SlideShare ist ein Scribd-Unternehmen logo
1 von 16
1
Elina Zlotchenko
Transportation Planning Branch
North Carolina Department of Transportation
 What is an RPO?
 What areas do they cover?
 Why were they established?
 How are they structured?
 What are their duties and responsibilities?
 What does it mean to stakeholders?
 What are Issues RPOs are facing in NC?
2
3
Insert MPO/RPO/Div Figure here
 2000 - GS 136-210 through 213 directed NCDOT to study RPOs
 2001 – Based on results of study, NCDOT began forming RPOs
◦ Between 2001 and 2003, 20 RPOs were established
4
 Contiguous areas of three to fifteen counties or a total population of
the entire area represented of at least 50K.
◦ Metropolitan Planning Organizations areas shall not be included
◦ Not all municipalities in a proposed RPO must join the organization but the county
must be a member in the RPO.
5
The RPOs assist NCDOT and local governments in the transportation planning process
through four core duties as defined by North Carolina General Statutes:
◦ Assist the Department in developing Comprehensive Transportation Plans (CTPs)
◦ Provide a forum for public participation in the transportation planning and project
development processes
◦ Develop and prioritize projects the organization believes should be included in the STIP
◦ Provide transportation related information to local governments
◦ Other duties as determined.
6
 Transportation Advisory Committee (TAC)
◦ Local Elected Officials
◦ BOT Area Representative
◦ FHWA advisory non-voting member
◦ Tribal Governments
◦ Other members designated by the MOU (Memorandum of Understanding)
 Technical Coordinating Committee (TCC)
◦ Member Government(s) Staff Representatives
◦ NCDOT
◦ FHWA
◦ Transit Providers
◦ Other Agencies
 LPA
◦ Designated Staff (City, County or COG)
7
 Federal State Planning And Research Funds with 20% local match
 Total $1.9 million/year; ~$84k-$104k per RPO
 Census 2010 Results (2012)
◦ Changes in planning organization boundaries
 Expanding MPO boundaries and formation of two new MPOs – Grand Strand
MPO and New Bern MPOs – RPO Funding Level Change
8
Examples of products and services provided by the RPOs include but are not limited to:
◦ Data Collection & Assessment (Highway, Rail, Bike/Ped, Transit, Freight);
◦ Environmental & Land Use Data Inventory and Assessment;
◦ Demographic Data Collection and Assessment;
◦ Socioeconomic Data Inventory;
◦ Demographic Data Collection and Assessment
◦ Comprehensive Transportation Plans Development Assistance;
◦ Local TIP Prioritization and Program Development;
◦ Regional and Statewide Planning;
◦ Special Studies;
◦ CMAQ Planning Assistance;
◦ Research and identification of alternative funding opportunities, grant writing
assistance;
◦ TITLE VI & Environmental Justice Assessment;
9
Updated Annually:
◦ Yearly Planning Work Program;
◦ Five-Year Calendar;
◦ Quarterly Report Packages;
◦ Final Yearly Narrative;
◦ CTP List of Study Needs;
◦ TIP Project Prioritization List.
Updated on as-needed basis:
◦ Memorandum of Understanding (MOU);
◦ Funding Agreement;
◦ Bylaws;
◦ Prospectus;
◦ Public Involvement Plan or Policy (PIP).
10
All work products are subject to review on the basis of quality and recipient satisfaction.
o The purpose of program evaluation is to ensure that high quality RPO services are being
provided and to identify areas for potential improvement.
o Concerns identified through the survey process are tracked yearly by RPO and TPB staff to
ensure adequate progress is made toward resolving related issues.
o Consistently poor evaluation results or inadequate progress on identified issues may result in
a request by NCDOT for alternate staffing or a change of the LPA.
Products are:
Differentiated Between: Technical & Non-Technical
AND
Rated in Two Categories: Quality & Timeliness
11
 Technical Products
◦ Expectations: The RPO pursues excellence in delivering projects, programs, services, and initiatives
and produces products that possess accurate information, require minimal redo iterations, and contain
complete elements useful in decision-making.
◦ Examples: Data Collection, GIS Layers, Maps, Technical Reports, CTP Technical Support, etc.
◦ Delivery Rating (Quality)
3 Best practice, sets new standard or innovative
2 Stands by itself, contains appropriate/required information/data, is clearly presented and is accurate
1 Contains missing, inaccurate, and/or unusable information/data
◦ Delivery Rating (Timeliness)
12
 Non-Technical Products
◦ Expectations: The RPO pursues excellence in delivering projects, programs, services, and initiatives
and produces products that possess accurate Information, require minimal redo iterations, and contain
complete elements useful in decision-making.
◦ Examples: Meeting Minutes, Meeting Agendas, Public Notices, Press Releases, Grant
Applications, Website Development/Maintenance, etc.
◦ Delivery Rating:
Received
Not Received
13
Southwestern RPO: NC 107 Corridor Study
This study is examining existing conditions along NC 107 in order to
assist the community with developing a unified vision of the corridor and
to create a list of strategies and recommendations that will improve the
overall quality of transportation, enhance economic viability, and preserve
the natural resources.
http://www.regiona.org/transportation-planning-rpo/jackson-county/
Kerr-Tar RPO: North Carolina Lakes District Blueways
This Plan is intended as a guide advocates may use to further expand the
development of a formal network of blueways in the Kerr-Tar region to
complement other tourism and recreation initiatives. It focuses on
combining a regional Bike and Pedestrian plan through the Lakes Region
with a Blueways Plan that utilizes recreational routes through the Lakes
and Rivers of the region. It promotes use of multi-use and multi-modal
facilities and doubles as a marketing initiative for regional tourism.
http://www.nclakesdistrict.com/blueways-plan.html
14
◦ NCDOT-MPO-RPO Coordination;
◦ Doing More With Less;
◦ Regional Project Coordination;
◦ NCDOT Division Planning Engineers;
15
16
Questions?
Elina Zlotchenko
MPO/RPO Program Manager
Tel: 919-707-0922
E-mail: ezlotchenko@ncdot.gov

Weitere ähnliche Inhalte

Was ist angesagt?

Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised final
pbcgov
 
Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15
Robert Smith
 

Was ist angesagt? (20)

Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised final
 
Reston Bike Share Feasibility Study: Public Open House
Reston Bike Share Feasibility Study: Public Open HouseReston Bike Share Feasibility Study: Public Open House
Reston Bike Share Feasibility Study: Public Open House
 
20-year Transportation Funding Shortfall in Florida
20-year Transportation Funding Shortfall in Florida20-year Transportation Funding Shortfall in Florida
20-year Transportation Funding Shortfall in Florida
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Florida
 
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
 
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
 
Yakima Valley Conference of Government's Prioritization Process
Yakima Valley Conference of Government's Prioritization ProcessYakima Valley Conference of Government's Prioritization Process
Yakima Valley Conference of Government's Prioritization Process
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
 
Agenda Item 5: VDOT Paving Program
Agenda Item 5: VDOT Paving ProgramAgenda Item 5: VDOT Paving Program
Agenda Item 5: VDOT Paving Program
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
 
Reston Transportation Funding Plan: Dec. 19, 2016
Reston Transportation Funding Plan: Dec. 19, 2016Reston Transportation Funding Plan: Dec. 19, 2016
Reston Transportation Funding Plan: Dec. 19, 2016
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planning
 
Funding programs
Funding programs Funding programs
Funding programs
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
 
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
 
Understanding the Bicycle Project Planning and Implementation Process--Roles ...
Understanding the Bicycle Project Planning and Implementation Process--Roles ...Understanding the Bicycle Project Planning and Implementation Process--Roles ...
Understanding the Bicycle Project Planning and Implementation Process--Roles ...
 
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
 
The Covenant of Mayors: recent development and perspectives - Bossio
The Covenant of Mayors: recent development and perspectives - BossioThe Covenant of Mayors: recent development and perspectives - Bossio
The Covenant of Mayors: recent development and perspectives - Bossio
 
Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15
 

Andere mochten auch (7)

Pilant tctd presentation
Pilant tctd presentationPilant tctd presentation
Pilant tctd presentation
 
Leftwich presentation
Leftwich presentationLeftwich presentation
Leftwich presentation
 
Cummings presentation
Cummings presentationCummings presentation
Cummings presentation
 
Local and State Partnerships: Freight in North Central PA
Local and State Partnerships: Freight in North Central PALocal and State Partnerships: Freight in North Central PA
Local and State Partnerships: Freight in North Central PA
 
Northwest Oregon Connector
Northwest Oregon ConnectorNorthwest Oregon Connector
Northwest Oregon Connector
 
Thompson Roadway Safety Data Program
Thompson Roadway Safety Data ProgramThompson Roadway Safety Data Program
Thompson Roadway Safety Data Program
 
Highway Safety Improvement Program and Safety Performance Management Measures...
Highway Safety Improvement Program and Safety Performance Management Measures...Highway Safety Improvement Program and Safety Performance Management Measures...
Highway Safety Improvement Program and Safety Performance Management Measures...
 

Ähnlich wie Zlotchenko ncdot presentation

Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
RPO America
 
2017-2018_DOP_CIP_FINAL_SUBMISSION
2017-2018_DOP_CIP_FINAL_SUBMISSION2017-2018_DOP_CIP_FINAL_SUBMISSION
2017-2018_DOP_CIP_FINAL_SUBMISSION
Jason Vincent, AICP
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
bunthy sros
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
MelissaARC
 
Leo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development CommissionLeo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development Commission
Center for Planning Excellence
 
Budget Critique Portland
Budget Critique PortlandBudget Critique Portland
Budget Critique Portland
Eric Schlimgen
 
Sart4 2008
Sart4 2008Sart4 2008
Sart4 2008
milesdog
 
Final TRB paper_061914_certified
Final TRB paper_061914_certifiedFinal TRB paper_061914_certified
Final TRB paper_061914_certified
Melissa Taylor
 

Ähnlich wie Zlotchenko ncdot presentation (20)

Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
Understanding the Bicycle Project Planning and Implementation Process
Understanding the Bicycle Project Planning and Implementation ProcessUnderstanding the Bicycle Project Planning and Implementation Process
Understanding the Bicycle Project Planning and Implementation Process
 
Coordination 2.0: Coordinated Transportation Plans
Coordination 2.0: Coordinated Transportation PlansCoordination 2.0: Coordinated Transportation Plans
Coordination 2.0: Coordinated Transportation Plans
 
2017-2018_DOP_CIP_FINAL_SUBMISSION
2017-2018_DOP_CIP_FINAL_SUBMISSION2017-2018_DOP_CIP_FINAL_SUBMISSION
2017-2018_DOP_CIP_FINAL_SUBMISSION
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
 
Rural Regional Transportation Plans (RRTP) in Tennessee
Rural Regional Transportation Plans (RRTP) in TennesseeRural Regional Transportation Plans (RRTP) in Tennessee
Rural Regional Transportation Plans (RRTP) in Tennessee
 
[2015 e-Government Program] Action Plan : Quito(Ecuador)
[2015 e-Government Program] Action Plan : Quito(Ecuador)[2015 e-Government Program] Action Plan : Quito(Ecuador)
[2015 e-Government Program] Action Plan : Quito(Ecuador)
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status Report
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
 
Preparing Plans for Future Opportunities
Preparing Plans for Future OpportunitiesPreparing Plans for Future Opportunities
Preparing Plans for Future Opportunities
 
Combining and Aligning Transportation and Economic Development Plans
Combining and Aligning Transportation and Economic Development PlansCombining and Aligning Transportation and Economic Development Plans
Combining and Aligning Transportation and Economic Development Plans
 
Leo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development CommissionLeo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development Commission
 
Budget Critique Portland
Budget Critique PortlandBudget Critique Portland
Budget Critique Portland
 
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
 
Sart4 2008
Sart4 2008Sart4 2008
Sart4 2008
 
Final TRB paper_061914_certified
Final TRB paper_061914_certifiedFinal TRB paper_061914_certified
Final TRB paper_061914_certified
 
COTA NextGen Evaluation Framework
COTA NextGen Evaluation FrameworkCOTA NextGen Evaluation Framework
COTA NextGen Evaluation Framework
 
PPP around the World: Learning from the experience
PPP around the World: Learning from the experiencePPP around the World: Learning from the experience
PPP around the World: Learning from the experience
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Florida
 
Norpc
NorpcNorpc
Norpc
 

Mehr von RPO America

Mehr von RPO America (20)

PEL implementation tools.pptx
PEL implementation tools.pptxPEL implementation tools.pptx
PEL implementation tools.pptx
 
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
 
Cheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewCheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL Overview
 
CARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityCARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural Mobility
 
BCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIBCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MI
 
Shared. Connected. Sustainable.
Shared. Connected. Sustainable.Shared. Connected. Sustainable.
Shared. Connected. Sustainable.
 
Microtransit and Digital Infrastructure
Microtransit and Digital InfrastructureMicrotransit and Digital Infrastructure
Microtransit and Digital Infrastructure
 
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Lowcountry Go Vanpool
Lowcountry Go VanpoolLowcountry Go Vanpool
Lowcountry Go Vanpool
 
Employment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionEmployment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia Region
 
EDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessEDDs and States: Collaborating for Success
EDDs and States: Collaborating for Success
 
Strengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsStrengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development Districts
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
The Future Started Yesterday
The Future Started Yesterday The Future Started Yesterday
The Future Started Yesterday
 
Brownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceBrownfields for Redeveloping Resilience
Brownfields for Redeveloping Resilience
 
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
 
CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase
 
CEDS 101 and Best Practices
CEDS 101 and Best Practices CEDS 101 and Best Practices
CEDS 101 and Best Practices
 
EDD Speed Networking and Listening Session
EDD Speed Networking and Listening SessionEDD Speed Networking and Listening Session
EDD Speed Networking and Listening Session
 

Zlotchenko ncdot presentation

  • 1. 1 Elina Zlotchenko Transportation Planning Branch North Carolina Department of Transportation
  • 2.  What is an RPO?  What areas do they cover?  Why were they established?  How are they structured?  What are their duties and responsibilities?  What does it mean to stakeholders?  What are Issues RPOs are facing in NC? 2
  • 4.  2000 - GS 136-210 through 213 directed NCDOT to study RPOs  2001 – Based on results of study, NCDOT began forming RPOs ◦ Between 2001 and 2003, 20 RPOs were established 4
  • 5.  Contiguous areas of three to fifteen counties or a total population of the entire area represented of at least 50K. ◦ Metropolitan Planning Organizations areas shall not be included ◦ Not all municipalities in a proposed RPO must join the organization but the county must be a member in the RPO. 5
  • 6. The RPOs assist NCDOT and local governments in the transportation planning process through four core duties as defined by North Carolina General Statutes: ◦ Assist the Department in developing Comprehensive Transportation Plans (CTPs) ◦ Provide a forum for public participation in the transportation planning and project development processes ◦ Develop and prioritize projects the organization believes should be included in the STIP ◦ Provide transportation related information to local governments ◦ Other duties as determined. 6
  • 7.  Transportation Advisory Committee (TAC) ◦ Local Elected Officials ◦ BOT Area Representative ◦ FHWA advisory non-voting member ◦ Tribal Governments ◦ Other members designated by the MOU (Memorandum of Understanding)  Technical Coordinating Committee (TCC) ◦ Member Government(s) Staff Representatives ◦ NCDOT ◦ FHWA ◦ Transit Providers ◦ Other Agencies  LPA ◦ Designated Staff (City, County or COG) 7
  • 8.  Federal State Planning And Research Funds with 20% local match  Total $1.9 million/year; ~$84k-$104k per RPO  Census 2010 Results (2012) ◦ Changes in planning organization boundaries  Expanding MPO boundaries and formation of two new MPOs – Grand Strand MPO and New Bern MPOs – RPO Funding Level Change 8
  • 9. Examples of products and services provided by the RPOs include but are not limited to: ◦ Data Collection & Assessment (Highway, Rail, Bike/Ped, Transit, Freight); ◦ Environmental & Land Use Data Inventory and Assessment; ◦ Demographic Data Collection and Assessment; ◦ Socioeconomic Data Inventory; ◦ Demographic Data Collection and Assessment ◦ Comprehensive Transportation Plans Development Assistance; ◦ Local TIP Prioritization and Program Development; ◦ Regional and Statewide Planning; ◦ Special Studies; ◦ CMAQ Planning Assistance; ◦ Research and identification of alternative funding opportunities, grant writing assistance; ◦ TITLE VI & Environmental Justice Assessment; 9
  • 10. Updated Annually: ◦ Yearly Planning Work Program; ◦ Five-Year Calendar; ◦ Quarterly Report Packages; ◦ Final Yearly Narrative; ◦ CTP List of Study Needs; ◦ TIP Project Prioritization List. Updated on as-needed basis: ◦ Memorandum of Understanding (MOU); ◦ Funding Agreement; ◦ Bylaws; ◦ Prospectus; ◦ Public Involvement Plan or Policy (PIP). 10
  • 11. All work products are subject to review on the basis of quality and recipient satisfaction. o The purpose of program evaluation is to ensure that high quality RPO services are being provided and to identify areas for potential improvement. o Concerns identified through the survey process are tracked yearly by RPO and TPB staff to ensure adequate progress is made toward resolving related issues. o Consistently poor evaluation results or inadequate progress on identified issues may result in a request by NCDOT for alternate staffing or a change of the LPA. Products are: Differentiated Between: Technical & Non-Technical AND Rated in Two Categories: Quality & Timeliness 11
  • 12.  Technical Products ◦ Expectations: The RPO pursues excellence in delivering projects, programs, services, and initiatives and produces products that possess accurate information, require minimal redo iterations, and contain complete elements useful in decision-making. ◦ Examples: Data Collection, GIS Layers, Maps, Technical Reports, CTP Technical Support, etc. ◦ Delivery Rating (Quality) 3 Best practice, sets new standard or innovative 2 Stands by itself, contains appropriate/required information/data, is clearly presented and is accurate 1 Contains missing, inaccurate, and/or unusable information/data ◦ Delivery Rating (Timeliness) 12
  • 13.  Non-Technical Products ◦ Expectations: The RPO pursues excellence in delivering projects, programs, services, and initiatives and produces products that possess accurate Information, require minimal redo iterations, and contain complete elements useful in decision-making. ◦ Examples: Meeting Minutes, Meeting Agendas, Public Notices, Press Releases, Grant Applications, Website Development/Maintenance, etc. ◦ Delivery Rating: Received Not Received 13
  • 14. Southwestern RPO: NC 107 Corridor Study This study is examining existing conditions along NC 107 in order to assist the community with developing a unified vision of the corridor and to create a list of strategies and recommendations that will improve the overall quality of transportation, enhance economic viability, and preserve the natural resources. http://www.regiona.org/transportation-planning-rpo/jackson-county/ Kerr-Tar RPO: North Carolina Lakes District Blueways This Plan is intended as a guide advocates may use to further expand the development of a formal network of blueways in the Kerr-Tar region to complement other tourism and recreation initiatives. It focuses on combining a regional Bike and Pedestrian plan through the Lakes Region with a Blueways Plan that utilizes recreational routes through the Lakes and Rivers of the region. It promotes use of multi-use and multi-modal facilities and doubles as a marketing initiative for regional tourism. http://www.nclakesdistrict.com/blueways-plan.html 14
  • 15. ◦ NCDOT-MPO-RPO Coordination; ◦ Doing More With Less; ◦ Regional Project Coordination; ◦ NCDOT Division Planning Engineers; 15
  • 16. 16 Questions? Elina Zlotchenko MPO/RPO Program Manager Tel: 919-707-0922 E-mail: ezlotchenko@ncdot.gov