4. Business Challenges
We understand Manufacturing
• Rising Business Costs – Reducing Operating Costs
– # 1 strategic challenge
• Improving Processes
• Improving Labor Productivity
• Real-time status of production
• Data collection accuracy
• Flexibility of production is critical
– Shop Floor control, maintenance
• Key Performance Indicators – OEE
– Overall Equipment Effectiveness, Benchmark
4
5. Critical Business Issues
Productivity – Capacity, bottlenecks, under utilization
Quality – identifying root cause and eliminating bad parts
Performance – validating and optimizing product standards
Visibility of shop floor operations
Integration of business systems such as ERP
Responsiveness – pro-active alerts to machine issues
Continuous improvement initiatives, TPM, LEAN, etc.
5
6. Shop Floor to Top Floor
Installable on any CNC control or production asset
Data protected behind customer Firewall
Unlimited number of dashboard displays
Wired or wireless eithernet connectivity supported
Bi-directional communication with workstation
Automatic & manual text notifications
6
7. Lean - Efficiencies - OEE
Visibility – Real-Time Status of Production – Dashboard
7
8. Event Chart
• Historical and Real Time machine states
8
12. OEE Definition
Productivity Increases
The OEE Industry Standard gives a guideline in
order to find ALL potential losses in effectiveness.
WHY?
An average machine in an average factory runs
about 35 to 45% OEE.
So it is losing 55 to 65% capacity!
While; - not running
- running at reduced speed
- or producing parts out of spec.
How come then, that the average management reports
numbers way over 80%?
It is a matter of definition, What you are not looking for
you will not find.
To really reveal the hidden machines in your factory, ALL Losses need to be defined and visualized.
www.oeefoundation.org
12
13. Why you should ACT NOW
Improvements in Capacity & Income from Operations
Real Dollar increased Income From Operations
Based on just ten machines
12.5% IMPROVEMENT IN PRODUCTIVITY
2400 HOURS available SPINDLE TIME
36,115 ADDITIONAL PARTS per YEAR
equivalency of 3 ADDITIONAL OPERATORS
That’s a machine and operators for free
Real results with ROI measured in weeks*
13 *From a customer testimonial