SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Sachin Tagalpallewar – B.E. (Mech.) with 8 years’ Experience
Cell: 7798496825 Email: tagalpallewar@gmail.com
Objective
• To contribute and add value to my organization for achieving success, by leveraging my skills
and knowledge, with the right attitude, and in turn achieving my career growth.
Summary
• 8 years diverse experience across India in Project Management, Industrial safety
Management, and Maintenance & operations management.
• Mechanical Engineering with First Class from Amravati University
• Appreciation received from Emmar for “effective handling of team” and HUL for providing
project which improves rating of world class manufacturing.
• Client appreciation at General Motors for timely completion of project with challenging
schedule
• Handled over 25 vendors across various sectors .
• Completed certification training on SAP in MM Module .
• completed Advance Diploma in Industrial Safety (ADIS) from NSO (National Safety
Organization ) and pursuing Professional Project Management (PMP) certification.
• Handled major client HUL , Cadbury (Mondelez) , Nestle ,Bajaj , General Motors , HCL
PARI , GSK , Johnson & Johnson , SKF .
Skill Set
• Project Management – Requirements Capture, Planning, Scheduling, Budgeting,
Tracking & Monitoring, Documentation and Successful Execution on site.
• Designing Maintenance strategies, procedures and methods as per ISO TS 16949
requirements and TPM.
• To participate and be active member of CFT to effect the TPM activity.
• Team Handling – Peak team size of 50 resources
• Win-Win Negotiation Skills – with vendors and customers
• Time Management – track record of on-time delivery for most engagements/initiatives
• Effective Business Communication Skills – written, verbal
• Strong analytical skills and business acumen for facility planning .
• Vendor Management (assessment, negotiation, development, monitoring, commercials)
• Industrial Safety Management – Tool box talk , permit to work system ,PPE Compliance
,Provide training related to LOTO , HIRA , Fire Fighting training , Co-ordinate legal
testing of tools and tackles and pressure vessels from competent person and government
authority. Prepare documents related to audit.
Career Timeline
• Feb 2014 onwards :- Flexlink Systems India Pvt Ltd
• April 2010-Feb 2014 : Updater Services Pvt. Ltd.
• Oct 2008 – Apr 2010: WB Engineers International Pvt. Ltd.
• April 2008 to oct 2008 – SGS india Pvt Ltd
Tenure : Feb 2014 to July 2016
Employer : Flexlink systems India Pvt. Ltd.
Flexlink systems is a worldwide leader in plastic chain conveyors. FlexLink is a leading conveyor
manufacturer offering automated conveyor systems, flexible conveyor equipment, and aluminum and
stainless steel conveyors.
Department : Operations
Role : Project Engineer
Resume
Responsibilities :
• Ensuring a project is fit–for–purpose & adheres to the project budget & schedule.
• Manages the Lifecycle Financials of the VAVE Program(s) and projects. Responsibility,
Authority and Accountability (RAA) for every project scope delivery and successful
execution within technical, schedule, cost and quality commitments
• Ensuring all relevant safety objectives & legal requirements are observed.
• Provides periodic project updates (Project Status Report – Green/Yellow/Red) of the current
situation relating to milestones and problem/high risk areas (e.g., technical, cost, and
schedule). Provides updates to the business units as well as divisional, and group levels
• Provides monthly project updates of the current situation relating to project milestones and
problem/high risk areas (e.g., technical, cost, and schedule).
• Accounting for engineering task to ensure they meet contract requirements.
• Works in a cross-disciplinary manner with other departments (e.g., Product Engineering,
Sourcing ,Manufacturing etc) and facilitates the phase gate processes.
• Developing project–specific procedures for the work to be carried out.
• Interpreting clients’ requirements, identifying & addressing design parameters &
Engineering problems & ensuring solutions are implemented.
• Ensuring all justifications for contractual variations (ECN) during projects are
Maintained to support subsequent commercial claims.
• Evaluating, organizing & prioritizing work within the overall project schedule.
• Liaising & managing third party contractors to ensure all equipment is fit for purpose.
• Responsible for making project specific standards.
• Ensures that the implementation of application engineers is reviewed with respect to
project standards and quality documents.
• Ensures that the final deliverable meets the functional specifications of the end user
by doing thorough quality checks.
• Interface with customers for technical queries.
• Handling service team all over India basis.
Tenure : April 2010 to Feb 2014
Employer : UPDATER SERVICES Pvt. Ltd.(UDS)
Department : Operations
Role : Assistant Manager Operations (2 Yrs work at General Motors Plant at talegaon)
Responsibilities :
• Operations: Monitor performance of teams at various sites, for quality, customer
satisfaction and adherence to plan and schedule
• Vendor Management: Identify alternative vendors, negotiate pricing and terms,
onboard vendors, develop vendor teams to deliver as per requirements, vendor
performance monitoring, payments tracking
• Carry out maintenance related to AHU , DG set , Compressors and AC (Split &
Window) water coolers etc.
• Ensure proper documentation in terms of status, progress and other operational
reports. Also maintain supplier database
• Cost Control for various projects with an objective to achieve financial targets of
the business unit
• Ensure Inventory control to optimize stocks and costs.
• Resolve delivery problems and complaints, vendor disputes.
• Follow up for payments with customer.
• Execute projects related to pipe line underground & open, structural fabrication,
conveyors, electrical wiring & related panels fitment. sheet metal jobs
Resume
• Carry out legal Testing of Pressure vessels, lifting tools & tackles, weighing
balancers LPG vessels, air receiver tank and maintaining all the records related to
health safety and environment related aspect.
• Ensuring Machine Maintenance through Preventive Maintenance resulting in
Zero Defects
• To prepare and execute the checklist and ensure timely preventive maintenance
of all of all machines / utilities/tools and equipment as per plan.
• Designing Maintenance strategies, procedures and methods as per ISO TS 16949
requirements and TPM.
• Arranging specialist procurement of fixtures, fittings or components.
• Controlling maintenance tools, stores and equipment as per the standards
• Monitoring and controlling maintenance costs as per the budgets
• Dealing with emergency and unplanned problems and repairs.
• Analysis and implementation of various counter measures.
• To plan and effect the Annual Maintenance activity.
• To participate and be active member of CFT to effect the TPM activity.
• To standardize the spare parts and plan for contingencies.
• To initiate various automations in order to increase productivity and cost saving.
• To ensure the erection and commissioning of new line/machines.
• To ensure the safety of men and machines by taking appropriate safety measures.
• To calculate and maintain MTTR and MTBF as per Company norms.
• To maintain the track of energy consumption mainly electricity and LPG.
• To Support Manager-F&A in preparation of Business Plan.
• To maintain the documentations as per requirements of Quality Systems.
• To prepare skill matrix and plan action thereon.
• To do continuous improvement through Kaizen initiatives.
• To lead the 5S activity in the Department.
• To conduct the regular training to the concerned for proper handling/keeping of
Machines/equipment/tools.
Tenure : Oct 2008 to April 2010
Employer : W.B.Engineers International Pvt. Ltd.
W.B. Engineers International Pvt. Ltd. is a reputed organization engaged in the
marketing of mining and construction equipment for over three decades. Since 1980
W.B. Engineers International Pvt. Ltd. have believed in providing total customer
satisfaction by supplying world-class equipment to the construction and mining
industries in India.
Role : Project Engineer (Site Activities)
Responsibilities : • Prepare project schedule and execute the activities accordingly
• Keep follow-up for material with purchasers & vendors
• Execute F.A.T. (Factory Acceptance Test)
• Prepare documentation of the system.
• Monitor the activities of packing & Dispatch.
• Co-ordinate with Customer for requirement and schedule.
• Plan accordingly to match requirement target date.
• To ensure proper worker utilization, productivity, safety & discipline.
• Installation of mobile crushers on site.
• Carry out maintenance of conveyors, hydraulic motors, hydraulic pumps &
engine parts also.
• Give training to operators about overall operation & daily maintenance of
crushers.
• Leading the effort from implementation in customer Acceptance test.
Participation in POG Reviews / quality process reviews.
Resume
Ensures timely completion of projects on schedule and within the
allocated budget.
• Project Reports and status submission to the customer as well as
management.
Projects Handled
• Emaar MGF Township Project at Hyderabad
Client : Emaar MGF, SPCL, ACC, CBRE
• Sesa Goa Mining Project at Goa
Client : Sesa Goa Pvt. Ltd.
Tenure : April 2008 to Oct 2008
Employer : SGS India Pvt. Ltd., Pune.
Role : Quality Assurance Engineer (Third Party Inspection)
Responsibilities : • Pre-shipment inspection and quality control at factories and warehouses.
• Shipment inspection at customer’s premises and ports
• Quality ascertainment.
• Supervision of container loading and stuffing.
• Final random and online inspection of steel products like Hot rolled, Cold
rolled, Galvanized, Pre-painted coils and sheet.
• Our scope also includes Packing & Marking check, Supervision of container
stuffing and loading for our mandatory and export order.
Educational Details
• B.E. (Mech. Egg.) with 63.50% from Jawaharlal Darda Inst. of Egg. & Tech.,
Yavatmal under Sant Gadge Baba University, Amravati in March 2008
• Diploma in Mechanical Engineering with 63.36% from Govt. Polytechnic,
Washim under MSBTE, Mumbai in June 2004.
• S.S.C with 75.46% from Maharashtra State Board of Secondary & Higher
Secondary Education,
Personal Information
Full Name : Sachin B Tagalpallewar
Address : Nakshatra I Land G wing Flat No 605 Moshi Alandi Road Moshi Pune .
Date of Birth : March 25 1984
Marital Status : Married
Passport Details : K9923719
Notice Period : 1 Month
Current CTC : 460000 pa
Declaration
I consider myself familiar with Mechanical Engineering Aspects. I am also confident of my ability to
work in a team. I solemnly affirm that the above-furnished particulars are true to the best of my
knowledge and belief.
Thanking you
Yours Truly
(Sachin Tagalpallewar)
Resume

Weitere ähnliche Inhalte

Was ist angesagt?

Hemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-Resume
Hemant Kale
 
karthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resumekarthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resume
Karthigairaj Kandan
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
Joseph. Gaon
 
Mark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement Presentation
Mark Redmond
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
Travis Lucas
 
Osric L Prowell - Resume - August 2016
Osric L Prowell - Resume -  August 2016Osric L Prowell - Resume -  August 2016
Osric L Prowell - Resume - August 2016
Osric Prowell
 

Was ist angesagt? (18)

Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb Uae
 
Hemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-Resume
 
karthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resumekarthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resume
 
rajesh (1) (1)
rajesh (1) (1)rajesh (1) (1)
rajesh (1) (1)
 
RESUME
RESUMERESUME
RESUME
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
 
U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...
U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...
U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...
 
Resume
ResumeResume
Resume
 
Ravindra pingale
Ravindra pingaleRavindra pingale
Ravindra pingale
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
 
Mark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement Presentation
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
Osric L Prowell - Resume - August 2016
Osric L Prowell - Resume -  August 2016Osric L Prowell - Resume -  August 2016
Osric L Prowell - Resume - August 2016
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
 
resumegfp_2016
resumegfp_2016resumegfp_2016
resumegfp_2016
 

Andere mochten auch

Cap ergo
Cap ergoCap ergo
Startup Grind Bangladesh
Startup Grind BangladeshStartup Grind Bangladesh
Startup Grind Bangladesh
Arif Nezami
 
Cause paragraph essay_transition_exercise
Cause paragraph essay_transition_exerciseCause paragraph essay_transition_exercise
Cause paragraph essay_transition_exercise
hacersivil
 

Andere mochten auch (13)

Cap ergo
Cap ergoCap ergo
Cap ergo
 
The Facebook Facts : Things Every User MUST Know
The Facebook Facts : Things Every User MUST KnowThe Facebook Facts : Things Every User MUST Know
The Facebook Facts : Things Every User MUST Know
 
B109 avarage
B109 avarageB109 avarage
B109 avarage
 
EL AYUNTAMIENTO INICIA LAS OBRAS PARA LA ESTABILIZACIÓN DEL TALUD DE LA CALLE...
EL AYUNTAMIENTO INICIA LAS OBRAS PARA LA ESTABILIZACIÓN DEL TALUD DE LA CALLE...EL AYUNTAMIENTO INICIA LAS OBRAS PARA LA ESTABILIZACIÓN DEL TALUD DE LA CALLE...
EL AYUNTAMIENTO INICIA LAS OBRAS PARA LA ESTABILIZACIÓN DEL TALUD DE LA CALLE...
 
Startup Grind Bangladesh
Startup Grind BangladeshStartup Grind Bangladesh
Startup Grind Bangladesh
 
Land of tigers Bangladesh Startup Report 2016
Land of tigers   Bangladesh Startup Report 2016Land of tigers   Bangladesh Startup Report 2016
Land of tigers Bangladesh Startup Report 2016
 
Bangladesh Startup Map 2017
Bangladesh Startup Map 2017Bangladesh Startup Map 2017
Bangladesh Startup Map 2017
 
20150916 ARMA Pittsburgh Do's and Don'ts of Managing Social Media
20150916 ARMA Pittsburgh Do's and Don'ts of Managing Social Media20150916 ARMA Pittsburgh Do's and Don'ts of Managing Social Media
20150916 ARMA Pittsburgh Do's and Don'ts of Managing Social Media
 
Cause paragraph essay_transition_exercise
Cause paragraph essay_transition_exerciseCause paragraph essay_transition_exercise
Cause paragraph essay_transition_exercise
 
82736 maths-specimen-paper-2-2014-2017
82736 maths-specimen-paper-2-2014-201782736 maths-specimen-paper-2-2014-2017
82736 maths-specimen-paper-2-2014-2017
 
25184 science-specimen-paper-1-mark-scheme-2014-2017
25184 science-specimen-paper-1-mark-scheme-2014-201725184 science-specimen-paper-1-mark-scheme-2014-2017
25184 science-specimen-paper-1-mark-scheme-2014-2017
 
Primary checkpoint science (0846) specimen 2014 paper 1
Primary checkpoint   science (0846) specimen 2014 paper 1Primary checkpoint   science (0846) specimen 2014 paper 1
Primary checkpoint science (0846) specimen 2014 paper 1
 
Observatorio Turístico de Málaga 2016
Observatorio Turístico de Málaga 2016Observatorio Turístico de Málaga 2016
Observatorio Turístico de Málaga 2016
 

Ähnlich wie Sachin be mech_8_yrs_exp

Ähnlich wie Sachin be mech_8_yrs_exp (20)

MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Girisha DN C V
Girisha DN C VGirisha DN C V
Girisha DN C V
 
vikas goel
vikas goelvikas goel
vikas goel
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
CV Amro Mohammed Noor Khayat
CV  Amro Mohammed Noor KhayatCV  Amro Mohammed Noor Khayat
CV Amro Mohammed Noor Khayat
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
 
Turnover Engineer
Turnover EngineerTurnover Engineer
Turnover Engineer
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 
Ajay_CV_SQA
Ajay_CV_SQAAjay_CV_SQA
Ajay_CV_SQA
 
Resume
ResumeResume
Resume
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
Vivek Patil
Vivek PatilVivek Patil
Vivek Patil
 
Resume 04.10.2015
Resume 04.10.2015Resume 04.10.2015
Resume 04.10.2015
 
Satyajit Sahoo_ Resume
Satyajit Sahoo_ ResumeSatyajit Sahoo_ Resume
Satyajit Sahoo_ Resume
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 

Kürzlich hochgeladen

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Kürzlich hochgeladen (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Sachin be mech_8_yrs_exp

  • 1. Sachin Tagalpallewar – B.E. (Mech.) with 8 years’ Experience Cell: 7798496825 Email: tagalpallewar@gmail.com Objective • To contribute and add value to my organization for achieving success, by leveraging my skills and knowledge, with the right attitude, and in turn achieving my career growth. Summary • 8 years diverse experience across India in Project Management, Industrial safety Management, and Maintenance & operations management. • Mechanical Engineering with First Class from Amravati University • Appreciation received from Emmar for “effective handling of team” and HUL for providing project which improves rating of world class manufacturing. • Client appreciation at General Motors for timely completion of project with challenging schedule • Handled over 25 vendors across various sectors . • Completed certification training on SAP in MM Module . • completed Advance Diploma in Industrial Safety (ADIS) from NSO (National Safety Organization ) and pursuing Professional Project Management (PMP) certification. • Handled major client HUL , Cadbury (Mondelez) , Nestle ,Bajaj , General Motors , HCL PARI , GSK , Johnson & Johnson , SKF . Skill Set • Project Management – Requirements Capture, Planning, Scheduling, Budgeting, Tracking & Monitoring, Documentation and Successful Execution on site. • Designing Maintenance strategies, procedures and methods as per ISO TS 16949 requirements and TPM. • To participate and be active member of CFT to effect the TPM activity. • Team Handling – Peak team size of 50 resources • Win-Win Negotiation Skills – with vendors and customers • Time Management – track record of on-time delivery for most engagements/initiatives • Effective Business Communication Skills – written, verbal • Strong analytical skills and business acumen for facility planning . • Vendor Management (assessment, negotiation, development, monitoring, commercials) • Industrial Safety Management – Tool box talk , permit to work system ,PPE Compliance ,Provide training related to LOTO , HIRA , Fire Fighting training , Co-ordinate legal testing of tools and tackles and pressure vessels from competent person and government authority. Prepare documents related to audit. Career Timeline • Feb 2014 onwards :- Flexlink Systems India Pvt Ltd • April 2010-Feb 2014 : Updater Services Pvt. Ltd. • Oct 2008 – Apr 2010: WB Engineers International Pvt. Ltd. • April 2008 to oct 2008 – SGS india Pvt Ltd Tenure : Feb 2014 to July 2016 Employer : Flexlink systems India Pvt. Ltd. Flexlink systems is a worldwide leader in plastic chain conveyors. FlexLink is a leading conveyor manufacturer offering automated conveyor systems, flexible conveyor equipment, and aluminum and stainless steel conveyors. Department : Operations Role : Project Engineer Resume
  • 2. Responsibilities : • Ensuring a project is fit–for–purpose & adheres to the project budget & schedule. • Manages the Lifecycle Financials of the VAVE Program(s) and projects. Responsibility, Authority and Accountability (RAA) for every project scope delivery and successful execution within technical, schedule, cost and quality commitments • Ensuring all relevant safety objectives & legal requirements are observed. • Provides periodic project updates (Project Status Report – Green/Yellow/Red) of the current situation relating to milestones and problem/high risk areas (e.g., technical, cost, and schedule). Provides updates to the business units as well as divisional, and group levels • Provides monthly project updates of the current situation relating to project milestones and problem/high risk areas (e.g., technical, cost, and schedule). • Accounting for engineering task to ensure they meet contract requirements. • Works in a cross-disciplinary manner with other departments (e.g., Product Engineering, Sourcing ,Manufacturing etc) and facilitates the phase gate processes. • Developing project–specific procedures for the work to be carried out. • Interpreting clients’ requirements, identifying & addressing design parameters & Engineering problems & ensuring solutions are implemented. • Ensuring all justifications for contractual variations (ECN) during projects are Maintained to support subsequent commercial claims. • Evaluating, organizing & prioritizing work within the overall project schedule. • Liaising & managing third party contractors to ensure all equipment is fit for purpose. • Responsible for making project specific standards. • Ensures that the implementation of application engineers is reviewed with respect to project standards and quality documents. • Ensures that the final deliverable meets the functional specifications of the end user by doing thorough quality checks. • Interface with customers for technical queries. • Handling service team all over India basis. Tenure : April 2010 to Feb 2014 Employer : UPDATER SERVICES Pvt. Ltd.(UDS) Department : Operations Role : Assistant Manager Operations (2 Yrs work at General Motors Plant at talegaon) Responsibilities : • Operations: Monitor performance of teams at various sites, for quality, customer satisfaction and adherence to plan and schedule • Vendor Management: Identify alternative vendors, negotiate pricing and terms, onboard vendors, develop vendor teams to deliver as per requirements, vendor performance monitoring, payments tracking • Carry out maintenance related to AHU , DG set , Compressors and AC (Split & Window) water coolers etc. • Ensure proper documentation in terms of status, progress and other operational reports. Also maintain supplier database • Cost Control for various projects with an objective to achieve financial targets of the business unit • Ensure Inventory control to optimize stocks and costs. • Resolve delivery problems and complaints, vendor disputes. • Follow up for payments with customer. • Execute projects related to pipe line underground & open, structural fabrication, conveyors, electrical wiring & related panels fitment. sheet metal jobs Resume
  • 3. • Carry out legal Testing of Pressure vessels, lifting tools & tackles, weighing balancers LPG vessels, air receiver tank and maintaining all the records related to health safety and environment related aspect. • Ensuring Machine Maintenance through Preventive Maintenance resulting in Zero Defects • To prepare and execute the checklist and ensure timely preventive maintenance of all of all machines / utilities/tools and equipment as per plan. • Designing Maintenance strategies, procedures and methods as per ISO TS 16949 requirements and TPM. • Arranging specialist procurement of fixtures, fittings or components. • Controlling maintenance tools, stores and equipment as per the standards • Monitoring and controlling maintenance costs as per the budgets • Dealing with emergency and unplanned problems and repairs. • Analysis and implementation of various counter measures. • To plan and effect the Annual Maintenance activity. • To participate and be active member of CFT to effect the TPM activity. • To standardize the spare parts and plan for contingencies. • To initiate various automations in order to increase productivity and cost saving. • To ensure the erection and commissioning of new line/machines. • To ensure the safety of men and machines by taking appropriate safety measures. • To calculate and maintain MTTR and MTBF as per Company norms. • To maintain the track of energy consumption mainly electricity and LPG. • To Support Manager-F&A in preparation of Business Plan. • To maintain the documentations as per requirements of Quality Systems. • To prepare skill matrix and plan action thereon. • To do continuous improvement through Kaizen initiatives. • To lead the 5S activity in the Department. • To conduct the regular training to the concerned for proper handling/keeping of Machines/equipment/tools. Tenure : Oct 2008 to April 2010 Employer : W.B.Engineers International Pvt. Ltd. W.B. Engineers International Pvt. Ltd. is a reputed organization engaged in the marketing of mining and construction equipment for over three decades. Since 1980 W.B. Engineers International Pvt. Ltd. have believed in providing total customer satisfaction by supplying world-class equipment to the construction and mining industries in India. Role : Project Engineer (Site Activities) Responsibilities : • Prepare project schedule and execute the activities accordingly • Keep follow-up for material with purchasers & vendors • Execute F.A.T. (Factory Acceptance Test) • Prepare documentation of the system. • Monitor the activities of packing & Dispatch. • Co-ordinate with Customer for requirement and schedule. • Plan accordingly to match requirement target date. • To ensure proper worker utilization, productivity, safety & discipline. • Installation of mobile crushers on site. • Carry out maintenance of conveyors, hydraulic motors, hydraulic pumps & engine parts also. • Give training to operators about overall operation & daily maintenance of crushers. • Leading the effort from implementation in customer Acceptance test. Participation in POG Reviews / quality process reviews. Resume
  • 4. Ensures timely completion of projects on schedule and within the allocated budget. • Project Reports and status submission to the customer as well as management. Projects Handled • Emaar MGF Township Project at Hyderabad Client : Emaar MGF, SPCL, ACC, CBRE • Sesa Goa Mining Project at Goa Client : Sesa Goa Pvt. Ltd. Tenure : April 2008 to Oct 2008 Employer : SGS India Pvt. Ltd., Pune. Role : Quality Assurance Engineer (Third Party Inspection) Responsibilities : • Pre-shipment inspection and quality control at factories and warehouses. • Shipment inspection at customer’s premises and ports • Quality ascertainment. • Supervision of container loading and stuffing. • Final random and online inspection of steel products like Hot rolled, Cold rolled, Galvanized, Pre-painted coils and sheet. • Our scope also includes Packing & Marking check, Supervision of container stuffing and loading for our mandatory and export order. Educational Details • B.E. (Mech. Egg.) with 63.50% from Jawaharlal Darda Inst. of Egg. & Tech., Yavatmal under Sant Gadge Baba University, Amravati in March 2008 • Diploma in Mechanical Engineering with 63.36% from Govt. Polytechnic, Washim under MSBTE, Mumbai in June 2004. • S.S.C with 75.46% from Maharashtra State Board of Secondary & Higher Secondary Education, Personal Information Full Name : Sachin B Tagalpallewar Address : Nakshatra I Land G wing Flat No 605 Moshi Alandi Road Moshi Pune . Date of Birth : March 25 1984 Marital Status : Married Passport Details : K9923719 Notice Period : 1 Month Current CTC : 460000 pa Declaration I consider myself familiar with Mechanical Engineering Aspects. I am also confident of my ability to work in a team. I solemnly affirm that the above-furnished particulars are true to the best of my knowledge and belief. Thanking you Yours Truly (Sachin Tagalpallewar) Resume