environment” Whilst we agree that Hong Kong Island is a dense urban environment, it is this type of dichotomy that gives the cycleway and its views great appeal. The cycleway is planned to be segregated for the majority of its route, so the dense urban environment is only a background to the panoramic views.
Response to comments “ The cycle tracks are in the New Territories, cyclists can go there to ride” The Hong Kong Island Cycleway has a different role than most of the New Territory cycle tracks as it is designed to be more than simply recreational, but also for access to separated amenities along the harbourfront by tourists and the Hong Kong public.
Response to comments “ most cycling in Hong Kong is recreational” All cycling is recreational to some extent, but the Harbourfront Cycleway is seen primarily as a way to give tourists and the public connectivity to all of the Harbourfront attractions, as well as being an attraction itself.
Response to comments “ Cycling should only be on segregated cycle tracks” With a careful and modern design philosophy, a cycleway along the harbourfront can be achieved. Learning from cycleway designs around the world will enable the more challenging areas of the route to be accomplished.
Response to comments “ cycling is not compatible with pedestrians ” Cyclists are simply ‘enabled pedestrians’. A cyclist can stop and lock their bike, immediately becoming a pedestrian.
Response to comments “ the LCSD do not allow cycling within their parks” Permission to allow cycling in LCSD parks is at the discretion of the LCSD director, and it is hoped that with the public behind us, the LCSD can support the Harbourfront Cycleway also.
Response to comments “ how do cyclists get their bikes to the cycleway” Bike hire stations give enable Hong Kong residents and tourists to enjoy the cycleway whenever and wherever they prefer. People that cycle on the roads already will be given another ‘less traffic’ route to travel.
Response to comments “ T he IEC space is five metres, not nine” In our survey, the IEC columns are generally 9.7m apart, however we agree that in some cases near the slip roads this varies. With alternative design solutions such as shown in the HK Cycling Alliance IEC boardwalk video, we believe that incorporating the cycleway adjacent to the boardwalk is entirely possible.
Response to comments “ the cycleway is not an enabling component of the harbourfront” The Government has directed that the Harbourfront should be connected using an environmental transport system, and the cycleway offers this for relatively little investment when compared to other larger scale alternatives.
Hong Kong Island Cycling routes The existing route indicated is defined as the current continuous legal route nearest the harbour front that cyclists can use. The preliminary route indicated is possible with very minor improvements such as painting lines to create the cycleway and adding signs to find the most harbourfront route. The new route indicated is our interpretation of the best possible future route considering future developments, with the least impact on existing facilities to be maintained. The route is found to be highly feasible along its whole length, with respect to existing land use and ownership, connectivity, topography and adjacent features. Challenges of this route are noted at: •   Restricted width of public access around Causeway Bay Typhoon Shelter •   Gas pigging station between Quarry Bay Park Phase 1 and Hoi Yu Street area
Kennedy Town Harbourfront CYCLEWAY LEAVES CADOGAN PARK ALONGSIDE THE ROAD, AND THEN ALONG KENNEDY TOWN PRAYA EXISTING ROUTE – ONE-WAY SYSTEM AROUND KENNEDY TOWN MEANS CYCLISTS MUST USE THE VERY BUSY BELCHERS ROAD CONNECTIVITY TO KENNEDY TOWN MTR BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],ROADWAY WIDTH REDUCED – TWO LANES REMAINING FOR TURNING INTO KENNEDY TOWN PRAYA AREA ALLOCATED TO NEW BICYCLE HIRE/MAINTENANCE FACILITY CYCLEWAY
[object Object],[object Object],[object Object],ROADWAY WIDTH – TWO LANES REMAINING FOR TURNING INTO KENNEDY TOWN PRAYA, TRAFFIC ISLAND TO BE ALTERED AREA ALLOCATED TO NEW BICYCLE HIRE/MAINTENANCE FACILITY CYCLEWAY
[object Object],[object Object],[object Object],PARKING REMOVED AND ROAD TO REMAIN AS TWO LANES PUBLIC PEDESTRIAN ACCESS TO KENNEDY TOWN PRAYA HARBOURFRONT CYCLEWAY
Kennedy Town Harbourfront CURRENT USE: MTR WIL BARGING POINT LATER USE: HARBOURFRONT PUBLIC ACCESS OR CYCLEWAY TO PASS AT REAR OF PCWA, ADJACENT TO SHING SAI ROAD EXISTING ROUTE – ONE-WAY SYSTEM AROUND KENNEDY TOWN MEANS CYCLISTS MUST USE THE VERY BUSY BELCHERS ROAD EXISTING ROUTE – FOLLOWING THE BUSY SHING SAI ROAD WITH TWO LANES AND FAST-MOVING TRAFFIC CONNECTIVITY TO KENNEDY TOWN BUS STATION
[object Object],[object Object],[object Object],TWO LANES REMAIN FOR CAR USE, AS PER EXISTING CYCLEWAY IT WILL BE USEFUL TO FILL IN THE CORNER OF THE HARBOUR HERE
[object Object],[object Object],[object Object],BUS TERMINUS APPEARS UNDER-USED, WITH SPACE FOR MOVING BUS PARKING TOWARDS SHING SAI ROAD CYCLEWAY
[object Object],[object Object],[object Object],IT MAY NOT BE NECESSARY TO RETAIN THE PATHWAY ON THIS SIDE OF THE ROAD, AS THE PEDESTRIANS COULD USE THE HARBOURFRONT PEDESTRIAN AREA CYCLEWAY
Sai Wan Harbourfront CURRENT USE: WESTERN WHOLESALE FOOD MARKET – SUJATA GOVADA’S PROPOSAL * REPORTS THAT OPERATORS REQUIRE ONE PIER ONLY, OPENING UP THE HARBOURFRONT. A CYCLING BRIDGE COULD PASS OVER THE STILL-IN-USE PIER AREA EXISTING ROUTE – FOLLOWING THE BUSY SHING SAI ROAD EXISTING ROUTE – FOLLOWING THE BUSY SHING SAI ROAD AND CROSSING TRAFFIC FROM THE SLIP ROAD TO GET TO THE CONNAUGHT ROAD WEST FLYOVER *  HBF  Harbour-front  Connectivity Study, Hong Kong ,  Dr Sujata Govada (2008) CONNECTIVITY TO KENNEDY TOWN/SAI WAN CURRENT USE: WESTERN DISTRICT PCWA LATER USE: HARBOURFRONT PUBLIC ACCESS OR CYCLEWAY TO PASS AT REAR OF PCWA, ADJACENT TO SHING SAI ROAD PRELIMINARY ROUTE ON FUNG MAT ROAD
[object Object],[object Object],[object Object],POSSIBLE ROUTE ALONG PUBLIC PIER AREA CYCLEWAY ALTERNATIVE ROUTE TO FOLLOW SHING SAI ROAD AND TOWARDS THE HARBOUR ADJACENT TO FUNG MAT ROAD – PARKING REMOVED
[object Object],[object Object],[object Object],PEDESTRIAN AND CYCLEWAY BRIDGE OVER WHOLESALE MARKET PIER THAT WILL REMAIN IN USE CYCLEWAY
Sai Ying Pun Harbourfront CURRENT USE: CONSTRUCTION SITE AND TEMPORARY VEHICLE PARKING,  SPACE IS CONSTRAINED NEAR THE ENTRANCE RAMP TO THE WESTERN HARBOUR TUNNEL, HOWEVER THERE IS APPROXIMATELY 10M CLEAR, ADEQUATE TO INCLUDE A CYCLEWAY AND PEDESTRIAN BOARDWALK EXISTING ROUTE – USING CONNAUGHT RD FLYOVER CURRENT USE: SUN YAT SEN MEMORIAL PARK & WESTERN DISTRICT COMMUNITY GARDEN. LCSD TO ACCOMMODATE A CYCLEWAY THROUGH THE PARK EXISTING ROUTE – ON THE VERY BUSY CONNAUGHT ROAD WEST (UNDER THE HIGHWAY) ALTERNATIVE ROUTE FOLLOWING EXISTING PATHWAYS IN PARK  - SEE LATER EXTRACT PLAN WSD EQUIPMENT TO BE RELOCATED INTO WD AREA CONNECTIVITY TO SUN YAT SEN PARK BICYCLE PARKING/HIRE FACILITY PRELIMINARY ROUTE ON EXISTING PATH AND  FUNG MAT ROAD
[object Object],[object Object],[object Object],WESTERN HARBOUR TUNNEL APPROACH ROAD CYCLEWAY PEDESTRIAN BOARDWALK  EXISTING WATERFRONT
[object Object],[object Object],[object Object],EXISTING PUBLIC BOARDWALK TO BE OPENED IN NOVEMBER 2011 CYCLEWAY PEDESTRIAN BOARDWALK AND CYCLEWAY TO CONTINUE THROUGH EXISTING TRUCK PARK TOWARDS WESTERN TUNNEL ENTRANCE
[object Object],[object Object],[object Object],CYCLISTS MAY BE REQUIRED TO DISMOUNT FOR THIS SECTION. MTR ACCESS ROAD CAN BE RECONFIGURED AS COMBINED EMERGENCY ACCESS AND CYCLEWAY ALTERNATIVE CYCLEWAY ROUTE AROUND PARK BICYCLE PARKING/HIRE FACILITY PRELIMINARY ROUTE ON EXISTING PATH AND QUIET ROAD
[object Object],[object Object],[object Object],CYCLEWAY IT MAY BE POSSIBLE TO REMOVE THE PATHWAY ON THIS SIDE OF THE ROAD, AS THE PEDESTRIANS COULD USE THE HARBOURFRONT PEDESTRIAN AREA, INCREASING THE AVAILABLE WIDTH THE CYCLEWAY CAN BE DIVIDED TO FOLLOW THE DIRECTIONS OF THE TRAFFIC, OR BE SEGREGATED IF THE PATHWAY IS REDUCED
[object Object],[object Object],[object Object],EXISTING WSD EQUIPMENT TO BE RELOCATED CYCLEWAY EXISTING LIFTING BEAM AND UNDERWATER EQUIPMENT TO BE RELOCATED TO INSIDE WSD DEPOT AREA
Sheung Wan Harbourfront CURRENT USE: SHUN TAK CENTRE CYCLEWAY MAY NEED TO JOIN EXISTING ROAD FOR THIS SHORT SECTION, OR SHUN TAK CENTRE ON-ROAD PARKING IS REMOVED EXISTING ROUTE – THROUGH SHUN TAK CENTRE CYCLEWAY IS BUILT ADJACENT TO THE EXISTING ROADS, IN CENTRAL MEDIAN, CURRENTLY VEGETATION CONNECTIVITY TO MACAU FERRY & SHEUNG WAN BICYCLE PARKING/HIRE FACILITY BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],CYCLEWAY MIXED TRAFFIC LANE UNDER SHUN TAK CENTRE PEDESTRIAN ACCESS ON CANTILEVER BRIDGE?
[object Object],[object Object],[object Object],CYCLEWAY MIXED USE AREA WITH CARS AND BICYCLES
[object Object],[object Object],[object Object],CYCLEWAY EXTENDED PEDESTRIAN ACCESS WIDTH ACROSS HARBOUR CORNER
Central Harbourfront ROAD LAYOUT UNCLEAR UNDER PEDESTRIAN DECK CYCLEWAY CROSSES ROADS – CYCLISTS DISMOUNT EXISTING ROUTE –  MAN YIU STREET IS BUSY WITH TAXIS AND BUSES FROM THE FERRY PIERS AND THE BUS STATION CYCLEWAY IS BUILT IN THE SPACE ALLOCATED FOR THE LANDSCAPED MEDIAN OF THE ROAD CYCLEWAY FOLLOWS THE SPACE ALLOCATED TO IT IN CURRENT PLAN CONNECTIVITY TO CENTRAL FERRY PIERS CONNECTIVITY TO CENTRAL BUSINESS & SHOPPING DISTRICT BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY TO RUN BEHIND TREES ALONG ROADSIDE CYCLISTS TO DISMOUNT AT ROAD CROSSINGS.
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY TO RUN BEHIND TREES ALONG ROADSIDE
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY TO RUN BEHIND TREES ALONG ROADSIDE CYCLEWAY CROSSES ROAD, OR IT MAY BE POSSIBLE TO REMOVE SOME OF THE CROSSINGS ALONG THIS SECTION OF ROAD? TO EASE THE CONTINUOUS FLOW OF CYCLISTS
[object Object],[object Object],[object Object],LOCATION OF UP TO 400 BIKE PARKING SPACES FOR ISLAND COMMUTERS
Admiralty Harbourfront CYCLEWAY CROSSES MAJOR PEDESTRIAN FOOTPATHS – CYCLISTS GIVE WAY / DISMOUNT CYCLEWAY CROSSES MINOR PEDESTRIAN FOOTPATHS – CYCLISTS HAVE RIGHT OF WAY, PEDESTRIANS GIVE WAY EXISTING ROUTE – ROAD P2 ONLY RECENTLY OPENED AND WILL BE FAST-MOVING TRAFFIC WHEN COMPLETE CYCLEWAY FOLLOWS THE ALIGNMENT ALLOCATED TO IT IN CURRENT PLAN CONNECTIVITY TO ENTIRE  FUTURE HARBOURFRONT DEVELOPMENT CONNECTIVITY TO STAR FERRY CONNECTIVITY TO CENTRAL GOVERNMENT OFFICES AND ADMIRALTY SHOPPING DISTRICT BICYCLE PARKING/HIRE FACILITY BICYCLE PARKING/HIRE FACILITY
Wanchai Harbourfront ALTERNATIVE CYCLEWAY THROUGH HKCEC MAY BE ON-ROAD OR SEPARATED ROAD/CYCLEWAY INTERSECTION NEEDS CAREFUL DESIGN. TRAFFIC LIGHTS CAN INCLUDE BICYCLES-ONLY SEQUENCE DETAILED ROUTING CAN BE CONFIRMED WITH PLANNING LAYOUTS – SEE LATER EXTRACT EXISTING ROUTE – RELATIVELY FAST-MOVING SECTION MAKES CYCLING DIFFICULT AS CARS, BUSES AND TRUCKS TRY TO PASS CYCLISTS CONNECTIVITY TO STAR FERRY CONNECTIVITY TO GOLDEN BAUHINIA  CONNECTIVITY TO ENTIRE  FUTURE HARBOURFRONT DEVELOPMENT CONNECTIVITY TO WANCHAI BICYCLE PARKING/HIRE FACILITY PRELIMINARY ROUTE ACROSS GOLDEN BAUHINIA SQUARE PEDESTRIAN AREA
[object Object],[object Object],[object Object],CYCLEWAY
[object Object],[object Object],[object Object],CYCLEWAY CROSSES MAJOR PEDESTRIAN FOOTPATHS – CYCLISTS DISMOUNT CYCLEWAY CROSSES MINOR PEDESTRIAN FOOTPATHS – CYCLISTS HAVE RIGHT OF WAY, PEDESTRIANS CROSS WHEN FREE BICYCLE PARKING/HIRE FACILITY
Wanchai – Causeway Bay Harbourfront PLANNING DESIGN NOT AVAILABLE BUT AVAILABLE WIDTH INDICATES ADEQUATE SPACE FOR THE CYCLEWAY PLANNING DESIGN NOT AVAILABLE – A SHARED-USE BICYCLE-PEDESTRIAN AREA MAY BE REQUIRED CAR PARKING SPACES RELOCATED TO ENABLE THE CYCLEWAY ROUTE PINCH-POINT AT HARBOUR CROSSING ENTRANCE – MAY BE NECESSARY TO REMOVE A SERVICES HUT EXISTING ROUTE – HEAVILY TRAFFICKED BY BUSES ACCESSING HARBOUR TUNNEL CYCLISTS WOULD NEED TO DISMOUNT ALONG THIS CONSTRICTED AREA OF THE HARBOURFRONT – ANY WIDENING WOULD ALLEVIATE THIS EXISTING ROUTE – CYCLISTS DISMOUNT AND WALK 1km
[object Object],[object Object],[object Object],[object Object],CYCLEWAY SERVICES HUT (MAY NEED TO BE RELOCATED) CYCLEWAY CROSSES ROAD
[object Object],[object Object],[object Object],[object Object],PUBLIC ACCESS TO CWB TYPHOON SHELTER CYCLEWAY SERVICES HUT (MAY NEED TO BE RELOCATED)
Causeway Bay Harbourfront CYCLISTS WOULD NEED TO DISMOUNT ALONG THIS CONSTRICTED AREA OF THE HARBOURFRONT – ANY WIDENING WOULD ALLEVIATE THIS CHANGING THE LAYOUT OF THE LAY-BY TO REMOVE THE CENTRAL ISLAND WOULD ALLOW THE CYCLEWAY TO CONTINUE, SEPARATED FROM THE ROAD EXISTING ROUTE – CYCLISTS DISMOUNT AND WALK 1km 1 2 3 CONNECTIVITY TO CAUSEWAY BAY SHOPPING & HOTEL DISTRICT CONNECTIVITY TO VICTORIA PARK VIA FUTURE BRIDGE CONNECTIVITY TO FUTURE CWB TYPHOON SHELTER DEVELOPMENT BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],[object Object],RESTRICTED WIDTH – ANY INCREASE IN WIDTH (ON THÈ ROAD OR THE HARBOUR SIDE) WOULD HELP TO INSTALL THE CYCLEWAY. OTHERWISE, CYCLISTS WILL NEED TO DISMOUNT FOR THIS PART OF THE HARBOURFRONT CYCLWAY SERVICES HUT (MAY NEED TO BE RELOCATED)
[object Object],[object Object],[object Object],[object Object],RESTRICTED WIDTH DIVIDER TO REMOVE, AND RELOCATE LAY-BY IT MAY BE NECESSARY TO CANTILEVER WALKWAY TO CREATE WIDTH PUBLIC ACCESS TO CWB TYPHOON SHELTER CYCLEWAY
[object Object],[object Object],[object Object],[object Object],NEGLECTED GARDEN AREA REPURPOSED FOR CYCLEWAY PUBLIC ACCESS TO CWB TYPHOON SHELTER CYCLEWAY
Causeway Bay Harbourfront CYCLEWAY RUNS UNDER THE IEC ON BOARDWALK EXISTING ROUTE – CYCLISTS DISMOUNT AND WALK 1KM EXISTING ROUTE – CYCLISTS USE ELECTRIC ROAD / JAVA ROAD EASTBOUND AND KING’S ROAD / HING FAT STREET WESTBOUND CONNECTIVITY TO TIN HAU DISTRICT AND MTR ADDITIONAL CONNECTIVITY TO VICTORIA PARK BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],STRUCTURE TO FOLLOW STYLE OF IEC BOARDWALK  PUBLIC ACCESS TO IEC BOARDWALK AND TIN HAU WATERFRONT CYCLEWAY
IEC Harbourfront EXISTING ROUTE – CYCLISTS USE ELECTRIC ROAD / JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND PLANNING DESIGN NOT AVAILABLE PLANNING DESIGN NOT AVAILABLE BUT AVAILABLE WIDTH INDICATES THAT IT WOULD BE POSSIBLE TO INCLUDE A CYCLEWAY BEHIND THE CENTRAL-WANCHAI BYPASS LINK TO THE IEC BICYCLE PARKING/HIRE FACILITY
IEC Harbourfront PLANNING DESIGN NOT AVAILABLE BUT AVAILABLE WIDTH WOULD ALLOW INCLUSION OF THE CYCLEWAY EXISTING ROUTE – CYCLISTS USE ELECTRIC ROAD / JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND – BOTH VERY FAST AND BUSY ROADS CYCLEWAY REJOINS BOARDWALK UNDER IEC
[object Object],[object Object],[object Object],[object Object],EXISTING STRUCTURE IS 9m BETWEEN SUPPORT COLUMNS CURRENT IEC BOARDWALK  WIDTH IS 5.0m, LEAVING 4.0m AVAILABLE FOR CYCLEWAY CYCLEWAY 5.0m 4.0m 9.0m
[object Object],[object Object],[object Object]
North Point Harbourfront CYCLEWAY FOLLOWS IEC BOARDWALK AROUND JUNCTION SLIP ROADS, PER EXISTING PLANS EXISTING ROUTE – CYCLISTS CAN USE JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND – BOTH VERY FAST AND BUSY ROADS CYCLISTS DISMOUNT AT PEDESTRIAN INTERSECTIONS WITH FERRY PIERS CONNECTIVITY NORTH POINT FERRY PIERS CONNECTIVITY NORTH POINT AREA CYCLEWAY CONTINUES WITH BOARDWALK UNDER IEC BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],[object Object],CYCLEWAY THE BOARDWALK AND CYCLEWAY FOLLOW THE SLIP ROADS OF THE IEC
North Point Harbourfront CYCLEWAY CONTINUES WITH BOARDWALK UNDER IEC  CYCLEWAY FOLLOWS IEC BOARDWALK  - THERE IS SUFFICIENT SPACE IN THIS LOCATION FOR THE BOARDWALK TO GO UNDER THE SLIP ROADS EXISTING ROUTE – CYCLISTS USE JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND CONNECTIVITY TO NORTH POINT
[object Object],[object Object],[object Object],[object Object],CYCLEWAY MANY POSSIBILITIES EXIST FOR THE IEC BOARDWALK ROUTE
North Point – Hoi Yu St Harbourfront CYCLEWAY CONTINUES WITH IEC BOARDWALK UNDER EXISTING ROUTE – CYCLISTS USE JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND CYCLISTS DISMOUNT AT PEDESTRIAN INTERSECTIONS WITH FERRY PIERS BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],[object Object],CYCLEWAY
Hoi Yu Street Harbourfront CYCLEWAY TO FOLLOW HOI YU STREET, OR ADJACENT TO WATERFRONT PEDESTRIAN AREA LCSD TO ACCOMMODATE CYCLEWAY THROUGH QUARRY BAY PARK PHASE 1 EXISTING ROUTE – CYCLISTS USE KING’S ROAD (FURTHER INLAND) CONNECTIVITY BETWEEN HOI YU ST AND QUARRY BAY PARK PHASE 1 IS PARTIALLY BLOCKED BY GAS PIGGING STATION – MAY BE NECESSARY TO RELOCATE IT, OR MAKE SHARED USE OF INTERNAL ACCESS ROAD. CONNECTIVITY WITH QUARRY BAY CONNECTIVITY WITH LCSD PARK BICYCLE PARKING/HIRE FACILITY
Quarry Bay Harbourfront LCSD TO ACCOMMODATE CYCLEWAY THROUGH QUARRY BAY PARK PHASE 1 CYCLEWAY NEXT TO TAI HONG STREET CYCLEWAY MAY REQIRE DUAL-USE WITH ROAD AROUND GRAND PROMENADE DEVELOPMENT EXISTING ROUTE – CYCLISTS USE KING’S ROAD (FURTHER INLAND) CONNECTIVITY WITH LCSD PARK CONNECTIVITY WITH SAI WAN HO PARK BICYCLE PARKING/HIRE FACILITY BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],CYCLEWAY
[object Object],[object Object],[object Object],CYCLEWAY TAI HONG STREET
[object Object],[object Object],[object Object],CYCLEWAY PARKING SPACES REMOVED TO ALLOW FOR CYCLEWAY
Sai Wan Ho Harbourfront CYCLEWAY MAY REQUIRE DUAL-USE WITH ROAD AROUND GRAND PROMENADE DEVELOPMENT CYCLEWAY TO FOLLOW ALDRICH BAY PROMENADE EXISTING ROUTE – CYCLISTS USE KING’S ROAD / SHAU KEI WAN ROAD  AND ON TO ALDRICH BAY CONNECTIVITY WITH SAI WAN HO MTR BICYCLE PARKING/HIRE FACILITY
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY MAY NEED TO BE MIXED USE WITH CARS FOR THIS SECTION
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY CONTINUES INTO PARK AREA
Coastal Museum Harbourfront CYCLEWAY TO FOLLOW TAM KUNG MUI ROAD AND TUNG HEI ROADS TOWARDS THE ACCESS RAMP TO THE ISLAND EASTERN CORRIDOR EXISTING ROUTE – CYCLISTS ARE REQUIRED TO CLIMB CHAI WAN ROAD – A STEEP HILL WITH FAST MOVING TRAFFIC CONNECTIVITY WITH COASTAL MUSEUM
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY MAY NEED TO BE MIXED USE WITH CARS FOR THIS SECTION, AND ALSO MAY NEED TO FOLLOW TUNG HEI ROAD FOR CYCLING IN THE OPPOSITE DIRECTION
[object Object],[object Object],[object Object],CYCLEWAY BUS STOP MAY NEED TO BE RELOCATED
[object Object],[object Object],[object Object],CYCLEWAY
[object Object],[object Object],[object Object],CYCLEWAY
Heng Fa Chuen Harbourfront CYCLEWAY MAY NEED TO FOLLOW THE ACCESS RAMP FROM THE ISLAND EASTERN CORRIDOR INTO HENG FA CHUEN EXISTING ROUTE – CYCLISTS USE ROAD FURTHER INLAND
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY FOLLOWS SHING TAI ROAD
[object Object],[object Object],[object Object],CYCLEWAY CYCLEWAY CAN BE MIXED USE WITH CARS & BICYCLES
Heng Fa Chuen Harbourfront CYCLEWAY MAY NEED TO FOLLOW THE ACCESS RAMP FROM THE ISLAND EASTERN CORRIDOR INTO HENG FA CHUEN BICYCLE PARKING/HIRE FACILITY IN HENG FA CHUEN PLAYGROUND EXISTING ROUTE – CYCLISTS USE ROAD FURTHER INLAND
[object Object],[object Object],[object Object],CYCLEWAY HENG FA CHUEN PLAYGROUND
[object Object],CYCLEWAY HENG FA CHUEN  KENNEDY TOWN
[object Object],CYCLEWAY HENG FA CHUEN  KENNEDY TOWN
Kowloon cycling routes The existing route indicated is defined as the current continuous legal route nearest the harbour front that cyclists can use. The new route indicated is our interpretation of the best possible future route considering future developments, with the least impact on existing facilities to be maintained. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],For the Kowloon Peninsula, this report presents only an overview of a possible continuous harbourfront cycle route.  Further consideration of these key difficulties is required.
Cycle track network in Kai Tak Development The cycle track network in the Kai Tak Development, proposed by CEDD and welcomed by relevant District Councils, offers a very promising basis for the provision of a continuous harbourfront cycleway in eastern Kowloon.
Kowloon Harbourfront TUEN MUN TO TSUEN WAN CYCLE PATH EXISTING ROUTE – COMES INLAND TO AVOID HIGHWAY CONTAINER TERMINAL & INDUSTRIAL AREAS MAKE IT DIFFICULT TO REACH THE WATERFRONT EXISTING ROUTE – THROUGH CONTAINER TERMINALS WITH HEAVY GOODS TRAFFIC NEW KAI TAK DEVELOPMENT SHOWS A WATERFRONT CYCLE TRACK AROUND MOST OF THE PERIMETER IT IS NOT CURRENTLY POSSIBLE TO CROSS THE HARBOUR TUNNEL APPROACH ROADS NEAR HUNG HOM BY BICYCLE, SO WE MUST USE ARGYLE ST. AND PRINCE EDWARD ROAD EAST
Kowloon Harbourfront INSTALLATION OF A CYCLEWAY INTO THE WKCD PLANNING IS CRITICAL FOR ANY FUTURE ROUTE IT IS NOT CURRENTLY POSSIBLE TO CROSS THE HARBOUR TUNNEL APPROACH ROADS NEAR HUNG HOM BY BICYCLE, SO WE MUST USE ARGYLE ST. AND PRINCE EDWARD ROAD EAST TO GET TO KAI TAK NEW KAI TAK DEVELOPMENT SHOWS A WATERFRONT CYCLE TRACK AROUND MOST OF THE PERIMETER FOLLOWING THE WATERFRONT TOWARDS HUNG HOM, IT IS NOT POSSIBLE TO PASS OVER THE TUNNEL APPROACH ROADS INSTALLING A CYCLEWAY AROUND TSIM SHA TSUI TO HUNG HOM WATERFRONT WOULD INVOLVE MAJOR INFRASTRUCTURE CHANGES
PRACTICAL DESIGN GUIDELINES Hong Kong guidelines from the Transport Planning and Design Manual can productively be supplemented by consideration of design guidelines from other major cities around the world. Particularly useful is the information from NACTO (National Association of City Transportation Officials) in the US. They give very clear, detailed, and up-to-date guidance on cycleway design in urban environments  See:  http://nacto.org/cities-for-cycling/design-guide/
Sign Typical cycleway / pedestrian interchange features Major public access to waterfront Cyclists dismount At intersections with   major pedestrian paths, cyclists must dismount Sign typical public access to waterfront Give way to pedestrians At intersections with significant pedestrian paths, cyclists must give way to pedestrians
Typical cycleway connectivity features Minor pedestrian crossings marked and protected with bollards  Cycleway interface with nearby roads where appropriate Bicycle parking Sign Give way to cyclists Pedestrian bridge
Typical cycleway / pedestrian interchange features Cycleways are protected by bollards, allowing free flow of pedestrians, whilst also alerting them to the cycleway  Open public area A different surface colour can increase visibility and awareness of the cycleway
Practical Design Guidelines Typical section through segregated cycleway adjacent to road 2.0m 2.0m EXISTING TREES NEAR CENTRAL FERRY PIERS PLANTERS WHERE NECESSARY ROADWAY CYCLEWAY CONTINUOUS KERB CENTRAL WHITE LINE GRASS VERGE WITH WHITE BOLLARDS AT 2m SPACING
Practical Design Guidelines Typical section through segregated cycleway in open areas 2.0m 2.0m CYCLEWAY CENTRAL WHITE LINE GRASS VERGE WITH WHITE BOLLARDS AT 2m SPACING GRASS VERGE WITH WHITE BOLLARDS AT 2m SPACING
Practical Design Guidelines Typical section through cycleway in pedestrian areas 2.0m 2.0m CYCLEWAY A DIFFERENT COLOUR CAN INCREASE VISIBILITY AND AWARENESS OF THE CYCLEWAY WHITE LINES INDICATE EDGE AND CENTRE LINE OF CYCLEWAY  THIS CYCLEWAY HAS DIFFERENT COLOURED PAVERS FOR DIFFERENT USES
Practical Design Guidelines Typical section through on-road cycleway  2.0m ROADWAY CYCLEWAY SURFACE MARKED DIVIDER LINES PEDESTRIAN PAVEMENT FOR VISIBILITY, THE CYCLEWAY COULD BE COLOUR DIFFERENTIATED FOR MIXED TRAFFIC USE, A DASHED LINE CAN BE USED FOR DEMARCATION
Practical Design Guidelines Further design features that facilitate cycling safety and ease TURNING LANES FOR CYCLISTS ADVANCED STOP LINES AT TRAFFIC LIGHTS COLOURED PARTITIONS WHERE OTHER TRAFFIC IS CROSSING THE CYCLEWAY
Clear surface markings Alternative surface markings Low kerbs and signage There are several different ways of marking the cycleway. Route type examples
Identified use by alternative surface finish There are several different ways of creating and identifying the cycleway using surface treatments. Alternative colours identify the cycleway Alternate pavier colouring Route type examples
Route type examples
Route type examples
Route types around the world
Challenging situations There are always several different ways of tackling even difficult features, such as roundabouts. Bicycle friendly roundabout design
Bicycle parking opportunities Sheffield stands with additional crossbar Modern bicycle parking may comprise simple installed hoops Sheffield stands, as already fitted around Hong Kong Can be surface finished in a variety of ways
Bicycle parking opportunities Space saving upright designs Modern bicycle storage options include proprietary and specialist designs. Adequate parking should be designed, based on demand profile. Austrian style bicycle parking stands High security ‘P’ stands
Bicycle parking opportunities Space saving modern design Modern bicycle parking designs give many options for styles and functionality. Artistic styling for more vibrant areas Functional, with automatic bicycle locking
Bicycle parking opportunities Modern simple design Modern bicycle shelters can be designed to suit their surroundings. Sculptured shelter Simple stands offering rain cover
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Bicycle parking requirements
Waterfront cycleways around the world
Waterfront cycleways around the world
Waterfront cycleways around the world
Hong Kong Cycling Alliance ( 香港單車同盟 )  is a non-profit organisation that works to make Hong Kong more bicycle-friendly and bicycle-enabled. We advise and support decision-makers about the needs of all kinds of cyclists and about the opportunities for improving Hong Kong through greater support and enablement of cycling.   Contact:  [email_address]

Weitere ähnliche Inhalte

Was ist angesagt?

SDC workshop on Signature Project Scheme
SDC workshop on Signature Project SchemeSDC workshop on Signature Project Scheme
SDC workshop on Signature Project Schemedenisleung
 
Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide RJ Sajeeb
 
Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)
Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)
Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)Paromita Roy
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Biharchauhansunny
 
Presentation-on-Water-Transport-System
Presentation-on-Water-Transport-SystemPresentation-on-Water-Transport-System
Presentation-on-Water-Transport-SystemMahjabeen Rahman Mim
 
Floating Construction
Floating ConstructionFloating Construction
Floating Constructionvivatechijri
 
Bike : Ped Advocates Workshop NACTO
Bike : Ped Advocates Workshop   NACTOBike : Ped Advocates Workshop   NACTO
Bike : Ped Advocates Workshop NACTOBikeTexas
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoSJ Ohi
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineeringkajol panchal
 
Introduction to intersection
Introduction to intersectionIntroduction to intersection
Introduction to intersectionYasirKhan357
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
 

Was ist angesagt? (20)

PMBP SALIENTS
PMBP SALIENTSPMBP SALIENTS
PMBP SALIENTS
 
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
 
SDC workshop on Signature Project Scheme
SDC workshop on Signature Project SchemeSDC workshop on Signature Project Scheme
SDC workshop on Signature Project Scheme
 
Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide
 
Hrm raw ppt
Hrm raw pptHrm raw ppt
Hrm raw ppt
 
Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)
Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)
Solving Congestion through Transit Oriented Development, Delhi (Romi Roy)
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Bihar
 
Presentation-on-Water-Transport-System
Presentation-on-Water-Transport-SystemPresentation-on-Water-Transport-System
Presentation-on-Water-Transport-System
 
Floating Construction
Floating ConstructionFloating Construction
Floating Construction
 
Bike : Ped Advocates Workshop NACTO
Bike : Ped Advocates Workshop   NACTOBike : Ped Advocates Workshop   NACTO
Bike : Ped Advocates Workshop NACTO
 
Bradford tod ca gbc 20120324 v2
Bradford tod ca gbc 20120324 v2Bradford tod ca gbc 20120324 v2
Bradford tod ca gbc 20120324 v2
 
Presentation1
Presentation1Presentation1
Presentation1
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: Chicago
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineering
 
Interchange
InterchangeInterchange
Interchange
 
Introduction to intersection
Introduction to intersectionIntroduction to intersection
Introduction to intersection
 
Rail in the Philippines 2012
Rail in the Philippines 2012 Rail in the Philippines 2012
Rail in the Philippines 2012
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 

Ähnlich wie Hk harbourfront cycleway route by hkcall (rev 3)

Suburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine StationSuburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine Stationlinda carroli
 
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeNorth East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeGreenlivingpedia
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsCityofBoulder
 
Designing Kong Kong: Tsim Sha Tsui terminus design illustrations
Designing Kong Kong: Tsim Sha Tsui terminus design illustrationsDesigning Kong Kong: Tsim Sha Tsui terminus design illustrations
Designing Kong Kong: Tsim Sha Tsui terminus design illustrationsDesigningHongKong
 
International Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesInternational Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesDesign South East
 
East-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsEast-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsAdams Carroll
 
2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking ManagementTOD India
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 
九龍綠色通道建議 Kowloon Greenway Proposal
九龍綠色通道建議 Kowloon Greenway Proposal九龍綠色通道建議 Kowloon Greenway Proposal
九龍綠色通道建議 Kowloon Greenway ProposalKowloonGreenway
 
Jay Street Pedestrian Plaza
Jay Street Pedestrian PlazaJay Street Pedestrian Plaza
Jay Street Pedestrian Plazasubtle116
 
"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09
"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09
"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09Paromita Roy
 
Walking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and SafetyWalking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and SafetyCity of College Station
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventDesign South East
 

Ähnlich wie Hk harbourfront cycleway route by hkcall (rev 3) (20)

Suburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine StationSuburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine Station
 
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeNorth East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House Boards
 
Bangkok
BangkokBangkok
Bangkok
 
Designing Kong Kong: Tsim Sha Tsui terminus design illustrations
Designing Kong Kong: Tsim Sha Tsui terminus design illustrationsDesigning Kong Kong: Tsim Sha Tsui terminus design illustrations
Designing Kong Kong: Tsim Sha Tsui terminus design illustrations
 
International Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesInternational Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil Jones
 
Urban redevelopment
Urban redevelopmentUrban redevelopment
Urban redevelopment
 
APWA mid atlantic awards
APWA mid atlantic awardsAPWA mid atlantic awards
APWA mid atlantic awards
 
East-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsEast-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking Recommendations
 
2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Mobility or Accessibility?
Mobility or Accessibility?Mobility or Accessibility?
Mobility or Accessibility?
 
九龍綠色通道建議 Kowloon Greenway Proposal
九龍綠色通道建議 Kowloon Greenway Proposal九龍綠色通道建議 Kowloon Greenway Proposal
九龍綠色通道建議 Kowloon Greenway Proposal
 
Jay Street Pedestrian Plaza
Jay Street Pedestrian PlazaJay Street Pedestrian Plaza
Jay Street Pedestrian Plaza
 
Urban planning
Urban planningUrban planning
Urban planning
 
"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09
"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09
"Reclaiming Connaught Place Delhi" to UTTIPEC, LG Nov 09
 
Walking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and SafetyWalking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and Safety
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 

Kürzlich hochgeladen

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 

Kürzlich hochgeladen (20)

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 

Hk harbourfront cycleway route by hkcall (rev 3)

  • 1.
  • 2. Response to comments “ The Cycleway is only for the cyclists in Hong Kong” The Cycleway will give connectivity to the entire harbourfront for everybody visiting the attractions, as well as it being an attraction itself.
  • 3. Response to comments “ It’s impossible to enjoy the view while cycling” Cycling is a great way to see the surrounding views, particularly when on segregated routes when little other traffic is around.
  • 4. Response to comments “ you can't imagine a guy going from Shau Kei Wan up to Soho, even if he did, he would have to drop off his bike and walk the two kilometers uphill to where he’s going” Cycling is a great way to improve public health and can be a great alternative to cramped & claustrophobic public transport. Going from the cycleway up to Soho is actually the easiest part of the journey, using the mid-levels escalator, as everyone else does.
  • 5. Response to comments “ Hong Kong is different to other cycling cites around the world” Hong Kong is different and unique, just like every other city is. So if they have all overcome barriers and local conditions, and everywhere has, so can we .
  • 6. Response to comments “ It is not the policy of the government to encourage cycling as transport” Martins answer.
  • 7. Response to comments “ there isn’t room for adding a cycleway on the harbourfront” We have identified a route already, and a flexible approach means that we can find a way. The currently designed Central - Wanchai cycle track on the Harbourfront development already finds its way along the harbourfront, crossing pedestrian paths and making its way through the park. We can extend this concept throughout the harbourfront cycleway.
  • 8. Response to comments “ there isn’t space for a cycleway along the harbourfront” Flexible designs mean that the cycleway can change it’s style and follow the most suitable locations as it progresses along the route.
  • 9. Response to comments “ the roads in Hong Kong are too busy” The isolated sections of roads we are suggesting to use are quiet, seldom used roads. Mixed-use car and cycle sections have been minimised in the design of the route.
  • 10. Response to comments “ Hong Kong Island is a dense urban environment” Whilst we agree that Hong Kong Island is a dense urban environment, it is this type of dichotomy that gives the cycleway and its views great appeal. The cycleway is planned to be segregated for the majority of its route, so the dense urban environment is only a background to the panoramic views.
  • 11. Response to comments “ The cycle tracks are in the New Territories, cyclists can go there to ride” The Hong Kong Island Cycleway has a different role than most of the New Territory cycle tracks as it is designed to be more than simply recreational, but also for access to separated amenities along the harbourfront by tourists and the Hong Kong public.
  • 12. Response to comments “ most cycling in Hong Kong is recreational” All cycling is recreational to some extent, but the Harbourfront Cycleway is seen primarily as a way to give tourists and the public connectivity to all of the Harbourfront attractions, as well as being an attraction itself.
  • 13. Response to comments “ Cycling should only be on segregated cycle tracks” With a careful and modern design philosophy, a cycleway along the harbourfront can be achieved. Learning from cycleway designs around the world will enable the more challenging areas of the route to be accomplished.
  • 14. Response to comments “ cycling is not compatible with pedestrians ” Cyclists are simply ‘enabled pedestrians’. A cyclist can stop and lock their bike, immediately becoming a pedestrian.
  • 15. Response to comments “ the LCSD do not allow cycling within their parks” Permission to allow cycling in LCSD parks is at the discretion of the LCSD director, and it is hoped that with the public behind us, the LCSD can support the Harbourfront Cycleway also.
  • 16. Response to comments “ how do cyclists get their bikes to the cycleway” Bike hire stations give enable Hong Kong residents and tourists to enjoy the cycleway whenever and wherever they prefer. People that cycle on the roads already will be given another ‘less traffic’ route to travel.
  • 17. Response to comments “ T he IEC space is five metres, not nine” In our survey, the IEC columns are generally 9.7m apart, however we agree that in some cases near the slip roads this varies. With alternative design solutions such as shown in the HK Cycling Alliance IEC boardwalk video, we believe that incorporating the cycleway adjacent to the boardwalk is entirely possible.
  • 18. Response to comments “ the cycleway is not an enabling component of the harbourfront” The Government has directed that the Harbourfront should be connected using an environmental transport system, and the cycleway offers this for relatively little investment when compared to other larger scale alternatives.
  • 19. Hong Kong Island Cycling routes The existing route indicated is defined as the current continuous legal route nearest the harbour front that cyclists can use. The preliminary route indicated is possible with very minor improvements such as painting lines to create the cycleway and adding signs to find the most harbourfront route. The new route indicated is our interpretation of the best possible future route considering future developments, with the least impact on existing facilities to be maintained. The route is found to be highly feasible along its whole length, with respect to existing land use and ownership, connectivity, topography and adjacent features. Challenges of this route are noted at: •   Restricted width of public access around Causeway Bay Typhoon Shelter •   Gas pigging station between Quarry Bay Park Phase 1 and Hoi Yu Street area
  • 20. Kennedy Town Harbourfront CYCLEWAY LEAVES CADOGAN PARK ALONGSIDE THE ROAD, AND THEN ALONG KENNEDY TOWN PRAYA EXISTING ROUTE – ONE-WAY SYSTEM AROUND KENNEDY TOWN MEANS CYCLISTS MUST USE THE VERY BUSY BELCHERS ROAD CONNECTIVITY TO KENNEDY TOWN MTR BICYCLE PARKING/HIRE FACILITY
  • 21.
  • 22.
  • 23.
  • 24. Kennedy Town Harbourfront CURRENT USE: MTR WIL BARGING POINT LATER USE: HARBOURFRONT PUBLIC ACCESS OR CYCLEWAY TO PASS AT REAR OF PCWA, ADJACENT TO SHING SAI ROAD EXISTING ROUTE – ONE-WAY SYSTEM AROUND KENNEDY TOWN MEANS CYCLISTS MUST USE THE VERY BUSY BELCHERS ROAD EXISTING ROUTE – FOLLOWING THE BUSY SHING SAI ROAD WITH TWO LANES AND FAST-MOVING TRAFFIC CONNECTIVITY TO KENNEDY TOWN BUS STATION
  • 25.
  • 26.
  • 27.
  • 28. Sai Wan Harbourfront CURRENT USE: WESTERN WHOLESALE FOOD MARKET – SUJATA GOVADA’S PROPOSAL * REPORTS THAT OPERATORS REQUIRE ONE PIER ONLY, OPENING UP THE HARBOURFRONT. A CYCLING BRIDGE COULD PASS OVER THE STILL-IN-USE PIER AREA EXISTING ROUTE – FOLLOWING THE BUSY SHING SAI ROAD EXISTING ROUTE – FOLLOWING THE BUSY SHING SAI ROAD AND CROSSING TRAFFIC FROM THE SLIP ROAD TO GET TO THE CONNAUGHT ROAD WEST FLYOVER * HBF Harbour-front Connectivity Study, Hong Kong , Dr Sujata Govada (2008) CONNECTIVITY TO KENNEDY TOWN/SAI WAN CURRENT USE: WESTERN DISTRICT PCWA LATER USE: HARBOURFRONT PUBLIC ACCESS OR CYCLEWAY TO PASS AT REAR OF PCWA, ADJACENT TO SHING SAI ROAD PRELIMINARY ROUTE ON FUNG MAT ROAD
  • 29.
  • 30.
  • 31. Sai Ying Pun Harbourfront CURRENT USE: CONSTRUCTION SITE AND TEMPORARY VEHICLE PARKING, SPACE IS CONSTRAINED NEAR THE ENTRANCE RAMP TO THE WESTERN HARBOUR TUNNEL, HOWEVER THERE IS APPROXIMATELY 10M CLEAR, ADEQUATE TO INCLUDE A CYCLEWAY AND PEDESTRIAN BOARDWALK EXISTING ROUTE – USING CONNAUGHT RD FLYOVER CURRENT USE: SUN YAT SEN MEMORIAL PARK & WESTERN DISTRICT COMMUNITY GARDEN. LCSD TO ACCOMMODATE A CYCLEWAY THROUGH THE PARK EXISTING ROUTE – ON THE VERY BUSY CONNAUGHT ROAD WEST (UNDER THE HIGHWAY) ALTERNATIVE ROUTE FOLLOWING EXISTING PATHWAYS IN PARK - SEE LATER EXTRACT PLAN WSD EQUIPMENT TO BE RELOCATED INTO WD AREA CONNECTIVITY TO SUN YAT SEN PARK BICYCLE PARKING/HIRE FACILITY PRELIMINARY ROUTE ON EXISTING PATH AND FUNG MAT ROAD
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37. Sheung Wan Harbourfront CURRENT USE: SHUN TAK CENTRE CYCLEWAY MAY NEED TO JOIN EXISTING ROAD FOR THIS SHORT SECTION, OR SHUN TAK CENTRE ON-ROAD PARKING IS REMOVED EXISTING ROUTE – THROUGH SHUN TAK CENTRE CYCLEWAY IS BUILT ADJACENT TO THE EXISTING ROADS, IN CENTRAL MEDIAN, CURRENTLY VEGETATION CONNECTIVITY TO MACAU FERRY & SHEUNG WAN BICYCLE PARKING/HIRE FACILITY BICYCLE PARKING/HIRE FACILITY
  • 38.
  • 39.
  • 40.
  • 41. Central Harbourfront ROAD LAYOUT UNCLEAR UNDER PEDESTRIAN DECK CYCLEWAY CROSSES ROADS – CYCLISTS DISMOUNT EXISTING ROUTE – MAN YIU STREET IS BUSY WITH TAXIS AND BUSES FROM THE FERRY PIERS AND THE BUS STATION CYCLEWAY IS BUILT IN THE SPACE ALLOCATED FOR THE LANDSCAPED MEDIAN OF THE ROAD CYCLEWAY FOLLOWS THE SPACE ALLOCATED TO IT IN CURRENT PLAN CONNECTIVITY TO CENTRAL FERRY PIERS CONNECTIVITY TO CENTRAL BUSINESS & SHOPPING DISTRICT BICYCLE PARKING/HIRE FACILITY
  • 42.
  • 43.
  • 44.
  • 45.
  • 46. Admiralty Harbourfront CYCLEWAY CROSSES MAJOR PEDESTRIAN FOOTPATHS – CYCLISTS GIVE WAY / DISMOUNT CYCLEWAY CROSSES MINOR PEDESTRIAN FOOTPATHS – CYCLISTS HAVE RIGHT OF WAY, PEDESTRIANS GIVE WAY EXISTING ROUTE – ROAD P2 ONLY RECENTLY OPENED AND WILL BE FAST-MOVING TRAFFIC WHEN COMPLETE CYCLEWAY FOLLOWS THE ALIGNMENT ALLOCATED TO IT IN CURRENT PLAN CONNECTIVITY TO ENTIRE FUTURE HARBOURFRONT DEVELOPMENT CONNECTIVITY TO STAR FERRY CONNECTIVITY TO CENTRAL GOVERNMENT OFFICES AND ADMIRALTY SHOPPING DISTRICT BICYCLE PARKING/HIRE FACILITY BICYCLE PARKING/HIRE FACILITY
  • 47. Wanchai Harbourfront ALTERNATIVE CYCLEWAY THROUGH HKCEC MAY BE ON-ROAD OR SEPARATED ROAD/CYCLEWAY INTERSECTION NEEDS CAREFUL DESIGN. TRAFFIC LIGHTS CAN INCLUDE BICYCLES-ONLY SEQUENCE DETAILED ROUTING CAN BE CONFIRMED WITH PLANNING LAYOUTS – SEE LATER EXTRACT EXISTING ROUTE – RELATIVELY FAST-MOVING SECTION MAKES CYCLING DIFFICULT AS CARS, BUSES AND TRUCKS TRY TO PASS CYCLISTS CONNECTIVITY TO STAR FERRY CONNECTIVITY TO GOLDEN BAUHINIA CONNECTIVITY TO ENTIRE FUTURE HARBOURFRONT DEVELOPMENT CONNECTIVITY TO WANCHAI BICYCLE PARKING/HIRE FACILITY PRELIMINARY ROUTE ACROSS GOLDEN BAUHINIA SQUARE PEDESTRIAN AREA
  • 48.
  • 49.
  • 50. Wanchai – Causeway Bay Harbourfront PLANNING DESIGN NOT AVAILABLE BUT AVAILABLE WIDTH INDICATES ADEQUATE SPACE FOR THE CYCLEWAY PLANNING DESIGN NOT AVAILABLE – A SHARED-USE BICYCLE-PEDESTRIAN AREA MAY BE REQUIRED CAR PARKING SPACES RELOCATED TO ENABLE THE CYCLEWAY ROUTE PINCH-POINT AT HARBOUR CROSSING ENTRANCE – MAY BE NECESSARY TO REMOVE A SERVICES HUT EXISTING ROUTE – HEAVILY TRAFFICKED BY BUSES ACCESSING HARBOUR TUNNEL CYCLISTS WOULD NEED TO DISMOUNT ALONG THIS CONSTRICTED AREA OF THE HARBOURFRONT – ANY WIDENING WOULD ALLEVIATE THIS EXISTING ROUTE – CYCLISTS DISMOUNT AND WALK 1km
  • 51.
  • 52.
  • 53. Causeway Bay Harbourfront CYCLISTS WOULD NEED TO DISMOUNT ALONG THIS CONSTRICTED AREA OF THE HARBOURFRONT – ANY WIDENING WOULD ALLEVIATE THIS CHANGING THE LAYOUT OF THE LAY-BY TO REMOVE THE CENTRAL ISLAND WOULD ALLOW THE CYCLEWAY TO CONTINUE, SEPARATED FROM THE ROAD EXISTING ROUTE – CYCLISTS DISMOUNT AND WALK 1km 1 2 3 CONNECTIVITY TO CAUSEWAY BAY SHOPPING & HOTEL DISTRICT CONNECTIVITY TO VICTORIA PARK VIA FUTURE BRIDGE CONNECTIVITY TO FUTURE CWB TYPHOON SHELTER DEVELOPMENT BICYCLE PARKING/HIRE FACILITY
  • 54.
  • 55.
  • 56.
  • 57. Causeway Bay Harbourfront CYCLEWAY RUNS UNDER THE IEC ON BOARDWALK EXISTING ROUTE – CYCLISTS DISMOUNT AND WALK 1KM EXISTING ROUTE – CYCLISTS USE ELECTRIC ROAD / JAVA ROAD EASTBOUND AND KING’S ROAD / HING FAT STREET WESTBOUND CONNECTIVITY TO TIN HAU DISTRICT AND MTR ADDITIONAL CONNECTIVITY TO VICTORIA PARK BICYCLE PARKING/HIRE FACILITY
  • 58.
  • 59. IEC Harbourfront EXISTING ROUTE – CYCLISTS USE ELECTRIC ROAD / JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND PLANNING DESIGN NOT AVAILABLE PLANNING DESIGN NOT AVAILABLE BUT AVAILABLE WIDTH INDICATES THAT IT WOULD BE POSSIBLE TO INCLUDE A CYCLEWAY BEHIND THE CENTRAL-WANCHAI BYPASS LINK TO THE IEC BICYCLE PARKING/HIRE FACILITY
  • 60. IEC Harbourfront PLANNING DESIGN NOT AVAILABLE BUT AVAILABLE WIDTH WOULD ALLOW INCLUSION OF THE CYCLEWAY EXISTING ROUTE – CYCLISTS USE ELECTRIC ROAD / JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND – BOTH VERY FAST AND BUSY ROADS CYCLEWAY REJOINS BOARDWALK UNDER IEC
  • 61.
  • 62.
  • 63. North Point Harbourfront CYCLEWAY FOLLOWS IEC BOARDWALK AROUND JUNCTION SLIP ROADS, PER EXISTING PLANS EXISTING ROUTE – CYCLISTS CAN USE JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND – BOTH VERY FAST AND BUSY ROADS CYCLISTS DISMOUNT AT PEDESTRIAN INTERSECTIONS WITH FERRY PIERS CONNECTIVITY NORTH POINT FERRY PIERS CONNECTIVITY NORTH POINT AREA CYCLEWAY CONTINUES WITH BOARDWALK UNDER IEC BICYCLE PARKING/HIRE FACILITY
  • 64.
  • 65. North Point Harbourfront CYCLEWAY CONTINUES WITH BOARDWALK UNDER IEC CYCLEWAY FOLLOWS IEC BOARDWALK - THERE IS SUFFICIENT SPACE IN THIS LOCATION FOR THE BOARDWALK TO GO UNDER THE SLIP ROADS EXISTING ROUTE – CYCLISTS USE JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND CONNECTIVITY TO NORTH POINT
  • 66.
  • 67. North Point – Hoi Yu St Harbourfront CYCLEWAY CONTINUES WITH IEC BOARDWALK UNDER EXISTING ROUTE – CYCLISTS USE JAVA ROAD EASTBOUND AND KING’S ROAD WESTBOUND CYCLISTS DISMOUNT AT PEDESTRIAN INTERSECTIONS WITH FERRY PIERS BICYCLE PARKING/HIRE FACILITY
  • 68.
  • 69. Hoi Yu Street Harbourfront CYCLEWAY TO FOLLOW HOI YU STREET, OR ADJACENT TO WATERFRONT PEDESTRIAN AREA LCSD TO ACCOMMODATE CYCLEWAY THROUGH QUARRY BAY PARK PHASE 1 EXISTING ROUTE – CYCLISTS USE KING’S ROAD (FURTHER INLAND) CONNECTIVITY BETWEEN HOI YU ST AND QUARRY BAY PARK PHASE 1 IS PARTIALLY BLOCKED BY GAS PIGGING STATION – MAY BE NECESSARY TO RELOCATE IT, OR MAKE SHARED USE OF INTERNAL ACCESS ROAD. CONNECTIVITY WITH QUARRY BAY CONNECTIVITY WITH LCSD PARK BICYCLE PARKING/HIRE FACILITY
  • 70. Quarry Bay Harbourfront LCSD TO ACCOMMODATE CYCLEWAY THROUGH QUARRY BAY PARK PHASE 1 CYCLEWAY NEXT TO TAI HONG STREET CYCLEWAY MAY REQIRE DUAL-USE WITH ROAD AROUND GRAND PROMENADE DEVELOPMENT EXISTING ROUTE – CYCLISTS USE KING’S ROAD (FURTHER INLAND) CONNECTIVITY WITH LCSD PARK CONNECTIVITY WITH SAI WAN HO PARK BICYCLE PARKING/HIRE FACILITY BICYCLE PARKING/HIRE FACILITY
  • 71.
  • 72.
  • 73.
  • 74. Sai Wan Ho Harbourfront CYCLEWAY MAY REQUIRE DUAL-USE WITH ROAD AROUND GRAND PROMENADE DEVELOPMENT CYCLEWAY TO FOLLOW ALDRICH BAY PROMENADE EXISTING ROUTE – CYCLISTS USE KING’S ROAD / SHAU KEI WAN ROAD AND ON TO ALDRICH BAY CONNECTIVITY WITH SAI WAN HO MTR BICYCLE PARKING/HIRE FACILITY
  • 75.
  • 76.
  • 77. Coastal Museum Harbourfront CYCLEWAY TO FOLLOW TAM KUNG MUI ROAD AND TUNG HEI ROADS TOWARDS THE ACCESS RAMP TO THE ISLAND EASTERN CORRIDOR EXISTING ROUTE – CYCLISTS ARE REQUIRED TO CLIMB CHAI WAN ROAD – A STEEP HILL WITH FAST MOVING TRAFFIC CONNECTIVITY WITH COASTAL MUSEUM
  • 78.
  • 79.
  • 80.
  • 81.
  • 82. Heng Fa Chuen Harbourfront CYCLEWAY MAY NEED TO FOLLOW THE ACCESS RAMP FROM THE ISLAND EASTERN CORRIDOR INTO HENG FA CHUEN EXISTING ROUTE – CYCLISTS USE ROAD FURTHER INLAND
  • 83.
  • 84.
  • 85. Heng Fa Chuen Harbourfront CYCLEWAY MAY NEED TO FOLLOW THE ACCESS RAMP FROM THE ISLAND EASTERN CORRIDOR INTO HENG FA CHUEN BICYCLE PARKING/HIRE FACILITY IN HENG FA CHUEN PLAYGROUND EXISTING ROUTE – CYCLISTS USE ROAD FURTHER INLAND
  • 86.
  • 87.
  • 88.
  • 89.
  • 90. Cycle track network in Kai Tak Development The cycle track network in the Kai Tak Development, proposed by CEDD and welcomed by relevant District Councils, offers a very promising basis for the provision of a continuous harbourfront cycleway in eastern Kowloon.
  • 91. Kowloon Harbourfront TUEN MUN TO TSUEN WAN CYCLE PATH EXISTING ROUTE – COMES INLAND TO AVOID HIGHWAY CONTAINER TERMINAL & INDUSTRIAL AREAS MAKE IT DIFFICULT TO REACH THE WATERFRONT EXISTING ROUTE – THROUGH CONTAINER TERMINALS WITH HEAVY GOODS TRAFFIC NEW KAI TAK DEVELOPMENT SHOWS A WATERFRONT CYCLE TRACK AROUND MOST OF THE PERIMETER IT IS NOT CURRENTLY POSSIBLE TO CROSS THE HARBOUR TUNNEL APPROACH ROADS NEAR HUNG HOM BY BICYCLE, SO WE MUST USE ARGYLE ST. AND PRINCE EDWARD ROAD EAST
  • 92. Kowloon Harbourfront INSTALLATION OF A CYCLEWAY INTO THE WKCD PLANNING IS CRITICAL FOR ANY FUTURE ROUTE IT IS NOT CURRENTLY POSSIBLE TO CROSS THE HARBOUR TUNNEL APPROACH ROADS NEAR HUNG HOM BY BICYCLE, SO WE MUST USE ARGYLE ST. AND PRINCE EDWARD ROAD EAST TO GET TO KAI TAK NEW KAI TAK DEVELOPMENT SHOWS A WATERFRONT CYCLE TRACK AROUND MOST OF THE PERIMETER FOLLOWING THE WATERFRONT TOWARDS HUNG HOM, IT IS NOT POSSIBLE TO PASS OVER THE TUNNEL APPROACH ROADS INSTALLING A CYCLEWAY AROUND TSIM SHA TSUI TO HUNG HOM WATERFRONT WOULD INVOLVE MAJOR INFRASTRUCTURE CHANGES
  • 93. PRACTICAL DESIGN GUIDELINES Hong Kong guidelines from the Transport Planning and Design Manual can productively be supplemented by consideration of design guidelines from other major cities around the world. Particularly useful is the information from NACTO (National Association of City Transportation Officials) in the US. They give very clear, detailed, and up-to-date guidance on cycleway design in urban environments See: http://nacto.org/cities-for-cycling/design-guide/
  • 94. Sign Typical cycleway / pedestrian interchange features Major public access to waterfront Cyclists dismount At intersections with major pedestrian paths, cyclists must dismount Sign typical public access to waterfront Give way to pedestrians At intersections with significant pedestrian paths, cyclists must give way to pedestrians
  • 95. Typical cycleway connectivity features Minor pedestrian crossings marked and protected with bollards Cycleway interface with nearby roads where appropriate Bicycle parking Sign Give way to cyclists Pedestrian bridge
  • 96. Typical cycleway / pedestrian interchange features Cycleways are protected by bollards, allowing free flow of pedestrians, whilst also alerting them to the cycleway Open public area A different surface colour can increase visibility and awareness of the cycleway
  • 97. Practical Design Guidelines Typical section through segregated cycleway adjacent to road 2.0m 2.0m EXISTING TREES NEAR CENTRAL FERRY PIERS PLANTERS WHERE NECESSARY ROADWAY CYCLEWAY CONTINUOUS KERB CENTRAL WHITE LINE GRASS VERGE WITH WHITE BOLLARDS AT 2m SPACING
  • 98. Practical Design Guidelines Typical section through segregated cycleway in open areas 2.0m 2.0m CYCLEWAY CENTRAL WHITE LINE GRASS VERGE WITH WHITE BOLLARDS AT 2m SPACING GRASS VERGE WITH WHITE BOLLARDS AT 2m SPACING
  • 99. Practical Design Guidelines Typical section through cycleway in pedestrian areas 2.0m 2.0m CYCLEWAY A DIFFERENT COLOUR CAN INCREASE VISIBILITY AND AWARENESS OF THE CYCLEWAY WHITE LINES INDICATE EDGE AND CENTRE LINE OF CYCLEWAY THIS CYCLEWAY HAS DIFFERENT COLOURED PAVERS FOR DIFFERENT USES
  • 100. Practical Design Guidelines Typical section through on-road cycleway 2.0m ROADWAY CYCLEWAY SURFACE MARKED DIVIDER LINES PEDESTRIAN PAVEMENT FOR VISIBILITY, THE CYCLEWAY COULD BE COLOUR DIFFERENTIATED FOR MIXED TRAFFIC USE, A DASHED LINE CAN BE USED FOR DEMARCATION
  • 101. Practical Design Guidelines Further design features that facilitate cycling safety and ease TURNING LANES FOR CYCLISTS ADVANCED STOP LINES AT TRAFFIC LIGHTS COLOURED PARTITIONS WHERE OTHER TRAFFIC IS CROSSING THE CYCLEWAY
  • 102. Clear surface markings Alternative surface markings Low kerbs and signage There are several different ways of marking the cycleway. Route type examples
  • 103. Identified use by alternative surface finish There are several different ways of creating and identifying the cycleway using surface treatments. Alternative colours identify the cycleway Alternate pavier colouring Route type examples
  • 106. Route types around the world
  • 107. Challenging situations There are always several different ways of tackling even difficult features, such as roundabouts. Bicycle friendly roundabout design
  • 108. Bicycle parking opportunities Sheffield stands with additional crossbar Modern bicycle parking may comprise simple installed hoops Sheffield stands, as already fitted around Hong Kong Can be surface finished in a variety of ways
  • 109. Bicycle parking opportunities Space saving upright designs Modern bicycle storage options include proprietary and specialist designs. Adequate parking should be designed, based on demand profile. Austrian style bicycle parking stands High security ‘P’ stands
  • 110. Bicycle parking opportunities Space saving modern design Modern bicycle parking designs give many options for styles and functionality. Artistic styling for more vibrant areas Functional, with automatic bicycle locking
  • 111. Bicycle parking opportunities Modern simple design Modern bicycle shelters can be designed to suit their surroundings. Sculptured shelter Simple stands offering rain cover
  • 112.
  • 116. Hong Kong Cycling Alliance ( 香港單車同盟 ) is a non-profit organisation that works to make Hong Kong more bicycle-friendly and bicycle-enabled. We advise and support decision-makers about the needs of all kinds of cyclists and about the opportunities for improving Hong Kong through greater support and enablement of cycling.   Contact:  [email_address]