SlideShare ist ein Scribd-Unternehmen logo
1 von 57
Downloaden Sie, um offline zu lesen
RASHAD ALAMI
ENGINEERING PROFILE
Done by Rashad Alami
+971 50 9988 248 ver. FEB16
My name is Rashad Alami, Palestinian with a Moroccan origin
& passport.
I have been graduated DEC 2007 from eastern Mediterranean
university of Turkish northern Cyprus.
I started my job opportunity in Dubai ARENCO consultant
engineering company, working as junior engineer in concept
design & working drawing.
At the moment of the financial crisis, it was a grateful chance
that I gained a lot of powerful skills, like working under high
pressure, working to survive, widening in work field & position,
gaining power & flexibility in how to keep the financial situation
permanently ongoing, & it gave me another simple opportunities
which empowered my work journey like: joining oil & gas fields,
aluminum works fields, a block factories, interior design offices
& other contracting fields to try to get up with extra detailed
knowledge about management in each organization & widen the
concept of being a future leader.
Mainly I gain 3 major Experience:
• 4 years in consultant (Design & supervision),
• 4 years in Main contracting & aluminum works
• 1 year skill gaining in petroleum works, & building
material suppling works.
MISSION
VALUES
• Grouping the world into one simple,
modern, & integrated community
• The green architecture, & renewable
energy sources
• The modern and ease transportation
technique & roads
• The artificial buildings form as per
functions with minimum wastage
• The urban district distribution, counting
the ratios of all human resources
• The financial resources as agriculture,
mining, oil, & gas
MY OPERATIONS
1. Two 75-storey residential towers
2. One 52-storey residential tower
3. Westin hotel 5-stars (by Starwood)
4. W hotels 5-stars (by Starwood)
5. Water theatre by Franco Dragone
6. St. Regis hotel5-stars (by Starwood)
1
1
2
3
4 5
6
https://youtu.be/yyVf6ScEF7s
Region’s biggest ever
development
- Al Habtoor City –
(Starwood)
DUBAI
U.S. $3 billion
(11 A.E.D. billion)
https://youtu.be/qFFUNsjzPsw
Al Habtoor Hilton Waldorf Astoria Hotel project
A project cost of 700 million AED (approx. 190 million U.S. Dollar) 5 stars hotel, my responsibility as site
architect was civil, structure, landscaping & I.D. works inspection, in addition of following up progresses,
& quality control .
Cayan Tower a 90 degree twisted high rise residential
building consist of 70 stories with studio, 1, 2, 3, 4 & pent
house apartments.
Position: Site Architect.
DUBAI POLICE ACADEMY PROJECT:
Consists of 26 main buildings which are barracks, reception, mosque, gates,
classrooms, on duty accommodation, clubhouse, restaurant, clinic, indoor
outdoor sports facilities, graduation hall, multipurpose test hall, storage
maintenance, library, police band rehearsal, & football field.
My roll in that project as a junior architect was some interior division
designing, exterior landscaping, work drawing, & detailing
JADDAF CULTURAL VILLAGE
It is a multi-purpose development project in the United Arab Emirates, located along the
shoreline of the Dubai creek on a 40 million square foot plot of land. My work field was on
that was completing the work drawing sectioning & detailing of a series of buildings which
consist of 4b+2p+G+1st+12 Residential Bldg.,
Civil engineering general skills:
• Pile repairing, water proofing, block
working, shuttering, steel spreading, tying,
& fixing, ply wood, …
•Site materials quantity counting &
surveying
•Distributions of the manpower on site.
•Following of the sub-contractors to
complete the work in perfect mode.
•Distributing of the machines in the site.
•Make a daily, weekly, & monthly reports
•A great knowledge of all types of
substructure, super structure,& building
finishes
Quantity Surveyor skill:
•Ability of total project studies, sub- contract
coordination & calculation from a-z projects
as per consultant inquires.
My roll always to provide an
incident free workplace during
the building progress under any
work pressure keeping on the
safety is a fundamental focus and
never been compromised.
QUALITY, HEALTH, SAFETY &
ENVIRONMENTAL COMMITMENT
My Knowledge In
construction:
Sub-structure
•Piling works
•Piling sheet
•Shoring
•Retaining wall
•Blind concrete
•Screed
•Water proofing
•Formwork, rebar, & shuttering
•Raft foundation
•Ground floor slab
My Knowledge In
construction:
Super-structure
•Columns
•Slabs
•Block works
•Floor finishing works
•Plaster works
•Pain works
•Doors & frame
•External cladding works
•Gypsum & false ceiling works
•Air conditioning, chillers & split unit
& ducting
•MEP
•Windows &/or curtain wall
•Kitchen & WC
•Lifts
•Granite & marble
Dolce Vita Dubai marina
project (project of the crisis)
started 2008 supposed to be
submitted 2010 the following
figure showing its current
situation…
It is B+G+2P+24, I attended
piling to the raft pouring session
then project stopped!!!, at that
moments I was working on daily
report, RFI, consultant
submission, project work super
vision, raft steel works, pile
works, pile protection, retaining
wall, stiffeners, block works,
plaster works, 100x70 raft
works, 0.8- 4 meter depth raft,
column works, pile caps,
drafting, etc…
The Regent hotel & apartments(2012)
A project cost of 1.3 billion Qatar rials (approx. 355 million U.S. Dollar) contains a 5 stars hotel & 9 hotel
apartments building, my responsibility was handling as a site engineer from the 1st to 7th floors of the hotel
all dirty works with finishing works.
Infinity tower (Cayan tower) tower cost of
approx. 800 million AED (220 million U.S. $), I
worked there in scope of site Architect,
inspecting work quality as a consultant,
snagging & reviewing As built designs
Good Knowledge in leveling,
excavation works, machineries like
bulldozer, grader, shovel, roller,
etc...
With the crisis and the Armageddon falling of the companies, in the addition of huge work pressure to
finish as much as we can the project, I worked for villas in Abu Dhabi, Dubai, & sharjah in separated
districts like khalifa A,B,& C, al shamkha, Mohammed bin zayed, Arabian ranches, al khan districts
for several clients at the same time for certain while as follow :
1. villa client name: Salem al Jamaan, G+1, a super deluxe villa with a high qualified Cleopatra ceramic
flooring & marbles, with a water jet marble works and external stone cladding over 1000m2 gross area
2. villa client name: Fatima G+1 (3 villas) with a standard design, I joined the block works duration, & the
service block foundation works, in addition of plastering, painting works for the villa & ceramic
3. villa client name: al alili G+1 (5 villas 1 main & 4 standards), I started that villa from the piling, tie beam
timber & steel works, concrete pouring, MEP & ground floor works preparations.
4. Villa client name: al shamkha, G+1 (1 villa G+1+R) I controlled the finishing works.
5. Villa client: Ahmad Saad G+1 maintenance villa, the purpose was extending 3 walls outside the villa and
making mud tile ceiling, with gypsum new wall extension, new service block for the driver & dog room &
electric extensions for the landscaping.
6. Shopping mall (Carrefour) small area 200x100 meters area, steel works detailing using AutoCAD
structural detailing, for foundation strip footing beam, ground floor , columns, water tank, roof floor etc…
7. Leveling works for a proposed piping factory of 20000sqm using bulldozer, shovels, graders, & rolling
compactors
Abu Dhabi villas works interior & exterior
examples:
Aluminum & Metallic skills:
• Estimating of Aluminum & steel works of CW, Doors, Windows, Hand rails,
Revolving, sliding, swing, frame, frameless doors, canopies, accessories,
labors work & time, & the total over head charges.
• Project time planning; mobilizing, payments & work possibilities according to
get the best result in submission on time with fewest amounts of wastages.
• Coordinating work designs, Structural studies, Submittal approvals, material
movement, fabrication & its installation, detailed invoices, work done, &
time planning, factory (if available), main/sub contractors, & supplier.
• Nice experience in getting & quoting projects in millions of dirham.
Al Mousa tower
(G+M+6P+36+swimming pool +
HP):
A lump sum aluminum project of
cost 20,000,000 AED My job roll was
supervision coordination with workshop, & work
ongoing programming
G+12 Al Dhaheri & Al muhairi Commercial Bldgs. aluminum project of cost
6,000,000 AED both projects
Abu dhabi
Khor fakkan neutralization & immigration Aluminum project of a cost 718,950
AED
Sharjah
Ruwais health club aluminum project of cost 5,483,000 + AED
Abu Dhabi
Khaledia Commercial building G+5
Aluminum project of a cost 1,100,000+
AED
Abu dhabi
Al noor commercial building
aluminum project cost 15,226,990
AED
Qatar
Swimming pool canopy 11x16meters
totally designed by me & excuted with
a cost of 150,000+ AED
Abu dhabi
Aluminum & building metallic field
projects (Site Engineer, QS, CAD
Detailing, etc...)
• Aluminum Works For 2 buildings
G+12 Al Mezin Cont. (totally
completed from contract to
snagging)
• Aluminum work G+7 in Abu Dhabi
Mohammed bin zayed district for
Shiryan cont. (totally completed
from contract to snagging)
• Aluminum work G+5 in Abu Dhabi
Khaldia for al Barq cont. (totally
completed from contract to
snagging)
• Aluminum work 6 Building Sports
resort in al Ain. (totally completed
from contract to snagging)
It was a good chanceto get a petroleum skills here in Qatar while trainingin petroleum services,piping & metallic field works
to get I wide knowledge in cutting,welding, fitting, & weld testing,& here are some skills I gain as follow:
• Petroleum Piping inch dia, for Qafco 5 in Qatar, cutting works fitting& welding.
• Working in pipe isometric drawings
• Working in standard schedules in piping, flanges valves fittings etc…
• Petroleum Piping report, field weld & shop weld counting
• Petroleum piping projects materials requirements sizes, elbows ,valves etc… organization
DUBAI
INSPIRATION
DUBAI
INSPIRATION
Dubai Mall Constructions
Dubai Mall Constructions
DUBAI INSPIRATION
DUBAI MARINA & JUMAIRA BEACH RESIDENCE
DUBAI INSPIRATION
MINA SALAM
DUBAI INSPIRATION
FESTIVAL CITY
MALL & MARINA
DUBAI INSPIRATION
INTERCONTINENTAL &
CROWNPLAZA HOTEL
(FESTIVAL CITY)
DUBAI INSPIRATION
THE PALM ISLAND ATLANTIS HOTEL &
AQUA VENTURE
DUBAI INSPIRATION
DUBAI METRO
DUBAI INSPIRATION
ROAD INTERSECTIONS
DUBAI INSPIRATION
DUBAI INTERNATIONAL AIRPORT
ABU DHABI INSPIRATION
ZAYED MOSQUE, FIRARI, & 2030 PLAN OF
ARCHITECURE
ABU DHABI INSPIRATION
ZAYED BRIDGE, & SHENGRELLA HOTEL
ABU DHABI INSPIRATION
2030 PLAN OF ARCHITECURE, HQ TOWER, &
GOGEN HAMS 3 MUSEUM
ABU DHABI INSPIRATION
2030 PLAN OF ARCHITECURE,
QATAR INSPIRATION
THE BEAUTY OF CONTEMPORARY
ARCHITECTURE IN CORNICH
QATAR INSPIRATION
QATAR INSPIRATION
THE BEAUTY OF TRADITIONAL ARCHITECTURE
QATAR INSPIRATION
PEARL ISLAND, MSHEIREB & QATAR
FOUNDATION
QATAR INSPIRATION
2022 MONDIAL MODERN STADIUM IMPACT
TURKEY INSPIRATION
THE OLD WONDERFUL CIVILIZATIONS
MOSQUES AGYA SOFYA, TUPCAPI, ISTANBUL
BRIDGE
TURKEY INSPIRATION
GREAT SULTAN AHMED MOSQUE
NORTHEN CYPRUS INSPIRATION
THE OLD WONDERFUL CIVILIZATIONS CASTLES
MAGOSA, KANTARA,AND BAFRA HOTEL
NORHTEN CYPRUS INSPIRATION
THE OLD WONDERFUL CIVILIZATIONS GIRNE
CASTLE, HARBOR, & VILLAS
NORTHEN CYPRUS INSPIRATION
GIRNE
My ambition
To lead the world into one integrated community, by solving the
following problems:
1- killing the poverty
• keeping the total people to find there absolute opportunity in work.
• Opening hundreds of work resources, like agriculture, industry, mining, building,
petroleum, green energy, technology, etc…
• Highlighting the charity works for the women, orphans, children, old people, travelers,
& ill people, by keeping them living as one family without any Stratified feeling
• Concentrating on food & place to be available as much as we can for every body,
keeping that those 2 things must not be raised in price for ever, and it must been given
as much as we can for free
• Supporting the advance programs of teaching & knowledge
2- raising the technology in the world
• especially the green energy resources as much as we can because of the weakness of
petroleum extraction toward the world needs in a ratio of 4:1
• Supporting IT in all districts in the world
• Supporting scientists
3- prevent the world from stealing operations, cheating, usury, bad dealing, bad talking,
fighting, killing etc… or any effective bad behavior, by supporting the interior police
defense & exterior military defense.
4- raising the knowledge of the world & all its supports as schools, universities, colleges,
laboratories, libraries, etc…
5- supporting brotherhood, neighborhood, kinship, love between the people, work groups,
& kicking off the autism psychology from our human nature
6-raising the nature, & the nature entertainments, because the human is so much in in need
to be involved with nature, & the nature is a source of mind to clearly opened, and
these could be by urban or nature design mainly, through a combination of green
raised fields with water, under the vision of the sky (green, yellow & blue). Also by
keeping the total houses combined with nature,(I saw a lot of throttled house, no
balconies, no sun rays entering the house, no green houses!!! There people mostly
having illness in their psychological behaviors)
GREEN AESTHETIC ARCHITECTURE
FUTURE OUTLOOK
GREEN AESTHETIC BUILDING FUTURE
OUTLOOK
GREAT AESTHETIC ARCHITECTURE
WITH RENEWABLE ENERGY SOURCE IN
BAHRAIN ENERGY TOWERS
THE FUTURE LOOKING IDEAS FOR
ENERGY SOURCES USING RUNNING
WATER
My Future Outlook skills
•Building Project management total
courses
•Primavera basics & advance courses
•3D max total courses
•Civil Engineering Master Degree
•Doctorate degree as per future
requirements
•Specialization studies in
Mechanical, electrical, Petroleum, &
Renewable energy
GREEN AESTHETIC AGRICULTURE
FUTURE OUTLOOK
My Under water skills:
• Open water diver over 10 SCUBA
dives
• Underwater photography
certificate
• Advanced underwater
photography certificate
Rashad Alami
Moroccan
UAE resident
00971 50 9988248
rashadalami@hotmail.com

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolio
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - Latest
 
Samy Gaber CV sep18
Samy Gaber CV sep18Samy Gaber CV sep18
Samy Gaber CV sep18
 
List of Projects
List of ProjectsList of Projects
List of Projects
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1
 
last c v 1-1-15
last c v 1-1-15last c v 1-1-15
last c v 1-1-15
 
AKANLAR 2015
AKANLAR 2015AKANLAR 2015
AKANLAR 2015
 
Ghassan al otaibi cv
Ghassan al otaibi cvGhassan al otaibi cv
Ghassan al otaibi cv
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
Senior Architect
Senior ArchitectSenior Architect
Senior Architect
 
CV.2016
CV.2016CV.2016
CV.2016
 
ENG Taher CV
ENG Taher CVENG Taher CV
ENG Taher CV
 
Hospitality Projects updated
Hospitality Projects updatedHospitality Projects updated
Hospitality Projects updated
 
RESUME VICTOR
RESUME VICTORRESUME VICTOR
RESUME VICTOR
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
Shady Alakhal
Shady AlakhalShady Alakhal
Shady Alakhal
 
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSAMARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
 
M-JASSIM-RESUME - .rtf
M-JASSIM-RESUME - .rtfM-JASSIM-RESUME - .rtf
M-JASSIM-RESUME - .rtf
 
Project List
Project ListProject List
Project List
 

Andere mochten auch

Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
Chia Ting
 
Full digital strategy for w hotel
Full digital strategy for w hotelFull digital strategy for w hotel
Full digital strategy for w hotel
Weiyi Yin
 
Structural engineer drawings
Structural engineer drawingsStructural engineer drawings
Structural engineer drawings
czlun
 
Engineering Structures Power Point
Engineering Structures Power PointEngineering Structures Power Point
Engineering Structures Power Point
Allison McMillen
 
Effect of wind Load On High Rise Building
Effect of wind Load On High Rise BuildingEffect of wind Load On High Rise Building
Effect of wind Load On High Rise Building
Vikas Patre
 

Andere mochten auch (13)

Princess Tower Brochure English
Princess Tower Brochure EnglishPrincess Tower Brochure English
Princess Tower Brochure English
 
Dam failure infinity tower dubaimari (5zal)
Dam failure infinity tower dubaimari (5zal)Dam failure infinity tower dubaimari (5zal)
Dam failure infinity tower dubaimari (5zal)
 
Structural Engineering
Structural Engineering Structural Engineering
Structural Engineering
 
Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
 
Full digital strategy for w hotel
Full digital strategy for w hotelFull digital strategy for w hotel
Full digital strategy for w hotel
 
Structural engineer drawings
Structural engineer drawingsStructural engineer drawings
Structural engineer drawings
 
Engineering Structures Power Point
Engineering Structures Power PointEngineering Structures Power Point
Engineering Structures Power Point
 
Structural engineering ppt 1
Structural  engineering ppt 1Structural  engineering ppt 1
Structural engineering ppt 1
 
The World's Ten Tallest Residential Building
The World's Ten Tallest Residential BuildingThe World's Ten Tallest Residential Building
The World's Ten Tallest Residential Building
 
Effect of wind Load On High Rise Building
Effect of wind Load On High Rise BuildingEffect of wind Load On High Rise Building
Effect of wind Load On High Rise Building
 
khansaaCV
khansaaCVkhansaaCV
khansaaCV
 
Shady c.v
Shady c.vShady c.v
Shady c.v
 
Chico xavier in-slujba_vietii_eterne
Chico xavier in-slujba_vietii_eterneChico xavier in-slujba_vietii_eterne
Chico xavier in-slujba_vietii_eterne
 

Ähnlich wie R PROFILE 0216

Ähnlich wie R PROFILE 0216 (20)

CV june-2016
CV june-2016CV june-2016
CV june-2016
 
CV GENDY 2016
CV GENDY 2016CV GENDY 2016
CV GENDY 2016
 
Ahmed Shakshouk
Ahmed ShakshoukAhmed Shakshouk
Ahmed Shakshouk
 
WAEL_CURRICULUM_VITAE-2
WAEL_CURRICULUM_VITAE-2WAEL_CURRICULUM_VITAE-2
WAEL_CURRICULUM_VITAE-2
 
Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Wael CV Latest1
Wael CV Latest1Wael CV Latest1
Wael CV Latest1
 
RCV JUN16
RCV JUN16RCV JUN16
RCV JUN16
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
Asim Resume
Asim ResumeAsim Resume
Asim Resume
 
Saed Obied Resume
Saed Obied ResumeSaed Obied Resume
Saed Obied Resume
 
Company Profile
Company ProfileCompany Profile
Company Profile
 
Mohammed Al Naggar Resume
Mohammed Al Naggar ResumeMohammed Al Naggar Resume
Mohammed Al Naggar Resume
 
Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
Alaa_Shaheen_C.V_2015
Alaa_Shaheen_C.V_2015Alaa_Shaheen_C.V_2015
Alaa_Shaheen_C.V_2015
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
Sr. Surveyor Mezit Khalil
Sr. Surveyor Mezit KhalilSr. Surveyor Mezit Khalil
Sr. Surveyor Mezit Khalil
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyor
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 

R PROFILE 0216

  • 1. RASHAD ALAMI ENGINEERING PROFILE Done by Rashad Alami +971 50 9988 248 ver. FEB16
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. My name is Rashad Alami, Palestinian with a Moroccan origin & passport. I have been graduated DEC 2007 from eastern Mediterranean university of Turkish northern Cyprus. I started my job opportunity in Dubai ARENCO consultant engineering company, working as junior engineer in concept design & working drawing. At the moment of the financial crisis, it was a grateful chance that I gained a lot of powerful skills, like working under high pressure, working to survive, widening in work field & position, gaining power & flexibility in how to keep the financial situation permanently ongoing, & it gave me another simple opportunities which empowered my work journey like: joining oil & gas fields, aluminum works fields, a block factories, interior design offices & other contracting fields to try to get up with extra detailed knowledge about management in each organization & widen the concept of being a future leader.
  • 11. Mainly I gain 3 major Experience: • 4 years in consultant (Design & supervision), • 4 years in Main contracting & aluminum works • 1 year skill gaining in petroleum works, & building material suppling works.
  • 12. MISSION VALUES • Grouping the world into one simple, modern, & integrated community • The green architecture, & renewable energy sources • The modern and ease transportation technique & roads • The artificial buildings form as per functions with minimum wastage • The urban district distribution, counting the ratios of all human resources • The financial resources as agriculture, mining, oil, & gas
  • 14.
  • 15. 1. Two 75-storey residential towers 2. One 52-storey residential tower 3. Westin hotel 5-stars (by Starwood) 4. W hotels 5-stars (by Starwood) 5. Water theatre by Franco Dragone 6. St. Regis hotel5-stars (by Starwood) 1 1 2 3 4 5 6 https://youtu.be/yyVf6ScEF7s Region’s biggest ever development - Al Habtoor City – (Starwood) DUBAI U.S. $3 billion (11 A.E.D. billion)
  • 16.
  • 17.
  • 18.
  • 20. Al Habtoor Hilton Waldorf Astoria Hotel project A project cost of 700 million AED (approx. 190 million U.S. Dollar) 5 stars hotel, my responsibility as site architect was civil, structure, landscaping & I.D. works inspection, in addition of following up progresses, & quality control .
  • 21. Cayan Tower a 90 degree twisted high rise residential building consist of 70 stories with studio, 1, 2, 3, 4 & pent house apartments. Position: Site Architect.
  • 22. DUBAI POLICE ACADEMY PROJECT: Consists of 26 main buildings which are barracks, reception, mosque, gates, classrooms, on duty accommodation, clubhouse, restaurant, clinic, indoor outdoor sports facilities, graduation hall, multipurpose test hall, storage maintenance, library, police band rehearsal, & football field. My roll in that project as a junior architect was some interior division designing, exterior landscaping, work drawing, & detailing
  • 23. JADDAF CULTURAL VILLAGE It is a multi-purpose development project in the United Arab Emirates, located along the shoreline of the Dubai creek on a 40 million square foot plot of land. My work field was on that was completing the work drawing sectioning & detailing of a series of buildings which consist of 4b+2p+G+1st+12 Residential Bldg.,
  • 24. Civil engineering general skills: • Pile repairing, water proofing, block working, shuttering, steel spreading, tying, & fixing, ply wood, … •Site materials quantity counting & surveying •Distributions of the manpower on site. •Following of the sub-contractors to complete the work in perfect mode. •Distributing of the machines in the site. •Make a daily, weekly, & monthly reports •A great knowledge of all types of substructure, super structure,& building finishes Quantity Surveyor skill: •Ability of total project studies, sub- contract coordination & calculation from a-z projects as per consultant inquires.
  • 25. My roll always to provide an incident free workplace during the building progress under any work pressure keeping on the safety is a fundamental focus and never been compromised. QUALITY, HEALTH, SAFETY & ENVIRONMENTAL COMMITMENT
  • 26. My Knowledge In construction: Sub-structure •Piling works •Piling sheet •Shoring •Retaining wall •Blind concrete •Screed •Water proofing •Formwork, rebar, & shuttering •Raft foundation •Ground floor slab
  • 27. My Knowledge In construction: Super-structure •Columns •Slabs •Block works •Floor finishing works •Plaster works •Pain works •Doors & frame •External cladding works •Gypsum & false ceiling works •Air conditioning, chillers & split unit & ducting •MEP •Windows &/or curtain wall •Kitchen & WC •Lifts •Granite & marble
  • 28. Dolce Vita Dubai marina project (project of the crisis) started 2008 supposed to be submitted 2010 the following figure showing its current situation… It is B+G+2P+24, I attended piling to the raft pouring session then project stopped!!!, at that moments I was working on daily report, RFI, consultant submission, project work super vision, raft steel works, pile works, pile protection, retaining wall, stiffeners, block works, plaster works, 100x70 raft works, 0.8- 4 meter depth raft, column works, pile caps, drafting, etc…
  • 29. The Regent hotel & apartments(2012) A project cost of 1.3 billion Qatar rials (approx. 355 million U.S. Dollar) contains a 5 stars hotel & 9 hotel apartments building, my responsibility was handling as a site engineer from the 1st to 7th floors of the hotel all dirty works with finishing works.
  • 30. Infinity tower (Cayan tower) tower cost of approx. 800 million AED (220 million U.S. $), I worked there in scope of site Architect, inspecting work quality as a consultant, snagging & reviewing As built designs
  • 31. Good Knowledge in leveling, excavation works, machineries like bulldozer, grader, shovel, roller, etc...
  • 32. With the crisis and the Armageddon falling of the companies, in the addition of huge work pressure to finish as much as we can the project, I worked for villas in Abu Dhabi, Dubai, & sharjah in separated districts like khalifa A,B,& C, al shamkha, Mohammed bin zayed, Arabian ranches, al khan districts for several clients at the same time for certain while as follow : 1. villa client name: Salem al Jamaan, G+1, a super deluxe villa with a high qualified Cleopatra ceramic flooring & marbles, with a water jet marble works and external stone cladding over 1000m2 gross area 2. villa client name: Fatima G+1 (3 villas) with a standard design, I joined the block works duration, & the service block foundation works, in addition of plastering, painting works for the villa & ceramic 3. villa client name: al alili G+1 (5 villas 1 main & 4 standards), I started that villa from the piling, tie beam timber & steel works, concrete pouring, MEP & ground floor works preparations. 4. Villa client name: al shamkha, G+1 (1 villa G+1+R) I controlled the finishing works. 5. Villa client: Ahmad Saad G+1 maintenance villa, the purpose was extending 3 walls outside the villa and making mud tile ceiling, with gypsum new wall extension, new service block for the driver & dog room & electric extensions for the landscaping. 6. Shopping mall (Carrefour) small area 200x100 meters area, steel works detailing using AutoCAD structural detailing, for foundation strip footing beam, ground floor , columns, water tank, roof floor etc… 7. Leveling works for a proposed piping factory of 20000sqm using bulldozer, shovels, graders, & rolling compactors
  • 33. Abu Dhabi villas works interior & exterior examples:
  • 34. Aluminum & Metallic skills: • Estimating of Aluminum & steel works of CW, Doors, Windows, Hand rails, Revolving, sliding, swing, frame, frameless doors, canopies, accessories, labors work & time, & the total over head charges. • Project time planning; mobilizing, payments & work possibilities according to get the best result in submission on time with fewest amounts of wastages. • Coordinating work designs, Structural studies, Submittal approvals, material movement, fabrication & its installation, detailed invoices, work done, & time planning, factory (if available), main/sub contractors, & supplier. • Nice experience in getting & quoting projects in millions of dirham.
  • 35. Al Mousa tower (G+M+6P+36+swimming pool + HP): A lump sum aluminum project of cost 20,000,000 AED My job roll was supervision coordination with workshop, & work ongoing programming
  • 36. G+12 Al Dhaheri & Al muhairi Commercial Bldgs. aluminum project of cost 6,000,000 AED both projects Abu dhabi Khor fakkan neutralization & immigration Aluminum project of a cost 718,950 AED Sharjah
  • 37. Ruwais health club aluminum project of cost 5,483,000 + AED Abu Dhabi Khaledia Commercial building G+5 Aluminum project of a cost 1,100,000+ AED Abu dhabi Al noor commercial building aluminum project cost 15,226,990 AED Qatar
  • 38. Swimming pool canopy 11x16meters totally designed by me & excuted with a cost of 150,000+ AED Abu dhabi
  • 39. Aluminum & building metallic field projects (Site Engineer, QS, CAD Detailing, etc...) • Aluminum Works For 2 buildings G+12 Al Mezin Cont. (totally completed from contract to snagging) • Aluminum work G+7 in Abu Dhabi Mohammed bin zayed district for Shiryan cont. (totally completed from contract to snagging) • Aluminum work G+5 in Abu Dhabi Khaldia for al Barq cont. (totally completed from contract to snagging) • Aluminum work 6 Building Sports resort in al Ain. (totally completed from contract to snagging)
  • 40. It was a good chanceto get a petroleum skills here in Qatar while trainingin petroleum services,piping & metallic field works to get I wide knowledge in cutting,welding, fitting, & weld testing,& here are some skills I gain as follow: • Petroleum Piping inch dia, for Qafco 5 in Qatar, cutting works fitting& welding. • Working in pipe isometric drawings • Working in standard schedules in piping, flanges valves fittings etc… • Petroleum Piping report, field weld & shop weld counting • Petroleum piping projects materials requirements sizes, elbows ,valves etc… organization
  • 41. DUBAI INSPIRATION DUBAI INSPIRATION Dubai Mall Constructions Dubai Mall Constructions DUBAI INSPIRATION DUBAI MARINA & JUMAIRA BEACH RESIDENCE DUBAI INSPIRATION MINA SALAM DUBAI INSPIRATION FESTIVAL CITY MALL & MARINA DUBAI INSPIRATION INTERCONTINENTAL & CROWNPLAZA HOTEL (FESTIVAL CITY)
  • 42. DUBAI INSPIRATION THE PALM ISLAND ATLANTIS HOTEL & AQUA VENTURE DUBAI INSPIRATION DUBAI METRO DUBAI INSPIRATION ROAD INTERSECTIONS DUBAI INSPIRATION DUBAI INTERNATIONAL AIRPORT
  • 43. ABU DHABI INSPIRATION ZAYED MOSQUE, FIRARI, & 2030 PLAN OF ARCHITECURE ABU DHABI INSPIRATION ZAYED BRIDGE, & SHENGRELLA HOTEL
  • 44. ABU DHABI INSPIRATION 2030 PLAN OF ARCHITECURE, HQ TOWER, & GOGEN HAMS 3 MUSEUM ABU DHABI INSPIRATION 2030 PLAN OF ARCHITECURE,
  • 45. QATAR INSPIRATION THE BEAUTY OF CONTEMPORARY ARCHITECTURE IN CORNICH QATAR INSPIRATION
  • 46. QATAR INSPIRATION THE BEAUTY OF TRADITIONAL ARCHITECTURE QATAR INSPIRATION PEARL ISLAND, MSHEIREB & QATAR FOUNDATION
  • 47. QATAR INSPIRATION 2022 MONDIAL MODERN STADIUM IMPACT
  • 48. TURKEY INSPIRATION THE OLD WONDERFUL CIVILIZATIONS MOSQUES AGYA SOFYA, TUPCAPI, ISTANBUL BRIDGE TURKEY INSPIRATION GREAT SULTAN AHMED MOSQUE
  • 49. NORTHEN CYPRUS INSPIRATION THE OLD WONDERFUL CIVILIZATIONS CASTLES MAGOSA, KANTARA,AND BAFRA HOTEL
  • 50. NORHTEN CYPRUS INSPIRATION THE OLD WONDERFUL CIVILIZATIONS GIRNE CASTLE, HARBOR, & VILLAS NORTHEN CYPRUS INSPIRATION GIRNE
  • 51. My ambition To lead the world into one integrated community, by solving the following problems: 1- killing the poverty • keeping the total people to find there absolute opportunity in work. • Opening hundreds of work resources, like agriculture, industry, mining, building, petroleum, green energy, technology, etc… • Highlighting the charity works for the women, orphans, children, old people, travelers, & ill people, by keeping them living as one family without any Stratified feeling • Concentrating on food & place to be available as much as we can for every body, keeping that those 2 things must not be raised in price for ever, and it must been given as much as we can for free • Supporting the advance programs of teaching & knowledge 2- raising the technology in the world • especially the green energy resources as much as we can because of the weakness of petroleum extraction toward the world needs in a ratio of 4:1 • Supporting IT in all districts in the world • Supporting scientists 3- prevent the world from stealing operations, cheating, usury, bad dealing, bad talking, fighting, killing etc… or any effective bad behavior, by supporting the interior police defense & exterior military defense. 4- raising the knowledge of the world & all its supports as schools, universities, colleges, laboratories, libraries, etc… 5- supporting brotherhood, neighborhood, kinship, love between the people, work groups, & kicking off the autism psychology from our human nature 6-raising the nature, & the nature entertainments, because the human is so much in in need to be involved with nature, & the nature is a source of mind to clearly opened, and these could be by urban or nature design mainly, through a combination of green raised fields with water, under the vision of the sky (green, yellow & blue). Also by keeping the total houses combined with nature,(I saw a lot of throttled house, no balconies, no sun rays entering the house, no green houses!!! There people mostly having illness in their psychological behaviors)
  • 52. GREEN AESTHETIC ARCHITECTURE FUTURE OUTLOOK GREEN AESTHETIC BUILDING FUTURE OUTLOOK
  • 53. GREAT AESTHETIC ARCHITECTURE WITH RENEWABLE ENERGY SOURCE IN BAHRAIN ENERGY TOWERS THE FUTURE LOOKING IDEAS FOR ENERGY SOURCES USING RUNNING WATER
  • 54. My Future Outlook skills •Building Project management total courses •Primavera basics & advance courses •3D max total courses •Civil Engineering Master Degree •Doctorate degree as per future requirements •Specialization studies in Mechanical, electrical, Petroleum, & Renewable energy
  • 56. My Under water skills: • Open water diver over 10 SCUBA dives • Underwater photography certificate • Advanced underwater photography certificate
  • 57. Rashad Alami Moroccan UAE resident 00971 50 9988248 rashadalami@hotmail.com