SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Downloaden Sie, um offline zu lesen
Enhancement Projects:
Improving Successful
Implementation in Minnesota
Annette Fiedler
Physical Development Director
Southwest RDC
Katie Caskey, AICP
Planning Program Coordinator
MnDOT
Ronda Allis
Principal Planner
MnDOT
Background and History
ISTEA & SAFETEA-LU
• Applications were conceptual ideas
• Often inaccurate cost estimates
• Projects frequently delayed or dropped after programmed
 MAP-21 & FAST
• New era, new project selection process
• Letter of intent step added
• Area Transportation Partnerships were challenged to keep projects from
slipping / dropping
2
Letter of Intent (LOI)
• One sentence description
• Budget: total, match, requested
• Project type (capital, planning, both)
• Description of the project
• Transportation purpose
• Identify in a plan
• SRTS
• Scenic Byways
• History delivering federal projects
• Sponsoring agency support
3
SRDC LOI Review Process
• Started by asking – what are the typical
causes of project delays?
• Developed a check-list
• Scheduled meetings with RDC, project
applicant, project sponsor, and others
4
Boldly go where no RDC has gone
before!
LOI Review Process Adoption
 Year 1 –
• SRDC and District 7 developed process and used it to review all projects
 Year 2 –
• Two area transportation partnerships used the process
• SRDC pulled previously programmed projects into the process too
Year 3 –
• SRTS staff adopted several components of the process into their standalone
process
• Other ATPs expressed interest in the process
 Year 4 –
TBD, but likely more RDCs and ATPs will use a similar review process
What does the LOI review process include?
• At least one hour
• All partners at the table
• Listen to what the applicant wants to do
• Take them through the check list
Result: SRDC makes recommendations to strengthen the application
Face-to-Face LOI Review
Key Considerations
Section 4(f) or Section 6(f) lands
Endangered
Species
Habitat
Key Considerations
National Register / Historic
Key Considerations
Haz Mat
Air Quality
Key Considerations
Wetlands
Key Considerations
Controversy?
Key Considerations
Key Considerations
Railroads
Utilities
Key Considerations
Airports
What issues do we usually catch?
• Connections – connections – connections
• Schools, sidewalks, street crossings, etc.
• ADA design
• Driveways, sidewalks
• Other ROW owners (roads, properties)
• Who is going to do the Preliminary Engineering and
design
• Budget
Typical Findings
Next Steps for Projects
After the LOI review:
• Applicants decides whether to continue to full application
• Full application submitted
• Area Transportation Partnership reviews applications
• Funding awarded to selected projects
10/1/2015 4/15/2016
11/1/2015 12/1/2015 1/1/2016 2/1/2016 3/1/2016 4/1/2016
10/1/2015 - 10/30/2015
LOI Window
11/2/2015 - 11/13/2015
LOI Review Period
11/16/2015 - 1/8/2016
Application Window
1/11/2016 - 4/15/2016
ATPs Select Projects
Is it working?
• Better applications
• Less time spent on applications for projects that aren’t ready
• Improved project delivery – TBD (project’s under this process aren’t constructed
yet)
Benefits of the LOI Review Process
Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
 
Countywide Transit Network Study: Public Meeting July 10, 2013
Countywide Transit Network Study: Public Meeting July 10, 2013Countywide Transit Network Study: Public Meeting July 10, 2013
Countywide Transit Network Study: Public Meeting July 10, 2013
 
Dulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingDulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and Funding
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updated
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the Beltway
 
Interstate 66 Corridor Improvements
Interstate 66 Corridor ImprovementsInterstate 66 Corridor Improvements
Interstate 66 Corridor Improvements
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status Report
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IV
 
Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016   Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016
 
Taking Pedestrian and Bicycle Counting Programs to the Next Level
Taking Pedestrian and Bicycle Counting Programs to the Next Level Taking Pedestrian and Bicycle Counting Programs to the Next Level
Taking Pedestrian and Bicycle Counting Programs to the Next Level
 
Fairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
Fairfax County Taxicab Regulation: 2015 Certificate Demand AnalysisFairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
Fairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
SMART Plan Update to the Miami-Dade TMC
SMART Plan Update to the Miami-Dade TMCSMART Plan Update to the Miami-Dade TMC
SMART Plan Update to the Miami-Dade TMC
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
 
FDOT Transplex/Focus on Community Presentation
FDOT Transplex/Focus on Community PresentationFDOT Transplex/Focus on Community Presentation
FDOT Transplex/Focus on Community Presentation
 

Andere mochten auch

Barcelona’s urban renewal
Barcelona’s urban renewalBarcelona’s urban renewal
Barcelona’s urban renewal
María Rivas
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
ALI HYDER GADHI
 
Urban Regeneration
Urban RegenerationUrban Regeneration
Urban Regeneration
Nubi Kay'
 

Andere mochten auch (20)

Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
 
History of conservation
History of conservationHistory of conservation
History of conservation
 
Residential Historic Preservation Portfolio
Residential Historic Preservation PortfolioResidential Historic Preservation Portfolio
Residential Historic Preservation Portfolio
 
Project Skrip - “The revitalization of historical and cultural complex of Škr...
Project Skrip - “The revitalization of historical and cultural complex of Škr...Project Skrip - “The revitalization of historical and cultural complex of Škr...
Project Skrip - “The revitalization of historical and cultural complex of Škr...
 
Planning & Historic Preservation: How Can Planners and Preservationists Work ...
Planning & Historic Preservation: How Can Planners and Preservationists Work ...Planning & Historic Preservation: How Can Planners and Preservationists Work ...
Planning & Historic Preservation: How Can Planners and Preservationists Work ...
 
The role of historic preservation in urban planning
The role of historic preservation in urban planningThe role of historic preservation in urban planning
The role of historic preservation in urban planning
 
THE BARCELONA MODEL
THE BARCELONA MODELTHE BARCELONA MODEL
THE BARCELONA MODEL
 
Presentation about urban regeneration - Cities & Regions Conference in Zagreb...
Presentation about urban regeneration - Cities & Regions Conference in Zagreb...Presentation about urban regeneration - Cities & Regions Conference in Zagreb...
Presentation about urban regeneration - Cities & Regions Conference in Zagreb...
 
Barcelona’s urban renewal
Barcelona’s urban renewalBarcelona’s urban renewal
Barcelona’s urban renewal
 
22@Barcelona 2011
22@Barcelona 201122@Barcelona 2011
22@Barcelona 2011
 
Sustainable transport
Sustainable transportSustainable transport
Sustainable transport
 
Urban Planning and Conservation
Urban Planning and ConservationUrban Planning and Conservation
Urban Planning and Conservation
 
D.o.t restoration and revitalizaion of historical buildings
D.o.t   restoration and revitalizaion of historical buildingsD.o.t   restoration and revitalizaion of historical buildings
D.o.t restoration and revitalizaion of historical buildings
 
Developing A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement PlanDeveloping A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement Plan
 
BDD - Writing better scenario
BDD - Writing better scenarioBDD - Writing better scenario
BDD - Writing better scenario
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
 
Urban renewal in Glasgow
Urban renewal in GlasgowUrban renewal in Glasgow
Urban renewal in Glasgow
 
Urban Regeneration
Urban RegenerationUrban Regeneration
Urban Regeneration
 
Redevelopment project ppt
Redevelopment project pptRedevelopment project ppt
Redevelopment project ppt
 
Urban Regeneration
Urban RegenerationUrban Regeneration
Urban Regeneration
 

Ähnlich wie Enhancement Projects: Improving Successful Implementation in Minnesota

2015 District One Public Works Integrating Committee Applicant Workshop
2015 District One Public Works Integrating Committee Applicant Workshop2015 District One Public Works Integrating Committee Applicant Workshop
2015 District One Public Works Integrating Committee Applicant Workshop
Cuyahoga County Planning Commission
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
bunthy sros
 

Ähnlich wie Enhancement Projects: Improving Successful Implementation in Minnesota (20)

Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
2015 District One Public Works Integrating Committee Applicant Workshop
2015 District One Public Works Integrating Committee Applicant Workshop2015 District One Public Works Integrating Committee Applicant Workshop
2015 District One Public Works Integrating Committee Applicant Workshop
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
SMART Plan Corridors' PD&Es Update
SMART Plan Corridors' PD&Es UpdateSMART Plan Corridors' PD&Es Update
SMART Plan Corridors' PD&Es Update
 
ppt watertech-1
ppt watertech-1ppt watertech-1
ppt watertech-1
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
 
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
 
Developing an air quality solution for Leeds - Polly Cook
Developing an air quality solution for Leeds - Polly CookDeveloping an air quality solution for Leeds - Polly Cook
Developing an air quality solution for Leeds - Polly Cook
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status Report
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on Transportation
 
Jan 2016 stakeholders mtg presentation
Jan 2016 stakeholders mtg presentationJan 2016 stakeholders mtg presentation
Jan 2016 stakeholders mtg presentation
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
 
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor StudyFairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
 
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor StudyFairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016
 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
 

Mehr von RPO America

Mehr von RPO America (20)

RPO America Peer Exchange: Rural Transportation Planning Programs
RPO America Peer Exchange: Rural Transportation Planning ProgramsRPO America Peer Exchange: Rural Transportation Planning Programs
RPO America Peer Exchange: Rural Transportation Planning Programs
 
Electric vehicle infrastructure in rural areas
Electric vehicle infrastructure in rural areasElectric vehicle infrastructure in rural areas
Electric vehicle infrastructure in rural areas
 
Tennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EVTennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EV
 
Electric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning OrganizationsElectric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning Organizations
 
PEL implementation tools.pptx
PEL implementation tools.pptxPEL implementation tools.pptx
PEL implementation tools.pptx
 
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
 
Cheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewCheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL Overview
 
CARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityCARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural Mobility
 
BCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIBCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MI
 
Shared. Connected. Sustainable.
Shared. Connected. Sustainable.Shared. Connected. Sustainable.
Shared. Connected. Sustainable.
 
Microtransit and Digital Infrastructure
Microtransit and Digital InfrastructureMicrotransit and Digital Infrastructure
Microtransit and Digital Infrastructure
 
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Lowcountry Go Vanpool
Lowcountry Go VanpoolLowcountry Go Vanpool
Lowcountry Go Vanpool
 
Employment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionEmployment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia Region
 
EDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessEDDs and States: Collaborating for Success
EDDs and States: Collaborating for Success
 
Strengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsStrengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development Districts
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
The Future Started Yesterday
The Future Started Yesterday The Future Started Yesterday
The Future Started Yesterday
 
Brownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceBrownfields for Redeveloping Resilience
Brownfields for Redeveloping Resilience
 

Kürzlich hochgeladen

Artificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptxArtificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptx
hariprasad279825
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
David Celestin
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Hung Le
 

Kürzlich hochgeladen (20)

Artificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptxArtificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptx
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf
 
globalisation project report displayed overview
globalisation project report displayed overviewglobalisation project report displayed overview
globalisation project report displayed overview
 
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait Cityin kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
 
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth death
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
 
ECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentation
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developers
 
Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20
 
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
 

Enhancement Projects: Improving Successful Implementation in Minnesota

  • 1. Enhancement Projects: Improving Successful Implementation in Minnesota Annette Fiedler Physical Development Director Southwest RDC Katie Caskey, AICP Planning Program Coordinator MnDOT Ronda Allis Principal Planner MnDOT
  • 2. Background and History ISTEA & SAFETEA-LU • Applications were conceptual ideas • Often inaccurate cost estimates • Projects frequently delayed or dropped after programmed  MAP-21 & FAST • New era, new project selection process • Letter of intent step added • Area Transportation Partnerships were challenged to keep projects from slipping / dropping 2
  • 3. Letter of Intent (LOI) • One sentence description • Budget: total, match, requested • Project type (capital, planning, both) • Description of the project • Transportation purpose • Identify in a plan • SRTS • Scenic Byways • History delivering federal projects • Sponsoring agency support 3
  • 4. SRDC LOI Review Process • Started by asking – what are the typical causes of project delays? • Developed a check-list • Scheduled meetings with RDC, project applicant, project sponsor, and others 4 Boldly go where no RDC has gone before!
  • 5. LOI Review Process Adoption  Year 1 – • SRDC and District 7 developed process and used it to review all projects  Year 2 – • Two area transportation partnerships used the process • SRDC pulled previously programmed projects into the process too Year 3 – • SRTS staff adopted several components of the process into their standalone process • Other ATPs expressed interest in the process  Year 4 – TBD, but likely more RDCs and ATPs will use a similar review process
  • 6. What does the LOI review process include? • At least one hour • All partners at the table • Listen to what the applicant wants to do • Take them through the check list Result: SRDC makes recommendations to strengthen the application Face-to-Face LOI Review
  • 7. Key Considerations Section 4(f) or Section 6(f) lands
  • 15. What issues do we usually catch? • Connections – connections – connections • Schools, sidewalks, street crossings, etc. • ADA design • Driveways, sidewalks • Other ROW owners (roads, properties) • Who is going to do the Preliminary Engineering and design • Budget Typical Findings
  • 16. Next Steps for Projects After the LOI review: • Applicants decides whether to continue to full application • Full application submitted • Area Transportation Partnership reviews applications • Funding awarded to selected projects 10/1/2015 4/15/2016 11/1/2015 12/1/2015 1/1/2016 2/1/2016 3/1/2016 4/1/2016 10/1/2015 - 10/30/2015 LOI Window 11/2/2015 - 11/13/2015 LOI Review Period 11/16/2015 - 1/8/2016 Application Window 1/11/2016 - 4/15/2016 ATPs Select Projects
  • 17. Is it working? • Better applications • Less time spent on applications for projects that aren’t ready • Improved project delivery – TBD (project’s under this process aren’t constructed yet) Benefits of the LOI Review Process

Hinweis der Redaktion

  1. 4 outcome objectives – transportation purpose, advance projects in plans, support SRTS, ensure project delivery
  2. 1 sentence description of the work for which you are seeking support: $$ requested from TAP: Total project $$. Explain the total estimated amount of financing needed. Include TAP request and other sources of financing, specifically how you will obtain the 20% match (100 words maximum): Project request type (capital, planning, both): Describe the work you want to do for which you are seeking TAP support. Provide a description of the project development activities for this project to date (250 words maximum): Describe how your project meets a transportation purpose (100 words max): List any adopted plans that your project has been identified in (statewide, regional, Safe Routes to School, Scenic Byways, etc.): Is the proposal an initiative of a local Safe Routes to School program?   Is the proposal located on a designated Scenic Byway? Yes/No Describe your organization and/or the sponsoring agency’s history with delivering Transportation Alternatives-type projects, including background working with federal funding requirements. If not applicable, identify the key steps and strategies that will be used to deliver the project (250 words maximum): Have you contacted representatives from the sponsoring agency, including elected officials and county engineers? If so, please describe what has resulted from this conversation and if you have written support for the project (50 words maximum):
  3. Connect to schedule a one hour meeting Provide electronic copy of LOI review questions Listen – is this at what stage are they in planning and development of the project? Is everyone on the same page? For one review I had 10 people at the table, county, city, school; and the school superintendent said he did not agree with the location of the project – a school board member took him out of the room and they returned about 5 minutes later – everyone agreed on the project. Planning? What plans – how much public involvement was there? TE Eligibility? Throughout you ask key questions to help them figure out who needs to take responsibility for what – in the application process, if they are funded who will take them through the development and construction of a federal project. Resolutions and Agreements? What is “required” and beyond – between applicant and sponsor. Where does the match come from? What if the project is more than estimates? Is there funds to pay that? ROW – always an issue Checklist – next page
  4. This slide for printed version