Suche senden
Hochladen
Heizer om10 ch03
•
4 gefällt mir
•
1,696 views
Rozaimi Mohd Saad
Folgen
Melden
Teilen
Melden
Teilen
1 von 18
Jetzt herunterladen
Downloaden Sie, um offline zu lesen
Empfohlen
Heizer om10 ch02
Heizer om10 ch02
Rozaimi Mohd Saad
Heizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programming
Rozaimi Mohd Saad
Heizer om10 ch04
Heizer om10 ch04
Rozaimi Mohd Saad
Heizer om10 ch07-process startegy
Heizer om10 ch07-process startegy
Rozaimi Mohd Saad
Heizer om10 ch14-mrp
Heizer om10 ch14-mrp
Rozaimi Mohd Saad
Heizer om10 ch01
Heizer om10 ch01
Rozaimi Mohd Saad
Heizer om10 ch05-designh good and services
Heizer om10 ch05-designh good and services
Rozaimi Mohd Saad
Heizer om10 ch07_s-capacity
Heizer om10 ch07_s-capacity
Rozaimi Mohd Saad
Empfohlen
Heizer om10 ch02
Heizer om10 ch02
Rozaimi Mohd Saad
Heizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programming
Rozaimi Mohd Saad
Heizer om10 ch04
Heizer om10 ch04
Rozaimi Mohd Saad
Heizer om10 ch07-process startegy
Heizer om10 ch07-process startegy
Rozaimi Mohd Saad
Heizer om10 ch14-mrp
Heizer om10 ch14-mrp
Rozaimi Mohd Saad
Heizer om10 ch01
Heizer om10 ch01
Rozaimi Mohd Saad
Heizer om10 ch05-designh good and services
Heizer om10 ch05-designh good and services
Rozaimi Mohd Saad
Heizer om10 ch07_s-capacity
Heizer om10 ch07_s-capacity
Rozaimi Mohd Saad
Heizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planning
Rozaimi Mohd Saad
Heizer om10 ch09-layout
Heizer om10 ch09-layout
Rozaimi Mohd Saad
Heizer om10 ch12-inventory
Heizer om10 ch12-inventory
Rozaimi Mohd Saad
Heizer om10 ch16-jit and lean operations
Heizer om10 ch16-jit and lean operations
Rozaimi Mohd Saad
Heizer om10 ch10-work design
Heizer om10 ch10-work design
Rozaimi Mohd Saad
Heizer om10 ch08-location
Heizer om10 ch08-location
Rozaimi Mohd Saad
Heizer om10 ch11_s-outsourching
Heizer om10 ch11_s-outsourching
Rozaimi Mohd Saad
Heizer om10 ch11-supply chain
Heizer om10 ch11-supply chain
Rozaimi Mohd Saad
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing quality
Rozaimi Mohd Saad
Heizer om10 ch17-maintenance and reliability
Heizer om10 ch17-maintenance and reliability
Rozaimi Mohd Saad
Heizer 10
Heizer 10
Rizwan Khurram
Heizer mod b
Heizer mod b
Rizwan Khurram
Heizer 13
Heizer 13
Rizwan Khurram
Heizer mod e
Heizer mod e
Rizwan Khurram
Heizer 01
Heizer 01
Rizwan Khurram
Heizer 04
Heizer 04
Rizwan Khurram
Heizer 16
Heizer 16
Rizwan Khurram
Heizer mod a
Heizer mod a
Rizwan Khurram
Heizer supp 11
Heizer supp 11
Rizwan Khurram
Heizer supp 06
Heizer supp 06
Rizwan Khurram
Heizer 03
Heizer 03
Rizwan Khurram
Heizer om10 ch11_r
Heizer om10 ch11_r
franchiskoli
Weitere ähnliche Inhalte
Was ist angesagt?
Heizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planning
Rozaimi Mohd Saad
Heizer om10 ch09-layout
Heizer om10 ch09-layout
Rozaimi Mohd Saad
Heizer om10 ch12-inventory
Heizer om10 ch12-inventory
Rozaimi Mohd Saad
Heizer om10 ch16-jit and lean operations
Heizer om10 ch16-jit and lean operations
Rozaimi Mohd Saad
Heizer om10 ch10-work design
Heizer om10 ch10-work design
Rozaimi Mohd Saad
Heizer om10 ch08-location
Heizer om10 ch08-location
Rozaimi Mohd Saad
Heizer om10 ch11_s-outsourching
Heizer om10 ch11_s-outsourching
Rozaimi Mohd Saad
Heizer om10 ch11-supply chain
Heizer om10 ch11-supply chain
Rozaimi Mohd Saad
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing quality
Rozaimi Mohd Saad
Heizer om10 ch17-maintenance and reliability
Heizer om10 ch17-maintenance and reliability
Rozaimi Mohd Saad
Heizer 10
Heizer 10
Rizwan Khurram
Heizer mod b
Heizer mod b
Rizwan Khurram
Heizer 13
Heizer 13
Rizwan Khurram
Heizer mod e
Heizer mod e
Rizwan Khurram
Heizer 01
Heizer 01
Rizwan Khurram
Heizer 04
Heizer 04
Rizwan Khurram
Heizer 16
Heizer 16
Rizwan Khurram
Heizer mod a
Heizer mod a
Rizwan Khurram
Heizer supp 11
Heizer supp 11
Rizwan Khurram
Heizer supp 06
Heizer supp 06
Rizwan Khurram
Was ist angesagt?
(20)
Heizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planning
Heizer om10 ch09-layout
Heizer om10 ch09-layout
Heizer om10 ch12-inventory
Heizer om10 ch12-inventory
Heizer om10 ch16-jit and lean operations
Heizer om10 ch16-jit and lean operations
Heizer om10 ch10-work design
Heizer om10 ch10-work design
Heizer om10 ch08-location
Heizer om10 ch08-location
Heizer om10 ch11_s-outsourching
Heizer om10 ch11_s-outsourching
Heizer om10 ch11-supply chain
Heizer om10 ch11-supply chain
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing quality
Heizer om10 ch17-maintenance and reliability
Heizer om10 ch17-maintenance and reliability
Heizer 10
Heizer 10
Heizer mod b
Heizer mod b
Heizer 13
Heizer 13
Heizer mod e
Heizer mod e
Heizer 01
Heizer 01
Heizer 04
Heizer 04
Heizer 16
Heizer 16
Heizer mod a
Heizer mod a
Heizer supp 11
Heizer supp 11
Heizer supp 06
Heizer supp 06
Andere mochten auch
Heizer 03
Heizer 03
Rizwan Khurram
Heizer om10 ch11_r
Heizer om10 ch11_r
franchiskoli
Chapter 3
Chapter 3
Ahmed Magdy
The Network Diagram and Critical Path
The Network Diagram and Critical Path
dmdk12
Heizer 07
Heizer 07
Rizwan Khurram
Network Problem CPM & PERT
Network Problem CPM & PERT
Pulchowk Campus
Constructing a network diagram
Constructing a network diagram
nelramlawy
Project management
Project management
bostonredsoxsux
Project management
Project management
Satish Yadavalli
Andere mochten auch
(9)
Heizer 03
Heizer 03
Heizer om10 ch11_r
Heizer om10 ch11_r
Chapter 3
Chapter 3
The Network Diagram and Critical Path
The Network Diagram and Critical Path
Heizer 07
Heizer 07
Network Problem CPM & PERT
Network Problem CPM & PERT
Constructing a network diagram
Constructing a network diagram
Project management
Project management
Project management
Project management
Ähnlich wie Heizer om10 ch03
360_ch03
360_ch03
ryaekle
Planning in management
Planning in management
DineshVeera5
Project management @ bec doms
Project management @ bec doms
Babasab Patil
13 project management
13 project management
Cynthia Adianti
Bechtel project planning example
Bechtel project planning example
asfandiyar
Pert techniques
Pert techniques
M Khairul Shaleh Md Asari
Qimonda Pm Foils
Qimonda Pm Foils
trahanr
Project Management C5 -scope_management
Project Management C5 -scope_management
Izah Asmadi
Into the Depths of OpenAccess - paper
Into the Depths of OpenAccess - paper
Tim55Ehrler
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
REDceo.net
best note.pptx
best note.pptx
DejeneDay
The Mathematics Behind Project Management
The Mathematics Behind Project Management
systred
111
111
Vadim Bogdanov PMP, PfMP, MVP, MCT, MCTS
Управление проектами: критический путь 2.0
Управление проектами: критический путь 2.0
Vadim Bogdanov PMP, PfMP, MVP, MCT, MCTS
A partial results from a PERT analysis for a project with 50 activit.pdf
A partial results from a PERT analysis for a project with 50 activit.pdf
rozakashif85
Conveyor Belt Project Report
Conveyor Belt Project Report
RISHABHSIINGH
PEPPOL Pilot Execution Guidelines
PEPPOL Pilot Execution Guidelines
Friso de Jong
Project mgt
Project mgt
Ngoc Dep
Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...
bkniffen
Microsoft EPM and Team Foundation Server [TFS]
Microsoft EPM and Team Foundation Server [TFS]
Jaiveer Singh
Ähnlich wie Heizer om10 ch03
(20)
360_ch03
360_ch03
Planning in management
Planning in management
Project management @ bec doms
Project management @ bec doms
13 project management
13 project management
Bechtel project planning example
Bechtel project planning example
Pert techniques
Pert techniques
Qimonda Pm Foils
Qimonda Pm Foils
Project Management C5 -scope_management
Project Management C5 -scope_management
Into the Depths of OpenAccess - paper
Into the Depths of OpenAccess - paper
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
best note.pptx
best note.pptx
The Mathematics Behind Project Management
The Mathematics Behind Project Management
111
111
Управление проектами: критический путь 2.0
Управление проектами: критический путь 2.0
A partial results from a PERT analysis for a project with 50 activit.pdf
A partial results from a PERT analysis for a project with 50 activit.pdf
Conveyor Belt Project Report
Conveyor Belt Project Report
PEPPOL Pilot Execution Guidelines
PEPPOL Pilot Execution Guidelines
Project mgt
Project mgt
Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...
Microsoft EPM and Team Foundation Server [TFS]
Microsoft EPM and Team Foundation Server [TFS]
Heizer om10 ch03
1.
10/16/2010
Project Management Outline 3 Global Company Profile: Bechtel Group The Importance of Project PowerPoint presentation to accompany Management Heizer and Render Operations Management, 10e Project Planning Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl The Project Manager Work Breakdown Structure Project Scheduling © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-1 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-2 Outline - Continued Outline - Continued Project Controlling Determining the Project Schedule Project Management Techniques: Forward Pass PERT and CPM Backward Pass The Framework of PERT and CPM Calculating Slack Time and Identifying the Critical Path(s) Network Diagrams and Approaches Activity-on-Node Example Variability in Activity Times Activity-on-Arrow Example Three Time Estimates in PERT Probability of Project Completion © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-3 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-4 Outline - Continued Learning Objectives Cost-Time Trade-Offs and Project When you complete this chapter you Crashing should be able to: A Critique of PERT and CPM 1. Use a Gantt chart for scheduling Using Microsoft Project to Manage 2. Draw AOA and AON networks 2 D d t k Projects 3. Complete forward and backward passes for a project 4. Determine a critical path © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-5 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-6 1
2.
10/16/2010
Learning Objectives Bechtel Projects When you complete this chapter you Building 26 massive distribution centers in just two years for the internet company Webvan should be able to: Group ($1 billion) 5. Calculate the variance of Constructing 30 high-security data centers activity times worldwide for Equinix, Inc. ($1.2 billion) Building and running a rail line between London 6. Crash a project and the Channel Tunnel ($4.6 billion) Developing an oil pipeline from the Caspian Sea region to Russia ($850 million) Expanding the Dubai Airport in the UAE ($600 million), and the Miami Airport in Florida ($2 billion) © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-7 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-8 Bechtel Projects Strategic Importance of Project Management Building liquid natural gas plants in Yemen $2 billion) and in Trinidad, West Indies ($1 billion) Bechtel Project Management: Building a new subway for Athens, Greece ($2.6 Iraq war aftermath billion) International workforce, construction Constructing a natural gas pipeline in Thailand professionals, cooks, medical personnel, ($700 million) security Building 30 plants for iMotors.com, a company Millions of tons of supplies that sells refurbished autos online ($300 million) Hard Rock Cafe Rockfest Project: Building a highway to link the north and south of 100,000 + fans Croatia ($303 million) planning began 9 months in advance © 2011 Pearson Education, Inc. publishing as Prentice Hall 3-9 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 10 Project Characteristics Examples of Projects Single unit Building Construction Many related activities Difficult production planning and inventory control General purpose equipment High labor skills Research Project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 11 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 12 2
3.
10/16/2010
Management of Projects Project Management Activities 1. Planning - goal setting, defining the Planning project, team organization Objectives Scheduling Project activities 2. Scheduling - relates people, money, Resources Start & end times and supplies to specific activities pp p Work break-down structure Network N t k and activities to each other Organization 3. Controlling - monitors resources, costs, quality, and budgets; revises plans and shifts resources to meet time and cost demands Controlling Monitor, compare, revise, action © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 14 Project Planning, Project Planning, Scheduling, and Controlling Scheduling, and Controlling Figure 3.1 Figure 3.1 Before Start of project During Before Start of project During project Timeline project project Timeline project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 15 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 16 Project Planning, Project Planning, Scheduling, and Controlling Scheduling, and Controlling Figure 3.1 Figure 3.1 Before Start of project During Before Start of project During project Timeline project project Timeline project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 17 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 18 3
4.
10/16/2010
Project Time/cost estimates Planning, Budgets Project Planning Scheduling, and Controlling Engineering diagrams Cash flow charts Material availability details Establishing objectives Defining project Budgets Delayed activities report Creating work Slack activities report breakdown structure b kd t t Determining CPM/PERT resources Gantt charts Milestone charts Forming organization Cash flow schedules Figure 3.1 Before Start of project During project Timeline project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 19 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 20 Project Organization Project Organization Works Best When Often temporary structure 1. Work can be defined with a specific goal and deadline Uses specialists from entire company 2. The job is unique or somewhat Headed by project manager unfamiliar to the existing organization Coordinates activities C di t ti iti 3. The work contains complex Monitors schedule interrelated tasks requiring specialized and costs skills Permanent 4. The project is temporary but critical to structure called the organization ‘matrix organization’ 5. The project cuts across organizational lines © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 21 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 22 A Sample Project Matrix Organization Organization Marketing Operations Engineering Finance President Project 1 Human Quality Resources Marketing Finance Design Production Mgt Project P j t2 Project 1 Project Manager Mechanical Test Technician Engineer Engineer Project 3 Project 2 Project Manager Electrical Computer Project 4 Engineer Engineer Technician Figure 3.2 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 23 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 24 4
5.
10/16/2010
The Role of The Role of the Project Manager the Project Manager Highly visible Highly visible Responsible for making sure that: Responsible for making sure that: should be: Project managers 1. All necessary activities are finished in order Good coaches 1. All necessary activities are finished in order and on time and on time Good communicators 2. The project comes in within budget 2. The project comesAble to organize activities in within budget 3. The project meets quality goals 3. The project meets from a variety of disciplines quality goals 4. The people assigned to the project receive 4. The people assigned to the project receive motivation, direction, and information motivation, direction, and information © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 25 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 26 Ethical Issues Work Breakdown Structure Project managers face many ethical decisions on a daily basis Level The Project Management Institute has established an ethical code to deal with 1. Project problems such as: 2. 2 Major tasks in the project 1. Offers of gifts from contractors 3. Subtasks in the major tasks 2. Pressure to alter status reports to mask delays 4. Activities (or work packages) 3. False reports for charges of time and expenses to be completed 4. Pressure to compromise quality to meet schedules © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 27 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 28 Work Breakdown Structure Project Scheduling Develop Windows 7 Level 1 1.0 Operating System Identifying precedence Level 2 Software Design 1.1 Project Management 1.2 System Testing 1.3 relationships Level 3 Develop 1.1.1 Planning 1.2.1 Module 1.3.1 Sequencing activities GUIs Testing Determining activity Ensure Compatibility with Earlier Versions 1.1.2 Cost/Schedule Management 1.2.2 Defect Testing 1.3.2 times & costs Level 4 Compatible with 1.1.2.1 Estimating material & (Work packages) Windows ME worker requirements Compatible with Windows Vista 1.1.2.2 Determining critical activities Compatible with Figure 3.3 Windows XP 1.1.2.3 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 29 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 30 5
6.
10/16/2010
Purposes of Project Scheduling Techniques Scheduling 1. Shows the relationship of each activity to 1. Ensure that all activities are planned others and to the whole project for 2. Identifies the precedence relationships 2. Their order of performance is among activities accounted for 3. Encourages the setting of realistic time 3. The activity time estimates are and cost estimates for each activity recorded 4. Helps make better use of people, money, 4. The overall project time is developed and material resources by identifying critical bottlenecks in the project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 31 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 32 Project Management A Simple Gantt Chart Techniques Gantt chart Time J F M A M J J A S Critical Path Method (CPM) Design es g Prototype Program Evaluation Test and Review Technique (PERT) Revise Production © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 33 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 34 Service For a Delta Jet Project Control Reports Deplaning Passengers Baggage Baggage claim Detailed cost breakdowns for each task Container offload Fueling Pumping Engine injection water Total program labor curves Cargo and mail Container offload Galley servicing Main cabin door Cost distribution tables Aft cabin door Lavatory servicing Drinking water Aft, center, forward Aft center for ard Loading Functional cost and hour summaries Cabin cleaning First-class section Economy section Raw materials and expenditure forecasts Cargo and mail Container/bulk loading Flight services Galley/cabin check Variance reports Receive passengers Operating crew Baggage Aircraft check Loading Time analysis reports Passengers Boarding 0 10 20 30 40 Work status reports Time, Minutes Figure 3.4 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 35 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 36 6
7.
10/16/2010
PERT and CPM Six Steps PERT & CPM Network techniques 1. Define the project and prepare the Developed in 1950’s work breakdown structure CPM by DuPont for chemical plants (1957) 2. Develop relationships among the PERT by Booz, Allen & Hamilton with the Booz U.S. Navy, for Polaris missile (1958) activities - d id which activities ti iti decide hi h ti iti must precede and which must Consider precedence relationships and interdependencies follow others Each uses a different estimate of 3. Draw the network connecting all of activity times the activities © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 37 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 38 Six Steps PERT & CPM Questions PERT & CPM Can Answer 4. Assign time and/or cost estimates to each activity 1. When will the entire project be completed? 5. Compute the longest time path through the network – thi is called th h th t k this i ll d 2. 2 What are the critical activities or tasks in the project? the critical path 3. Which are the noncritical activities? 6. Use the network to help plan, 4. What is the probability the project will be schedule, monitor, and control the completed by a specific date? project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 39 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 40 Questions PERT & CPM A Comparison of AON and Can Answer AOA Network Conventions Activity on Activity Activity on 5. Is the project on schedule, behind Node (AON) Meaning Arrow (AOA) schedule, or ahead of schedule? A comes before 6. Is the money spent equal to, less than, or y p q (a) A B C B, which comes greater than the budget? before C. b f C A B C A A 7. Are there enough resources available to A and B must both finish the project on time? (b) C be completed before C can start. C B B 8. If the project must be finished in a shorter B time, what is the way to accomplish this B and C cannot at least cost? (c) A begin until A is B completed. A C C © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 41 © 2011 Pearson Education, Inc. publishing as Prentice Hall Figure 3.5 3 - 42 7
8.
10/16/2010
A Comparison of AON and A Comparison of AON and AOA Network Conventions AOA Network Conventions Activity on Activity Activity on Activity on Activity Activity on Node (AON) Meaning Arrow (AOA) Node (AON) Meaning Arrow (AOA) C and D cannot A C begin until both g A C B and C cannot begin until A is (d) A and B are completed. D B D completed. A B D cannot begin A B D B D until both B and (f) C are completed. Dummy C cannot begin A dummy C C activity until both A and B activity is again A C are completed; D A C introduced in (e) cannot begin until Dummy activity AOA. B is completed. A B D dummy activity is introduced in AOA. B D © 2011 Pearson Education, Inc. publishing as Prentice Hall Figure 3.5 3 - 43 © 2011 Pearson Education, Inc. publishing as Prentice Hall Figure 3.5 3 - 44 AON Example AON Network for Milwaukee Paper Manufacturing's Milwaukee Paper Activities and Predecessors Immediate Activity Description Predecessors A Build internal components — Activity A A B Modify roof and floor y — (Build Internal Components) C Construct collection stack A D Pour concrete and install frame A, B Start E Build high-temperature burner C F Install pollution control system C Activity B Start B G Install air pollution device D, E (Modify Roof and Floor) Activity H Inspect and test F, G Table 3.1 Figure 3.6 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 45 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 46 AON Network for AON Network for Milwaukee Paper Milwaukee Paper Activity A Precedes Activity C F A C A C E Start Start H B D B D G Activities A and B Arrows Show Precedence Precede Activity D Figure 3.7 Relationships Figure 3.8 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 47 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 48 8
9.
10/16/2010
AOA Network for Determining the Project Milwaukee Paper Schedule Perform a Critical Path Analysis C 2 4 (Construct The critical path is the longest path Stack) through the network The critical path is the shortest time in 1 Dummy 6 H 7 which the project can be completed Activity (Inspect/ Test) Any delay in critical path activities delays the project 3 D 5 Critical path activities have no slack (Pour Concrete/ time Install Frame) Figure 3.9 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 49 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 50 Determining the Project Determining the Project Schedule Schedule Perform a Critical Path Analysis Perform a Critical Path Analysis Activity Description Time (weeks) Earliest start (ES) = earliest time at which an activity can A Build internal components 2 Activity Description assuming all predecessors(weeks) start, Time have B Modify roof and floor 3 A Build internal components p been completed 2 C Construct collection stack 2 EarliestB Modify roof and floor 3 finish (EF) = earliest time at which an activity can D Pour concrete and install frame 4 C be finished Construct collection stack 2 E Build high-temperature burner 4 Latest start (LS) =concrete and install frame D Pour latest time at which an activity can 4 F Install pollution control system 3 E Build high-temperature delay the completion start so as to not burner 4 G Install air pollution device 5 F Install time of the entire project pollution control system 3 H Inspect and test 2 Latest finish (LF) = latest time bydevice an activity has to G Install air pollution which 5 be finished so as to not delay the Total Time (weeks) 25 H Inspect and test 2 completion time of the entire project Total Time (weeks) 25 Table 3.2 Table 3.2 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 51 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 52 Determining the Project Forward Pass Schedule Begin at starting event and work forward Perform a Critical Path Analysis Activity Name Earliest Start Time Rule: or Symbol If an activity has only a single immediate A Earliest predecessor, its ES equals the EF of the d it l th f th Earliest ES EF Finish predecessor Start If an activity has multiple immediate predecessors, its ES is the maximum of Latest LS LF Latest all the EF values of its predecessors Start 2 Finish ES = Max {EF of all immediate predecessors} Figure 3.10 Activity Duration © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 53 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 54 9
10.
10/16/2010
Forward Pass ES/EF Network for Milwaukee Paper Begin at starting event and work forward Earliest Finish Time Rule: ES EF = ES + Activity time The earliest finish time (EF) of an activity Start is th i the sum of its earliest start ti f it li t t t time (ES) 0 0 and its activity time 0 EF = ES + Activity time © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 55 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 56 ES/EF Network for ES/EF Network for Milwaukee Paper Milwaukee Paper EF of A = A ES ES of A + 2 0 2 of A A 2 EF of B = 0 2 ES ES of B + 3 0 Start 0 0 Start 0 of B B 0 0 0 3 2 3 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 57 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 58 ES/EF Network for ES/EF Network for Milwaukee Paper Milwaukee Paper A C A C 0 2 2 4 0 2 2 4 2 2 2 2 Start Start 0 0 0 0 = Max (2, 3) D 0 0 3 7 B B 0 3 0 3 3 3 4 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 59 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 60 10
11.
10/16/2010
ES/EF Network for ES/EF Network for Milwaukee Paper Milwaukee Paper A C A C F 0 2 2 4 0 2 2 4 4 7 2 2 2 2 3 Start Start E H 0 0 0 0 4 8 13 15 0 0 4 2 B D B D G 0 3 3 7 0 3 3 7 8 13 3 4 3 4 5 Figure 3.11 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 61 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 62 Backward Pass Backward Pass Begin with the last event and work backwards Begin with the last event and work backwards Latest Finish Time Rule: Latest Start Time Rule: If an activity is an immediate predecessor The latest start time (LS) of an activity is for just f j t a single activity, its LF equals the i l ti it it l th the diff th difference of it l t t finish time (LF) f its latest fi i h ti LS of the activity that immediately follows it and its activity time If an activity is an immediate predecessor to more than one activity, its LF is the minimum of all LS values of all activities LS = LF – Activity time that immediately follow it LF = Min {LS of all immediate following activities} © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 63 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 64 LS/LF Times for LS/LF Times for Milwaukee Paper Milwaukee Paper A C F A C F 0 2 2 4 4 7 0 2 2 4 4 7 10 13 2 2 3 2 2 3 Start E H Start E H 0 0 0 0 4 8 13 15 LF = Min(LS of 4 8 13 15 13 15 following activity) 13 15 0 4 2 0 4 2 B LS = LF – Activity time D G B D G 0 3 3 7 8 13 0 3 3 7 8 13 3 4 5 LF = EF 3 4 5 of Project © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 65 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 66 11
12.
10/16/2010
LS/LF Times for LS/LF Times for Milwaukee Paper LF = Min(4, 10) Milwaukee Paper A C F A C F 0 2 2 4 4 7 0 2 2 4 4 7 2 4 10 13 0 2 2 4 10 13 2 2 3 2 2 3 Start E H Start E H 0 0 4 8 13 15 0 0 4 8 13 15 4 8 13 15 0 0 4 8 13 15 0 4 2 0 4 2 B D G B D G 0 3 3 7 8 13 0 3 3 7 8 13 8 13 1 4 4 8 8 13 3 4 5 3 4 5 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 67 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 68 Computing Slack Time Computing Slack Time After computing the ES, EF, LS, and LF times Earliest Earliest Start Finish Latest Start Latest Finish Slack On Critical for all activities, compute the slack or free Activity ES EF LS LF LS – ES Path time for each activity A 0 2 0 2 0 Yes B 0 3 1 4 1 No Slack is the length of time an activity can C 2 4 2 4 0 Yes be delayed without delaying the entire D 3 7 4 8 1 No project E 4 8 4 8 0 Yes F 4 7 10 13 6 No Slack = LS – ES or Slack = LF – EF G 8 13 8 13 0 Yes H 13 15 13 15 0 Yes Table 3.3 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 69 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 70 Critical Path for ES – EF Gantt Chart Milwaukee Paper for Milwaukee Paper 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A C F 0 2 2 4 4 7 A Build internal components 0 2 2 4 10 13 2 2 3 B Modify roof and floor C Construct collection Start E H stack 0 0 4 8 13 15 D Pour concrete and 13 15 install frame 0 0 4 8 0 4 2 E Build high- temperature burner B D G F Install pollution 0 3 3 7 8 13 control system 1 4 4 8 8 13 G Install air pollution 3 4 5 device H Inspect and test © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 71 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 72 12
13.
10/16/2010
LS – LF Gantt Chart Variability in Activity Times for Milwaukee Paper 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 CPM assumes we know a fixed time A Build internal components estimate for each activity and there B Modify roof and floor C Construct collection is no variability in activity times stack D Pour concrete and PERT uses a probability distribution install frame E Build high- for activity times to allow for temperature burner variability F Install pollution control system G Install air pollution device H Inspect and test © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 73 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 74 Variability in Activity Times Variability in Activity Times Estimate follows beta distribution Three time estimates are required Expected time: Optimistic time (a) – if everything t = (a + 4m + b)/6 g goes according to plan g p Variance of times: V i f ti Pessimistic time (b) – assuming very unfavorable conditions v = [(b – a)/6]2 Most likely time (m) – most realistic estimate © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 75 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 76 Variability in Activity Times Computing Variance Most Expected Estimate follows beta distribution Optimistic Likely Pessimistic Time Variance Activity a m b t = (a + 4m + b)/6 [(b – a)/6]2 Expected time: Figure 3.12 A 1 2 3 2 .11 t = (a + 4m + b)/6 B 2 3 4 3 .11 Variance of ti V i Probabilityfoftimes: 1 in 100 of Probability C 1 2 3 2 .11 Probability < a occurring v = [(b − a)/6]2 of 1 in 100 of [(b D 2 4 6 4 .44 > b occurring E 1 4 7 4 1.00 F 1 2 9 3 1.78 Activity G 3 4 11 5 1.78 Time H 1 2 3 2 .11 Optimistic Most Likely Pessimistic Time (a) Time (m) Time (b) Table 3.4 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 77 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 78 13
14.
10/16/2010
Probability of Project Probability of Project Completion Completion Project variance is computed by Project variance is computed by summing the variances of critical summing the variances of critical activities Project variance activities σ2 = .11 + .11 + 1.00 + 1.78 + .11 = 3 11 11 11 1 00 1 78 11 3.11 σp = Project variance 2 p = ∑(variances of activities on critical path) Project standard deviation σp = Project variance = 3.11 = 1.76 weeks © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 79 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 80 Probability of Project Probability of Project Completion Completion PERT makes two more assumptions: Standard deviation = 1.76 weeks Total project completion times follow a normal probability distribution Activity times are statistically independent 15 Weeks (Expected Completion Time) Figure 3.13 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 81 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 82 Probability of Project Probability of Project Completion Completion From Appendix I What is the probability this project can What is the probability this project can .00 .01 .07 .08 be completed on or before the 16 week be completed on or before the 16 week .1 .50000 .50399 .52790 .53188 deadline? deadline? .53983 .54380 .2 .56749 .57142 Z = due – expected date /σp .5 = due − expected date /σp Z.69146 .69497 .71566 .71904 date of completion date of completion .6 .72575 .72907 .74857 .75175 = (16 wks – 15 wks)/1.76 = (16 wks − 15 wks)/1.76 = 0.57 Where Z is the number of = 0.57 Where Z is the number of standard deviations the due standard deviations the due date or target date lies from date or target date lies from the mean or expected date the mean or expected date © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 83 © 2011 Pearson Education, Inc. publishing as Prentice Hall 3 - 84 14