SAP AT CO OPERATIVE BULK HANDLING LTD. (CBH)<br />The Company<br />Co-operative Bulk Handling Limited (CBH), Perth, Australia.<br />Company website: http://www.cbh.com.au/<br />Co-operative bulk handling ltd. (CBH) based in Perth, Western Australia, stores, transports and markets more than 10 million tonnes of grain annually, some 40 percent of Australia’s total production. CBH is controlled over by 5700 grower shareholders, and exports around 95 percent of the grain tonnage it produces to more than 20 countries.<br />The Problem/Situation<br />Strategic diversification through corporate acquisitions, development of enhanced services for growers and closer integration with world markets lead to considerable increases in workload for the IT infrastructure. In parallel with these changes, senior management took the opportunity to review business processes, looking in particular for efficiencies and cost savings.<br />With almost 200 grain receival points, twelve administration offices, four ports and 19 million tonnes of total storage capacity, managing the logistics alone is a complex business. The company turned to automation whenever possible to increase efficiency and productivity, to help control staff costs and enhance its ability to respond quickly to customers’ needs.<br />The Solution and Implementation  <br />From 1998, CBH has been SAP R/3 applications (on IBM AS/400 servers using DB2) for up to 900 users to run the business, combined with specific grain-handling and administrative systems at multiple sites. Since practically all operations touched SAP applications at some point, the company settled on SAP software as one of the strategic foundations for CBH. The IT team reviewed the total cost of ownership, likely new functionality and workload requirements, and the design of new IT infrastructure with the goal of increasing processing efficiency and response times, laying the foundation for future process improvements, finding way to include and automate workflow processes. The company also wanted to speed up the internal information flow to exploit existing resources more efficiently by removing delays and, by lessening the administrative workload the employees could be released for doing more productive, customer-facing tasks.<br />Attracted by the advanced functionality contained in my SAP ERP software, CBH turned to W.J.Moncrieff, an IBM business partner and to IBM itself, to create and delay an IT infrastructure that would meet the company’s flexibility, scalability and cost-efficiency requirement.<br />CBH selected Intel Xeon MP EM64T processor-based IBM eServer xSeries model x366 servers, developing eight systems to run the new SAP applications and associated database. Chips based on the Intel EM64T architecture can run as true 64-bit processors, addressing up to 1 TB of physical memory, and or in 32-bit ‘legacy’ mode, with the usual 4 GB limit of addressable memory.  The EM64T architecture allows multiple 32-bit applications each to access up to 4 GB physical memory, delivering significant potential performance improvements.<br />SAP software has been able for some time to address more than 4 GB of memory and the Intel EM64T architecture enables the SAP applications to do so on the Intel platform. CBH currently runs in ‘legacy’ mode, but will be able to switch to 64-bit mode if performance requirements increase.<br />CBH also implemented a new storage area network based around an IBM Total Storage DS4300 storage system. The IBM DS4300 storage system can scale to more than 33 TB physical capacity and provides enterprise scale capabilities at low total costs of ownership, offering economical and scalable storage for growing application needs.<br />Since R/3 was running on AS/400, the initial challenge was to migrate to the Windows environment. With more than 200 existing IBM Intel based servers already in the business, CBH expects to gain considerable cost benefits by standardizing on a single environment for its main line of business applications. The company now runs or plans to run financials, controlling, human resources, payroll, maintenance, procurement, sales and distribution, and project management applications.<br />As the migration to the new my SAP ERP software is completed, the CBH team is looking to exploit the portal services available with SAP Netweaver. Both the IBM x366 servers and DS4300 storage system are ideally suited to this addition of workload, making capacity addition a business –as usual task at cost effective price points. With the my SAP ERP applications, CBH also plans to introduce SAP Netweaver@Business Intelligence, a component of the SAP Netweaver platform. <br />The Benefits<br />The new system improved the processing speeds by about 90%. Transactions that took more than 45 minute to run could be completed in less than 5 minutes offering significant savings in the time and productivity boots for a 900 user base. With my SAP ERP, CBH has the potential to take advantage of automated report generation and delivery, with on-screen acceptance and approval that has embedded workflows. Should a piece of equipment be in a maintenance program and therefore affect production planning, managers can see the status, approve necessary actions and make informed decisions without the delays that would occur if they were reliant on praperwork circulating through the company. The new system also lowered system administration workload and costs and improved the ability to introduce enhanced reporting services to 5700 grain-grower shareholder and international customers.<br />With the CBM personnel portal CBH personnel will be able to self serve their personal details, such as address changes and intranet pages, view payroll data and book holiday periods, accessing the personnel application directly.<br />Sources<br />1, Co-operative Bulk Handling Limited (http://www.cbh.com.au/index.html)<br />2, IBM (http://www-306.ibm.com/)<br />3, Lansa (http://www.lansa.com)<br />
Erp case study

Weitere ähnliche Inhalte

Was ist angesagt?

ERP Implementation Failure Case Study
ERP Implementation Failure Case StudyERP Implementation Failure Case Study
ERP Implementation Failure Case StudyYuvraj Zala
 
Erp case study
Erp case studyErp case study
Erp case studyUMaine
 
ERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola HellenicERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola HellenicStathis Simeonidis
 
Hershey's case study.: ERP Implementation Failure
Hershey's case study.: ERP Implementation FailureHershey's case study.: ERP Implementation Failure
Hershey's case study.: ERP Implementation Failuresadia butt
 
ERP Implementation Failure with example of Hershey and HP
ERP Implementation Failure with example of Hershey and HPERP Implementation Failure with example of Hershey and HP
ERP Implementation Failure with example of Hershey and HPSamanway Bera
 
Top 6 Factors for ERP Success
Top 6 Factors for ERP SuccessTop 6 Factors for ERP Success
Top 6 Factors for ERP SuccessCasey Cramer
 
A Successful ERP Implementation in an Ethiopian Company
A Successful ERP Implementation in an Ethiopian CompanyA Successful ERP Implementation in an Ethiopian Company
A Successful ERP Implementation in an Ethiopian CompanyMayuree Srikulwong
 
Erp case study on tata steel
Erp case study on tata steelErp case study on tata steel
Erp case study on tata steelmohammed kazi
 
ERP Project: Implementation Failure in HP
ERP Project: Implementation Failure in HPERP Project: Implementation Failure in HP
ERP Project: Implementation Failure in HPGunjan Kalita
 
ERP implementation Failure at Hershey Food Corperation
ERP implementation Failure at Hershey Food CorperationERP implementation Failure at Hershey Food Corperation
ERP implementation Failure at Hershey Food CorperationOlivier Tisun
 
Use of enterprise resource planning(erp) in food industry
Use of enterprise resource planning(erp) in food industry Use of enterprise resource planning(erp) in food industry
Use of enterprise resource planning(erp) in food industry food tech blog
 
ERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management SystemERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management SystemSharad Srivastava
 
Erp in cadbury
Erp in cadburyErp in cadbury
Erp in cadburyaman963
 
Erp implementation failuer at hp
Erp implementation failuer at hpErp implementation failuer at hp
Erp implementation failuer at hpAqib Khan
 
ERP Case Study - Failure case - FoxMeyer Case
ERP Case Study - Failure case - FoxMeyer CaseERP Case Study - Failure case - FoxMeyer Case
ERP Case Study - Failure case - FoxMeyer CaseShaunak Sontakke
 
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...Software AG
 

Was ist angesagt? (20)

Hul
HulHul
Hul
 
ERP Implementation Failure Case Study
ERP Implementation Failure Case StudyERP Implementation Failure Case Study
ERP Implementation Failure Case Study
 
Erp case study
Erp case studyErp case study
Erp case study
 
ERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola HellenicERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola Hellenic
 
Hershey's case study.: ERP Implementation Failure
Hershey's case study.: ERP Implementation FailureHershey's case study.: ERP Implementation Failure
Hershey's case study.: ERP Implementation Failure
 
k11922 opc
k11922 opck11922 opc
k11922 opc
 
ERP Implementation Failure with example of Hershey and HP
ERP Implementation Failure with example of Hershey and HPERP Implementation Failure with example of Hershey and HP
ERP Implementation Failure with example of Hershey and HP
 
Top 6 Factors for ERP Success
Top 6 Factors for ERP SuccessTop 6 Factors for ERP Success
Top 6 Factors for ERP Success
 
A Successful ERP Implementation in an Ethiopian Company
A Successful ERP Implementation in an Ethiopian CompanyA Successful ERP Implementation in an Ethiopian Company
A Successful ERP Implementation in an Ethiopian Company
 
Erp case study on tata steel
Erp case study on tata steelErp case study on tata steel
Erp case study on tata steel
 
ERP Project: Implementation Failure in HP
ERP Project: Implementation Failure in HPERP Project: Implementation Failure in HP
ERP Project: Implementation Failure in HP
 
ERP implementation Failure at Hershey Food Corperation
ERP implementation Failure at Hershey Food CorperationERP implementation Failure at Hershey Food Corperation
ERP implementation Failure at Hershey Food Corperation
 
Use of enterprise resource planning(erp) in food industry
Use of enterprise resource planning(erp) in food industry Use of enterprise resource planning(erp) in food industry
Use of enterprise resource planning(erp) in food industry
 
Erp success of dabur
Erp success of daburErp success of dabur
Erp success of dabur
 
ERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management SystemERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management System
 
Erp in cadbury
Erp in cadburyErp in cadbury
Erp in cadbury
 
Final erp ppt
Final erp pptFinal erp ppt
Final erp ppt
 
Erp implementation failuer at hp
Erp implementation failuer at hpErp implementation failuer at hp
Erp implementation failuer at hp
 
ERP Case Study - Failure case - FoxMeyer Case
ERP Case Study - Failure case - FoxMeyer CaseERP Case Study - Failure case - FoxMeyer Case
ERP Case Study - Failure case - FoxMeyer Case
 
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
The Coca-Cola Company: BPM in the Context of Global ERP (Enterprise Resource ...
 

Ähnlich wie Erp case study

Pushing new industry standards with Sap Hana
Pushing new industry standards with Sap HanaPushing new industry standards with Sap Hana
Pushing new industry standards with Sap HanaAnkit Bose
 
Sap at co operative bulk handling ltd
Sap at co operative bulk handling ltdSap at co operative bulk handling ltd
Sap at co operative bulk handling ltdAnjali Gupta
 
The IBM and SAP Partnership
The IBM and SAP PartnershipThe IBM and SAP Partnership
The IBM and SAP PartnershipthinkASG
 
Disaster Recovery for SAP HANA with SUSE Linux
Disaster Recovery for SAP HANA with SUSE LinuxDisaster Recovery for SAP HANA with SUSE Linux
Disaster Recovery for SAP HANA with SUSE LinuxDirk Oppenkowski
 
Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...
Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...
Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...Amazon Web Services
 
SAP HANA with SGI Solution Brief
SAP HANA with SGI Solution BriefSAP HANA with SGI Solution Brief
SAP HANA with SGI Solution BriefJosh Goergen
 
Grupo hefame SAP HANA on POWER - IBM
Grupo hefame SAP HANA on POWER -  IBMGrupo hefame SAP HANA on POWER -  IBM
Grupo hefame SAP HANA on POWER - IBMDiego Alberto Tamayo
 
PMC - SAPInsider Magazine
PMC - SAPInsider MagazinePMC - SAPInsider Magazine
PMC - SAPInsider MagazineAdhir Mattu
 
Blogthetech why are companies investing billions in sap implementation
Blogthetech why are companies investing billions in sap implementationBlogthetech why are companies investing billions in sap implementation
Blogthetech why are companies investing billions in sap implementationHarryJake1
 
Acantho improves services and boosts energy savings
Acantho improves services and boosts  energy savingsAcantho improves services and boosts  energy savings
Acantho improves services and boosts energy savingsIBM India Smarter Computing
 
Servium Freshen Up with NextGen Proliant
Servium Freshen Up with NextGen ProliantServium Freshen Up with NextGen Proliant
Servium Freshen Up with NextGen ProliantServium
 
Pneuhage improves control and visibility of stock levels
Pneuhage improves control and visibility of stock levelsPneuhage improves control and visibility of stock levels
Pneuhage improves control and visibility of stock levelsIBM India Smarter Computing
 
SAP HANA on IBM Power Systems
SAP HANA on IBM Power SystemsSAP HANA on IBM Power Systems
SAP HANA on IBM Power SystemsthinkASG
 
Lenovo -- Geared up for global growth with streamlined supply chain operations
Lenovo -- Geared up for global growth with streamlined supply chain operationsLenovo -- Geared up for global growth with streamlined supply chain operations
Lenovo -- Geared up for global growth with streamlined supply chain operationsLenovo Data Center
 
SAP migration and integration success
SAP migration and integration successSAP migration and integration success
SAP migration and integration successVivian Yang Shic
 

Ähnlich wie Erp case study (20)

Pushing new industry standards with Sap Hana
Pushing new industry standards with Sap HanaPushing new industry standards with Sap Hana
Pushing new industry standards with Sap Hana
 
L&T–CASE engineers faster production
L&T–CASE engineers faster productionL&T–CASE engineers faster production
L&T–CASE engineers faster production
 
Spc03570 usen
Spc03570 usenSpc03570 usen
Spc03570 usen
 
AriZona Beverage Company sucess case
AriZona Beverage Company sucess caseAriZona Beverage Company sucess case
AriZona Beverage Company sucess case
 
Sap at co operative bulk handling ltd
Sap at co operative bulk handling ltdSap at co operative bulk handling ltd
Sap at co operative bulk handling ltd
 
The IBM and SAP Partnership
The IBM and SAP PartnershipThe IBM and SAP Partnership
The IBM and SAP Partnership
 
Disaster Recovery for SAP HANA with SUSE Linux
Disaster Recovery for SAP HANA with SUSE LinuxDisaster Recovery for SAP HANA with SUSE Linux
Disaster Recovery for SAP HANA with SUSE Linux
 
Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...
Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...
Best Practices for Running SAP HANA Workloads with EC2 - August 2016 Monthly ...
 
SAP HANA with SGI Solution Brief
SAP HANA with SGI Solution BriefSAP HANA with SGI Solution Brief
SAP HANA with SGI Solution Brief
 
Grupo hefame SAP HANA on POWER - IBM
Grupo hefame SAP HANA on POWER -  IBMGrupo hefame SAP HANA on POWER -  IBM
Grupo hefame SAP HANA on POWER - IBM
 
PMC - SAPInsider Magazine
PMC - SAPInsider MagazinePMC - SAPInsider Magazine
PMC - SAPInsider Magazine
 
Blogthetech why are companies investing billions in sap implementation
Blogthetech why are companies investing billions in sap implementationBlogthetech why are companies investing billions in sap implementation
Blogthetech why are companies investing billions in sap implementation
 
Acantho improves services and boosts energy savings
Acantho improves services and boosts  energy savingsAcantho improves services and boosts  energy savings
Acantho improves services and boosts energy savings
 
Servium Freshen Up with NextGen Proliant
Servium Freshen Up with NextGen ProliantServium Freshen Up with NextGen Proliant
Servium Freshen Up with NextGen Proliant
 
Pneuhage improves control and visibility of stock levels
Pneuhage improves control and visibility of stock levelsPneuhage improves control and visibility of stock levels
Pneuhage improves control and visibility of stock levels
 
Balu sap ibm retail
Balu sap ibm retailBalu sap ibm retail
Balu sap ibm retail
 
SAP HANA on IBM Power Systems
SAP HANA on IBM Power SystemsSAP HANA on IBM Power Systems
SAP HANA on IBM Power Systems
 
SAP HANA on POWER9 systems
SAP HANA on POWER9 systemsSAP HANA on POWER9 systems
SAP HANA on POWER9 systems
 
Lenovo -- Geared up for global growth with streamlined supply chain operations
Lenovo -- Geared up for global growth with streamlined supply chain operationsLenovo -- Geared up for global growth with streamlined supply chain operations
Lenovo -- Geared up for global growth with streamlined supply chain operations
 
SAP migration and integration success
SAP migration and integration successSAP migration and integration success
SAP migration and integration success
 

Erp case study

  • 1. SAP AT CO OPERATIVE BULK HANDLING LTD. (CBH)<br />The Company<br />Co-operative Bulk Handling Limited (CBH), Perth, Australia.<br />Company website: http://www.cbh.com.au/<br />Co-operative bulk handling ltd. (CBH) based in Perth, Western Australia, stores, transports and markets more than 10 million tonnes of grain annually, some 40 percent of Australia’s total production. CBH is controlled over by 5700 grower shareholders, and exports around 95 percent of the grain tonnage it produces to more than 20 countries.<br />The Problem/Situation<br />Strategic diversification through corporate acquisitions, development of enhanced services for growers and closer integration with world markets lead to considerable increases in workload for the IT infrastructure. In parallel with these changes, senior management took the opportunity to review business processes, looking in particular for efficiencies and cost savings.<br />With almost 200 grain receival points, twelve administration offices, four ports and 19 million tonnes of total storage capacity, managing the logistics alone is a complex business. The company turned to automation whenever possible to increase efficiency and productivity, to help control staff costs and enhance its ability to respond quickly to customers’ needs.<br />The Solution and Implementation <br />From 1998, CBH has been SAP R/3 applications (on IBM AS/400 servers using DB2) for up to 900 users to run the business, combined with specific grain-handling and administrative systems at multiple sites. Since practically all operations touched SAP applications at some point, the company settled on SAP software as one of the strategic foundations for CBH. The IT team reviewed the total cost of ownership, likely new functionality and workload requirements, and the design of new IT infrastructure with the goal of increasing processing efficiency and response times, laying the foundation for future process improvements, finding way to include and automate workflow processes. The company also wanted to speed up the internal information flow to exploit existing resources more efficiently by removing delays and, by lessening the administrative workload the employees could be released for doing more productive, customer-facing tasks.<br />Attracted by the advanced functionality contained in my SAP ERP software, CBH turned to W.J.Moncrieff, an IBM business partner and to IBM itself, to create and delay an IT infrastructure that would meet the company’s flexibility, scalability and cost-efficiency requirement.<br />CBH selected Intel Xeon MP EM64T processor-based IBM eServer xSeries model x366 servers, developing eight systems to run the new SAP applications and associated database. Chips based on the Intel EM64T architecture can run as true 64-bit processors, addressing up to 1 TB of physical memory, and or in 32-bit ‘legacy’ mode, with the usual 4 GB limit of addressable memory. The EM64T architecture allows multiple 32-bit applications each to access up to 4 GB physical memory, delivering significant potential performance improvements.<br />SAP software has been able for some time to address more than 4 GB of memory and the Intel EM64T architecture enables the SAP applications to do so on the Intel platform. CBH currently runs in ‘legacy’ mode, but will be able to switch to 64-bit mode if performance requirements increase.<br />CBH also implemented a new storage area network based around an IBM Total Storage DS4300 storage system. The IBM DS4300 storage system can scale to more than 33 TB physical capacity and provides enterprise scale capabilities at low total costs of ownership, offering economical and scalable storage for growing application needs.<br />Since R/3 was running on AS/400, the initial challenge was to migrate to the Windows environment. With more than 200 existing IBM Intel based servers already in the business, CBH expects to gain considerable cost benefits by standardizing on a single environment for its main line of business applications. The company now runs or plans to run financials, controlling, human resources, payroll, maintenance, procurement, sales and distribution, and project management applications.<br />As the migration to the new my SAP ERP software is completed, the CBH team is looking to exploit the portal services available with SAP Netweaver. Both the IBM x366 servers and DS4300 storage system are ideally suited to this addition of workload, making capacity addition a business –as usual task at cost effective price points. With the my SAP ERP applications, CBH also plans to introduce SAP Netweaver@Business Intelligence, a component of the SAP Netweaver platform. <br />The Benefits<br />The new system improved the processing speeds by about 90%. Transactions that took more than 45 minute to run could be completed in less than 5 minutes offering significant savings in the time and productivity boots for a 900 user base. With my SAP ERP, CBH has the potential to take advantage of automated report generation and delivery, with on-screen acceptance and approval that has embedded workflows. Should a piece of equipment be in a maintenance program and therefore affect production planning, managers can see the status, approve necessary actions and make informed decisions without the delays that would occur if they were reliant on praperwork circulating through the company. The new system also lowered system administration workload and costs and improved the ability to introduce enhanced reporting services to 5700 grain-grower shareholder and international customers.<br />With the CBM personnel portal CBH personnel will be able to self serve their personal details, such as address changes and intranet pages, view payroll data and book holiday periods, accessing the personnel application directly.<br />Sources<br />1, Co-operative Bulk Handling Limited (http://www.cbh.com.au/index.html)<br />2, IBM (http://www-306.ibm.com/)<br />3, Lansa (http://www.lansa.com)<br />