1. CURRICULUM VITAE
RAM RAJ YADAV
S/o- Daya Ram Yadav
At- Lodhan (Near primary school)
Post- Shivpur
Dist- Varanasi
State- Uttar Pradesh
Pin- 221003
Country- India
Email: ramraj_sepco@hotmail.com, raj_yadav135@yahoo.co.in
Cell : +919685090373, +917089668347
CAREER OBJECTIVES
To work with dynamic and result oriented atmosphere, which provides me a
Challenging career and opportunities for learning and growth especially in THERMAL
POWER SECTOR. So that my skills and knowledge can be utilized and broadened.
MYSELF
I am a Mechanical Steam Turbine Engineer having extravert communication skill,
focused and always willing to learn. Accepting responsibility, challenges and
professionalism in work culture to grow with the multiple level growth of the
organization and to get higher management position utilizing my qualification, skills and
hard work.
EDUCATIONAL QUALIFICATION
HSC passed from SARDAR PATEL INTER COLLEGE, BAWAN BIGHA,
VARANASI, UTTAR PRADESH, INDIA with 66.83% of marks in the year of
1999.
+2 Science passed from GOVT. QUEENS INTER COLLEGE, LAHURABIR,
VARANASI, UTTAR PRADESH, INDIA with 55.80% of marks in the year of
2001.
TECHNICAL QUALIFICATION
DIPLOMA IN MECHANICAL ENGINEERING passed from INSTITUTE OF
ENGINEERING AND RURAL TECHNOLOGY, ALLAHABAD, UTTAR
PRADESH, INDIA with 76.48% of marks in the year of 2006.
D CONTINUING (EQUIVALENT TO B-TECH.) IN MECHANICAL
ENGINEERING AT KARNATAKA STATE OPEN UNIVERSITY,
MANASAGANGOTRI, MYSORE, INDIA.
2. COMPUTER SKILL
MS WORD, EXCEL, AUTO CAD AND INTERNET APPLICATIONS.
PROFESSIONAL EXPERIENCE
10 YEARS EXPERIENCE IN THERMAL POWER PROJECTS.
1) STEAM TURBINE INSTALLATION, PRE-ASSEMBLY, ALIGNMENT, PRE-
COMMISSIONING, COMMISSIONING AND MAINTENANCE.
2) STATIC AND ROTARY EQUIPMENT INSTALLATION, PRE-ASSEMBLY &
ALIGNMENT (TURBINE AUXILIARY).
3) TURBINE STRUCTURE (ERECTION & PRE- ASSEMBLY).
4) PRE-ASSEMBLY AND ERECTION OF LP & HP PIPING, LUBE OIL PIPING
COOLING WATER PIPING (UNDERGROUND AND ABOVE GROUND).
5) CONDENSER INSTALLATION, PRE-ASSEMBLY, ALIGNMENT AND PRE-
COMMISSIONING.
KEY ACTIVITIES AND RESPONSIBILITIES
1) Reading drawing.
2) Sequence wise material line up for erection.
3) Maintaining the entire job related document.
4) Taking the need full decision as required for job.
5) Arrangement of tools and accessories required for my job.
6) Co-ordination with client & contractor agencies.
7) Motivating junior staff for safe and quality job within targeted period.
8) Discussing with senior staffs and planning for better efficiencies of work.
9) Planning and create schedule of job.
10) Maintaining discipline in office & site.
11) And taking weekly, monthly review meeting for better performance of contractor
and my junior staffs.
3. EXPERIENCE/PROJECTS DETAILS:
*CURRENT EXPERIENCE:
*COMPANY NAME- M/S FINEHOPE ALLIED ENGINEERING (INDIA) PVT. LTD
(SEPCO1) AS A SENIOR ENGINEER (STEAM TURBINE, STG STATIC & ROTARY
EQUIPMENTS AND PIPELINES).
PROJECT DETAILS- M/S KSK MAHANADI THERMAL POWER PROJECT
6X600MW, NARIYARA, AKALTARA, CHHATTISGARH, INDIA.
(FROM 12TH JULY-2016 TO TILL DATE)
DESIGN & MATERIAL- (SEPCO1)
NATURE OF WORK-
1) STEAM TURBINE INSTALLATION, PRE-ASSEMBLY, ALIGNMENT.
2) STATIC AND ROTARY EQUIPMENT INSTALLATION, PRE-ASSEMBLY &
ALIGNMENT (TURBINE AUXILIARY).
3) TURBINE STRUCTURE (ERECTION & PRE- ASSEMBLY).
4) PRE-ASSEMBLY AND ERECTION OF LP & HP PIPING, LUBE OIL PIPING
COOLING WATER PIPING (UNDERGROUND AND ABOVE GROUND).
5) CONDENSER INSTALLATION, PRE-ASSEMBLY, ALIGNMENT, PRE-
COMMISSIONING.
6) CONDUCTED FLUID TEST OF CONDENSER.
7) STEAM BLOWING OF STEAM PIPELINES.
8) LUBE OIL FLUSHING OF OIL PIPELINES.
9) ALKALI CLEANING OF CONDENSATE PIPELINES.
10) HYDRO TEST OF LP AND HP PIPELINES.
PREVIOUS WORK EXPERIENCE:
*COMPANY NAME- M/S RANDSTAD INDIA PVT. LTD. (MANPOWER
SUPPLY).
CLIENT NAME- M/S ALSTOM INDIA LTD. AS A FIELD SERVICE ENGINEER
FOR SERVICING OF STEAM TURBINE FUNCTION.
PROJECT DETAILS- OVERHAULING OF 3X210MW STEAM TURBINE IN
THERMAL POWER PLANT (NTPC-VSTPP).
(FROM 28TH SEPTEMBER-2015 TO 30TH JUNE-2016)
4. *COMPANY NAME- M/S (SEPCO-1) SHANDONG ELECTRIC POWER
CONSTRUCTION CORPORATION (A Chinese EPC Company of thermal power
projects) AS A SENIOR TURBINE ENGINEER (STEAM TURBINE, STG STATIC &
ROTARY EQUIPMENTS AND PIPELINES).
PROJECT DETAILS- M/S KSK MAHANADI THERMAL POWER PROJECT
2X600MW, NARIYARA, AKALTARA, CHHATTISGARH, INDIA.
(FROM 1st AUGUST-2011 TO 18th SEPTEMBER-2015)
DESIGN & MATERIAL- OWN (SEPCO1)
NATURE OF WORK-
1) STEAM TURBINE INSTALLATION, PRE-ASSEMBLY, ALIGNMENT.
2) STATIC AND ROTARY EQUIPMENT INSTALLATION, PRE-ASSEMBLY &
ALIGNMENT (TURBINE AUXILIARY).
3) TURBINE STRUCTURE (ERECTION & PRE- ASSEMBLY).
4) PRE-ASSEMBLY AND ERECTION OF LP & HP PIPING, LUBE OIL PIPING
COOLING WATER PIPING (UNDERGROUND AND ABOVE GROUND).
5) CONDENSER INSTALLATION, PRE-ASSEMBLY, ALIGNMENT, PRE-
COMMISSIONING.
6) CONDUCTED FLUID TEST OF CONDENSER.
7) STEAM BLOWING OF STEAM PIPELINES.
8) LUBE OIL FLUSHING OF OIL PIPELINES.
9) ALKALI CLEANING OF CONDENSATE PIPELINES.
10) HYDRO TEST OF LP AND HP PIPELINES.
*COMPANY NAME- M/S KALINDI POWER & STEEL LTD. AS A SHIFT
ENGINEER (OPERATION AND MAINTENANCE).
POWER PLANT DETAILS- M/S KALINDI POWER & STEEL LTD. 1 X 8 MW
THERMAL POWER PLANT, BENDRIDIH, MAHASAMUND, CHHATTISGARH.
(FROM 9TH JULY-2010 TO 15TH JULY-2011)
NATURE OF WORK-
1) OPERATION AND MAINTENANCE OF STEAM TURBINE.
2) OPERATION AND MAINTENANCE OF STATIC & ROTARY EQUIPMENTS.
5. *COMPANY NAME- M/S ALPHA PROJECT SERVICES PVT. LTD. (MANPOWER
SUPPLY).
CLIENT NAME- M/S LARSEN & TOUBRO LTD. PNCP-CPP REFINERY
PROJECT, PANIPAT, HARYANA AS A COMMISSIONING ENGINEER.
OWNER NAME- M/S IOCL NAPHTHA CRACKER PROJECT, EPCC-4 CPP,
PANIPAT, HARYANA.
PROJECT DETAILS- M/S IOCL REFINERY PROJECT, 238.5MW (3 X 37.85 MW
STEAM TURBINE AND 5X25MW GAS TURBINE) PANIPAT, HARYANA.
(FROM 6TH APRIL-2009 TO 30TH JUNE-2010)
DESIGN & MATERIAL- M/S ENGINEERS INDIA LTD. AND M/S BHEL.
NATURE OF WORK-
PRE-COMMISSIONING & COMMISSIONING OF STG, STG AUXILIARY, VAM,
FUEL OIL PUMP HOUSE, AUXILIARY BOILER, CLOSED COOLING SYSTEM.
*COMPANY NAME- M/S TRIVENI ENGINEERING & INDUSTRIES LTD.
(TURBINE BUSINESS GROUP) AS A PROJECT DIPLOMA TRAINEE FOR
SERVICING OF STEAM TURBINE FUNCTION.
PROJECT DETAILS- VARIOUS THERMAL POWER PROJECTS AND SUGAR
PLANTS UP TO 27MW.
(FROM 12TH JUNE-2006 TO 31ST MARCH-2009)
DESIGN & MATERIAL- M/S TRIVENI ENGINEERING & INDUSTRIES LTD.
NATURE OF WORK-
1) STEAM TURBINE INSTALLATION, PRE-ASSEMBLY, ALIGNMENT, PRE-
COMMISSIONING, COMMISSIONING, TROUBLESHOOTING AND
OVERHAULING.
2) STATIC AND ROTARY EQUIPMENT INSTALLATION, PRE-ASSEMBLY,
ALIGNMENT, PRE-COMMISSIONING AND COMMISSIONING (TURBINE
AUXILIARY).
3) PRE-ASSEMBLY AND ERECTION OF LUBE OIL PIPING, COOLING WATER
PIPING.
4) CONDENSER INSTALLATION, ALIGNMENT, PRE-COMMISSIONING AND
COMMISSIONING.
5) CONDUCTED FLUID TEST OF CONDENSER.
6) STEAM BLOWING OF STEAM PIPELINES.
7) LUBE OIL FLUSHING OF OIL PIPELINES.
8) CARRIED OUT VACUUM TEST OF CONDENSER.
6. 9) TESTING AND PRE-COMMISSIONING OF TURBINE OIL SYSTEM, TURBINE
GOVERNING SYSTEM, TURBINE OVER-SPEED SYSTEM.
10) CONFIRMING THE SCOPE OF WORK, ROLES, RESPONSIBILITIES AND
PLANS IN DETAIL.
11) HANDLING THE COMPLETE PROJECT RESOURCE UTILIZATION AND
MANPOWER MANAGEMENT.
ACHIEVEMENTS:
1) SUCCESSFULLY COMPLETED FLUID TEST OF CONDENSER.
2) SUCCESSFULLY COMPLETED STEAM BLOWING OF STEAM PIPELINES.
3) SUCCESSFULLY COMPLETED LUBE OIL FLUSHING OF OIL PIPELINES.
4) SUCCESSFULLY COMPLETED ALKALI CLEANING OF CONDENSATE
PIPELINES.
5) SUCCESSFULLY COMPLETED HYDRO TEST OF LP AND HP PIPELINES.
6) SUCCESSFULLY COMPLETED PRE-COMMISSIONING & COMMISSIONING
OF STG, STG AUXILIARY, VAM, FUEL OIL PUMP HOUSE, AUXILIARY
BOILER, CLOSED COOLING WATER SYSTEM.
7) SUCCESSFULLY COMPLETED VACUUM TEST OF CONDENSER.
8) SUCCESSFULLY COMPLETED TESTING AND PRE-COMMISSIONING OF
TURBINE OIL SYSTEM, TURBINE GOVERNING SYSTEM, TURBINE OVER-
SPEED SYSTEM.
7. PERSONALDETAILS:
Name - Ram Raj Yadav
Father’s name - Daya Ram Yadav
Date of birth - 13/05/1984
Marital Status - Married
Sex - Male
Religion - Hindu
Nationality - Indian
Language known - Hindi & English
Contact No. - +918932011318 & +917089668347
Passport No. - M2131611 (Valid up to 11/09/2024)
DECLARATION
I hereby declare that the above information’s are true to the best of my
knowledge and belief.
Date: 26/10/2016 Yours, faithfully
Place: SEPCO1 (AKALTARA) RAM RAJ YADAV