Boost Fertility New Invention Ups Success Rates.pdf
August 2012 Ur-Energy Corporate Presentation
1. NYSE MKT: URG TSX: URE
Ur-Energy is an Advanced Pre-Production
g p y
Junior Mining Company
Focused on development of low-cost
uranium production properties in the
United States
Corporate Objectives:
Lost Creek Development
Resource Growth
Strategic Opportunities
Corporate Presentation
August 2012
2. Disclaimer
This presentation contains “forward-looking statements,” within the meaning of applicable securities laws, regarding events or conditions that
p g , g pp , g g
may occur in the future. Such statements include without limitation the long term effects on the uranium market of events in Japan in 2011
including supply and demand projections; the Company’s timeframe for events leading to and culminating in the commencement of production at
Lost Creek (including procurement, construction); the technical and economic viability of the Lost Creek Project (including the projections
contained in the preliminary analysis of economics of the Lost Creek Project); receipt of (and related timing of) Record of Decision from the U.S.
Bureau of Land Management related to Lost Creek; timing and completion of closing of the Pathfinder transaction; the ability to complete
additional favorable uranium sales agreements and ability to reduce exposure to volatile market; the potential of exploration targets throughout
the Lost Creek Property; and the further exploration, development and permitting of exploration projects including Lost Soldier, the Nebraska
p p y,
property, Screech Lake and, following a closing, at PMC projects; and whether a re-rating of the Company will occur as production nears. These
, g g, p j ; g p y p
statements are based on current expectations that, while considered reasonable by management at this time, inherently involve a number of
significant business, economic and competitive risks, uncertainties and contingencies. Numerous factors could cause actual events to differ
materially from those in the forward-looking statements. Factors that could cause such differences, without limiting the generality of the following,
include: risks inherent in exploration activities; volatility and sensitivity to market prices for uranium; volatility and sensitivity to capital market
fluctuations; the impact of exploration competition; the ability to raise funds through private or public equity financings; imprecision in resource
and reserve estimates; environmental and safety risks including increased regulatory burdens; unexpected geological or hydrological conditions;
a possible deterioration in political support for nuclear energy; changes in government regulations and policies, including trade laws and policies;
demand for nuclear power; weather and other natural phenomena; delays in obtaining or failures to obtain required governmental, environmental
p ; p ; y g q g ,
or other project approvals; and other exploration, development, operating, financial market and regulatory risks. Although Ur-Energy Inc.
believes that the assumptions inherent in the forward-looking statements are reasonable, undue reliance should not be placed on these
statements, which only apply as of the date of this presentation. Ur-Energy Inc. disclaims any intention or obligation to update or revise any
forward-looking statement, whether as a result of new information, future events or otherwise.
Cautionary Note Regarding Projections: Similarly, this presentation also may contain projections relating to an extended future period and,
accordingly, the estimates and assumptions underlying the projections are inherently highly uncertain, based on events that have not taken
place, and are subject to significant economic, financial, regulatory, competitive and other uncertainties and contingencies beyond the control of
Ur-Energy Inc. Further, given the nature of the Company's business and industry that is subject to a number of significant risk factors, there can
be no assurance that the projections can be or will be realized. It is probable that the actual results and outcomes will differ, possibly materially,
from those projected.
The attention of investors is drawn to the Risk Factors set out in the Company's Annual Information Form and Annual Report on Form 40-F,
dated March 2, 2012, which are filed, respectively, with the regulatory authorities in Canada on SEDAR and with the U.S. Securities and
Exchange Commission on EDGAR. (www.sedar.com and http://www.sec.gov/edgar.shtml)
Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources: the information presented uses
the terms "measured", "indicated" and "inferred" mineral resources. United States investors are advised that while such terms are recognized
and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. United States
investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral
reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically
or legally minable.
John Cooper, Ur-Energy Project Geologist, P.Geo. and SME Registered Member, and Qualified Person as defined by National
Instrument 43-101, and Catherine Bull, Ur-Energy Project Engineer, Wyoming P.E., and Qualified Person as defined by the NI 43-101,
reviewed and approved the technical information contained in this presentation.
2 NYSE MKT: URG TSX: URE
3. Ur-Energy At A Glance
R R ti is Likely in 2012 as URG Nears Production
Re-Rating i Lik l i N P d ti
Advanced Pre-Production Project at Lost Creek, Wyoming
One regulatory approval remaining
l l
Construction anticipated to commence this summer
First production forecast for mid-2013
Expanding resources Through Acquisition and Exploration
Definitive agreement to acquire Pathfinder Mines Corporation
Continued expansion of the Lost Creek Property
Secure Future Revenue Stream Through Sales Agreements
Strong Balance Sheet
See Disclaimer re Forward-looking Statements and Projections (slide 2)
3 NYSE MKT: URG TSX: URE
4. Ur-Energy’s Market Position
Share Capital & Cash Position NYSE MKT URG
MKT:
As of 07/26/12
Shares Outstanding 121.1M
Stock Options & RSUs 8.0M
Fully Dil t d
F ll Diluted 129.1M
129 1M
Market Cap (08/08/12) C$112.78M
Cash (06/30/12) C$35.7M
Debt $0
Cash per share (06/30/12) ~C$0.295
Share price (08/08/12) C$0.93
52 Week Range C$.74 - $1.63
Avg. Daily Volume ~626,000 TSX:
TSX URE
(3-mo URG & URE 08/08/12)
Member of S&P/TSX SmallCap Index
Geographical Distribution as of 6/30/12
United States ~46%
Canada ~40%
Other 14%
~14%
See Disclaimer re Forward-looking Statements and Projections (slide 2)
4 NYSE MKT: URG TSX: URE
5. Analyst Coverage
United States
Roth Capital Partners Michael Legg (New York, NY) 1 646 358 1917
Canada
Dundee Securities David A. Talbot (Toronto, ON) 1 416-350-3082
Haywood Securities Colin Healey (Vancouver, BC) 1 604-697-7400
Raymond James David Sadowski (Vancouver, BC) 1 604-659-8255
RBC Capital Adam Schatzker (Toronto, ON) 1 416-842-7850
Ur-Energy Inc. is followed by the analysts listed above. This list, including the firms and individual analysts at these firms, is subject
to change at any time without notice. Please note that any opinions, estimates, forecasts, conclusions or recommendations
regarding Ur-Energy Inc. performance made by these analysts are theirs alone and do not represent opinions, estimates, forecasts,
conclusions, recommendations or predictions of Ur-Energy Inc. or its management. Ur-Energy Inc. does not by its reference above
or in any other manner imply its endorsement of or concurrence with such information, conclusions or recommendations.
5 NYSE MKT: URG TSX: URE
6. Experienced Management Team
Board of Directors
Executive Directors
Wayne W. Heili, President & Chief Executive Officer (Metallurgical Engineer)
y , ( g g )
Jeffrey T. Klenda*, Board Chairman, Executive Director (Mining Finance)
Non-Executive Directors
W. William Boberg*, Former President & CEO (Professional Geologist)
James M. Franklin*, Chair-Technical Committee (Professional Geologist)
Paul Macdonell*, Chair-Compensation and Corp. Governance & Nominating Committees
(Senior Federal Mediator)
Thomas H. Parker, Chair-Audit Committee (Professional Engineer)
Officers
Roger L. Smith, Chief Financial Officer & Chief Administrative Officer(CPA & MBA)
Steven M. Hatten, VP Operations (Mining Engineer)
John W. Cash, VP Regulatory Affairs, Exploration & Geology (Geologist & Geophysicist)
Penne A. Goplerud, Corporate Secretary & General Counsel (JD)
* Founding Directors
6 NYSE MKT: URG TSX: URE
7. Industry Leading Team
Highly Experienced Technical and Management
Professionals
113 Years of Direct Uranium Production Experience
ISR operations experience – Nebraska, Texas & Wyoming
7 NYSE MKT: URG TSX: URE
8. Nuclear Markets Remain Positive
J
Japan restarting after t
t ti ft two months without nuclear power
th ith t l
Ohi Units 3 and 4 reactors resumed operation in July
US NRC approved four new construction & operation licenses this
year (2012)
First nuclear power plant licenses in 30+ years
HEU Agreement to expire next year
Provides 13% of world and 45% of US annual supply
63 new reactors under construction
t d t ti
Russia, China and India represent 50% of new builds and have
reaffirmed support for nuclear power
Saudi Arabia & the United Kingdom combined have announced
plans to build 24 new reactors
See Disclaimer re Forward-looking Statements and Projections (slide 2)
8 NYSE MKT: URG TSX: URE
9. Growth of Nuclear Will Continue
Historically, growth of nuclear power continued despite major accidents
Growth expected to continue beyond Fukushima at 10 reactors per year
10 years, 10.2
reactors per
t
year
eactors
22 years, 4
reactors per
year
Number of Re
8 years, 21.9
reactors per
yea
year
Fukushima
13 years,
11.3reactors Chernobyl
per year
Three Mile Island
Source: World Nuclear Association See Disclaimer re Forward-looking Statements and Projections (slide 2)
9 NYSE MKT: URG TSX: URE
10. The US Uranium Market
The US mines produce ~ 4M lbs of uranium/yr1
p /y
The US utilities consume 55M lbs of uranium/yr1
October 2011 Nuclear Energy Institute survey shows two-thirds of Americans
support nuclear energy
Ur-Energy is well positioned to capitalize on this opportunity
See Disclaimer re Forward-looking Statements and Projections (slide 2) 1 – U.S. Energy Information Administration
10 NYSE MKT: URG TSX: URE
11. Sound Marketing Strategy
B l i t t i d
Balancing strategic and
economic benefits of the
spot/term price ratio
p p
De-risking by securing future
revenue stream in an uncertain
market
Securing pricing that supports
development plans for the Lost
Creek Project
Four term contracts secured with North American utilities
F t t t d ith N th A i tiliti
Exclusive representation by NuCore Energy, LLC in off-take
purchase agreement negotiations
See Disclaimer re Forward-looking Statements and Projections (slide 2)
11 NYSE MKT: URG TSX: URE
15. The Lost Creek Property
Upgrade to the NI 43-101 Mineral Resource Estimate on the Lost
Creek Property (as of April 30, 2012 PEA)
Measured: 4.20 Mlbs eU3O8 (in 3.85 Mt @ 0.055%)
Indicated: 4.15 Mlbs eU3O8 (in 3.96 Mt @ 0.053%)
Inferred: 2.87 Mlbs eU3O8 (in 2.99 Mt @ 0.049%)
* Based on grade cutoff of 0.02% eU3O8 and a GT cutoff of 0.3
Updated technical report includes new
claims and upgraded resources
Exploration targets within the Lost
Creek Project and adjoining projects
provide potential of additional
resources U3O8
Lost Creek Project – 4 254 permit acres
4,254
Adjoining Projects – ~39,000 acres
Many of these exploration targets remain conceptual in nature. There has been
y p g p
insufficient exploration to define mineral resource estimates at all such
exploration targets. It is uncertain if further exploration will result in the
additional target areas being delineated as further mineral resource.
See Disclaimer re Forward-looking Statements and Projections (slide 2)
15 NYSE MKT: URG TSX: URE
16. Lost Creek
Adjacent to Rio Tinto Sweetwater Mine Complex
(NRC licensed conventional uranium mill)
JK
NYSE Amex: URG TSX: URE
17. 2012 Property Acquisition
Asset Exchange
Added ~5,250 acres
No Cash Cost
Additional ~250 new mining claims staked
Resource gain (as of April 30, 2012 PEA)
30
Measured: 1.26 Mlbs eU3O8 (in 1.16 Mt @ 0.054%)
Indicated: 1.33 Mlbs eU3O8 (in 1.55 Mt @ 0.043%)
Inferred: 0.85 Mlbs eU3O8 (in 0.93 Mt @ 0.048%)
*B
Based on grade cutoff of 0.02% eU3O8 and a GT cutoff of 0.3
d d t ff f 0 02% U d t ff f 0 3
Ur-Energy possesses ~1,100 holes of
historic drill data on new lands
Properties directly adjacent to Lost Creek
Project boundaries
See Disclaimer re Forward-looking Statements and Projections (slide 2)
17 NYSE MKT: URG TSX: URE
18. Preliminary Economic Assessment
April 30, 2012 PEA* Updates Resources and Economics
Mineral Resource Increase from February 2012 PEA
45% Increase in Measured and Indicated Resources
42% Increase in Inferred Resources
Estimates Operating Costs at US$16.12/lb
US$16 12/lb
Lowest quartile of all uranium producers
Project Internal Rate of Return (IRR) at 87%
Pre-Production Capital Costs of Only US$31.6M Remaining
Lowest quartile of all developing uranium production facilities
Extended Life f Mi t 8 10
E t d d Lif of Mine to 8-10 years
* Preliminary Economic Assessment of the Lost Creek Property, Sweetwater
County, Wyoming Prepared by Ur-Energy Inc. – (April 30, 2012)
(posted on SEDAR and EDGAR)
Cautionary Statement: This PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have the economic
y p y , p g g y
considerations applied to them that would enable them to be categorized as mineral reserves. The estimated mineral recovery used in this PEA is based on both site-specific
laboratory recovery data as well as URE personnel and industry experience at similar facilities. There can be no assurance that recovery at this level will be achieved.
See Disclaimer re Forward-looking Statements and Projections (slide 2)
18 NYSE MKT: URG TSX: URE
19. US$27M in CapEx Completed
Mine Units 1 & 2 Delineated
MU #1 Monitor Well Ring Completed
Plant Engineering Completed
Drilled and Tested Class I UIC
Well
W ll
Ordered Key Plant Equipment Ur-Energy’s Ion Exchange Columns
Ion Exchange & Elution Columns
g
Filter Presses
Process Tanks
Reverse Osmosis
Design/Build of Header House
Building
Interior of Ur-Energy’s Prototype Header House
19 NYSE MKT: URG TSX: URE
20. Lost Creek Path to Production
Licenses and Permits Received
US NRC License
Wyoming DEQ Permit to Mine – Includes Approval of First Mine Unit
WDEQ Class I UIC Permit (water disposal well)
EPA Aquifer Exemption
One Remaining Regulatory Approval Needed
g g y pp
US Bureau of Land Management Plan of Operations
Draft EIS Published April 27, 2012
Record of Decision anticipated summer 2012
Construction: 6-9 month build-out
First Production
Planned for second quarter next year
Ramp-up to 1 million pound per year production rate
See Disclaimer re Forward-looking Statements and Projections (slide 2)
20 NYSE MKT: URG TSX: URE
21. Pathfinder Mines Corporation
PMC h ld U E
holds Ur-Energy’s N t P d ti
’ Next Production C t
Center
Definitive Purchase Agreement
with Cogema Resources signed
in July, 2012 PATHFINDER
Includes Shirley Basin & Lucky
Mc projects located in historic
uranium production centers
Over 71 million pounds U3O8
produced by PMC
d db
PMC’s extensive exploration
database included
Purchase Price: US$13.25 million
Transaction expected to close in first quarter of 2013
See Disclaimer re Forward-looking Statements and Projections (slide 2)
21 NYSE MKT: URG TSX: URE
22. Shirley Basin Property Snapshot
Located in the Historic Shirley Basin Mining District
Historic estimate of remaining resources: >10 million lbs
U3O8*
High grade roll front deposit: average 0.21% U3O8
Based on historic reports and drilling results*
Uranium resources can be converted to NI 43-101 compliant
Shallow, ISR amenable mineralization
Main mineral trend located on patented mining claims
Low holding costs and free of royalty interests
Brownfield property with existing infrastructure, permits and
licenses
Licensed ISR by-product disposal facility
*Ur-Energy is not treating the historic reports as current mineral resources or mineral reserves, because a Qualified
Person has not yet conducted sufficient work to classify the estimates as such.
See Disclaimer re Forward-looking Statements and Projections (slide 2)
22 NYSE MKT: URG TSX: URE
23. Lucky Mc Property Snapshot
Located in the Historic Gas Hills Uranium Mining District
Historic estimate of remaining resources: 4.7 million lbs
U3O8*
Based on historic reports and drilling results*
Uranium resources can be converted to NI 43-101 compliant
Low holding costs
Resources on patented mining claims and state leases
Complete reclamation in all past mining areas
Permitted for open pit mining
Strategic
St t i opportunities with nearby d
t iti ith b developers
l
*Ur-Energy is not treating the historic reports as current mineral resources or mineral reserves, because a Qualified
Person has not yet conducted sufficient work to classify the estimates as such.
See Disclaimer re Forward-looking Statements and Projections (slide 2)
23 NYSE MKT: URG TSX: URE
24. Future Growth Opportunities
Resource Expansion Through Ongoing Exploration Efforts
Increase minable resources that will be accessible to the Lost
Creek processing plant
p gp
Exploration properties in Western Nebraska
Growth in Production Profile
Development of second production site at Shirley Basin
Proven acquisition strategy with focus on production potential
Monetizing Historic Exploration Databases
Strategic Alliance Opportunities
g pp
For both exploration and production projects
See Disclaimer re Forward-looking Statements and Projections (slide 2)
24 NYSE MKT: URG TSX: URE
25. Lost Soldier – 12.2M M&I lbs U3O8
Can be Licensed with NRC as Amendment to Lost Creek License
NI 43-101 Resource | July 2006
Measured & Indicated: 12.2 Mlbs eU3O8
(in 9.4 Mt @ 0.065%)
Inferred: 1.8 Mlbs eU3O8
(in1.6 Mt @ 0.055%)
M & I Resource average GT of 1 1
1.1
(17.2 ft @ 0.065% U3O8)
Shallow: 240 feet deep
Over 3,700 drill holes define deposit
(Technical Report on the Lost Soldier Project, Wyoming, C. Stewart Wallis, Roscoe Postle Associates Inc., July 10, 2006 - Posted on SEDAR)
See Disclaimer re Forward-looking Statements and Projections (slide 2)
25 NYSE MKT: URG TSX: URE
26. Screech Lake, Thelon Basin, NWT
C l t d A di M t t ll i G h i lS
Completed Audio-Magnetotelluric Geophysical Survey,
and Soil Gas Hydrocarbon and Enzyme Leach Soil
Geochemistry Analyses to Better Define Drill Targets
y y g
MegaTEM Survey
Screech
Lake
See Disclaimer re Forward-looking Statements and Projections (slide 2) 0 4
Kilometers
26 NYSE MKT: URG TSX: URE
27. Ur-Energy – Right Now!
G
Growth O i t d T h i l & Management Team
th Oriented Technical M tT
Strong Balance Sheet
C$35.7 Million (06/30/11)
Advanced Pre-Production Project at Lost Creek
Low-cost uranium production center
Plant construction planned to begin summer 2012
Signed Multiple Long-Term Uranium Sales Agreements
Reducing Company exposure to volatile marketplace
Re-rating Likely as Ur-Energy Nears Production
See Disclaimer re Forward-looking Statements and Projections (slide 2)
27 NYSE MKT: URG TSX: URE
28. Re-Rating Potential
Stage
St EV/Lb
URG Upside vs. Producers Producers $4.61
3X (+$3.58/Lb)
(+$3 58/Lb) URG $1.03
$1 03
Source: Dundee (July 10, 2012)
As Ur-Energy
Nears Production, ,
Re-rating is Likely
See Disclaimer re Forward-looking Statements and Projections (slide 2)
28 NYSE MKT: URG TSX: URE
29. Ur-Energy’s News Flow
Final Regulatory Approval
BLM decision expected summer 2012
Construction at Lost Creek Project
Summer 2012
Expanding Resources
Acquisition
Exploration
See Disclaimer re Forward-looking Statements and Projections (slide 2)
29 NYSE MKT: URG TSX: URE
30. Ur-Energy - The Right People. The Right Projects. Right Now.
For more information, please contact:
Wayne Heili, President, Chief Executive Officer & Director
Jeff Klenda Board Chairman & Director
Klenda,
Rich Boberg, Director of Public Relations
By Mail: Ur-Energy
Ur Energy Corporate Office
10758 W. Centennial Rd., Ste. 200
Littleton, CO 80127 USA
By Phone: Office (720) 981-4588
981 4588
Toll-Free (866) 981-4588
Fax (720) 981-5643
By E-mail: wayne.heili@ur-energyusa.com
jeff.klenda@ur-energyusa.com
rich.boberg@ur-energyusa.com
30 NYSE MKT: URG TSX: URE
NYSE Amex:URG TSX: URE