1. CLIENT
PROJECT
Fiberpipe Hamon Daelim
1 Verification of DN 900 spools
All spool pieces of DN 900 is available as per
the drawing.
2
Verification of smaller
diameter spool pieces
All are as per the drawing and the requirement.
3 Bonding material at the inside
Specification states that extra material should
be there to identify the completeness of the
bonding.
4 Shortage of spool pieces Shortage will be re-supplied.
5
Shortage of nut-bolts (331
pcs)
Shortage will be re-supplied.
6 Outside bonding material
The outside material is technically correct as it
indicates complete bonding of the joints..
7 Repair procedure for removal
of the bonding material at the
inside.
Repairing at the inside is not advisable and it
may invoke cracks in the cured bondings. Any
extra material will be removed by the flow at
the initial testing of the spool pieces and the
spool becomes sychronised with the system.
Repair procedure will be submitted
Invoice will be raised
Invoice will be raised
SITE INSPECTION REPORT
DAELIM dated-05/02/2015 to 06/02/2015
FRP SPOOLS FOR FGD SYSTEM FOR O MON TPP
Sl
No
Description Observation Position
Signatures if closed