4. PGESCo
Over 20 Regional Projects
24 Power Plant Projects Inside EGYPT - 20,930 MW
20 Years of service
644 employees
2002-2012
199,654,725 Jobhours Managed by PGESCo
COMPANY INFORMATION
5. Department Head Count
Commercial 5
Construction 205
Engineering 236
Finance 14
Human Resources 7
International Operations 20
IS&T 19
Management 26
Management Information 6
Office Administration 58
Office Transportation 14
Procurement 26
Project Controls 18
Record Management 38
Total 644
1%
27%
0%
37%
2%
1%
3%
4%
1% 12%
2% 4% 3% 3%
Commercial
Construction
Construction Management
Engineering
Finance
Human Resources
IS&T
Management
Management Information
Office Administration
Office Transportation
Procurement
Project Controls
Quality Services
PGESCo Current Head Count
7. PGESCo was established on March 18, 1993
PGESCo started the Cairo North I Combined Power Plant (750MW) 2001
PGESCo started support ACESCo projects
PGESCo started the Sidi Krir I&II Thermal Power Plant (650MW) 1994
PGESCo as a joint stock company under the Egyptian Investment Law Number 230 for 1989.
COMPANY MILESTONES
PGESCo started EmergencySimple Cycle Power Plants (2640 MW) 2010
20 Years of service of PGESCo
1993 1994 2001 2004 2010 2 0 1 32012
PGESCo started the first project in Iraq
12. Fast Track Program (2002-2007) 4,500 MW
Cairo North I&II
Nubaria I&II
Talkha
El Kureimat II
Expansion Plan Program (2007-2012) 7,000
MW
El Kureimat III
El Tebbin
Nubaria III
Cairo West
Sidi Krir
El Atf
Abu Qir
El Ain El Sokhna
Expansion Plan Program (2012-2017)
12,400 MW
Banha
Giza North I, II & III
Suez
South Helwan
Fast Track Program (2011-2012) 2,600 MW
Al Shabab
Damietta
West Damietta
6 October
13. PGESCo
OTHER PROJECTS INSIDE EGYPT
Sidi Krir 500 kv GIS Substation
500 kv – Suez Canal Crossing Towers
500 kv Overhead Transmission Line – Project (Sidi Krir – Nubaria –Cairo)
El Arish Power Plant-Shore line Protection
El Arish Power Plant Off-Shore intake Design
EL-MACo Transformer Factory (Industrial Project in post-award phase)
14. PGESCo
Benghazi North Combined Cycle
Zawia Combined Cycle
Westren Mountain Gas Turbine Project
Zawia gas turbine Simple Cycle
Zawia Combined Cycle Extension
Benghazi 750 MW Combined Cycle
Misurata Combined Cycle
Westren Mountain Gas Turbine Project Extension
Obari Simple Cycle Power Plant
Zwitina Combined Cycle
Tripoli West Thermal Power Plant
Sarir Simple Cycle Power Plant
Zwitina Simple Cycle
Total Capacity in MW 7201 MW
POWER PROJECTS IN LIBYA
15. LIBYA
KSA
IRAQ
SYRIA
UAE
Aboutrabba Desalination Plant (40,000 m3/day)
Zawia Desalination Plant (80,000 m3/day)
Soussa Desalination Plant (40,000 m3/day)
Derna Desalination Plant (40,000 m3/day)
15 High voltage Substations
2000 kM 400 kV High Voltage Lines
Al-Taweelah B Combined Cycle Power Project – United Arab Emirates (completed)
Aleppo Power Project – Syria (completed)
Ghazlan Power Project – Saudi Arabia (completed)
Baiji 6 X 160 MW Simple Cycle Power Plant - IRAQ
20. PGESCo
One envelopes tendering systems was used for the following packages:
CP-102 Civil Works.
CP-104A 500kV Switchyard.
CP-104B 220kV Switchyard.
CP-107 Yard Tanks.
CP-108 Wrap-up Insurance.
PO-109A Major Pumps and Drivers.
PO-109B Miscellaneous Pumps and Drives.
PO-112 Critical Piping and Valves
CP-117 Electrical Equipment/Instrument Installation
CP-118 Mechanical and Piping Installation
CP-119 Off Site Intake and Discharge.
CP-120 Colony.
CP-121 Piling.
CP-123 Site Services
Two envelopes tendering systems was used for the following packages:
CP-101 Combustion Turbine Generator.
CP-103 Environmental Monitoring.
CP-105 Heat Recovery Steam Generator.
CP-106 Steam Turbine Generator and Condenser.
CP-111 Water and Wastewater Treatments.
PO-113 Power Transformers.
PO-114 Distributed Control Systems.
PO-122 Medium and Low Switchgears
Nubaria Project (22 package system)
21. PGESCo
750 MW
New Talkha Project (8 packages system)
CP -101 Combustion Turbine Generator
CP- 102 Civil Works, including site Preparation and Piling
CP-103 Environmental Monitoring
CP-104 Switchyard
CP-105 Heat Recovery Steam Generator
Cp-106 Steam Turbine Generator and Condenser
CP- 108 Wrap-up Insurance
CP-111 Water Treatment
EPCM Engineering, Procurement, and Construction Management
22. PGESCo
One envelopes tendering systems was used for the following packages:
1. CP-103 Environmental Monitoring.
2. CP-107 Yard Tanks.
3. CP-108 Wrap-up Insurance.
4. PO-110 Heat Exchangers.
5. PO-112 Critical Piping and Valves
6. CP-117 Electrical Equipment/Instrument Installation
7. CP-118 Mechanical and Piping Installation
Two envelopes tendering systems was used for the following packages:
1. CP-101 Combustion Turbine Generator.
2. CP-102 Civil Works.
3. CP-104 Switchyard.
4. CP-105 Heat Recovery Steam Generator.
5. CP-106 Steam Turbine Generator and Condenser.
6. PO-109 Major Pumps and Drivers.
7. CP-111 Water and Wastewater Treatments.
8. PO-113 Power Transformers.
9. PO-114 Distributed Control Systems.
10. PO-122 Medium and Low Switchgears
Cairo West Project (17 package system)
23.
24. PGESCo
• Planning & Scheduling
• Cost & budget Control
• Estimate
• Progress Monitoring &
Reporting
Project
controls
• Loan Administration
• Project Accounting Service
Project
Commercial
Services
• Concept, preliminary, detailed
Engineering
• Review & Coordinate AE
Activities
• Permits Coordination
• Engineering Supporting
construction
Project
Engineering
Services
•Managing Safety & Quality Services
•Managing Construction & Contractors
Activities
•Control & manage Project schedule
•Managing Start-up & Turn Over
Site
Construction
Management
•Establish the Project IT work Platform
•Site & Office Support
Project IT
Support
• Contracting & Tendering
Terms & Conditions
• Prequalification Process
• Tendering & Evaluation
• Award recommendations
& Award
• Contracts Administration
• Expediting & TL services
• Change Orders & Claims
management
• Administrate Quality
Assurance Plan
• Contract Close out
Project
Procurement
&
Contracting
Services
• Document Control
• Administrate project
communications
Record
Management