❖ PERT was developed in the late 1950 by the US Navy
submarine missile programme and was applied in 1958
❖ PERT shows the time taken by each component of project &the
total time required for its completion.
❖ PERT breaks down theproject into events, activity & lays down
their proper sequence relationship & duration in the form of
network.
❖ PERT is a technique of representing project plan innetwork.
❖ This is represented in a graphic form known as network diagram.
The programme (or project) evaluation and review
technique commonly abbreviated as ‘PERT’; is a
statistical tool, used in project management, which was
designed to analyze and represent the tasks involved in
completing a given project & to illustrate the flow of
events in a project.
There are two types of network diagrams,
❑ ACTIVITY ON ARROW (AOA) :
In the first variant the duration is denoted on arrowconnecting
diagram nodes. Such diagram type calledAOA.
❑ ACTIVITY ON NODE (AON) :
in such diagram the information about the task duration is
denoted in the diagram node & each task is represented inthe
form of rectangle with definite set of fields.
❖ Prediction of deliverables
❖ Planning resource requirement
❖ Controlling resourceallocation
❖ Internal programme review
❖ Performance evaluation
❖ Uniform wide acceptance
❖ Reduction in cost
❖ Saving time
❖ Determination of activities
❖ Elimination of risk in complex activities
❖ Flexibility
❖ Evaluation of alternatives
❖ Useful effective control
❖ Useful decision making
❖ Useful research work
PERT PLANNING INVOLVE THE FOLLOWING
STEPS:
2) Determine
the proper
sequence of
the activities
3) Construct a
network
diagram
4) Estimate the
time require
for each
activity
5) Determine
the critical
path
1) Identity
the
specific
activity &
events
1. Identity Activities & events :
The activities are tasks require to complete the project. The
events marking the beginning & end of one or more
activities. It is helpful to list the tasks in a table that in later
steps can be expanded to include on sequence is duration .
2.Determine the proper sequence of the activities :
This steps may be combine with the activity identification
steps since the activity sequence is event for some task .
Other tasks may require more analysis to determine exact
order in which they must be perform .
3.Construct a network diagram :
Using the activity sequence information , a network diagram
can be drawn showing the sequence of the serial is & parallel
activities .For the original activity –on-are model, the activities
are depicted by arrowed lines & milestones are depicted by
circles.
4.Estimate the time required for activity:
Adistinguishing feature of PERTis its ability to dealwith
uncertainty in activity completiontimes
For each activity , the model usually includes threetime
estimates;-
A) Optimistic time:
Generally the shortest time in which the activity canbe
completed .
B) Most likely time :
The completion time having the highest probability notethat
this time is different for the expected time.
C) Pessimistic time :
The longest time that an activity might require.
5. Determine the critical path :
The critical path is determine by adding the times for the
activities in each sequence & determining the longest pathin
project. The critical path determines the total timerequire.
6.Update the PERT chart as the project progresses :
Make adjustment in the PERT chart as the projectprogresses.
As the project unfolds ,the estimated times can be replaced
with actual times. The PERT chart may be modified&
improved to reflect the new situation.
❑ Simple to understand and use.
❑ Show whether the project is on schedule; or behind /aheadof
the schedule.
❑ Identify the activities that need closerattention
❑ Determine the flexibility available withactivities
❑ Show potential risk with activities
❑ Provide good documentation of the project activities
❑ Help to set priorities among activities & resource allocationas
per priority
Used in research and development projects
For developing, tooling and introducing a new project
Toplan and execute the acquisition and installation of an
electronic system
Development and administration of various training
programmes
For management development and organizational planning
❑ Amajor disadvantages of PERT has been its emphasisonly
on time, not on costs.
❑ The cost of setting up such systemare extensive.
❑ It is difficult to estimate accurate time & cost of various
activities involved in a project
❑ Errors in estimation makesthe PERT chart unreliable as a
control aid.
❑ These systems will not help managers to solve all their
problem.
Activity
Prepare patient
Give anaesthesia
Events
Patient prepare
Anaesthesia given
Prepare instrument-trolley Instrument trolley prepared
Perform operation operation performed
Operation
performed
4 5
3
PERTactivity
analysis
Prepare
patient 1
Anaesthesia
given
2
Programme evaluation review technique

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Planning
PlanningPlanning
Planning
 
Cost benefit analysis
Cost benefit analysisCost benefit analysis
Cost benefit analysis
 
Planning
PlanningPlanning
Planning
 
Concepts, principles and functions of management
Concepts, principles and functions of managementConcepts, principles and functions of management
Concepts, principles and functions of management
 
ORGANIZATION
ORGANIZATIONORGANIZATION
ORGANIZATION
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
Planning- Management Process
Planning- Management ProcessPlanning- Management Process
Planning- Management Process
 
Material management
Material managementMaterial management
Material management
 
Cost effectiveness
Cost effectivenessCost effectiveness
Cost effectiveness
 
PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
 
Organization chart and organization structure types
Organization chart and organization structure typesOrganization chart and organization structure types
Organization chart and organization structure types
 
Budgeting in nursing
 Budgeting in nursing  Budgeting in nursing
Budgeting in nursing
 
In service education
In service educationIn service education
In service education
 
Public relations in nursing
Public relations in nursingPublic relations in nursing
Public relations in nursing
 
Nursing management
Nursing management Nursing management
Nursing management
 
Planning - mission, philosophy ppt
Planning - mission, philosophy  ppt Planning - mission, philosophy  ppt
Planning - mission, philosophy ppt
 
Management information system
Management information systemManagement information system
Management information system
 
Performance appraisal- Nursing Management
Performance appraisal- Nursing ManagementPerformance appraisal- Nursing Management
Performance appraisal- Nursing Management
 
Operational planning
Operational planningOperational planning
Operational planning
 

Ähnlich wie Programme evaluation review technique

Control techniques
Control techniquesControl techniques
Control techniques
Adnan Shakir
 

Ähnlich wie Programme evaluation review technique (20)

Pert and gantt chart.pptx
Pert and gantt chart.pptxPert and gantt chart.pptx
Pert and gantt chart.pptx
 
PERT PPT.pptx
PERT PPT.pptxPERT PPT.pptx
PERT PPT.pptx
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Schedule_Module_V.10.ppt
Schedule_Module_V.10.pptSchedule_Module_V.10.ppt
Schedule_Module_V.10.ppt
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
Programme Evaluation and Review Technique
Programme Evaluation and Review TechniqueProgramme Evaluation and Review Technique
Programme Evaluation and Review Technique
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
Control techniques
Control techniquesControl techniques
Control techniques
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 ppt
 

Mehr von saheli chakraborty

Clinic and types of clinic in the community area
Clinic and types of clinic in the community areaClinic and types of clinic in the community area
Clinic and types of clinic in the community area
saheli chakraborty
 

Mehr von saheli chakraborty (20)

Endometriosis
EndometriosisEndometriosis
Endometriosis
 
Laryngitis
Laryngitis Laryngitis
Laryngitis
 
Immunoprophylaxis and Immunization
Immunoprophylaxis and ImmunizationImmunoprophylaxis and Immunization
Immunoprophylaxis and Immunization
 
Epidemiology of Tuberculosis
Epidemiology of TuberculosisEpidemiology of Tuberculosis
Epidemiology of Tuberculosis
 
Audit/ Nursing audit
Audit/ Nursing auditAudit/ Nursing audit
Audit/ Nursing audit
 
Clinic and types of clinic in the community area
Clinic and types of clinic in the community areaClinic and types of clinic in the community area
Clinic and types of clinic in the community area
 
Bag technique of community health nursing
Bag technique of community health nursingBag technique of community health nursing
Bag technique of community health nursing
 
Home visit
Home visitHome visit
Home visit
 
Malignant malenoma
Malignant malenomaMalignant malenoma
Malignant malenoma
 
National institute of public cooperation and child development (NIPCCD)
National institute of public cooperation and child development (NIPCCD)National institute of public cooperation and child development (NIPCCD)
National institute of public cooperation and child development (NIPCCD)
 
Role of nurse in Nutritional education
Role of nurse in Nutritional educationRole of nurse in Nutritional education
Role of nurse in Nutritional education
 
Central food technological research institute
Central food technological research instituteCentral food technological research institute
Central food technological research institute
 
Johari window
Johari windowJohari window
Johari window
 
Infertility
InfertilityInfertility
Infertility
 
Toxic shock syndrome
Toxic shock syndromeToxic shock syndrome
Toxic shock syndrome
 
Pelvic inflammatory disease (PID)
Pelvic inflammatory disease (PID)Pelvic inflammatory disease (PID)
Pelvic inflammatory disease (PID)
 
Vitamin A prophylaxis programme
Vitamin A prophylaxis programmeVitamin A prophylaxis programme
Vitamin A prophylaxis programme
 
Cooperative for assistance and relief everywhere (CARE)
Cooperative for assistance and relief everywhere (CARE)Cooperative for assistance and relief everywhere (CARE)
Cooperative for assistance and relief everywhere (CARE)
 
National nutritional programme (NNP)
National nutritional programme (NNP)National nutritional programme (NNP)
National nutritional programme (NNP)
 
National Institute of Nutrition (NIN)
National Institute of Nutrition (NIN)National Institute of Nutrition (NIN)
National Institute of Nutrition (NIN)
 

Kürzlich hochgeladen

Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...
Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...
Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...
chetankumar9855
 

Kürzlich hochgeladen (20)

Top Rated Bangalore Call Girls Mg Road ⟟ 9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Mg Road ⟟   9332606886 ⟟ Call Me For Genuine S...Top Rated Bangalore Call Girls Mg Road ⟟   9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Mg Road ⟟ 9332606886 ⟟ Call Me For Genuine S...
 
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
 
Top Rated Bangalore Call Girls Majestic ⟟ 9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Majestic ⟟  9332606886 ⟟ Call Me For Genuine S...Top Rated Bangalore Call Girls Majestic ⟟  9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Majestic ⟟ 9332606886 ⟟ Call Me For Genuine S...
 
Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...
Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...
Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...
 
💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...
💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...
💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...
 
Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...
Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...
Call Girl In Pune 👉 Just CALL ME: 9352988975 💋 Call Out Call Both With High p...
 
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service AvailableCall Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
 
Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...
Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...
Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...
 
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
 
Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟ 9332606886 ⟟ Call Me For G...
Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟  9332606886 ⟟ Call Me For G...Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟  9332606886 ⟟ Call Me For G...
Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟ 9332606886 ⟟ Call Me For G...
 
Mumbai ] (Call Girls) in Mumbai 10k @ I'm VIP Independent Escorts Girls 98333...
Mumbai ] (Call Girls) in Mumbai 10k @ I'm VIP Independent Escorts Girls 98333...Mumbai ] (Call Girls) in Mumbai 10k @ I'm VIP Independent Escorts Girls 98333...
Mumbai ] (Call Girls) in Mumbai 10k @ I'm VIP Independent Escorts Girls 98333...
 
Call Girls Kakinada Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Kakinada Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Kakinada Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Kakinada Just Call 9907093804 Top Class Call Girl Service Available
 
Model Call Girls In Chennai WhatsApp Booking 7427069034 call girl service 24 ...
Model Call Girls In Chennai WhatsApp Booking 7427069034 call girl service 24 ...Model Call Girls In Chennai WhatsApp Booking 7427069034 call girl service 24 ...
Model Call Girls In Chennai WhatsApp Booking 7427069034 call girl service 24 ...
 
Most Beautiful Call Girl in Bangalore Contact on Whatsapp
Most Beautiful Call Girl in Bangalore Contact on WhatsappMost Beautiful Call Girl in Bangalore Contact on Whatsapp
Most Beautiful Call Girl in Bangalore Contact on Whatsapp
 
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
 
Call Girls Raipur Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Raipur Just Call 9630942363 Top Class Call Girl Service AvailableCall Girls Raipur Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Raipur Just Call 9630942363 Top Class Call Girl Service Available
 
Top Rated Hyderabad Call Girls Chintal ⟟ 9332606886 ⟟ Call Me For Genuine Se...
Top Rated  Hyderabad Call Girls Chintal ⟟ 9332606886 ⟟ Call Me For Genuine Se...Top Rated  Hyderabad Call Girls Chintal ⟟ 9332606886 ⟟ Call Me For Genuine Se...
Top Rated Hyderabad Call Girls Chintal ⟟ 9332606886 ⟟ Call Me For Genuine Se...
 
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
 
Trichy Call Girls Book Now 9630942363 Top Class Trichy Escort Service Available
Trichy Call Girls Book Now 9630942363 Top Class Trichy Escort Service AvailableTrichy Call Girls Book Now 9630942363 Top Class Trichy Escort Service Available
Trichy Call Girls Book Now 9630942363 Top Class Trichy Escort Service Available
 
Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...
Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...
Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...
 

Programme evaluation review technique

  • 1. PRESENTED BY- MS. SAHELI C PROGRAMME EVALUATION REVIEW TECHNIQUE
  • 2. ❖ PERT was developed in the late 1950 by the US Navy submarine missile programme and was applied in 1958 ❖ PERT shows the time taken by each component of project &the total time required for its completion. ❖ PERT breaks down theproject into events, activity & lays down their proper sequence relationship & duration in the form of network. ❖ PERT is a technique of representing project plan innetwork. ❖ This is represented in a graphic form known as network diagram.
  • 3. The programme (or project) evaluation and review technique commonly abbreviated as ‘PERT’; is a statistical tool, used in project management, which was designed to analyze and represent the tasks involved in completing a given project & to illustrate the flow of events in a project.
  • 4. There are two types of network diagrams, ❑ ACTIVITY ON ARROW (AOA) : In the first variant the duration is denoted on arrowconnecting diagram nodes. Such diagram type calledAOA. ❑ ACTIVITY ON NODE (AON) : in such diagram the information about the task duration is denoted in the diagram node & each task is represented inthe form of rectangle with definite set of fields.
  • 5. ❖ Prediction of deliverables ❖ Planning resource requirement ❖ Controlling resourceallocation ❖ Internal programme review ❖ Performance evaluation ❖ Uniform wide acceptance ❖ Reduction in cost ❖ Saving time
  • 6. ❖ Determination of activities ❖ Elimination of risk in complex activities ❖ Flexibility ❖ Evaluation of alternatives ❖ Useful effective control ❖ Useful decision making ❖ Useful research work
  • 7. PERT PLANNING INVOLVE THE FOLLOWING STEPS: 2) Determine the proper sequence of the activities 3) Construct a network diagram 4) Estimate the time require for each activity 5) Determine the critical path 1) Identity the specific activity & events
  • 8. 1. Identity Activities & events : The activities are tasks require to complete the project. The events marking the beginning & end of one or more activities. It is helpful to list the tasks in a table that in later steps can be expanded to include on sequence is duration . 2.Determine the proper sequence of the activities : This steps may be combine with the activity identification steps since the activity sequence is event for some task . Other tasks may require more analysis to determine exact order in which they must be perform .
  • 9. 3.Construct a network diagram : Using the activity sequence information , a network diagram can be drawn showing the sequence of the serial is & parallel activities .For the original activity –on-are model, the activities are depicted by arrowed lines & milestones are depicted by circles. 4.Estimate the time required for activity: Adistinguishing feature of PERTis its ability to dealwith uncertainty in activity completiontimes
  • 10. For each activity , the model usually includes threetime estimates;- A) Optimistic time: Generally the shortest time in which the activity canbe completed . B) Most likely time : The completion time having the highest probability notethat this time is different for the expected time. C) Pessimistic time : The longest time that an activity might require.
  • 11. 5. Determine the critical path : The critical path is determine by adding the times for the activities in each sequence & determining the longest pathin project. The critical path determines the total timerequire.
  • 12. 6.Update the PERT chart as the project progresses : Make adjustment in the PERT chart as the projectprogresses. As the project unfolds ,the estimated times can be replaced with actual times. The PERT chart may be modified& improved to reflect the new situation.
  • 13. ❑ Simple to understand and use. ❑ Show whether the project is on schedule; or behind /aheadof the schedule. ❑ Identify the activities that need closerattention ❑ Determine the flexibility available withactivities ❑ Show potential risk with activities ❑ Provide good documentation of the project activities ❑ Help to set priorities among activities & resource allocationas per priority
  • 14. Used in research and development projects For developing, tooling and introducing a new project Toplan and execute the acquisition and installation of an electronic system Development and administration of various training programmes For management development and organizational planning
  • 15. ❑ Amajor disadvantages of PERT has been its emphasisonly on time, not on costs. ❑ The cost of setting up such systemare extensive. ❑ It is difficult to estimate accurate time & cost of various activities involved in a project ❑ Errors in estimation makesthe PERT chart unreliable as a control aid. ❑ These systems will not help managers to solve all their problem.
  • 16. Activity Prepare patient Give anaesthesia Events Patient prepare Anaesthesia given Prepare instrument-trolley Instrument trolley prepared Perform operation operation performed