“REBO terminal Oostende, the ideal hub
for offshore wind activities in the North Sea”
easyaccess|priorityforoffshoreinstallationvessels|nolocks | >150.000m²installation&storagearea | dedicatedO&M | pontoons
201405
www.reboostende.be
REBO is ...
a good location for actual and future wind farms in a 200
km radius.
REBO transformed ...
the port of Oostende into an offshore terminal for
handling, storage, assembling and transportation of
present and future offshore components and structures.
REBO aims ...
at specialized project developers, manufacturers and
contractors in the offshore energy sector.
REBO offers ...
127 hectares: 4 sites (Zeewezendok, Halve Maan,
Visserijdok, Vlotdok).
800 m adapted heavy quay capacity up to 20 T/m².
prepared surfaces over 10 T/m² for storage of
foundations, nacelles, hubs, towers and blades.
fully equipped offices, covered and open storage
possibilities for project management and O&M.
a dedicated team to help project developers and
suppliers with their activity in the energy port of
Oostende.
offshore support services.public
private
SHARE HOLDERS
REBO: Renewable Energy Base Oostende
www.reboostende.be
15%
15%
15%
15%
40%
200 km
map: La Tene maps
EASY ACCESS
The Port of Oostende, situated in Europe’s
busiest maritime area (51°14’ N - 2° 56’ E), is
a versatile short sea port.
It can accommodate all types of coastal
maritime traffic, including RORO, bulk and
project cargo. In addition to its seaport,
Oostende is also home to an international
freight and passenger airport.
The multi-modal function is further
emphasized by the presence of
comprehensive railroad infrastructure, of a
canal leading up to the European inland
waterway network and of course the
motorway A10-E40 linked directly to the port
terminals.
ENERGY PORT OOSTENDE
The port has recently been modernised in
both infrastructure and organisation and is
now the leading force in the industrialisation
of the hinterland.
The port gives priority to vessels active for
the offshore wind industry.
CITY
Oostende is a medium-sized Belgian city,
which has all the assets of a large town.
image
arrival of blades for C-Power wind farm, by
bardge and by road
www.portofoostende.be
www.visitoostende.be
MultitechCMI
office
Falck
Fabricom
pontoon
Multitech
grindbed
new
H
20T/m²
Alstom
Parkwind
Senvion
GeoSea
ReboB
Flansea
C-Power
crew changes
& refueling
E40 - Brussels
VLOTDOK
VISSERIJDOK
ZEEWEZENDOK
HALVE
M
AAN
HAVENGEUL
sanitarycomplex
Vestas
OOSTENDE
ZEEBRUGGE
ZONES RESERVED
FOR WIND FARMS
29 km
Thorntonbank
Blighbank
Lodewijkbank
NORTHER: 350 MW
TOTAL: 2 120 MW
C-POWER: 325 MW
RENTEL: 288 - 312 MW
NORTHWIND: 216 MW
SEASTAR: 246 - 432 MW
BELWIND: 330 MW
449 -
490 MW
MERMAID
NORTHWESTERN II
72 x
41-62 x
24 x
36-78 x
49-73 x
20 x
55 x
30 x
NORTH SEA
connection to Oostende
connection to Zeebrugge
future Stevin connection
Halve maan
- site prepared for offshore
wind works
- surface: 5 ha
- quay length: 100 m
- quay capacity: 10 T/m²
- draught: -8 TAW
Zeewezendok
- site prepared for offshore
wind works
- surface: 10-15 ha
- quay length: 600 m
- quay capacity:
4 T/m² to 20 T/m²
- draught: - 8m TAW
Vlotdok
- site prepared for 		
berthing & refueling
- length: 800 m
berthing places
Visserijdok
- terminal extension area
- surface: 7 ha
assembly & storage area with direct access to open sea
offices & storage
assembly & storage area behind the locks
BELGIAN WIND FARMS The wind farms in the North Sea
make an important contribution
to achieving the Belgian
renewable energy targets. The
various offshore wind farms
(once fully operational) have an
installed capacity of some 2,200
MW and an annual electricity
output of 7,700,000 MWH.
This is equivalent to:
- 9% of total electricity
consumption in Belgium (80 85
TWh)
- 46% of Belgian households
- All necessary energy for the 66
largest cities of Belgium (5.082
million inhabitants).
Besides supply, offshore wind
in Belgium creates direct and
indirect jobs (+ / - 20,000 jobs) in
an innovative technology with
export potential. Belgium is, to
installed capacity (380 MW),
currently among the European
top three in the offshore wind
business.
operational
ongoing
in preparation
503
502
602
603
604
605
501
FUTURE
FUTURE
FUTURE
FUTURE
INSTALLATION
Rebo terminal in the port of Oostende is ideal for installation of windmills because:
... easy access by road, by railway, by vessel
... 127 ha available in the port of Oostende for renewable energy activities
… quays with a capacity able to handle from 4T/m2
to 20 T/m2
… 10 Ha of terminal surfaces (with heavy lift capacity) and with capacity of extension
... the port gives priority to vessels active for the offshore wind industry
operations & maintenance
The Rebo terminal is equiped with:
- 4 pontoons and 2 cranes for service vessels
- technical services: welding, construction, diving works, offshore transport & crew, ....
www.multitech-oostende.be
- storage, offices & sanitary complex for crew changes
- easy and fast access to open sea on site infrastructure & services for O&M
NEW & RENOVATED OFFICES
renewable energy companies present in Oostende
Falck Safety Services - Cofely FabricomSenvion - Technum - OWA - Flidar - eCoast
MHI Vestas - Alstom - Parkwind - GeoSea
REFERENCES
C-Power I - construction (Halve Maan)
C-Power II & III- construction (Zeewezendok)
C-Power I - operational (6 x Senvion 5 MW)
©C-PowerN.V.,fotograafTomD’Haenens©C-PowerN.V.,fotograafTomD’Haenens
C-Power II & III - operational (48 x Senvion 6 MW)
©Northwind
©Belwind
Alstom Haliade 6MW - construction
(Zeewezendok)
Northwind - under construction
(72 x MHI Vestas 3 MW)
Belwind - operational
(55 x MHI Vestas 3 MW)
REBO nv
Slijkensesteenweg 2
BE 8400 Oostende
+32 59 34 07 11
www.reboostende.be
twitter: @reboostende
Emmanuël Timmermans
e.timmermans@reboostende.be
+ 32 475 42 48 85
©RobertPirotte

Weitere ähnliche Inhalte

Was ist angesagt?

Els encant , barcelona, spain
Els encant , barcelona, spainEls encant , barcelona, spain
Els encant , barcelona, spainshubham harlalka
 
7 simon brett - port of hull
7   simon brett - port of hull7   simon brett - port of hull
7 simon brett - port of hulljohannaparans
 
Ufa - the importance of heritage in contemporary developments
Ufa - the importance of heritage in contemporary developmentsUfa - the importance of heritage in contemporary developments
Ufa - the importance of heritage in contemporary developmentsLAZOVOY
 
Development Series: Greater Manchester Update - Tony Skipper, 5plus Architects
Development Series: Greater Manchester Update - Tony Skipper, 5plus ArchitectsDevelopment Series: Greater Manchester Update - Tony Skipper, 5plus Architects
Development Series: Greater Manchester Update - Tony Skipper, 5plus ArchitectsPlace North West
 

Was ist angesagt? (6)

Els encant , barcelona, spain
Els encant , barcelona, spainEls encant , barcelona, spain
Els encant , barcelona, spain
 
7 simon brett - port of hull
7   simon brett - port of hull7   simon brett - port of hull
7 simon brett - port of hull
 
Ufa - the importance of heritage in contemporary developments
Ufa - the importance of heritage in contemporary developmentsUfa - the importance of heritage in contemporary developments
Ufa - the importance of heritage in contemporary developments
 
CURRICULIM VITAE
CURRICULIM VITAECURRICULIM VITAE
CURRICULIM VITAE
 
Development Series: Greater Manchester Update - Tony Skipper, 5plus Architects
Development Series: Greater Manchester Update - Tony Skipper, 5plus ArchitectsDevelopment Series: Greater Manchester Update - Tony Skipper, 5plus Architects
Development Series: Greater Manchester Update - Tony Skipper, 5plus Architects
 
Gothic Revival
Gothic RevivalGothic Revival
Gothic Revival
 

Andere mochten auch

REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15 reboostende
 
Rebo general 2015-05-04
Rebo general 2015-05-04Rebo general 2015-05-04
Rebo general 2015-05-04reboostende
 
Masterplan Energy Port Oostende - 2014-03-25
Masterplan Energy Port Oostende - 2014-03-25Masterplan Energy Port Oostende - 2014-03-25
Masterplan Energy Port Oostende - 2014-03-25reboostende
 
REBO unloading-components-roro 2014-10-02
REBO unloading-components-roro 2014-10-02REBO unloading-components-roro 2014-10-02
REBO unloading-components-roro 2014-10-02reboostende
 
Technical specifications Port of Oostende
Technical specifications Port of OostendeTechnical specifications Port of Oostende
Technical specifications Port of Oostendereboostende
 
Slide dlgs 28/2011 - Lezione 1
Slide dlgs 28/2011 - Lezione 1Slide dlgs 28/2011 - Lezione 1
Slide dlgs 28/2011 - Lezione 1Andrea Bernardi
 
Beeldende Kunst aan Zee - 1e biënnale - editie 2014
Beeldende Kunst aan Zee - 1e biënnale - editie 2014Beeldende Kunst aan Zee - 1e biënnale - editie 2014
Beeldende Kunst aan Zee - 1e biënnale - editie 2014reboostende
 
Rotary Kunst aan Zee catalogus 2016
Rotary Kunst aan Zee catalogus 2016Rotary Kunst aan Zee catalogus 2016
Rotary Kunst aan Zee catalogus 2016reboostende
 
Rebo installation vessels 2014-07
Rebo installation vessels 2014-07Rebo installation vessels 2014-07
Rebo installation vessels 2014-07reboostende
 
Energy Port Oostende CHINESE version 2014-06
Energy Port Oostende CHINESE version 2014-06Energy Port Oostende CHINESE version 2014-06
Energy Port Oostende CHINESE version 2014-06reboostende
 
Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07reboostende
 
Libretto di impianto dpr 74 2013 v.3
Libretto di impianto dpr 74 2013 v.3Libretto di impianto dpr 74 2013 v.3
Libretto di impianto dpr 74 2013 v.3Andrea Bernardi
 
Impianti termici alimentati da biomasse (sotto i 35kW)
Impianti termici alimentati da biomasse (sotto i 35kW)Impianti termici alimentati da biomasse (sotto i 35kW)
Impianti termici alimentati da biomasse (sotto i 35kW)Andrea Bernardi
 
ecobuilding - teambuilding - rebo - eventmosaic
ecobuilding - teambuilding - rebo - eventmosaicecobuilding - teambuilding - rebo - eventmosaic
ecobuilding - teambuilding - rebo - eventmosaicreboostende
 
Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102
Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102
Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102Andrea Bernardi
 
Novità Terzo responsabile - 2014 maggio
Novità Terzo responsabile - 2014 maggioNovità Terzo responsabile - 2014 maggio
Novità Terzo responsabile - 2014 maggioAndrea Bernardi
 

Andere mochten auch (18)

Asthma
AsthmaAsthma
Asthma
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15
 
Rebo general 2015-05-04
Rebo general 2015-05-04Rebo general 2015-05-04
Rebo general 2015-05-04
 
Masterplan Energy Port Oostende - 2014-03-25
Masterplan Energy Port Oostende - 2014-03-25Masterplan Energy Port Oostende - 2014-03-25
Masterplan Energy Port Oostende - 2014-03-25
 
REBO unloading-components-roro 2014-10-02
REBO unloading-components-roro 2014-10-02REBO unloading-components-roro 2014-10-02
REBO unloading-components-roro 2014-10-02
 
Technical specifications Port of Oostende
Technical specifications Port of OostendeTechnical specifications Port of Oostende
Technical specifications Port of Oostende
 
Slide dlgs 28/2011 - Lezione 1
Slide dlgs 28/2011 - Lezione 1Slide dlgs 28/2011 - Lezione 1
Slide dlgs 28/2011 - Lezione 1
 
Beeldende Kunst aan Zee - 1e biënnale - editie 2014
Beeldende Kunst aan Zee - 1e biënnale - editie 2014Beeldende Kunst aan Zee - 1e biënnale - editie 2014
Beeldende Kunst aan Zee - 1e biënnale - editie 2014
 
Rotary Kunst aan Zee catalogus 2016
Rotary Kunst aan Zee catalogus 2016Rotary Kunst aan Zee catalogus 2016
Rotary Kunst aan Zee catalogus 2016
 
Rebo installation vessels 2014-07
Rebo installation vessels 2014-07Rebo installation vessels 2014-07
Rebo installation vessels 2014-07
 
Energy Port Oostende CHINESE version 2014-06
Energy Port Oostende CHINESE version 2014-06Energy Port Oostende CHINESE version 2014-06
Energy Port Oostende CHINESE version 2014-06
 
Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07
 
Definition of ready
Definition of readyDefinition of ready
Definition of ready
 
Libretto di impianto dpr 74 2013 v.3
Libretto di impianto dpr 74 2013 v.3Libretto di impianto dpr 74 2013 v.3
Libretto di impianto dpr 74 2013 v.3
 
Impianti termici alimentati da biomasse (sotto i 35kW)
Impianti termici alimentati da biomasse (sotto i 35kW)Impianti termici alimentati da biomasse (sotto i 35kW)
Impianti termici alimentati da biomasse (sotto i 35kW)
 
ecobuilding - teambuilding - rebo - eventmosaic
ecobuilding - teambuilding - rebo - eventmosaicecobuilding - teambuilding - rebo - eventmosaic
ecobuilding - teambuilding - rebo - eventmosaic
 
Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102
Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102
Scarico a parete per caldaie sotto i 35k kW - d.lgs 4 luglio 2014 n.102
 
Novità Terzo responsabile - 2014 maggio
Novità Terzo responsabile - 2014 maggioNovità Terzo responsabile - 2014 maggio
Novità Terzo responsabile - 2014 maggio
 

Ähnlich wie Rebo folder 2014-05

Offshore wind power presentation for China
Offshore wind power presentation for ChinaOffshore wind power presentation for China
Offshore wind power presentation for ChinaChris Westra
 
Imma Offshore and Marine Vessels
Imma Offshore and Marine VesselsImma Offshore and Marine Vessels
Imma Offshore and Marine VesselsMurat Ilica
 
Netherlands, Maritime and Offshore Market snapshot 2015
Netherlands, Maritime and Offshore Market snapshot 2015Netherlands, Maritime and Offshore Market snapshot 2015
Netherlands, Maritime and Offshore Market snapshot 2015Business Finland
 
Artificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind PowerArtificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind PowerChris Westra
 
The Gjøa project
The Gjøa projectThe Gjøa project
The Gjøa projectStatoil
 
Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07laure_martroye
 
France_Maritime offshore market snapshot
France_Maritime offshore market snapshot France_Maritime offshore market snapshot
France_Maritime offshore market snapshot Business Finland
 
FWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouFWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouBluesign
 
CKrugerCV2016 Riverlake Solutions
CKrugerCV2016 Riverlake SolutionsCKrugerCV2016 Riverlake Solutions
CKrugerCV2016 Riverlake SolutionsChris Kruger
 
Norwegian shipbuilding, Market overview 2015
Norwegian shipbuilding, Market overview 2015Norwegian shipbuilding, Market overview 2015
Norwegian shipbuilding, Market overview 2015Business Finland
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentationEUROHULL LTD
 
Industrial Projects Department Netherlands
Industrial Projects Department NetherlandsIndustrial Projects Department Netherlands
Industrial Projects Department NetherlandsMaria Verbeek
 

Ähnlich wie Rebo folder 2014-05 (20)

Offshore wind power presentation for China
Offshore wind power presentation for ChinaOffshore wind power presentation for China
Offshore wind power presentation for China
 
Imma Offshore and Marine Vessels
Imma Offshore and Marine VesselsImma Offshore and Marine Vessels
Imma Offshore and Marine Vessels
 
Netherlands, Maritime and Offshore Market snapshot 2015
Netherlands, Maritime and Offshore Market snapshot 2015Netherlands, Maritime and Offshore Market snapshot 2015
Netherlands, Maritime and Offshore Market snapshot 2015
 
Artificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind PowerArtificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind Power
 
Discover Bretagne's know-how at SMM
Discover Bretagne's know-how at SMMDiscover Bretagne's know-how at SMM
Discover Bretagne's know-how at SMM
 
The Gjøa project
The Gjøa projectThe Gjøa project
The Gjøa project
 
NBR.PDF
NBR.PDFNBR.PDF
NBR.PDF
 
Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07
 
Sines Close the Loop
Sines Close the LoopSines Close the Loop
Sines Close the Loop
 
France_Maritime offshore market snapshot
France_Maritime offshore market snapshot France_Maritime offshore market snapshot
France_Maritime offshore market snapshot
 
The Ports of Flanders
The Ports of FlandersThe Ports of Flanders
The Ports of Flanders
 
FWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouFWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, Piriou
 
Sines close the loop
Sines   close the loopSines   close the loop
Sines close the loop
 
BRETAGNE at EWEA OFFSHORE 2015
BRETAGNE at EWEA OFFSHORE 2015BRETAGNE at EWEA OFFSHORE 2015
BRETAGNE at EWEA OFFSHORE 2015
 
CKrugerCV2016 Riverlake Solutions
CKrugerCV2016 Riverlake SolutionsCKrugerCV2016 Riverlake Solutions
CKrugerCV2016 Riverlake Solutions
 
Norwegian shipbuilding, Market overview 2015
Norwegian shipbuilding, Market overview 2015Norwegian shipbuilding, Market overview 2015
Norwegian shipbuilding, Market overview 2015
 
Cost-effective Floating Wind
Cost-effective Floating WindCost-effective Floating Wind
Cost-effective Floating Wind
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentation
 
Industrial Projects Department Netherlands
Industrial Projects Department NetherlandsIndustrial Projects Department Netherlands
Industrial Projects Department Netherlands
 
aicep Global Parques, industrial clusters the power of partnerships
aicep Global Parques, industrial clusters   the power of partnershipsaicep Global Parques, industrial clusters   the power of partnerships
aicep Global Parques, industrial clusters the power of partnerships
 

Kürzlich hochgeladen

Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 

Kürzlich hochgeladen (20)

Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 

Rebo folder 2014-05

  • 1. “REBO terminal Oostende, the ideal hub for offshore wind activities in the North Sea” easyaccess|priorityforoffshoreinstallationvessels|nolocks | >150.000m²installation&storagearea | dedicatedO&M | pontoons 201405 www.reboostende.be
  • 2. REBO is ... a good location for actual and future wind farms in a 200 km radius. REBO transformed ... the port of Oostende into an offshore terminal for handling, storage, assembling and transportation of present and future offshore components and structures. REBO aims ... at specialized project developers, manufacturers and contractors in the offshore energy sector. REBO offers ... 127 hectares: 4 sites (Zeewezendok, Halve Maan, Visserijdok, Vlotdok). 800 m adapted heavy quay capacity up to 20 T/m². prepared surfaces over 10 T/m² for storage of foundations, nacelles, hubs, towers and blades. fully equipped offices, covered and open storage possibilities for project management and O&M. a dedicated team to help project developers and suppliers with their activity in the energy port of Oostende. offshore support services.public private SHARE HOLDERS REBO: Renewable Energy Base Oostende www.reboostende.be 15% 15% 15% 15% 40%
  • 3. 200 km map: La Tene maps
  • 4. EASY ACCESS The Port of Oostende, situated in Europe’s busiest maritime area (51°14’ N - 2° 56’ E), is a versatile short sea port. It can accommodate all types of coastal maritime traffic, including RORO, bulk and project cargo. In addition to its seaport, Oostende is also home to an international freight and passenger airport. The multi-modal function is further emphasized by the presence of comprehensive railroad infrastructure, of a canal leading up to the European inland waterway network and of course the motorway A10-E40 linked directly to the port terminals. ENERGY PORT OOSTENDE The port has recently been modernised in both infrastructure and organisation and is now the leading force in the industrialisation of the hinterland. The port gives priority to vessels active for the offshore wind industry. CITY Oostende is a medium-sized Belgian city, which has all the assets of a large town. image arrival of blades for C-Power wind farm, by bardge and by road www.portofoostende.be www.visitoostende.be
  • 5. MultitechCMI office Falck Fabricom pontoon Multitech grindbed new H 20T/m² Alstom Parkwind Senvion GeoSea ReboB Flansea C-Power crew changes & refueling E40 - Brussels VLOTDOK VISSERIJDOK ZEEWEZENDOK HALVE M AAN HAVENGEUL sanitarycomplex Vestas OOSTENDE ZEEBRUGGE ZONES RESERVED FOR WIND FARMS 29 km Thorntonbank Blighbank Lodewijkbank NORTHER: 350 MW TOTAL: 2 120 MW C-POWER: 325 MW RENTEL: 288 - 312 MW NORTHWIND: 216 MW SEASTAR: 246 - 432 MW BELWIND: 330 MW 449 - 490 MW MERMAID NORTHWESTERN II 72 x 41-62 x 24 x 36-78 x 49-73 x 20 x 55 x 30 x NORTH SEA connection to Oostende connection to Zeebrugge future Stevin connection Halve maan - site prepared for offshore wind works - surface: 5 ha - quay length: 100 m - quay capacity: 10 T/m² - draught: -8 TAW Zeewezendok - site prepared for offshore wind works - surface: 10-15 ha - quay length: 600 m - quay capacity: 4 T/m² to 20 T/m² - draught: - 8m TAW Vlotdok - site prepared for berthing & refueling - length: 800 m berthing places Visserijdok - terminal extension area - surface: 7 ha assembly & storage area with direct access to open sea offices & storage assembly & storage area behind the locks BELGIAN WIND FARMS The wind farms in the North Sea make an important contribution to achieving the Belgian renewable energy targets. The various offshore wind farms (once fully operational) have an installed capacity of some 2,200 MW and an annual electricity output of 7,700,000 MWH. This is equivalent to: - 9% of total electricity consumption in Belgium (80 85 TWh) - 46% of Belgian households - All necessary energy for the 66 largest cities of Belgium (5.082 million inhabitants). Besides supply, offshore wind in Belgium creates direct and indirect jobs (+ / - 20,000 jobs) in an innovative technology with export potential. Belgium is, to installed capacity (380 MW), currently among the European top three in the offshore wind business. operational ongoing in preparation
  • 8. INSTALLATION Rebo terminal in the port of Oostende is ideal for installation of windmills because: ... easy access by road, by railway, by vessel ... 127 ha available in the port of Oostende for renewable energy activities … quays with a capacity able to handle from 4T/m2 to 20 T/m2 … 10 Ha of terminal surfaces (with heavy lift capacity) and with capacity of extension ... the port gives priority to vessels active for the offshore wind industry
  • 9. operations & maintenance The Rebo terminal is equiped with: - 4 pontoons and 2 cranes for service vessels - technical services: welding, construction, diving works, offshore transport & crew, .... www.multitech-oostende.be - storage, offices & sanitary complex for crew changes - easy and fast access to open sea on site infrastructure & services for O&M
  • 10. NEW & RENOVATED OFFICES renewable energy companies present in Oostende Falck Safety Services - Cofely FabricomSenvion - Technum - OWA - Flidar - eCoast MHI Vestas - Alstom - Parkwind - GeoSea
  • 11. REFERENCES C-Power I - construction (Halve Maan) C-Power II & III- construction (Zeewezendok) C-Power I - operational (6 x Senvion 5 MW) ©C-PowerN.V.,fotograafTomD’Haenens©C-PowerN.V.,fotograafTomD’Haenens C-Power II & III - operational (48 x Senvion 6 MW) ©Northwind ©Belwind Alstom Haliade 6MW - construction (Zeewezendok) Northwind - under construction (72 x MHI Vestas 3 MW) Belwind - operational (55 x MHI Vestas 3 MW)
  • 12. REBO nv Slijkensesteenweg 2 BE 8400 Oostende +32 59 34 07 11 www.reboostende.be twitter: @reboostende Emmanuël Timmermans e.timmermans@reboostende.be + 32 475 42 48 85 ©RobertPirotte