SlideShare ist ein Scribd-Unternehmen logo
1 von 32
Downloaden Sie, um offline zu lesen
Unraveling Data Sharing Challenges to
      Improve Collaboration at
       Global Ford Powertrain


   Sassan Khoubyari
   Lead Program Manager
   Global Powertrain C3PNG(PLM) Deployment
   Digital Innovation Department
   Ford Motor Company
   skhoubya@ford.com


   Gokul Venkatesan
   Principle PLM Consultant
   PLM Ford Program Office
   UGS Corporation
   gvenkate@ugs.com
                                             1
Introduction

Product Lifecycle Management is a key enabler in achieving
operational efficiency and plays a pivotal role in achieving
economical and fast-to-market solutions.
Powertrain Organization partners with Global Supplier base to
design, assemble and manufacture products, globally and to
delivers to the Ford vehicle teams across the world.
Implementation of a PLM solution, which helps grapple with the
challenges by managing a multi-CAD, multi-PIM environment,
broad-based visualization, regimented workflows and BOM
authoring to maximize its collaboration success in a global
environment.
This presentation shares the insights of Powertrain’s tactical
and strategic efforts to support global collaboration.




                                                                                                    2
            Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Ford Motor Company


         Ford Motor Company, a global automotive
         industry leader based in Dearborn, Mich.,
         manufactures and distributes automobiles in
         200 markets across six continents. With about
         300,000 employees and 108 plants worldwide,
         the company’s core and affiliated automotive
         brands include Ford, Jaguar, Land Rover,
         Lincoln, Mazda, Mercury and Volvo. Its
         automotive-related services include Ford Motor
         Credit Company.




                                                                                              3
                 Source: http://www.ford.com
      Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
GLOBAL FORD POWERTAIN ACTIVITY

                                                                                                              Asia-Pacific
                                                                                                              I-Engines
                                                                   Europe                                     Manual Transmissions
 North America                                                     Diesel Engines                             Aluminum & Iron Castings
 V-Engines                                                         V-Engines                                  Chassis Components
 I-Engines                                                         I-Engines
 N.A. Diesel                                                       Manual Transmissions
 Automatic Transmissions & Driveline                               Transaxles
 Continuously Variable Transmissions                               Iron Castings
 Iron and Aluminum Castings & Forging



                                                                              Africa
                                                                              I-Engines




South America
I-Engines
Chassis & Engine Components
Iron Castings
Aluminum Castings                                                                                               Draft



                                                                                                                               4
                      Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Evolution of the
          Ford Product Creation Process
                                                                                                        Since
              1985                      1992                    1993                                    1996               2005+

              CTC                      WCT                    WCP                                      FPDS                GPDS
                                                                                                                     Global Product
            Concept                 World                    World                            Ford Product            Development
               to                   Class                    Class                            Development               System
            Customer                Timing                  Process                             System
                                                                                                                         An Enterprise-
                                                                                                                          wide process
MBJ#1* 72 MBJ#1                 68 MBJ#1 65 MBJ#1                                                   43 MBJ#1         built from Global Best
                                                                                                                             Practices




 * <KO> equivalent timing for S4/P4 program




                                                                                                                      For Joint Programs
                                                                                                                                         5
                             Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Key Business Drivers –
                                           Commonality (Before C3PNG)
                                                                                                      Manual

Requirements:
                                                                                                   Processes and                        Current Situation:
                                                                                                     Resources                          •Different PDM
•Common PDM
                                                                                                                                        •Different Product Structure
•Common Product Structure
                                                                                                                                        •Different CAD
•Common CAD
                              Manual                                                                     Supplier                              Supplier   FNA
                           Processes and
                                                                                                              PDM             CAD                   PDM       CAD
                             Resources                                                                      Metaphase        IDEAS                  VPM     CATIA V5

                  Volvo
       Supplier                                             Supplier     FOE
            PDM        CAD                                       PDM            CAD
            VPM      CATIA V4                                  Metaphase       IDEAS
                                                                                                                                                     Manual
                                                                                                                                                  Processes and
                                                                                                                                                    Resources

                                                                                                                    Supplier
                                                                                                                               Mazda
                          Supplier            Jaguar
                                                                                                                        PDM             CAD
                              PDM                  CAD
                                                                                                                      Metaphase        IDEAS
      Manual                Metaphase             IDEAS

     Processes                                                                                                                         CAD
        and                                                                                                                            GNC
     Resources                  Supplier     Land Rover
                                                                                           Manual
                                      PDM          CAD
                                      VPM        CATIA V4                                 Processes
                                                                                             and
                                                                                          Resources
        Our current Methods/Tools/Data environment inhibits cross brand programs
                                                                                                                                                                       6
                                     Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business Challenges


Ford Global Powertrain Operations serves the following organizations & Joint
                                                              ventures




                                   North America
                                          • VEE
                                          • ATO
                                           • Mfg




             Europe
             • IGEE
             • EU Diesel
             • FFA / R&A
             • GFT




                                                                                                              7
                      Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business Challenges (Contd.) – Learning
curve effects with a large scale technology
transformation
  C3P Classic                                                                                C3P NG
    Teamcenter
     Enterprise                                            Teamcenter Engineering
                                                                        ETS (Engineering
                                                                       Translation Services)
                                           IMI 2                                                           •Migration to Single
                                                             CAD to JT
                                                                                                           PDM
                                                                                                           •Dual CAD Authoring
                                                                                                           Managed in Team
                                                                                                           Center Engineering
                                                                                                           •Supplier Access via
Supplier                                                                                                   Next Generation
                  TDM                                                                                      Environment
 TDM
                                              authoring




Supplier
                                                                                 I-Deas
                                                CAD
                                I-Deas




                                                                                CATIA V5




                                                                                                                             8
                   Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business challenges (Contd.)
 Powertrain suppliers are located in geographically
 disparate locations (Europe, India, China)                                                               NA *


 Suppliers are connected to the Tce sites which are in
 their proximity. For eg. suppliers in Germany are
                                                                                                         Europe
 connected to Tce in Merkenich / Cologne depending
 on their proximity to these sites.
 New PLM tools seem to be bringing the suppliers
 closer to the OEMs ….. but need reasonable amount
 of process changes for seamless data sharing




                                                                                                                  9
                 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business challenges (Contd.) :Process of Data Sharing
              Ford/GM Transmission Joint Venture Example



         External                                                                                       Internal
                                                                                                                                  TCe NG
                                                                                                     C3P
                                  ANX                                                          Classic for
                                                                                                   Interop.                   IMI 2
                                     FDX



                                                           TeamCenter                                                   Metaphase
TeamCenter            Ford                                        Engineering                                                                    Digita
   (G-iMAN)                                                                                                             IMI
                    Suppliers                                                                                                                    Buck
                                                                        OOtB                                                                     Tool
                                                                                                         JT data in
                                                                                                         P/T position
                                                                                                                          TDM
                                                                                                                                        Vehicle Digital
                                                                                                                                            Buck
 Unigraphics
                                                                         NX 3                                                 PDV          Server
     NX                                                                  Unix
                                         References NX
                                         data, converts                                                                 PC User
                                          into I-DEAS

                                                                      I-DEAS                                            JT data
                                                                                                                        PD & Mfg Eng.
                                                                                                                                                10
                       Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Technical Challenges

 Suppliers located in Europe, China, India are connected to the
 Tce sites in their proximity
 Vehicle teams of other brands, needing data from FNA
 powertrains are connected to Tce sites in their geography.
 Data that these teams need from other sites need to be
 imported or replicated at their sites in a timely fashion.
 Manually importing large assemblies is a tedious task and is
 also subject to latency issues due to data traffic.
 Data from suppliers need to be staged
 Supplier data has to be tessellated
 Data translation from OOTB NX to Ideas so that it can be
 shared with the vehicle teams that are using C3PNG.


                                                                                                  11
          Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Addressing the challenges

 Main Objective:
    Return on Assets
 Approach
       Productization approach, by standardizing operations on the
       portfolio of tools available
       Rearrangement of the configuration of physical assets and
       processes in the value chain
 Drivers
    Maximize value creation and minimize costs
    increase the utilization of the fixed cost components
    (PLM systems, hardware)
    Improve dividends (returns) from the capital already
    invested in the PLM solution


                                                                                                   12
           Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Tactical and Strategic measures

  Tactical measures (Interim)
    Automated data transfer processes to better utilize the
    systems (fixed cost components) and minimized
    manual data pull and push (variable cost components)
       to improve data flow with suppliers and other
       CBGs for the interim and also to
       to be positioned to scale up to cater to the data
       demands until a strategic solution is launched
  Strategic measure (for the future)
    ‘Synergy’ Project


                                                                                                13
        Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data sharing process for the Suppliers
                                                                                PTO Program                Transfer group
  PT Supplier               Supplier is                                        needing the data           ownership of the
 sourced for an          connected to the                                          creates a               placeholder to
Engine/Transmi            proximal Ford-                                        placeholder to              the supplier
 ssion program           Tce installation                                         share data

                                                                                                           Multi-site the
                                                                                                           placeholder to
                                                                                                           the site where
                                                                                                           the supplier is
                                                                                                             connected


                                                                                                          Send reference
                                                                                                          data in the form
                                                                                                            of a Design
                                                                                                              Solution

 Powertrain -                                                                 Supplier designs
                            data sync setup
North America               to multisite the                                  components and              Supplier utilizes
 has the data                 data to sites                                   adds the data to              the data for
   needed                    where data is                                    the placeholder             background info.
                                needed                                         in the FOE site                           14
                  Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Powertrain Supplier Place Holder

• Every Powertrain supplier has
a placeholder that is attached
                                                            030101
to an associated product
structure to store the data 030100
                                                                                 V
                                                                  030102                     MP (Carry Over Master Package)
                   030000
            EBO
             M
                                                Node
  PT
 Prog      VSS       Node
 ram                                            Node

           ECS

                                                                  Node
                                Collaboration
                                                                Supplier
                              PDN Deliverables                   _cad
                                                                                              GEN-PSS-PGM-
                               CAE Deliverables                                             1132100/1-supplier_x




                                                                                                                              15
                     Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data transfer process with a supplier


          Ford Environment
                                                                                      Background data
 FNA Tce                             FOE Tce                                            referenced              Supplier 1
environment                         environment

                                                                                                  Manual data
   FNA                                      FOE                                                    check-in
   TCe                                      TCe


              Automatic data sync




                                                                                                                       16
                 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data sharing process with other Ford
      Business Units
                                                                               Receive
                                                                           reference data in                 PTO
Vehicle team           The site that the                                    the form of a                 Program
 needing the               CBG is                                               Design
                       connected to is                                         Solution
                                                                                                        providing the
data contacts
    PTO                  identified                                         for positioning             data creates
                                                                            the powertrain              a placeholder
                                                                             components


                                                                                                         Multi-site the
                                                                                                          PT-external
                                                                                                         placeholder to
                                                                                                           the site to
                                                                                                           which the
                                                                                                         other CBG is
                                                                                                           connected


                     Other CBG                                              data sync setup               PTO designs
                     has the data                                           to multisite the            components and
                                                                              data to sites             adds the data to
                       needed
                                                                             where data is              the placeholder
                                                                                needed                   in the FOE site 17
                Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Ford Business Unit Place Holder

• Every CBG to which
Powertrain is providing data
                                                           030101
has a placeholder that is
attached to an associated 030100
product structure                                                030102
                                                                                V
                                                                                            MP (Carry Over Master Package)
                  030000
           EBO
            M
                                               Node
  PT
 Prog     VSS       Node
 ram                                           Node

           ECS

                                                                 Node
                               Collaboration
                                                                                     Node
                                                                 PT-
                             PDN Deliverables                  external
                                                                                      PT-
                                                                                      CAD
                              CAE Deliverables
                                                                                                             GEN-PSS-PGM-
                                                                                                            1132100/1-CBG_x
                                                                                                                              18
                    Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data transfer Process with Other
 Business Units
                                         Background data
                                            referenced
                                       Automatic data sync

FNA Tce
                                                                                                           FOA TCE


                                          Automatic data sync




                         PTO positions components in
                          the context of vehicle data




                                                                                                                     CATIA V5
          I-Deas




                             and attaches it to the
                                 placeholder



                                                                                                                                19
                   Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Piloting New Approach


 The mentioned implementation has now
 equipped us with lessons and provides us the
 opportunity to scale up gradually to enable data
 sharing with other CBGS and other suppliers in
 this data sharing approach
 Additionally, Powertrain organization is looking
 into a new approach called ‘synergy’ project,
 based on jt-only data sharing




                                                                                               20
       Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data Flow (Synergy)

   1. Create Work Assy                                   1. Analyze Data                                    1. Design in Context
   2. Export Data                                        2. Import Data                                     2. Save to TC2005




                                                                                                               PTO 2005
          C3PNG                                                 Exchange
                                                                                                               SR1 Client
          Client                                                 Manager




          C3PNG                                                 Exchange                                        PTO 2005
          Client                                                 Manager                                        SR1 Client

1. Evaluate Design from                                  1. Export Data                                     1. Design review
  PTO                                                    2. Analyze Data
                                                                                                                             21
                                                         3. Import Data
                    Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
The Raw Data


JT: Roughly 10% of CAD data
Double precision NURB geometry included
Single PLMXML structure file




                                                                                                 22
         Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Solution Architecture
                                    Teamcenter                                             Teamcenter
                                    Rich Client                                            Rich Client

     Ford                                                                                                     Supplier
   C3P-NG                                                                                                    Teamcenter
  Tce 9.1.3.4                                                                                                 2005 SR1
                                                                                                          Exchange Manager
                                                                                                               Server
Exchange Manager leverages the existing
infrastructure with no required changes to the
current C3P-NG certified solution
Exchange Manager client can be run form
anywhere within the supplier LAN while still
leveraging the most efficient high bandwidth
connection to the OEM                                                                                        Exchange
                                                                                                             Manager
6F/6F-Mid Teamcenter is OOTB data model –
key metadata is mapped to the proper location
based on configurable intelligent table
2005 SR1 will be connected to 6F/6F Mid
                                                                                                                          23
database          Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Solution Architecture
                                 Teamcenter                                             Teamcenter
                                 Rich Client                                            Rich Client

   Ford                                                                                                  Supplier
 C3P-NG                                                                                                 Teamcenter
Tce 9.1.3.4                                                                                              2005 SR1
                                                                                                       Data Exchange
                                                                                                           Server




Exchange Manager support both in process as
well as batched transfer, and structure only vs.
structure with geometry
Supplier Teamcenter’s OOTB data model –                                                                  Exchange
key metadata is mapped to the proper location                                                            Manager

based on configurable intelligent table


                                                                                                                     24
               Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Benefits to Ford Suppliers

1.   Provides local data management solution
        Unlimited
        Comprehensive
        Multi-CAD capable
        Latest generation
2.   Enables asynchronous data transfer work flow enhanced
     with JT (Data Manager/Release Analyst Role)
3.   Provides platform for supplier internal PLM processes
     and workflows
4.   Greatly reduce costs related to bandwidth for OEM
     connectivity.
                                                                                                        25
                Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Benefits to Ford

1.   No need to upgrade to a new release.
2.   Eliminates load on the ETS server to tessellate supplier data
3.   Jt reduces the disk space required for supplier data
4.   Greatly reduces the time a supplier needs to go from source to
     productively supporting the program
5.   Throughput increase as supplier data no longer needs to be:
        Staged
        Translated, Cleaned and Re-validated prior to delivery
6.   Decreases the scope/risk involved with each C3PNG upgrade
7.   Broadens the supplier market with more entrants in both
     infrastructure and geography



                                                                                                           26
                   Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Results

improved collaboration and increased utilization of the fixed cost
components (PLM systems, hardware) and
Shortened time needed to collaborate data between suppliers and the
powertrain programs
shorter setup times to prepare data that has to be shared along the value
chain
Improved operational efficiency and increased throughput with out the
need for huge resource requirements.
Utilization of down time by making sure these automated processes are
scheduled during low load on the servers (physical assets)
Reduced operational complexity from automation of the data transfer
(using data sync and data lists)
Increased flexibility while lowered costs.
Directly affects profits by controlling the cost side of the equation
Taken together it shows the management team's decision to improve
return by optimizing the logistics and the collaboration processes.


                                                                                                        27
                Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Q&A




                                                                                        28
Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Appendix



                                                                                        29
Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Synergy Pilot at Powertrain

  Data Sharing (PLMXML)
  Item can be replicated only with JT
  Load into CAD with JT only components
  Load IDEAS assembly containing parts that have JT only datasets
  Load CATIA v5 assemblies containing parts that have JT only datasets
  Load UG-NX assemblies containing parts that have JT only datasets
  Load IDEAS assemblies containing sub assemblies that have JT only for components
  Load UG-NX assemblies containing sub assemblies that have JT only for components
  Load CATIA v5 assemblies containing sub assemblies that have JT only for components
  Save in CAD with JT only components
  Save IDEAS assembly containing parts that have JT only datasets
  Save UG-NX assembly containing parts that have JT only datasets
  Save CATIA v5 assembly containing parts that have JT only datasets
  Save IDEAS assembly containing sub assemblies that have JT only for components
  Save UG-NX assembly containing sub assemblies that have JT only for components
  Save CATIA v5 assembly containing sub assemblies that have JT only for components



                                                                                                      30
              Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Synergy Pilot

NG Actions on Hybrid Assemblies
Freeze New Revision on a Item that has only JT dataset
Create New Revision on a Item that has only JT dataset
Freeze on Hybrid I-DEAS assembly with components that contain only JT
Freeze on Hybrid CATIA v5 assembly with components that contain only JT
Create New Revision on Hybrid IDEAS/Catia V5 assembly with components that
   contain only JT
Constrain assembly in I-DEAS/CATIA V5 using JT created from UG-NX
Working on Hybrid assembly in the publication workflow


ETS Handling of an Hybrid Assembly
Sending Hybrid IDEAS assembly for on-demand JT tessellation
Sending Hybrid CATIA v5 assembly for on-demand JT tessellation
Sending Hybrid IDEAS assembly for on-demand CAD2CAD translation
Sending Hybrid CATIA v5 assembly for on-demand CAD2CAD tessellation


                                                                                                      31
              Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Synergy Pilot

Working with Workflows
Establish workflow with 6F/6F Mid supplier Items containing JT only
Follow workflow process for at least one complete cycle
Log any issues / concerns


Working with End Item Configurations
Identify limitations of JT only usage
Identify any business requirements related to geometry requirements
Log any issues / concerns Identify any improvements required


Working with Positional / Motion Files
Complete a transfer of JT data in and out of Ford TcEng with Position
Identify any limitations of Positional data received from 6F/6F-Mid
Identify any limitations of Positional data sent to 6F/6F-Mid supplier
Define assembly constraints and save into TcEng for reuse
Identify any improvements required for Positional data
Identify any limitations of Motion data received from Engine
                                                                                                          32
                  Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain

Weitere ähnliche Inhalte

Andere mochten auch

Introduce to TS16949 automotive core tools
Introduce to TS16949 automotive core toolsIntroduce to TS16949 automotive core tools
Introduce to TS16949 automotive core tools
Nukool Thanuanram
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
shekhar67
 

Andere mochten auch (19)

Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours
 
Toyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon Tanner
 
Agile Kaizen - Continuous Improvement Far Beyond Retrospectives
Agile Kaizen - Continuous Improvement Far Beyond RetrospectivesAgile Kaizen - Continuous Improvement Far Beyond Retrospectives
Agile Kaizen - Continuous Improvement Far Beyond Retrospectives
 
The toyota production system
The toyota production systemThe toyota production system
The toyota production system
 
Plm World 06
Plm World 06Plm World 06
Plm World 06
 
Introduce to TS16949 automotive core tools
Introduce to TS16949 automotive core toolsIntroduce to TS16949 automotive core tools
Introduce to TS16949 automotive core tools
 
APQP. and Control Plan
APQP. and Control PlanAPQP. and Control Plan
APQP. and Control Plan
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
 
sistema de producción Toyota TPS
sistema de producción Toyota   TPSsistema de producción Toyota   TPS
sistema de producción Toyota TPS
 
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi TanakaThe Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Kaizen, Nemawashi and a Project Management Work Cell
Kaizen, Nemawashi and a Project Management Work CellKaizen, Nemawashi and a Project Management Work Cell
Kaizen, Nemawashi and a Project Management Work Cell
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
A3 & Kaizen: Here's How
A3 & Kaizen: Here's HowA3 & Kaizen: Here's How
A3 & Kaizen: Here's How
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
 
Lean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean in new Product Development by Jim Morgan
Lean in new Product Development by Jim Morgan
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
SISTEMA DE PRODUCCION TOYOTA
SISTEMA DE PRODUCCION TOYOTASISTEMA DE PRODUCCION TOYOTA
SISTEMA DE PRODUCCION TOYOTA
 

Ähnlich wie Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Powertrain

lear 09 2606
lear 09 2606lear 09 2606
lear 09 2606
finance16
 
LEAR Q4 05 Presentation Final
LEAR Q4 05 Presentation FinalLEAR Q4 05 Presentation Final
LEAR Q4 05 Presentation Final
finance16
 
Roland berger automotive_landscape_2025_20110314
Roland berger automotive_landscape_2025_20110314Roland berger automotive_landscape_2025_20110314
Roland berger automotive_landscape_2025_20110314
lauri213
 
LEAR 2008AnnualMeeting-289cya
LEAR 2008AnnualMeeting-289cyaLEAR 2008AnnualMeeting-289cya
LEAR 2008AnnualMeeting-289cya
finance16
 
Ford team-project-builds-relationships
Ford team-project-builds-relationshipsFord team-project-builds-relationships
Ford team-project-builds-relationships
racka perkasa
 
E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012
keshav_13
 
arvinmeritor analystday120706
arvinmeritor analystday120706arvinmeritor analystday120706
arvinmeritor analystday120706
finance27
 
arvinmeritor analystday120706
arvinmeritor analystday120706arvinmeritor analystday120706
arvinmeritor analystday120706
finance27
 
JDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdf
JDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdfJDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdf
JDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdf
InSync2011
 
LEAR 2004 ubs
 LEAR 2004 ubs LEAR 2004 ubs
LEAR 2004 ubs
finance16
 

Ähnlich wie Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Powertrain (20)

lear 09 2606
lear 09 2606lear 09 2606
lear 09 2606
 
Cloud computing for Department of Transportation Federal Motor Carrier Safety...
Cloud computing for Department of Transportation Federal Motor Carrier Safety...Cloud computing for Department of Transportation Federal Motor Carrier Safety...
Cloud computing for Department of Transportation Federal Motor Carrier Safety...
 
Continuous Move Planner Overview and Quick Tour
Continuous Move Planner Overview and Quick TourContinuous Move Planner Overview and Quick Tour
Continuous Move Planner Overview and Quick Tour
 
LEAR Q4 05 Presentation Final
LEAR Q4 05 Presentation FinalLEAR Q4 05 Presentation Final
LEAR Q4 05 Presentation Final
 
Tulevaisuuden ostaja rakentaa kumppanuutta ja vaatii kilpailukykyä 18.9.2008 ...
Tulevaisuuden ostaja rakentaa kumppanuutta ja vaatii kilpailukykyä 18.9.2008 ...Tulevaisuuden ostaja rakentaa kumppanuutta ja vaatii kilpailukykyä 18.9.2008 ...
Tulevaisuuden ostaja rakentaa kumppanuutta ja vaatii kilpailukykyä 18.9.2008 ...
 
Roland berger automotive_landscape_2025_20110314
Roland berger automotive_landscape_2025_20110314Roland berger automotive_landscape_2025_20110314
Roland berger automotive_landscape_2025_20110314
 
Omnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex 2019 Newsletter Navigator
Omnex 2019 Newsletter Navigator
 
LEAR 2008AnnualMeeting-289cya
LEAR 2008AnnualMeeting-289cyaLEAR 2008AnnualMeeting-289cya
LEAR 2008AnnualMeeting-289cya
 
BMW – The Impact of 3D Printing
BMW – The Impact of 3D PrintingBMW – The Impact of 3D Printing
BMW – The Impact of 3D Printing
 
ChannelNet GM Case Study
ChannelNet GM Case StudyChannelNet GM Case Study
ChannelNet GM Case Study
 
Ford team-project-builds-relationships
Ford team-project-builds-relationshipsFord team-project-builds-relationships
Ford team-project-builds-relationships
 
Drupal CDN integration: easier, more flexible and faster!
Drupal CDN integration: easier, more flexible and faster!Drupal CDN integration: easier, more flexible and faster!
Drupal CDN integration: easier, more flexible and faster!
 
E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012
 
arvinmeritor analystday120706
arvinmeritor analystday120706arvinmeritor analystday120706
arvinmeritor analystday120706
 
arvinmeritor analystday120706
arvinmeritor analystday120706arvinmeritor analystday120706
arvinmeritor analystday120706
 
EMC World 2016 - DevOps-at-Scale Session
EMC World 2016 - DevOps-at-Scale SessionEMC World 2016 - DevOps-at-Scale Session
EMC World 2016 - DevOps-at-Scale Session
 
JDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdf
JDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdfJDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdf
JDE & Peoplesoft 3 | John Schiff | JDE World Technology Expanding Your World.pdf
 
Cv Tvs Dc Tfuture Trends011009
Cv Tvs Dc Tfuture Trends011009Cv Tvs Dc Tfuture Trends011009
Cv Tvs Dc Tfuture Trends011009
 
LEAR 2004 ubs
 LEAR 2004 ubs LEAR 2004 ubs
LEAR 2004 ubs
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 

Kürzlich hochgeladen

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Kürzlich hochgeladen (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Powertrain

  • 1. Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain Sassan Khoubyari Lead Program Manager Global Powertrain C3PNG(PLM) Deployment Digital Innovation Department Ford Motor Company skhoubya@ford.com Gokul Venkatesan Principle PLM Consultant PLM Ford Program Office UGS Corporation gvenkate@ugs.com 1
  • 2. Introduction Product Lifecycle Management is a key enabler in achieving operational efficiency and plays a pivotal role in achieving economical and fast-to-market solutions. Powertrain Organization partners with Global Supplier base to design, assemble and manufacture products, globally and to delivers to the Ford vehicle teams across the world. Implementation of a PLM solution, which helps grapple with the challenges by managing a multi-CAD, multi-PIM environment, broad-based visualization, regimented workflows and BOM authoring to maximize its collaboration success in a global environment. This presentation shares the insights of Powertrain’s tactical and strategic efforts to support global collaboration. 2 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 3. Ford Motor Company Ford Motor Company, a global automotive industry leader based in Dearborn, Mich., manufactures and distributes automobiles in 200 markets across six continents. With about 300,000 employees and 108 plants worldwide, the company’s core and affiliated automotive brands include Ford, Jaguar, Land Rover, Lincoln, Mazda, Mercury and Volvo. Its automotive-related services include Ford Motor Credit Company. 3 Source: http://www.ford.com Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 4. GLOBAL FORD POWERTAIN ACTIVITY Asia-Pacific I-Engines Europe Manual Transmissions North America Diesel Engines Aluminum & Iron Castings V-Engines V-Engines Chassis Components I-Engines I-Engines N.A. Diesel Manual Transmissions Automatic Transmissions & Driveline Transaxles Continuously Variable Transmissions Iron Castings Iron and Aluminum Castings & Forging Africa I-Engines South America I-Engines Chassis & Engine Components Iron Castings Aluminum Castings Draft 4 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 5. Evolution of the Ford Product Creation Process Since 1985 1992 1993 1996 2005+ CTC WCT WCP FPDS GPDS Global Product Concept World World Ford Product Development to Class Class Development System Customer Timing Process System An Enterprise- wide process MBJ#1* 72 MBJ#1 68 MBJ#1 65 MBJ#1 43 MBJ#1 built from Global Best Practices * <KO> equivalent timing for S4/P4 program For Joint Programs 5 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 6. Key Business Drivers – Commonality (Before C3PNG) Manual Requirements: Processes and Current Situation: Resources •Different PDM •Common PDM •Different Product Structure •Common Product Structure •Different CAD •Common CAD Manual Supplier Supplier FNA Processes and PDM CAD PDM CAD Resources Metaphase IDEAS VPM CATIA V5 Volvo Supplier Supplier FOE PDM CAD PDM CAD VPM CATIA V4 Metaphase IDEAS Manual Processes and Resources Supplier Mazda Supplier Jaguar PDM CAD PDM CAD Metaphase IDEAS Manual Metaphase IDEAS Processes CAD and GNC Resources Supplier Land Rover Manual PDM CAD VPM CATIA V4 Processes and Resources Our current Methods/Tools/Data environment inhibits cross brand programs 6 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 7. Business Challenges Ford Global Powertrain Operations serves the following organizations & Joint ventures North America • VEE • ATO • Mfg Europe • IGEE • EU Diesel • FFA / R&A • GFT 7 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 8. Business Challenges (Contd.) – Learning curve effects with a large scale technology transformation C3P Classic C3P NG Teamcenter Enterprise Teamcenter Engineering ETS (Engineering Translation Services) IMI 2 •Migration to Single CAD to JT PDM •Dual CAD Authoring Managed in Team Center Engineering •Supplier Access via Supplier Next Generation TDM Environment TDM authoring Supplier I-Deas CAD I-Deas CATIA V5 8 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 9. Business challenges (Contd.) Powertrain suppliers are located in geographically disparate locations (Europe, India, China) NA * Suppliers are connected to the Tce sites which are in their proximity. For eg. suppliers in Germany are Europe connected to Tce in Merkenich / Cologne depending on their proximity to these sites. New PLM tools seem to be bringing the suppliers closer to the OEMs ….. but need reasonable amount of process changes for seamless data sharing 9 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 10. Business challenges (Contd.) :Process of Data Sharing Ford/GM Transmission Joint Venture Example External Internal TCe NG C3P ANX Classic for Interop. IMI 2 FDX TeamCenter Metaphase TeamCenter Ford Engineering Digita (G-iMAN) IMI Suppliers Buck OOtB Tool JT data in P/T position TDM Vehicle Digital Buck Unigraphics NX 3 PDV Server NX Unix References NX data, converts PC User into I-DEAS I-DEAS JT data PD & Mfg Eng. 10 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 11. Technical Challenges Suppliers located in Europe, China, India are connected to the Tce sites in their proximity Vehicle teams of other brands, needing data from FNA powertrains are connected to Tce sites in their geography. Data that these teams need from other sites need to be imported or replicated at their sites in a timely fashion. Manually importing large assemblies is a tedious task and is also subject to latency issues due to data traffic. Data from suppliers need to be staged Supplier data has to be tessellated Data translation from OOTB NX to Ideas so that it can be shared with the vehicle teams that are using C3PNG. 11 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 12. Addressing the challenges Main Objective: Return on Assets Approach Productization approach, by standardizing operations on the portfolio of tools available Rearrangement of the configuration of physical assets and processes in the value chain Drivers Maximize value creation and minimize costs increase the utilization of the fixed cost components (PLM systems, hardware) Improve dividends (returns) from the capital already invested in the PLM solution 12 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 13. Tactical and Strategic measures Tactical measures (Interim) Automated data transfer processes to better utilize the systems (fixed cost components) and minimized manual data pull and push (variable cost components) to improve data flow with suppliers and other CBGs for the interim and also to to be positioned to scale up to cater to the data demands until a strategic solution is launched Strategic measure (for the future) ‘Synergy’ Project 13 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 14. Data sharing process for the Suppliers PTO Program Transfer group PT Supplier Supplier is needing the data ownership of the sourced for an connected to the creates a placeholder to Engine/Transmi proximal Ford- placeholder to the supplier ssion program Tce installation share data Multi-site the placeholder to the site where the supplier is connected Send reference data in the form of a Design Solution Powertrain - Supplier designs data sync setup North America to multisite the components and Supplier utilizes has the data data to sites adds the data to the data for needed where data is the placeholder background info. needed in the FOE site 14 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 15. Powertrain Supplier Place Holder • Every Powertrain supplier has a placeholder that is attached 030101 to an associated product structure to store the data 030100 V 030102 MP (Carry Over Master Package) 030000 EBO M Node PT Prog VSS Node ram Node ECS Node Collaboration Supplier PDN Deliverables _cad GEN-PSS-PGM- CAE Deliverables 1132100/1-supplier_x 15 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 16. Data transfer process with a supplier Ford Environment Background data FNA Tce FOE Tce referenced Supplier 1 environment environment Manual data FNA FOE check-in TCe TCe Automatic data sync 16 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 17. Data sharing process with other Ford Business Units Receive reference data in PTO Vehicle team The site that the the form of a Program needing the CBG is Design connected to is Solution providing the data contacts PTO identified for positioning data creates the powertrain a placeholder components Multi-site the PT-external placeholder to the site to which the other CBG is connected Other CBG data sync setup PTO designs has the data to multisite the components and data to sites adds the data to needed where data is the placeholder needed in the FOE site 17 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 18. Ford Business Unit Place Holder • Every CBG to which Powertrain is providing data 030101 has a placeholder that is attached to an associated 030100 product structure 030102 V MP (Carry Over Master Package) 030000 EBO M Node PT Prog VSS Node ram Node ECS Node Collaboration Node PT- PDN Deliverables external PT- CAD CAE Deliverables GEN-PSS-PGM- 1132100/1-CBG_x 18 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 19. Data transfer Process with Other Business Units Background data referenced Automatic data sync FNA Tce FOA TCE Automatic data sync PTO positions components in the context of vehicle data CATIA V5 I-Deas and attaches it to the placeholder 19 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 20. Piloting New Approach The mentioned implementation has now equipped us with lessons and provides us the opportunity to scale up gradually to enable data sharing with other CBGS and other suppliers in this data sharing approach Additionally, Powertrain organization is looking into a new approach called ‘synergy’ project, based on jt-only data sharing 20 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 21. Data Flow (Synergy) 1. Create Work Assy 1. Analyze Data 1. Design in Context 2. Export Data 2. Import Data 2. Save to TC2005 PTO 2005 C3PNG Exchange SR1 Client Client Manager C3PNG Exchange PTO 2005 Client Manager SR1 Client 1. Evaluate Design from 1. Export Data 1. Design review PTO 2. Analyze Data 21 3. Import Data Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 22. The Raw Data JT: Roughly 10% of CAD data Double precision NURB geometry included Single PLMXML structure file 22 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 23. Solution Architecture Teamcenter Teamcenter Rich Client Rich Client Ford Supplier C3P-NG Teamcenter Tce 9.1.3.4 2005 SR1 Exchange Manager Server Exchange Manager leverages the existing infrastructure with no required changes to the current C3P-NG certified solution Exchange Manager client can be run form anywhere within the supplier LAN while still leveraging the most efficient high bandwidth connection to the OEM Exchange Manager 6F/6F-Mid Teamcenter is OOTB data model – key metadata is mapped to the proper location based on configurable intelligent table 2005 SR1 will be connected to 6F/6F Mid 23 database Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 24. Solution Architecture Teamcenter Teamcenter Rich Client Rich Client Ford Supplier C3P-NG Teamcenter Tce 9.1.3.4 2005 SR1 Data Exchange Server Exchange Manager support both in process as well as batched transfer, and structure only vs. structure with geometry Supplier Teamcenter’s OOTB data model – Exchange key metadata is mapped to the proper location Manager based on configurable intelligent table 24 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 25. Benefits to Ford Suppliers 1. Provides local data management solution Unlimited Comprehensive Multi-CAD capable Latest generation 2. Enables asynchronous data transfer work flow enhanced with JT (Data Manager/Release Analyst Role) 3. Provides platform for supplier internal PLM processes and workflows 4. Greatly reduce costs related to bandwidth for OEM connectivity. 25 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 26. Benefits to Ford 1. No need to upgrade to a new release. 2. Eliminates load on the ETS server to tessellate supplier data 3. Jt reduces the disk space required for supplier data 4. Greatly reduces the time a supplier needs to go from source to productively supporting the program 5. Throughput increase as supplier data no longer needs to be: Staged Translated, Cleaned and Re-validated prior to delivery 6. Decreases the scope/risk involved with each C3PNG upgrade 7. Broadens the supplier market with more entrants in both infrastructure and geography 26 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 27. Results improved collaboration and increased utilization of the fixed cost components (PLM systems, hardware) and Shortened time needed to collaborate data between suppliers and the powertrain programs shorter setup times to prepare data that has to be shared along the value chain Improved operational efficiency and increased throughput with out the need for huge resource requirements. Utilization of down time by making sure these automated processes are scheduled during low load on the servers (physical assets) Reduced operational complexity from automation of the data transfer (using data sync and data lists) Increased flexibility while lowered costs. Directly affects profits by controlling the cost side of the equation Taken together it shows the management team's decision to improve return by optimizing the logistics and the collaboration processes. 27 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 28. Q&A 28 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 29. Appendix 29 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 30. Synergy Pilot at Powertrain Data Sharing (PLMXML) Item can be replicated only with JT Load into CAD with JT only components Load IDEAS assembly containing parts that have JT only datasets Load CATIA v5 assemblies containing parts that have JT only datasets Load UG-NX assemblies containing parts that have JT only datasets Load IDEAS assemblies containing sub assemblies that have JT only for components Load UG-NX assemblies containing sub assemblies that have JT only for components Load CATIA v5 assemblies containing sub assemblies that have JT only for components Save in CAD with JT only components Save IDEAS assembly containing parts that have JT only datasets Save UG-NX assembly containing parts that have JT only datasets Save CATIA v5 assembly containing parts that have JT only datasets Save IDEAS assembly containing sub assemblies that have JT only for components Save UG-NX assembly containing sub assemblies that have JT only for components Save CATIA v5 assembly containing sub assemblies that have JT only for components 30 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 31. Synergy Pilot NG Actions on Hybrid Assemblies Freeze New Revision on a Item that has only JT dataset Create New Revision on a Item that has only JT dataset Freeze on Hybrid I-DEAS assembly with components that contain only JT Freeze on Hybrid CATIA v5 assembly with components that contain only JT Create New Revision on Hybrid IDEAS/Catia V5 assembly with components that contain only JT Constrain assembly in I-DEAS/CATIA V5 using JT created from UG-NX Working on Hybrid assembly in the publication workflow ETS Handling of an Hybrid Assembly Sending Hybrid IDEAS assembly for on-demand JT tessellation Sending Hybrid CATIA v5 assembly for on-demand JT tessellation Sending Hybrid IDEAS assembly for on-demand CAD2CAD translation Sending Hybrid CATIA v5 assembly for on-demand CAD2CAD tessellation 31 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
  • 32. Synergy Pilot Working with Workflows Establish workflow with 6F/6F Mid supplier Items containing JT only Follow workflow process for at least one complete cycle Log any issues / concerns Working with End Item Configurations Identify limitations of JT only usage Identify any business requirements related to geometry requirements Log any issues / concerns Identify any improvements required Working with Positional / Motion Files Complete a transfer of JT data in and out of Ford TcEng with Position Identify any limitations of Positional data received from 6F/6F-Mid Identify any limitations of Positional data sent to 6F/6F-Mid supplier Define assembly constraints and save into TcEng for reuse Identify any improvements required for Positional data Identify any limitations of Motion data received from Engine 32 Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain