Major Assignment on
Operation planning and control
Submitted by Submitted to
Sagar bhardwaj Mr. Bhupendra
K10692 (asst. prof. ME dept)
ERP IMPLEMENTATION
LIFE CYCLE
Enterprise resource planning
• ERP covers the technique and concepts employed
for the integrated management of business as a
whole,
• ERP packages are integrated software packages that
support the above ERP concepts.
ERP LIFE CYCLE
• ERP lifecycle is in which highlights the different
stages in implementation of An ERP.
Different phases of ERP
• Pre evaluation Screening
• Evaluation Package
• Project Planning
• GAP analysis
• Reengineering
• Team training
• Testing
• Post implementation
Pre-selection Process
Package Evaluation
Project Planning
Gap Analysis Reengineering Configuration
Implementation
Team Training
Testing End- user Training
Going Live
Post – implementation
Phase
ERP implementation Life Cycle
Pre evaluation screening
• Decision for perfect package
• Number of ERP vendors
• Screening eliminates the packages that are not at all
suitable for the company’s business processes.
• Selection is done on best few package available.
Package Evaluation
• Package is selected on the basis of different
parameter.
• Test and certify the package and also check the
coordination with different department
• Selected package will determine the success or
failure of the project.
Cont.
• Package must be user friendly
• Regular up gradation should available.
• Cost
Project planning
• Designs the implementation process.
• Resources are identified.
• Implementation team is selected and task allocated.
• Special arrangement for contegencies.
Gap analysis
• Most crucial phase.
• Process through which company can create a model
of where they are standing now and where they
want to go.
• Model help the company to cover the functional gap
Reengineering
• Implementation is going to involve a significant
change in number of employees and their job
responsibilities.
• Process become more automated and efficient.
Team Training
• Takes place along with the process of
implementation.
• Company trains its employees to implement and
later, run the system.
• Employee become self sufficient to implement the
software after the vendors and consultant have left.
Testing
• This phase is performed to find the weak link so that
it can be rectified before its implementation.
Going Live
• The work is complete, data conversion is done,
databases are up and running, the configuration is
complete & testing is done.
• The system is officially proclaimed.
• Once the system is live the old system is removed
End User Training
• The employee who is going to use the system are
identified and trained.
Post Implementation
• This is the maintenance phase.
• Employees who are trained enough to handle
problems those crops up time to time.
• The post implementation will need a different set of
roles and skills than those with less integrated kind
of systems.
K10692 OPC

Weitere ähnliche Inhalte

Was ist angesagt?

erplifecycle-141107014844-conversion-gate02
erplifecycle-141107014844-conversion-gate02erplifecycle-141107014844-conversion-gate02
erplifecycle-141107014844-conversion-gate02
Tushar Jaitly
 
Continuous Integration Approach
Continuous Integration ApproachContinuous Integration Approach
Continuous Integration Approach
Nigel Thurlow
 

Was ist angesagt? (20)

Oracle Lifecycle
Oracle LifecycleOracle Lifecycle
Oracle Lifecycle
 
Different Phases of ERP Implementation | OptiProERP
Different Phases of ERP Implementation | OptiProERP Different Phases of ERP Implementation | OptiProERP
Different Phases of ERP Implementation | OptiProERP
 
Phases of ERP Implementation Lifecycle By ControlERP
Phases of ERP Implementation Lifecycle By ControlERPPhases of ERP Implementation Lifecycle By ControlERP
Phases of ERP Implementation Lifecycle By ControlERP
 
Sap Implementation Life Cycle Complete Process
Sap Implementation Life Cycle Complete ProcessSap Implementation Life Cycle Complete Process
Sap Implementation Life Cycle Complete Process
 
erplifecycle-141107014844-conversion-gate02
erplifecycle-141107014844-conversion-gate02erplifecycle-141107014844-conversion-gate02
erplifecycle-141107014844-conversion-gate02
 
Agile meets Enterprise ERP
Agile meets Enterprise ERPAgile meets Enterprise ERP
Agile meets Enterprise ERP
 
Erp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and supportErp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and support
 
Swl10
Swl10Swl10
Swl10
 
ERP Implementation Life Cycle
ERP Implementation Life CycleERP Implementation Life Cycle
ERP Implementation Life Cycle
 
Software engineering 4 critical analysis of waterfall model
Software engineering 4 critical analysis of waterfall modelSoftware engineering 4 critical analysis of waterfall model
Software engineering 4 critical analysis of waterfall model
 
Intro to Agile
Intro to AgileIntro to Agile
Intro to Agile
 
QA Best Practices in Agile World_new
QA Best Practices in Agile World_newQA Best Practices in Agile World_new
QA Best Practices in Agile World_new
 
Waterfall VS Scrum – CSC INDIA
Waterfall VS Scrum – CSC INDIAWaterfall VS Scrum – CSC INDIA
Waterfall VS Scrum – CSC INDIA
 
Software Test Automation
Software Test AutomationSoftware Test Automation
Software Test Automation
 
Intro erp implemetation
Intro erp implemetationIntro erp implemetation
Intro erp implemetation
 
Rajiv cv 170816
Rajiv cv 170816 Rajiv cv 170816
Rajiv cv 170816
 
The Agile Buffet table
The Agile Buffet tableThe Agile Buffet table
The Agile Buffet table
 
РАМЕЛЛА БАСЕНКО «Поліпшення процесу тестування, як результат аудиту процесів ...
РАМЕЛЛА БАСЕНКО «Поліпшення процесу тестування, як результат аудиту процесів ...РАМЕЛЛА БАСЕНКО «Поліпшення процесу тестування, як результат аудиту процесів ...
РАМЕЛЛА БАСЕНКО «Поліпшення процесу тестування, як результат аудиту процесів ...
 
Continuous Integration Approach
Continuous Integration ApproachContinuous Integration Approach
Continuous Integration Approach
 
Agile QA presentation
Agile QA presentationAgile QA presentation
Agile QA presentation
 

Andere mochten auch

Sampled-Data Piecewise Affine Slab Systems: A Time-Delay Approach
Sampled-Data Piecewise Affine Slab Systems: A Time-Delay ApproachSampled-Data Piecewise Affine Slab Systems: A Time-Delay Approach
Sampled-Data Piecewise Affine Slab Systems: A Time-Delay Approach
Behzad Samadi
 
State description of digital processors,sampled continous systems,system with...
State description of digital processors,sampled continous systems,system with...State description of digital processors,sampled continous systems,system with...
State description of digital processors,sampled continous systems,system with...
manish5289
 
Social Media Case Study: Gail India
Social Media Case Study: Gail India Social Media Case Study: Gail India
Social Media Case Study: Gail India
Social Samosa
 

Andere mochten auch (13)

K10692 rac
K10692 racK10692 rac
K10692 rac
 
Sampled-Data Piecewise Affine Slab Systems: A Time-Delay Approach
Sampled-Data Piecewise Affine Slab Systems: A Time-Delay ApproachSampled-Data Piecewise Affine Slab Systems: A Time-Delay Approach
Sampled-Data Piecewise Affine Slab Systems: A Time-Delay Approach
 
State description of digital processors,sampled continous systems,system with...
State description of digital processors,sampled continous systems,system with...State description of digital processors,sampled continous systems,system with...
State description of digital processors,sampled continous systems,system with...
 
Presentation1
Presentation1Presentation1
Presentation1
 
Social Media Case Study: Gail India
Social Media Case Study: Gail India Social Media Case Study: Gail India
Social Media Case Study: Gail India
 
Gail(india) limited
Gail(india) limitedGail(india) limited
Gail(india) limited
 
Thermo electric effect
Thermo electric effectThermo electric effect
Thermo electric effect
 
Gail india ppt
Gail india pptGail india ppt
Gail india ppt
 
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
 
ERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola HellenicERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola Hellenic
 
K10695 ic engine
K10695  ic engineK10695  ic engine
K10695 ic engine
 
K10692 control theory
K10692 control theoryK10692 control theory
K10692 control theory
 
The thermo electric effect
The thermo electric effectThe thermo electric effect
The thermo electric effect
 

Ähnlich wie K10692 OPC

Erp implementation life cycle
Erp implementation life cycleErp implementation life cycle
Erp implementation life cycle
sawanlaladiya
 
Sap implementation by priya pangam
Sap implementation by priya pangamSap implementation by priya pangam
Sap implementation by priya pangam
amol1212
 

Ähnlich wie K10692 OPC (20)

ERP implementation
ERP implementationERP implementation
ERP implementation
 
Implementation life cycle
Implementation life cycleImplementation life cycle
Implementation life cycle
 
Erp implementation life cycle
Erp implementation life cycleErp implementation life cycle
Erp implementation life cycle
 
ERPredefined Corporate Profile
ERPredefined Corporate ProfileERPredefined Corporate Profile
ERPredefined Corporate Profile
 
Erp implementation guide
Erp implementation guideErp implementation guide
Erp implementation guide
 
ERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System Study
 
6 key phases of an erp implemantion plan
6 key phases of an erp implemantion plan6 key phases of an erp implemantion plan
6 key phases of an erp implemantion plan
 
6 key phases of an erp implemantion plan
6 key phases of an erp implemantion plan6 key phases of an erp implemantion plan
6 key phases of an erp implemantion plan
 
My Erp Implementation Lifecycle
My Erp Implementation LifecycleMy Erp Implementation Lifecycle
My Erp Implementation Lifecycle
 
Sap implementation by priya pangam
Sap implementation by priya pangamSap implementation by priya pangam
Sap implementation by priya pangam
 
Erp in cadbury
Erp in cadburyErp in cadbury
Erp in cadbury
 
Cloud ERP Software & Systems with Netsuite Implementation Sydney
Cloud ERP Software & Systems with Netsuite Implementation SydneyCloud ERP Software & Systems with Netsuite Implementation Sydney
Cloud ERP Software & Systems with Netsuite Implementation Sydney
 
Agile Acceptance testing with Fitnesse
Agile Acceptance testing with FitnesseAgile Acceptance testing with Fitnesse
Agile Acceptance testing with Fitnesse
 
Erp
ErpErp
Erp
 
Management511 team f_presentation[1]
Management511 team f_presentation[1]Management511 team f_presentation[1]
Management511 team f_presentation[1]
 
Introduction to ERP Concept
Introduction to ERP ConceptIntroduction to ERP Concept
Introduction to ERP Concept
 
Standard operating procedures (SOPs)
Standard operating procedures (SOPs)Standard operating procedures (SOPs)
Standard operating procedures (SOPs)
 
Agile Methodology - Software Engineering
Agile Methodology - Software EngineeringAgile Methodology - Software Engineering
Agile Methodology - Software Engineering
 
Lecture3.se.pptx
Lecture3.se.pptxLecture3.se.pptx
Lecture3.se.pptx
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptx
 

Kürzlich hochgeladen

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

K10692 OPC

  • 1. Major Assignment on Operation planning and control Submitted by Submitted to Sagar bhardwaj Mr. Bhupendra K10692 (asst. prof. ME dept)
  • 3. Enterprise resource planning • ERP covers the technique and concepts employed for the integrated management of business as a whole, • ERP packages are integrated software packages that support the above ERP concepts.
  • 4. ERP LIFE CYCLE • ERP lifecycle is in which highlights the different stages in implementation of An ERP.
  • 5. Different phases of ERP • Pre evaluation Screening • Evaluation Package • Project Planning • GAP analysis • Reengineering • Team training • Testing • Post implementation
  • 6. Pre-selection Process Package Evaluation Project Planning Gap Analysis Reengineering Configuration Implementation Team Training Testing End- user Training Going Live Post – implementation Phase ERP implementation Life Cycle
  • 7. Pre evaluation screening • Decision for perfect package • Number of ERP vendors • Screening eliminates the packages that are not at all suitable for the company’s business processes. • Selection is done on best few package available.
  • 8. Package Evaluation • Package is selected on the basis of different parameter. • Test and certify the package and also check the coordination with different department • Selected package will determine the success or failure of the project.
  • 9. Cont. • Package must be user friendly • Regular up gradation should available. • Cost
  • 10. Project planning • Designs the implementation process. • Resources are identified. • Implementation team is selected and task allocated. • Special arrangement for contegencies.
  • 11. Gap analysis • Most crucial phase. • Process through which company can create a model of where they are standing now and where they want to go. • Model help the company to cover the functional gap
  • 12. Reengineering • Implementation is going to involve a significant change in number of employees and their job responsibilities. • Process become more automated and efficient.
  • 13. Team Training • Takes place along with the process of implementation. • Company trains its employees to implement and later, run the system. • Employee become self sufficient to implement the software after the vendors and consultant have left.
  • 14. Testing • This phase is performed to find the weak link so that it can be rectified before its implementation.
  • 15. Going Live • The work is complete, data conversion is done, databases are up and running, the configuration is complete & testing is done. • The system is officially proclaimed. • Once the system is live the old system is removed
  • 16. End User Training • The employee who is going to use the system are identified and trained.
  • 17. Post Implementation • This is the maintenance phase. • Employees who are trained enough to handle problems those crops up time to time. • The post implementation will need a different set of roles and skills than those with less integrated kind of systems.