AGENDA
• What is control chart?
• History of control chart
• Types of data
• Defect and defective
• Types of control charts
• Control limits vs specification limits
• Variable control charts
• Attribute control charts
CONTROL CHART
A statistical tool to study the variation in the process over time.
A control chart always has a
• central line for the average,
• an upper line for the upper control limit and
• a lower line for the lower control limit.
• These lines are determined from historical data.
CL = Mean x
UCL = x + 3σ
Y-axis
X-axis
LCL = x - 3σ
CONTROL CHART
Purpose:
• Analyze the past data and determine the performance of the process
• Measure control of the process against standards
HISTORY
• Invented by Walter Andrew Shewhart, father of statistical quality control in 1920.
• The company's engineers had been seeking to improve the reliability of their telephony
transmission systems.
• There was a stronger business need to reduce the frequency of failures and repairs
• Shewhart framed the problem in terms of Common- and special-causes of variation and,
on May 16, 1924, wrote an internal memo introducing the control chart as a tool for
distinguishing between the two.
• He understood data from physical processes typically produce a "normal distribution
curve“.
TYPES OF DATA
DISCRETE DATA CONTINUOUS DATA
Infinite number of values between whole
numbers
Data that can be counted
DEFECTS AND DEFECTIVES
Defects :
• A defect is any item or service that exhibits a departure from specifications.
• A defect does not necessarily mean that the product or service cannot be used.
• A defect indicates only that the product result is not entirely as intended.
Example: crack, bend in a shaft
Defectives:
• A defective is an item or service that is considered
completely unacceptable for use.
• Each item or service experience is either considered
defective or not—there are only two choices.
LOTS AND SAMPLES
CONTROL LIMITS
• Voice of the process
• Calculated from Data
• Appear on control charts
• Appear to subgroups
• Guide for process actions
• What the process is doing
SPECIFICATION LIMITS
• Voice of the customer
• Defined from the customer
• Appear on histograms
• Apply to items
• Separate good items from bad items
• What we want the process do
TYPES OF CONTROL CHARTS
CONTROL CHARTS
General Procedure of constructing a chart:
A control chart consists of:
• A graph such that part number is plotted along X-axis and attribute measure along Y-
axis.
• The mean of this statistic using all the samples is calculated (e.g., the mean of the
means, mean of the ranges, mean of the proportions)
• A centre line (CL) is drawn at the value of the mean.
CL = Mean x
Y-axis
X-axis
CONTROL CHARTS
• The standard deviation σ of the statistic is also calculated using all the samples.
• Upper and lower control limits indicate the threshold at which the process output is considered
undesired and are drawn at 3 standard deviation from the centre line.
CL = Mean x
UCL = x + 3σ
LCL = x - 3σ
Y-axis
X-axis
CONTROL CHARTS
• Plot the attribute measure representing a statistic (e.g., a mean, range, proportion) of
measurements of a quality characteristic in samples taken from the process at different times
(i.e., the da for each part number and join all the points to form a curve).
• If anyone of the points in the curve exceeds the upper and lower control limits, then the
process is said to be out of control
CL = Mean x
UCL = x + 3σ
LCL = x - 3σA
B
C
D
E
F
G
H
I
J
K
L M
Y-axis
X-axis
CONTROL CHART FOR VARIABLES
A single measurable quality characteristic ,such as dimension, weight, or volume, is called
variable.
Our objectives for this section are to learn how to use control charts to monitor continuous
data.
We want to learn the assumptions behind the charts, their application, and their interpretation.
Since statistical control for continuous data depends on both the mean and the variability,
variables control charts are constructed to monitor each.
The most commonly used chart to monitor the mean is called the X-BAR chart.
There are two commonly used charts used to monitor the variability: the R chart and the s
chart.
15
The X-BAR Chart:
This chart is called the X-BAR chart because the statistic being plotted is the sample mean. The
reason for taking a sample is because we are not always sure of the process distribution. By using
the sample mean we can "invoke" the central limit theorem to assume normality.
The R chart
I. The R chart is used to monitor process variability when sample sizes are small (n<10), or to simplify the
calculations made by process operators.
II. This chart is called the R chart because the statistic being plotted is the sample range.
III. Using the R chart, the estimate of the process standard deviation,σ ,is R/d2.
THE S CHART
i. The s chart is used to monitor process variability when sample sizes are large (n*10), or when a
computer is available to automate the calculations.
ii. This chart is called the s chart because the statistic being plotted is the sample standard
deviation.
iii. Using the s chart, the estimate of the process standard deviation, σ, is
PROCEDURE FOR USING VARIABLES CONTROL CHARTS:
I. Determine the variable to monitor.
II. At predetermined, even intervals, take samples of size n (usually n=4 or 5).
III. Compute X BAR and R (or s) for each sample, and plot them on their respective control
charts. Use the following relationships:
IV. After collecting a sufficient number of samples, k (k>20), compute the control limits for the
charts. The following additional calculations will be necessary:
V. If any points fall outside of the control limits, conclude that the process is out of control, and
begin a search for an assignable or special cause. When the special cause is identified,
remove that point and return to step 4 to re-evaluate the remaining points.
VI. If all the points are within limits, conclude that the process is in control, and use the calculated
limits for future monitoring of the process.
EXAMPLE PROBLEM
A large hotel in a resort area has a housekeeping staff that cleans and prepares all of the hotel's
guestrooms daily. In an effort to improve service through reducing variation in the time required to
clean and prepare a room, a series of measurements is taken of the times to service rooms in one
section of the hotel. Cleaning times for five rooms selected each day for 25 consecutive days
appear below:
Day Room 1 Room 2 Room 3 Room 4 Room 5
1 15.6 14.3 17.7 14.3 15
2 15 14.8 16.8 16.9 17.4
3 16.4 15.1 15.7 17.3 16.6
4 14.2 14.8 17.3 15 16.4
5 16.4 16.3 17.6 17.9 14.9
6 14.9 17.2 17.2 15.3 14.1
7 17.9 17.9 14.7 17 14.5
8 14 17.7 16.9 14 14.9
9 17.6 16.5 15.3 14.5 15.1
10 14.6 14 14.7 16.9 14.2
11 14.6 15.5 15.9 14.8 14.2
12 15.3 15.3 15.9 15 17.8
13 17.4 14.9 17.7 16.6 14.7
14 15.3 16.9 17.9 17.2 17.5
15 14.8 15.1 16.6 16.3 14.5
16 16.1 14.6 17.5 16.9 17.7
17 14.2 14.7 15.3 15.7 14.3
18 14.6 17.2 16 16.7 16.3
19 15.9 16.5 16.1 15 17.8
20 16.2 14.8 14.8 15 15.3
21 16.3 15.3 14 17.4 14.5
22 15 17.6 14.5 17.5 17.8
23 16.4 15.9 16.7 15.7 16.9
24 16.6 15.1 14.1 17.4 17.8
25 17 17.5 17.4 16.2 17.9
CALCULATE THE MEAN, RANGE, STANDARD DEVIATION
Day Average Range St. Dev
1 15.4 3.4 1.41
2 16.2 2.6 1.19
3 16.2 2.2 0.85
4 15.5 3.1 1.27
5 16.6 3 1.19
6 15.7 3.1 1.4
7 16.4 3.4 1.69
8 15.5 3.7 1.71
9 15.8 3.1 1.24
10 14.9 2.9 1.16
11 15 1.7 0.69
12 15.9 2.8 1.13
13 16.3 3 1.39
14 17 2.6 1
15 15.5 2.1 0.93
16 16.6 3.1 1.26
17 14.8 1.5 0.65
18 16.2 2.6 0.98
19 16.3 2.8 1.02
20 15.2 1.4 0.58
21 15.5 3.4 1.37
22 16.5 3.3 1.59
23 16.3 1.2 0.51
24 16.2 3.7 1.56
25 17.2 1.7 0.64
CALCULATE THE CONTROL LIMITS
15.94 2.7 1.14
X R s
x Chart Control Limits
UCL = x + A R
LCL = x - A R
2
2
R Chart Control Limits
UCL = D R
LCL = D R
4
3
X-BAR , R CHART X- BAR ,S CHART
TABLE FOR CONSTANTS
SQC A MODERN
INTRODUCTION
6th Edition,
D.C. Montgomery
CONSTANTS FOR X-BAR ,R & X-BAR, S CHARTS
X-BAR , R CHART X-BAR , S CHART
A2 D4 D3
0.577 2.004 0
A3 B4 B3
1.427 2.089 0
X-BAR CHART
CL =15.94
UCL = 15.94+ 0.577(2.7) = 17.49
LCL = 15.94 – 0.577(2.7) = 14.38
R CHART
CL = 2.7
UCL = 2.004(2.7) = 5.41
LCL = 0 (2.7) = 0
X-BAR CHART
CL =15.94
UCL = 15.94+ 1.427(1.14) = 17.56
LCL = 15.94 – 1.427(1.14) = 14.31
S CHART
CL = 1.14
UCL = 2.089(1.14) = 2.38
LCL = 0 (1.14) = 0
X-BAR , R CONTROL CHART
X-BAR,S CONTROL CHART
CONTROL CHARTS
CLASSIFICATION OF ATTRIBUTES CONTROL CHARTS
CONTROL CHARTS FOR ATTRIBUTES
CLASSIFICATION CHARTS
P-chart
NP-chart
COUNT CHARTS
C-chart
U-chart
CONTROL CHARTS FOR ATTRIBUTES
Classification charts:
Classification charts deal with either the fraction of items or the number of
items in a series of subgroups.
CONTROL CHARTS FOR ATTRIBUTES
P – chart:
The P-Chart monitors the percent of samples having the condition, relative to
either a fixed or varying sample size.
EXAMPLE SCENARIO:
Consider a shop purchasing bundles of readymade shirts from same
manufacturer. The number of shirts in each bundle and the defective item are as
follows. Plot a suitable control chart.
Keywords: Changing sample size (No. of shirts in the bundle), defectives.
No. of shirts in the
bundle
No. of defective
shirts
20 5
15 3
20 2
25 1
20 5
CONTROL CHARTS FOR ATTRIBUTES(P chart)
A team in an accounting group has been working on improving the processing of invoices. The
team is trying to reduce the cost of processing invoices by decreasing the fraction of invoices with errors.
The team developed the following operational definition for a defective invoice: an invoice is defective if it
has incorrect price, incorrect quantity, incorrect coding, incorrect address, or incorrect name. The team
decided to pull a random sample of 50 invoices per day. If the invoice had one or more errors it was
defective. The data from the last 20 days are given in the table. Draw the p chart.
Sample no No of defectives Fraction defective
1 4 0.08
2 3 0.06
3 8 0.16
4 12 0.24
5 7 0.14
6 15 0.30
7 20 0.40
8 13 0.26
9 9 0.18
10 8 0.16
11 5 0.10
Sample no No of defectives Fraction defective
12 14 0.28
13 9 0.18
14 11 0.22
15 2 0.04
16 9 0.18
17 3 0.06
18 13 0.26
19 6 0.12
20 9 0.18
180
CONTROL CHARTS FOR ATTRIBUTES (P chart)
CALCULATION:
P =Σpi/n
= 18/(20 x 50)
= 0.18
UCL = p + 3 √(p x (1-p)/n)
= 0.18 + 3 √(0.18 x (1 - 0.18)/50)
= 0.343
LCL = p - 3 √(p x (1-p)/n)
= 0.18 - 3 √(0.18 x (1- 0.18)/50)
= 0.017
CONTROL CHARTS FOR ATTRIBUTES (P chart)
The process is out of control because lot number 7 exceeds the upper control limit.
191715131197531
0.4
0.3
0.2
0.1
0.0
Sample
Proportion
_
P=0.18
UCL=0.3430
LCL=0.0170
1
P Chart of C2
CONTROL CHARTS FOR ATTRIBUTES
NP-chart:
The NP-Chart monitors the number of times a condition occurs, relative to a
constant sample size.
Example scenario:
Consider a ball manufacturing company. It produces 1000 balls daily. The
number of defective balls produced each day for 10 days are 10, 13, 9, 3, 7, 16, 21,19,
12, 10. Plot the control chart.
Keywords: Sample size doesn’t change (1000 balls), defectives
CONTROL CHARTS FOR ATTRIBUTES (NP chart)
The data representing the results of inspecting l00 units of personal computer produced for the past
10 days. Does the process appear to be in control.
Sample lot number Sample size No. of defectives
1 100 8
2 100 7
3 100 12
4 100 5
5 100 18
6 100 2
7 100 10
8 100 16
9 100 14
10 100 6
Total 1000 98
CONTROL CHARTS FOR ATTRIBUTES (NP chart)
CALCULATION:
Average number of defective = np =98/10 = 9.8
Average fraction defective = p =98/1000 = 0.098
UCL = np + 3 √(np x (1-p))
= 9. 8 + 3 √(9.8 x (1 - 0.098))
= 18.72
LCL = np - 3 √(np x (1-p))
= 9.8 - 3 √(9.8 x (1- 0.098))
= 0.88
CONTROL CHARTS FOR ATTRIBUTES (NP chart)
The process is in control
10987654321
20
15
10
5
0
Sample
SampleCount
__
NP=9.8
UCL=18.72
LCL=0.88
NP Chart of C3
CONTROL CHARTS FOR ATTRIBUTES
Count charts:
Count charts deal with the number of times a particular characteristic appear in
some given area of opportunity.
C-chart:
The c-chart monitors the number of times a condition occurs, relative to a constant
sample size. In this case, a given sample can have more than one instance of the
condition, in which case we count all the times it occurs in the sample.
Example scenario:
Consider an engineer buys a set of 10 ropes for his construction project. All the
ropes of same length of 100 meters. Each rope is inspected and the number of defects in
each rope are found to be 1,1,3,1,2,1,5,3,4 and 2 respectively. Plot the control chart.
Keywords: Sample size doesn’t change (100 m), defects
CONTROL CHARTS FOR ATTRIBUTES (C chart)
The data represents no. of non-conformities per 1000 metres in a telephone cable. From the analysis
of these data, you conclude that the process is in control or not?
Sample no No. of Non-conformities
1 1
2 1
3 3
4 7
5 8
6 10
7 5
8 13
9 0
10 19
11 24
Sample no No. of Non-conformities
12 6
13 9
14 11
15 15
16 8
17 3
18 6
19 7
20 4
21 9
22 20
CONTROL CHARTS FOR ATTRIBUTES (C chart)
CL = c = 189/22 = 8.59
UCL = c + 3 √c
= 8.59 + 3 √8.59
= 17.38
LCL = c - 3 √c
= 8.59 - 3 √8.59
= 0
CONTROL CHARTS FOR ATTRIBUTES (C chart)
The process is out of control
21191715131197531
25
20
15
10
5
0
Sample
SampleCount
_
C=8.59
UCL=17.38
LCL=0
1
1
1
C Chart of C4
CONTROL CHARTS FOR ATTRIBUTES
U-chart:
The u-Chart monitors the percent of samples having the condition, relative to either a
fixed or varying sample size. In this case, a given sample can have more than one instance of
the condition, in which case we count all the times it occurs in the sample.
Example scenario:
5 lots of cloth produced by a manufacturer are inspected for defects. The sample
taken for each inspection is different. The sample taken and number of defects found are as
follows.
Keywords: changing sample size (length of the cloth), defects
Length of the cloth inspected No. of defects
20 m 5
15 m 3
20 m 2
25 m 1
20 m 5
CONTROL CHARTS FOR ATTRIBUTES (U chart)
Lots of cloth produced by a manufacturer are inspected for defects. Because of the nature of
inspection process, the size of the inspection sample varies from lot to lot. Calculate the center line
and lower control limits for the appropriate control chart
Lot number 100s of square yards No. of defects
1 2 5
2 2.5 7
3 1 3
4 0.9 2
5 1.2 4
6 0.8 1
7 1.4 0
8 1.6 2
Lot number 100s of square yards No. of defects
9 1.9 3
10 1.5 0
11 1.7 2
12 1.7 3
13 2 1
14 1.6 2
15 1.9 4
CONTROL CHARTS FOR ATTRIBUTES (U chart)
CALCULATION:
CL = u = Σc/Σa
= 1.646
LCL = u – 3 √(u/a1)
= 1.646 - 3 √(1.646/2)
= 0
UCL= u1 + 3√(u/a1)
= 1.646 + 3 √ (1.646/2)
= 4.36
CONTROL CHARTS FOR ATTRIBUTES (U chart)
The process is in control
151413121110987654321
6
5
4
3
2
1
0
Sample
SampleCountPerUnit
_
U=1.646
UCL=4.437
LCL=0
U Chart of C6
Tests performed with unequal sample sizes
CONTROL CHARTS FOR ATTRIBUTES
How to select control chart:
Defects
Example: A crack in the shaft
Defectives
Example: Broken shaft
Constant sample size C chart np chart
Changing sample size U chart p chart
CONTROL CHARTS FOR ATTRIBUTES
A large publisher counts the number of keyboard errors that make their way into finished
books. The number of errors and the number of pages in the past 26 publications are
Book no. No. of errors No. of pages
1 49 202
2 63 232
3 57 332
4 33 429
5 54 512
6 37 347
7 38 401
8 45 412
9 65 481
10 62 770
11 40 577
12 21 734
13 35 455
Book no. No. of errors No. of pages
14 48 612
15 50 432
16 41 538
17 45 383
18 51 302
19 49 285
20 38 591
21 70 310
22 55 547
23 63 469
24 33 652
25 14 343
26 44 401
CONTROL CHARTS FOR ATTRIBUTES
Try yourself…
The following 20 days data represent the findings from a study conducted at a factory that
manufactures film canisters. Each day 500 canisters were sampled and inspected. The number of
defective film canisters were recorded each day as follows. Is this process in control?
Day No. of nonconforming
1 26
2 25
3 23
4 24
5 26
6 20
7 21
8 27
9 23
10 25
Day No. of nonconforming
11 22
12 26
13 27
14 29
15 20
16 19
17 23
18 19
19 18
20 27
CONTROL CHARTS FOR ATTRIBUTES
Try yourself…
Consider the output of a paper mill: the product appears at the end of a web and is rolled
onto a spool called reel. Each reel is examined for blemishes. Results of the inspections are as
follows. Is this in control?
Reel No. of blemishes
1 4
2 5
3 5
4 10
5 6
6 4
7 5
8 6
9 3
10 6
11 6
12 7
Reel No. of blemishes
13 11
14 9
15 1
16 1
17 6
18 10
19 3
20 7
21 4
22 8
23 7
24 9
25 7
CONTROL CHARTS FOR ATTRIBUTES
Try yourself…
The following data represent the results of inspecting all units of a personal computer
produced for the past 10 days. Is this process in control?
Day Unit Inspected Non-confirming units
1 80 4
2 110 7
3 90 5
4 75 8
5 130 6
6 120 6
7 70 4
8 125 5
9 105 8
10 95 7
ADVANTAGES OF CONTROL CHARTS
A control chart indicate whether the process is in control or out of control.
It determines the process variability and detects unusual variations in a process.
It ensures product quality level.
It warns in time and if process is rectified at that time percentage of rejection can be
reduced.
It provides information about selection of process and setting up of tolerance limits.
Control charts

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to control charts
Introduction to control chartsIntroduction to control charts
Introduction to control chartskavya ravali
 
Statistical Quality Control.
Statistical Quality Control.Statistical Quality Control.
Statistical Quality Control.Raviraj Jadeja
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control ChartAshish Gupta
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlTushar Naik
 
Process Capability - Cp, Cpk. Pp, Ppk
Process Capability - Cp, Cpk. Pp, Ppk Process Capability - Cp, Cpk. Pp, Ppk
Process Capability - Cp, Cpk. Pp, Ppk J. García - Verdugo
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality ControlDr. Rana Singh
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality controlIrfan Hussain
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality ControlMahmudul Hasan
 
Statistical quality control presentation
Statistical quality control presentationStatistical quality control presentation
Statistical quality control presentationSuchitra Sahu
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality controlSai Datri Arige
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capabilityvaidehishah25
 
Seven tools of TQM
Seven tools of TQMSeven tools of TQM
Seven tools of TQMvar93
 
Quality control and its Tools
Quality control and its ToolsQuality control and its Tools
Quality control and its ToolsRaziya Hameed
 

Was ist angesagt? (20)

Introduction to control charts
Introduction to control chartsIntroduction to control charts
Introduction to control charts
 
Statistical Quality Control.
Statistical Quality Control.Statistical Quality Control.
Statistical Quality Control.
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control Chart
 
Statistical control chart
Statistical control chartStatistical control chart
Statistical control chart
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Process Capability - Cp, Cpk. Pp, Ppk
Process Capability - Cp, Cpk. Pp, Ppk Process Capability - Cp, Cpk. Pp, Ppk
Process Capability - Cp, Cpk. Pp, Ppk
 
Control chart basics
Control chart basicsControl chart basics
Control chart basics
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality Control
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Control charts
Control chartsControl charts
Control charts
 
Control charts
Control charts Control charts
Control charts
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality Control
 
Statistical quality control presentation
Statistical quality control presentationStatistical quality control presentation
Statistical quality control presentation
 
PROCESS CAPABILITY
PROCESS CAPABILITYPROCESS CAPABILITY
PROCESS CAPABILITY
 
Basics of Process Capability
Basics of Process CapabilityBasics of Process Capability
Basics of Process Capability
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capability
 
Seven tools of TQM
Seven tools of TQMSeven tools of TQM
Seven tools of TQM
 
Quality control and its Tools
Quality control and its ToolsQuality control and its Tools
Quality control and its Tools
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 

Andere mochten auch

Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributesBuddy Krishna
 
Variable control chart
Variable control chartVariable control chart
Variable control chartJassfer Alina
 
Statistical Process Control & Control Chart
Statistical Process Control  & Control ChartStatistical Process Control  & Control Chart
Statistical Process Control & Control ChartShekhar Verma
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlANOOPA NARAYANAN
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlMarwa Abo-Amra
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assuranceLeola Ramirez
 
Quality Control
Quality ControlQuality Control
Quality Controlvishakeb
 
7 btoq control chart
7 btoq control chart7 btoq control chart
7 btoq control chartEdgar Mata
 
FIRE RESISTING BUILDINGS
FIRE RESISTING BUILDINGSFIRE RESISTING BUILDINGS
FIRE RESISTING BUILDINGSbala kp
 
Statistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartStatistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartkevin Richard
 
Fitness and wellness
Fitness and wellnessFitness and wellness
Fitness and wellnessaquadevida
 

Andere mochten auch (19)

Control chart ppt
Control chart pptControl chart ppt
Control chart ppt
 
Control chart
Control chartControl chart
Control chart
 
Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributes
 
Variable control chart
Variable control chartVariable control chart
Variable control chart
 
Statistical Process Control & Control Chart
Statistical Process Control  & Control ChartStatistical Process Control  & Control Chart
Statistical Process Control & Control Chart
 
Control chart
Control chartControl chart
Control chart
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Quality Control
Quality ControlQuality Control
Quality Control
 
Facility Location
Facility Location Facility Location
Facility Location
 
7 btoq control chart
7 btoq control chart7 btoq control chart
7 btoq control chart
 
FIRE RESISTING BUILDINGS
FIRE RESISTING BUILDINGSFIRE RESISTING BUILDINGS
FIRE RESISTING BUILDINGS
 
Qa.spc
Qa.spcQa.spc
Qa.spc
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Statistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartStatistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chart
 
5. spc control charts
5. spc   control charts5. spc   control charts
5. spc control charts
 
P Charts
P ChartsP Charts
P Charts
 
Fitness and wellness
Fitness and wellnessFitness and wellness
Fitness and wellness
 

Ähnlich wie Control charts

Statistical process control
Statistical process control Statistical process control
Statistical process control Hardil Shah
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysissigmatest2011
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controljsembiring
 
Control Chart Basics.ppt
Control Chart Basics.pptControl Chart Basics.ppt
Control Chart Basics.pptVishnuCRajan1
 
Control Chart Basics.ppt
Control Chart Basics.pptControl Chart Basics.ppt
Control Chart Basics.pptSulavGiri3
 
Statistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxStatistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxARUN KUMAR
 
STATISTICAL PHARMACEUTICAL QUALITY CONTROL
STATISTICAL  PHARMACEUTICAL QUALITY CONTROLSTATISTICAL  PHARMACEUTICAL QUALITY CONTROL
STATISTICAL PHARMACEUTICAL QUALITY CONTROLHasnat Tariq
 
STATISTICAL PROCESS CONTROL(PPT).pptx
STATISTICAL PROCESS CONTROL(PPT).pptxSTATISTICAL PROCESS CONTROL(PPT).pptx
STATISTICAL PROCESS CONTROL(PPT).pptxmayankdubey99
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxhinal10
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlNAVEENBANSHIWAL
 
lecture 5 SPC Charta.pptx
lecture 5 SPC Charta.pptxlecture 5 SPC Charta.pptx
lecture 5 SPC Charta.pptxssuser378d7c
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrolceutics1315
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality controlVicky Raj
 
statistical process control
 statistical process control statistical process control
statistical process controlAnkitaGorhe
 

Ähnlich wie Control charts (20)

Statistical process control
Statistical process control Statistical process control
Statistical process control
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysis
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Control Chart Basics.ppt
Control Chart Basics.pptControl Chart Basics.ppt
Control Chart Basics.ppt
 
Control Chart Basics.ppt
Control Chart Basics.pptControl Chart Basics.ppt
Control Chart Basics.ppt
 
Statistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxStatistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptx
 
STATISTICAL PHARMACEUTICAL QUALITY CONTROL
STATISTICAL  PHARMACEUTICAL QUALITY CONTROLSTATISTICAL  PHARMACEUTICAL QUALITY CONTROL
STATISTICAL PHARMACEUTICAL QUALITY CONTROL
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
STATISTICAL PROCESS CONTROL(PPT).pptx
STATISTICAL PROCESS CONTROL(PPT).pptxSTATISTICAL PROCESS CONTROL(PPT).pptx
STATISTICAL PROCESS CONTROL(PPT).pptx
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptx
 
Spc la
Spc laSpc la
Spc la
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
7 QC - NEW.ppt
7 QC - NEW.ppt7 QC - NEW.ppt
7 QC - NEW.ppt
 
lecture 5 SPC Charta.pptx
lecture 5 SPC Charta.pptxlecture 5 SPC Charta.pptx
lecture 5 SPC Charta.pptx
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality control
 
statistical process control
 statistical process control statistical process control
statistical process control
 
C Charts
C ChartsC Charts
C Charts
 
Statistical quality control
Statistical  quality  controlStatistical  quality  control
Statistical quality control
 

Kürzlich hochgeladen

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfEr. Suman Jyoti
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Kürzlich hochgeladen (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Control charts

  • 1. ARAVIND BABU R SAHUL HAMEED.H M.E-INDUSTRIAL ENGG 1
  • 2. AGENDA • What is control chart? • History of control chart • Types of data • Defect and defective • Types of control charts • Control limits vs specification limits • Variable control charts • Attribute control charts
  • 3. CONTROL CHART A statistical tool to study the variation in the process over time. A control chart always has a • central line for the average, • an upper line for the upper control limit and • a lower line for the lower control limit. • These lines are determined from historical data. CL = Mean x UCL = x + 3σ Y-axis X-axis LCL = x - 3σ
  • 4. CONTROL CHART Purpose: • Analyze the past data and determine the performance of the process • Measure control of the process against standards
  • 5. HISTORY • Invented by Walter Andrew Shewhart, father of statistical quality control in 1920. • The company's engineers had been seeking to improve the reliability of their telephony transmission systems. • There was a stronger business need to reduce the frequency of failures and repairs • Shewhart framed the problem in terms of Common- and special-causes of variation and, on May 16, 1924, wrote an internal memo introducing the control chart as a tool for distinguishing between the two. • He understood data from physical processes typically produce a "normal distribution curve“.
  • 6. TYPES OF DATA DISCRETE DATA CONTINUOUS DATA Infinite number of values between whole numbers Data that can be counted
  • 7. DEFECTS AND DEFECTIVES Defects : • A defect is any item or service that exhibits a departure from specifications. • A defect does not necessarily mean that the product or service cannot be used. • A defect indicates only that the product result is not entirely as intended. Example: crack, bend in a shaft Defectives: • A defective is an item or service that is considered completely unacceptable for use. • Each item or service experience is either considered defective or not—there are only two choices.
  • 9. CONTROL LIMITS • Voice of the process • Calculated from Data • Appear on control charts • Appear to subgroups • Guide for process actions • What the process is doing SPECIFICATION LIMITS • Voice of the customer • Defined from the customer • Appear on histograms • Apply to items • Separate good items from bad items • What we want the process do
  • 11. CONTROL CHARTS General Procedure of constructing a chart: A control chart consists of: • A graph such that part number is plotted along X-axis and attribute measure along Y- axis. • The mean of this statistic using all the samples is calculated (e.g., the mean of the means, mean of the ranges, mean of the proportions) • A centre line (CL) is drawn at the value of the mean. CL = Mean x Y-axis X-axis
  • 12. CONTROL CHARTS • The standard deviation σ of the statistic is also calculated using all the samples. • Upper and lower control limits indicate the threshold at which the process output is considered undesired and are drawn at 3 standard deviation from the centre line. CL = Mean x UCL = x + 3σ LCL = x - 3σ Y-axis X-axis
  • 13. CONTROL CHARTS • Plot the attribute measure representing a statistic (e.g., a mean, range, proportion) of measurements of a quality characteristic in samples taken from the process at different times (i.e., the da for each part number and join all the points to form a curve). • If anyone of the points in the curve exceeds the upper and lower control limits, then the process is said to be out of control CL = Mean x UCL = x + 3σ LCL = x - 3σA B C D E F G H I J K L M Y-axis X-axis
  • 14.
  • 15. CONTROL CHART FOR VARIABLES A single measurable quality characteristic ,such as dimension, weight, or volume, is called variable. Our objectives for this section are to learn how to use control charts to monitor continuous data. We want to learn the assumptions behind the charts, their application, and their interpretation. Since statistical control for continuous data depends on both the mean and the variability, variables control charts are constructed to monitor each. The most commonly used chart to monitor the mean is called the X-BAR chart. There are two commonly used charts used to monitor the variability: the R chart and the s chart. 15
  • 16. The X-BAR Chart: This chart is called the X-BAR chart because the statistic being plotted is the sample mean. The reason for taking a sample is because we are not always sure of the process distribution. By using the sample mean we can "invoke" the central limit theorem to assume normality. The R chart I. The R chart is used to monitor process variability when sample sizes are small (n<10), or to simplify the calculations made by process operators. II. This chart is called the R chart because the statistic being plotted is the sample range. III. Using the R chart, the estimate of the process standard deviation,σ ,is R/d2.
  • 17. THE S CHART i. The s chart is used to monitor process variability when sample sizes are large (n*10), or when a computer is available to automate the calculations. ii. This chart is called the s chart because the statistic being plotted is the sample standard deviation. iii. Using the s chart, the estimate of the process standard deviation, σ, is
  • 18. PROCEDURE FOR USING VARIABLES CONTROL CHARTS: I. Determine the variable to monitor. II. At predetermined, even intervals, take samples of size n (usually n=4 or 5). III. Compute X BAR and R (or s) for each sample, and plot them on their respective control charts. Use the following relationships: IV. After collecting a sufficient number of samples, k (k>20), compute the control limits for the charts. The following additional calculations will be necessary:
  • 19. V. If any points fall outside of the control limits, conclude that the process is out of control, and begin a search for an assignable or special cause. When the special cause is identified, remove that point and return to step 4 to re-evaluate the remaining points. VI. If all the points are within limits, conclude that the process is in control, and use the calculated limits for future monitoring of the process.
  • 20.
  • 21. EXAMPLE PROBLEM A large hotel in a resort area has a housekeeping staff that cleans and prepares all of the hotel's guestrooms daily. In an effort to improve service through reducing variation in the time required to clean and prepare a room, a series of measurements is taken of the times to service rooms in one section of the hotel. Cleaning times for five rooms selected each day for 25 consecutive days appear below: Day Room 1 Room 2 Room 3 Room 4 Room 5 1 15.6 14.3 17.7 14.3 15 2 15 14.8 16.8 16.9 17.4 3 16.4 15.1 15.7 17.3 16.6 4 14.2 14.8 17.3 15 16.4 5 16.4 16.3 17.6 17.9 14.9 6 14.9 17.2 17.2 15.3 14.1 7 17.9 17.9 14.7 17 14.5 8 14 17.7 16.9 14 14.9 9 17.6 16.5 15.3 14.5 15.1 10 14.6 14 14.7 16.9 14.2
  • 22. 11 14.6 15.5 15.9 14.8 14.2 12 15.3 15.3 15.9 15 17.8 13 17.4 14.9 17.7 16.6 14.7 14 15.3 16.9 17.9 17.2 17.5 15 14.8 15.1 16.6 16.3 14.5 16 16.1 14.6 17.5 16.9 17.7 17 14.2 14.7 15.3 15.7 14.3 18 14.6 17.2 16 16.7 16.3 19 15.9 16.5 16.1 15 17.8 20 16.2 14.8 14.8 15 15.3 21 16.3 15.3 14 17.4 14.5 22 15 17.6 14.5 17.5 17.8 23 16.4 15.9 16.7 15.7 16.9 24 16.6 15.1 14.1 17.4 17.8 25 17 17.5 17.4 16.2 17.9
  • 23. CALCULATE THE MEAN, RANGE, STANDARD DEVIATION Day Average Range St. Dev 1 15.4 3.4 1.41 2 16.2 2.6 1.19 3 16.2 2.2 0.85 4 15.5 3.1 1.27 5 16.6 3 1.19 6 15.7 3.1 1.4 7 16.4 3.4 1.69 8 15.5 3.7 1.71 9 15.8 3.1 1.24 10 14.9 2.9 1.16 11 15 1.7 0.69 12 15.9 2.8 1.13 13 16.3 3 1.39 14 17 2.6 1 15 15.5 2.1 0.93 16 16.6 3.1 1.26 17 14.8 1.5 0.65 18 16.2 2.6 0.98 19 16.3 2.8 1.02 20 15.2 1.4 0.58 21 15.5 3.4 1.37 22 16.5 3.3 1.59 23 16.3 1.2 0.51 24 16.2 3.7 1.56 25 17.2 1.7 0.64
  • 24. CALCULATE THE CONTROL LIMITS 15.94 2.7 1.14 X R s x Chart Control Limits UCL = x + A R LCL = x - A R 2 2 R Chart Control Limits UCL = D R LCL = D R 4 3 X-BAR , R CHART X- BAR ,S CHART
  • 25. TABLE FOR CONSTANTS SQC A MODERN INTRODUCTION 6th Edition, D.C. Montgomery
  • 26. CONSTANTS FOR X-BAR ,R & X-BAR, S CHARTS X-BAR , R CHART X-BAR , S CHART A2 D4 D3 0.577 2.004 0 A3 B4 B3 1.427 2.089 0 X-BAR CHART CL =15.94 UCL = 15.94+ 0.577(2.7) = 17.49 LCL = 15.94 – 0.577(2.7) = 14.38 R CHART CL = 2.7 UCL = 2.004(2.7) = 5.41 LCL = 0 (2.7) = 0 X-BAR CHART CL =15.94 UCL = 15.94+ 1.427(1.14) = 17.56 LCL = 15.94 – 1.427(1.14) = 14.31 S CHART CL = 1.14 UCL = 2.089(1.14) = 2.38 LCL = 0 (1.14) = 0
  • 27. X-BAR , R CONTROL CHART
  • 29.
  • 30. CONTROL CHARTS CLASSIFICATION OF ATTRIBUTES CONTROL CHARTS CONTROL CHARTS FOR ATTRIBUTES CLASSIFICATION CHARTS P-chart NP-chart COUNT CHARTS C-chart U-chart
  • 31. CONTROL CHARTS FOR ATTRIBUTES Classification charts: Classification charts deal with either the fraction of items or the number of items in a series of subgroups.
  • 32. CONTROL CHARTS FOR ATTRIBUTES P – chart: The P-Chart monitors the percent of samples having the condition, relative to either a fixed or varying sample size. EXAMPLE SCENARIO: Consider a shop purchasing bundles of readymade shirts from same manufacturer. The number of shirts in each bundle and the defective item are as follows. Plot a suitable control chart. Keywords: Changing sample size (No. of shirts in the bundle), defectives. No. of shirts in the bundle No. of defective shirts 20 5 15 3 20 2 25 1 20 5
  • 33. CONTROL CHARTS FOR ATTRIBUTES(P chart) A team in an accounting group has been working on improving the processing of invoices. The team is trying to reduce the cost of processing invoices by decreasing the fraction of invoices with errors. The team developed the following operational definition for a defective invoice: an invoice is defective if it has incorrect price, incorrect quantity, incorrect coding, incorrect address, or incorrect name. The team decided to pull a random sample of 50 invoices per day. If the invoice had one or more errors it was defective. The data from the last 20 days are given in the table. Draw the p chart. Sample no No of defectives Fraction defective 1 4 0.08 2 3 0.06 3 8 0.16 4 12 0.24 5 7 0.14 6 15 0.30 7 20 0.40 8 13 0.26 9 9 0.18 10 8 0.16 11 5 0.10 Sample no No of defectives Fraction defective 12 14 0.28 13 9 0.18 14 11 0.22 15 2 0.04 16 9 0.18 17 3 0.06 18 13 0.26 19 6 0.12 20 9 0.18 180
  • 34. CONTROL CHARTS FOR ATTRIBUTES (P chart) CALCULATION: P =Σpi/n = 18/(20 x 50) = 0.18 UCL = p + 3 √(p x (1-p)/n) = 0.18 + 3 √(0.18 x (1 - 0.18)/50) = 0.343 LCL = p - 3 √(p x (1-p)/n) = 0.18 - 3 √(0.18 x (1- 0.18)/50) = 0.017
  • 35. CONTROL CHARTS FOR ATTRIBUTES (P chart) The process is out of control because lot number 7 exceeds the upper control limit. 191715131197531 0.4 0.3 0.2 0.1 0.0 Sample Proportion _ P=0.18 UCL=0.3430 LCL=0.0170 1 P Chart of C2
  • 36. CONTROL CHARTS FOR ATTRIBUTES NP-chart: The NP-Chart monitors the number of times a condition occurs, relative to a constant sample size. Example scenario: Consider a ball manufacturing company. It produces 1000 balls daily. The number of defective balls produced each day for 10 days are 10, 13, 9, 3, 7, 16, 21,19, 12, 10. Plot the control chart. Keywords: Sample size doesn’t change (1000 balls), defectives
  • 37. CONTROL CHARTS FOR ATTRIBUTES (NP chart) The data representing the results of inspecting l00 units of personal computer produced for the past 10 days. Does the process appear to be in control. Sample lot number Sample size No. of defectives 1 100 8 2 100 7 3 100 12 4 100 5 5 100 18 6 100 2 7 100 10 8 100 16 9 100 14 10 100 6 Total 1000 98
  • 38. CONTROL CHARTS FOR ATTRIBUTES (NP chart) CALCULATION: Average number of defective = np =98/10 = 9.8 Average fraction defective = p =98/1000 = 0.098 UCL = np + 3 √(np x (1-p)) = 9. 8 + 3 √(9.8 x (1 - 0.098)) = 18.72 LCL = np - 3 √(np x (1-p)) = 9.8 - 3 √(9.8 x (1- 0.098)) = 0.88
  • 39. CONTROL CHARTS FOR ATTRIBUTES (NP chart) The process is in control 10987654321 20 15 10 5 0 Sample SampleCount __ NP=9.8 UCL=18.72 LCL=0.88 NP Chart of C3
  • 40. CONTROL CHARTS FOR ATTRIBUTES Count charts: Count charts deal with the number of times a particular characteristic appear in some given area of opportunity. C-chart: The c-chart monitors the number of times a condition occurs, relative to a constant sample size. In this case, a given sample can have more than one instance of the condition, in which case we count all the times it occurs in the sample. Example scenario: Consider an engineer buys a set of 10 ropes for his construction project. All the ropes of same length of 100 meters. Each rope is inspected and the number of defects in each rope are found to be 1,1,3,1,2,1,5,3,4 and 2 respectively. Plot the control chart. Keywords: Sample size doesn’t change (100 m), defects
  • 41. CONTROL CHARTS FOR ATTRIBUTES (C chart) The data represents no. of non-conformities per 1000 metres in a telephone cable. From the analysis of these data, you conclude that the process is in control or not? Sample no No. of Non-conformities 1 1 2 1 3 3 4 7 5 8 6 10 7 5 8 13 9 0 10 19 11 24 Sample no No. of Non-conformities 12 6 13 9 14 11 15 15 16 8 17 3 18 6 19 7 20 4 21 9 22 20
  • 42. CONTROL CHARTS FOR ATTRIBUTES (C chart) CL = c = 189/22 = 8.59 UCL = c + 3 √c = 8.59 + 3 √8.59 = 17.38 LCL = c - 3 √c = 8.59 - 3 √8.59 = 0
  • 43. CONTROL CHARTS FOR ATTRIBUTES (C chart) The process is out of control 21191715131197531 25 20 15 10 5 0 Sample SampleCount _ C=8.59 UCL=17.38 LCL=0 1 1 1 C Chart of C4
  • 44. CONTROL CHARTS FOR ATTRIBUTES U-chart: The u-Chart monitors the percent of samples having the condition, relative to either a fixed or varying sample size. In this case, a given sample can have more than one instance of the condition, in which case we count all the times it occurs in the sample. Example scenario: 5 lots of cloth produced by a manufacturer are inspected for defects. The sample taken for each inspection is different. The sample taken and number of defects found are as follows. Keywords: changing sample size (length of the cloth), defects Length of the cloth inspected No. of defects 20 m 5 15 m 3 20 m 2 25 m 1 20 m 5
  • 45. CONTROL CHARTS FOR ATTRIBUTES (U chart) Lots of cloth produced by a manufacturer are inspected for defects. Because of the nature of inspection process, the size of the inspection sample varies from lot to lot. Calculate the center line and lower control limits for the appropriate control chart Lot number 100s of square yards No. of defects 1 2 5 2 2.5 7 3 1 3 4 0.9 2 5 1.2 4 6 0.8 1 7 1.4 0 8 1.6 2 Lot number 100s of square yards No. of defects 9 1.9 3 10 1.5 0 11 1.7 2 12 1.7 3 13 2 1 14 1.6 2 15 1.9 4
  • 46. CONTROL CHARTS FOR ATTRIBUTES (U chart) CALCULATION: CL = u = Σc/Σa = 1.646 LCL = u – 3 √(u/a1) = 1.646 - 3 √(1.646/2) = 0 UCL= u1 + 3√(u/a1) = 1.646 + 3 √ (1.646/2) = 4.36
  • 47. CONTROL CHARTS FOR ATTRIBUTES (U chart) The process is in control 151413121110987654321 6 5 4 3 2 1 0 Sample SampleCountPerUnit _ U=1.646 UCL=4.437 LCL=0 U Chart of C6 Tests performed with unequal sample sizes
  • 48. CONTROL CHARTS FOR ATTRIBUTES How to select control chart: Defects Example: A crack in the shaft Defectives Example: Broken shaft Constant sample size C chart np chart Changing sample size U chart p chart
  • 49.
  • 50. CONTROL CHARTS FOR ATTRIBUTES A large publisher counts the number of keyboard errors that make their way into finished books. The number of errors and the number of pages in the past 26 publications are Book no. No. of errors No. of pages 1 49 202 2 63 232 3 57 332 4 33 429 5 54 512 6 37 347 7 38 401 8 45 412 9 65 481 10 62 770 11 40 577 12 21 734 13 35 455 Book no. No. of errors No. of pages 14 48 612 15 50 432 16 41 538 17 45 383 18 51 302 19 49 285 20 38 591 21 70 310 22 55 547 23 63 469 24 33 652 25 14 343 26 44 401
  • 51. CONTROL CHARTS FOR ATTRIBUTES Try yourself… The following 20 days data represent the findings from a study conducted at a factory that manufactures film canisters. Each day 500 canisters were sampled and inspected. The number of defective film canisters were recorded each day as follows. Is this process in control? Day No. of nonconforming 1 26 2 25 3 23 4 24 5 26 6 20 7 21 8 27 9 23 10 25 Day No. of nonconforming 11 22 12 26 13 27 14 29 15 20 16 19 17 23 18 19 19 18 20 27
  • 52. CONTROL CHARTS FOR ATTRIBUTES Try yourself… Consider the output of a paper mill: the product appears at the end of a web and is rolled onto a spool called reel. Each reel is examined for blemishes. Results of the inspections are as follows. Is this in control? Reel No. of blemishes 1 4 2 5 3 5 4 10 5 6 6 4 7 5 8 6 9 3 10 6 11 6 12 7 Reel No. of blemishes 13 11 14 9 15 1 16 1 17 6 18 10 19 3 20 7 21 4 22 8 23 7 24 9 25 7
  • 53. CONTROL CHARTS FOR ATTRIBUTES Try yourself… The following data represent the results of inspecting all units of a personal computer produced for the past 10 days. Is this process in control? Day Unit Inspected Non-confirming units 1 80 4 2 110 7 3 90 5 4 75 8 5 130 6 6 120 6 7 70 4 8 125 5 9 105 8 10 95 7
  • 54. ADVANTAGES OF CONTROL CHARTS A control chart indicate whether the process is in control or out of control. It determines the process variability and detects unusual variations in a process. It ensures product quality level. It warns in time and if process is rectified at that time percentage of rejection can be reduced. It provides information about selection of process and setting up of tolerance limits.

Hinweis der Redaktion

  1. 1 of 7 QC tools
  2. Class strength Dimensions Volume
  3. Before, control charts, types of data
  4. BROKEN SHAFT