CLIENT
PROJECT
Fiberpipe Hamon Daelim
1 Verification of DN 900 spools
All spool pieces of DN 900 is available as per
the drawing.
2
Verification of smaller
diameter spool pieces
All are as per the drawing and the requirement.
3 Bonding material at the inside
Specification states that extra material should
be there to identify the completeness of the
bonding.
4 Shortage of spool pieces Shortage will be re-supplied.
5
Shortage of nut-bolts (331
pcs)
Shortage will be re-supplied.
6 Outside bonding material
The outside material is technically correct as it
indicates complete bonding of the joints..
7 Repair procedure for removal
of the bonding material at the
inside.
Repairing at the inside is not advisable and it
may invoke cracks in the cured bondings. Any
extra material will be removed by the flow at
the initial testing of the spool pieces and the
spool becomes sychronised with the system.
Repair procedure will be submitted
Invoice will be raised
Invoice will be raised
SITE INSPECTION REPORT
DAELIM dated-05/02/2015 to 06/02/2015
FRP SPOOLS FOR FGD SYSTEM FOR O MON TPP
Sl
No
Description Observation Position
Signatures if closed

Weitere ähnliche Inhalte

Andere mochten auch

Full House Inspections Sample Report
Full House Inspections Sample ReportFull House Inspections Sample Report
Full House Inspections Sample Report
Justin Macduff
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
Maria Archana
 

Andere mochten auch (12)

Schindler’s house
Schindler’s houseSchindler’s house
Schindler’s house
 
Full House Inspections Sample Report
Full House Inspections Sample ReportFull House Inspections Sample Report
Full House Inspections Sample Report
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 
Quality control in construction site
Quality control in construction siteQuality control in construction site
Quality control in construction site
 
Analysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteAnalysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concrete
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Project proposal
Project proposalProject proposal
Project proposal
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
Site visit report
Site visit reportSite visit report
Site visit report
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 

Mehr von Rentu Philipose (11)

Tees
TeesTees
Tees
 
Reducers
ReducersReducers
Reducers
 
Pipes
PipesPipes
Pipes
 
Galvanised flange
Galvanised flangeGalvanised flange
Galvanised flange
 
Elbows 2
Elbows   2Elbows   2
Elbows 2
 
Elbows 1
Elbows   1Elbows   1
Elbows 1
 
Eccentric reducer with dual flange
Eccentric reducer with dual flangeEccentric reducer with dual flange
Eccentric reducer with dual flange
 
Couplings
CouplingsCouplings
Couplings
 
Concentric reducer with dual flange
Concentric reducer with dual flangeConcentric reducer with dual flange
Concentric reducer with dual flange
 
Collar
CollarCollar
Collar
 
Blind flange
Blind flangeBlind flange
Blind flange
 

Kürzlich hochgeladen

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Kürzlich hochgeladen (20)

Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 

Site inspection report

  • 1. CLIENT PROJECT Fiberpipe Hamon Daelim 1 Verification of DN 900 spools All spool pieces of DN 900 is available as per the drawing. 2 Verification of smaller diameter spool pieces All are as per the drawing and the requirement. 3 Bonding material at the inside Specification states that extra material should be there to identify the completeness of the bonding. 4 Shortage of spool pieces Shortage will be re-supplied. 5 Shortage of nut-bolts (331 pcs) Shortage will be re-supplied. 6 Outside bonding material The outside material is technically correct as it indicates complete bonding of the joints.. 7 Repair procedure for removal of the bonding material at the inside. Repairing at the inside is not advisable and it may invoke cracks in the cured bondings. Any extra material will be removed by the flow at the initial testing of the spool pieces and the spool becomes sychronised with the system. Repair procedure will be submitted Invoice will be raised Invoice will be raised SITE INSPECTION REPORT DAELIM dated-05/02/2015 to 06/02/2015 FRP SPOOLS FOR FGD SYSTEM FOR O MON TPP Sl No Description Observation Position Signatures if closed